HomeMy WebLinkAbout2011-293 1 RESOLUTION NO. 2011-293 2 RESOLUTION OF THE MAYOR AND COMMON COUNCIL OF THE CITY OF SAN BERNARDINO AUTHORIZING THE DIRECTOR OF FINANCE TO ISSUE A CHANGE 3 ORDER TO INCREASE PURCHASE ORDER NO. 301791 BY $29,572 TO $164,872 TO RHA LANDSCAPE ARCHITECTS-PLANNERS, INC. FOR THE EXPANDED DESIGN AND 4 ENGINEERING OF THE NUNEZ P ARK/RUBEN CAMPOS COMMUNITY CENTER OUTDOOR PAVILION PER CAPITAL IMPROVEMENT PROJECT PR04-38. 5 6 WHEREAS, the Mayor and Common Council approved Resolution 2007 -165 approving 7 an agreement for services with RHA Landscape Architects-Planners, Inc., for the design and 8 engineering of several park projects; 9 WHEREAS, RHA Landscape Architects-Planners, Inc., completed the initial design and 10 engineering of the Nunez Park/Ruben Campos Community'Cetlter Outdoor Pavilidti',;'ptojed; 11 WHEREAS, Mayor and Common Council approved Resolution 2011-261 approving a 12 Memorandum of Understanding with Omnitrans to supplement and expand the scope of design and 13 . construction of the Nunez ParklRuben Campos Community Center Outdoor Pavilion Project, to 14 include transportation and pedestrian amenities and; 15 WHEREAS, RHA Landscape Architects-Planners, Inc, has agreed to provide the 1 6 expanded park design, engineering and surveying services to the City. 1 7 BE IT RESOLVED BY THE MA YORAND COMMON COUNCIL OF THE CITY 18 OF SAN BERNARDINO AS FOLLOWS: 19 SECTION 1. The City Manager of the City of San Bernardino is hereby authorized to 2 0 accept, on behalf of said City, a change order request between the City of San Bernardino and RHA 21 Landscape Architects-Planners, Inc., a copy of which is attached hereto and incorporated herein by 22 this reference as though set forth at length as Attachment "1", as an addendum to the existing 23 agreement previously executed. 24 SECTION 2. That pursuant to this Resolution the Director of Finance or her designee is 25 hereby authorized to issue a change order to increase purchase order no. 301791 by $29,572 to 26 $164,872, to RHA Landscape Architects-Planners, Inc., for the expanded design and engineering of 27 the Nunez ParklRuben Campos Community Center Outdoor Pavilion per capital improvement 28 project PR04-38. ".*.,j....^",.,,_.,'_'....__._4'""~__......'"""",_.~~';."i.'.."."".,i>"'''__''.''''''''''~.''~ 2011-293 1 RESOLUTION OF THE MA YORAND COMMON COUNCIL OF THE CITY OF SAN BERNARDINO AUTHORIZING THE DIRECTOR OF FINANCE TO ISSUE A 2 CHANGE ORDER TO INCREASE PURCHASE ORDERNO.301791 BY $29,572 TO $164,872 TO RHA LANDSCAPE ARCHITECTS-PLANNERS, INC. FORTHE EXPANDED DESIGN AND 3 ENGINEERING OF THE NUNEZ PARKlRUBEN CAMPOS COMMUNITY CENTER OUTDOOR PAVILION PER CAPITAL IMPROVEMENT PROJECT PR04-38. 4 5 I HEREBY CERTIFY that the foregoing Resolution was duly adopted by the Mayor and 6 Common Council of the City of San Bernardino at aRegular meeting thereof, held on the 7th day 7 of November ,2011, by the following vote, to wit: 8 Council Members: AYES NAYS ABSTAIN ABSENT '~-';;,"j..::?:\;.;-. 9 MARQUEZ 1 0 JENKINS x x 11 BRINKER x 12 SHORETT 13 KELLEY 14 JOHNSON 15 McCAMMACK x x x x 17 Q~ h.~ ~hel Clark, City Clerk The foregoing resolution is hereby approved this / /) nJ day of November , 2011. 16 18 19 20 21 Approved as to Form: 22 ..---- - 23 James F. Penman, City Attorney 24 25 26 27 28 """""'d_'~""'''''''~l...,,.~ :::'1 '. ~~,-,",""""""~--" ATTACHMENT 1 2011-293 IH~ LA" n S C\ P E ARCHITECTS I>L\'\'\ERS.I\(" AUTHORIZATION FOR ADDITIONAL WORK To: Robert Lennox, Deputy Director City of San Bernardino Parks, Recreation & Comm. Services 1350 South "E" Street San Bernardino, CA 92408-2725 Date: Project: March 7, 2011 Electric Avenue/Ruben Campos Pavilion 10119 2 RHA Job No: Authorization No: Dear Robert, The following is our proposed fee to provide additional design services for the bus turnout, sidewalk, perimeter DG path and additional drainage improvements at Ruben Campos Pavilion. Sub-Consultant proposals have been attached to provide greater detail on the scope of services. SCOPE OF SERVICES 1) Civil Engineering (see attached for breakdown) 2) Utility Engineering (see attached for breakdown) 3) Construction Plan changes and Coordination (RHA) LS LS LS TOTAL: $17,122 $9,900 $2,550 $29,572 This additional work authorization is an addendum to the existing contract. The terms and conditions of the original contract are applicable to this addendum. Subsequent to your review of the above referenced Scope of Services, please sign and return this form to our office. A faxed copy of the signed additional work order is acceptable. Please follow with a hard copy and original signature by mail. Cordially, ~DS ~V~L Principal E ARCHITECTS-PLANNERS, INC. Authorized by: CITY OF SAN BERNARDINO Date: By: Name/Title: ~"~_'""'~"'_"4_~._"'''''''#'''''''.'''_';'''''''_tlIv~~~,--""~"",",,,,,,-",.,..:"",-~_.~~~~,,"""'''''''''''''''''-''. ATTACHMENT 1 AE I'.CASC CONSULTING 2011-293 937 South Via Lata, Suite 500 Colton, CA 92324 Telephone: (909)783-0101 . Fax: (909)783-0 I 08 AUTHORIZATION FOR ADDITIONAL WORK Job Number: Authorization: March 3, 2011 Ruben Campos Pavilion 5th Street Sidewalk, Bus . Bay and Strom Drain Design Addendum 0523-0002-00 #01 Doug Grove RHA Landscape Architects-Planners, Inc. 6216 Brockton Avenue Suite 212 Riverside, CA 92506 dougg@rhala.com PH: (951) 781-1930 ext 121 FAX: (951) 686-8091 Date: Project: Dear Mr. Grove: AEI-CASC Consulting has developed the following scope of services and schedule of fees for additional services of providing. surveying and mapping and the design of sidewalk, a bus bay, and storm drain facilities as requested for the Ruben Campos Pavilion project. These services are being provided to you outside of the original scope of services and schedule of fees. You will be invoiced for this work in accordance with the fee schedule below and our standard hourly fee rate schedule. SCOPE OF SERVICE See Attachment "A" SCHEDULE OF FEES See Attachment "A" This additional work order is an addendum to the existing contract. The terms and conditions of the original contract are applicable to this addendum. Subsequent to your review of the above referenced scope of services, please sign and return this form to AEI-CASC Consulting so that work efforts may commence. A faxed copy of the signed additional work order is acceptable. Sincerely, Authorized by: RHA Landscape Architects-Planners, Inc. Steve J. osford P.E. Project Manager By: Name/Title: Date: SH/kn March 3, 2011 Addendum# 1 / 523-0002-00 AE~CASCCONSULTING >.....,"'.<,.","'""____-____~~....Il.:..,...... - ATTACHMENT 1 RUBEN CAMPOS PAVILION 5TH STREET SIDEWALK AND BUS BAY DESIGN ADDENDUM AUTHORIZATION FOR ADDITIONAL WORK NO. 01 2011-293 ATTACHMENT "A" SCOPE OF SERVICES I SIDEWALK AND BUS BAY Objective is to include the design of approximately 2000 linear feet of sidewalk along the south side of Fifth Street spanning from the east side of the Lytle Creek Channel and connect to the existing ADA ramp on the west side of the parking lot entrance across from Medical Center Drive. Sidewalk is curb adjacent, 6 feet wide measured from the back of curb in accordance with City of San Bernardino City Standard 202. Existing Telephone Poles, Street Lights, and Palm trees in the path of the sidewalk will be protected in place with sidewalk notches provided where there is adequate ADA clearance. Where ADA clearance can not be met, relocation of utility poles or undergrounding of facilities will be performed by others. The existing maintenance entry drive on the east side of the Ball Fields shall be reconstructed to a standard PCC drive approach with an ADA complaint meandering sidewalk behind the drive approach and a Pipe Gate to replace the posts and chain currently blocking access. The Bus Bay (OmniTrans' Mid Block Turnout) will be located east of the Medical Center Drive park entrance on the south side of Fifth Street. In the segment along the ball fields east of the Lytle Creek Channel there are two segments of existing PCC Drive approach depressions that have been filled with an AC berm. It is assumed these two locations will have the curb and gutter depressions replaced with standard Curb and Gutter. With the exception of these two areas and bus bay, no further curb and gutter reconstruction is part of this scope. 1. Fifth Street Sidewalk Survey & Mapping - Additional survey topography will be conducted along the areas to the west and to the east of the survey previously conducted for the Ruben Campos Pavilion site. Survey includes gathering elevations at the top of the existing curb and points 6 and 10 feet from the curb at regular intervals, locating trees, power poles, posts, street lights, pull boxes, manholes, fences, and other features that may be affected by the sidewalk and the bus bay. 2. Fifth Street Sidewalk & Bus Bav Design - Drawings for the improvements will be in Plan View only. Back of sidewalk elevations will be provided along areas where grading may be necessary or where small retaining curbs may be required to protect trees or other protected features. Top of Curb, Gutter Flow Line, and Back of Walk Grades, are called out for the Bus Bay. It is anticipated that all improvements can be shown on one 20-scale Plan View sheet. Quantities, Cost Estimate and technical specifications for this additional work is performed and added to the Ruben Campos Pavilion contract. II STORM DRAIN DESIGN With the City Park's Staff recognizing that existing drainage problems can best be addressed by providing a storm drain system to areas in the vicinity of the pavilion, it is proposed to provide a storm drain to this project to collect both the drainage generated by the additional run-off that will be produced by the impervious pavilion and the drainage that currently ponds in the parking lot adjacent to Third Base in the base ball field. It is proposed to collect drainage from these two areas and convey them into a storm drain that will connect to the existing storm drain system on the north side of Fourth Street. Since the Fourth Street storm drain outlets into the Lytle Creek Channel west of Nunez Park, this scope does not include encroachment permit processing through San Bernardino County Flood Control District. 3. Storm Drain Survey and Mapping - Survey includes topographic survey in an area that completes the collection of survey in the parking lot at the Medical Center Drive entrance, includes additional March 3, 2011 Addendum# 1 / 523-0002-00 AEI-CASC CONSULTING ATTACHMENT 1 2011-293 RUBEN CAMPOS PAVILION 5TH STREET SIDEWALK AND BUS BAY DESIGN ADDENDUM AUTHORIZATION FOR ADDITIONAL WORK NO. 01 survey between the proposed inlet in the vicinity of the baseball field's Third Base and the proposed connection point north of 4th Street and includes identifying existing storm drain manholes and dipping them when possible. 4. Drainage Report Update - The original Drainage Report includes only the study of the surface flow generated by the pavilion and the surrounding improvements. With the introduction of an underground storm drain system that connects to an existing storm drain facility, additional drainage areas as well as the capability for the existing 4th Street Storm Drain to accept the flow from a connect system must be analyzed and documented. This task includes additional research regarding the existing Fourth Street Storm drain outletting into Lytle Creek Channel. 5. Storm Drain Plans and Profiles - Prepare one sheet of plan and profile Storm Drain plan with details that collects drainage in the Medical Center Drive entrance parking lot in the vicinity of the baseball field's 3rd Base and collects drainage from the pavilion. This system will consist of two drop inlets that conveys drainage south to and connects with the existing storm drain system that collects drainage in the catch basin in the parking lot north of Fourth Street and east of the synthetic soccer field. This task includes preparation of quantities, specifications, and approval of the plans by the City of San Bernardino. III W ALKW A Y ON NORTH SIDE OF FOURTH STREET This effort consists of providing topographic survey and mapping of the existing the entire limits of the north parkway of Fourth Street within the limits of Nunez Park for the purposes ofRHA to prepare a D.G. Trail plan. 6. Fourth Street Survey and Mapping - Additional survey topography will be conducted along north side of Fourth Street within the limits of the park and includes gathering elevations at the edge of the street right of way at regular intervals, locating trees, power poles, posts, street lights, pull boxes, manholes, fences, and other features that may be affected by the DG Walkway design by RHA. Deliverable consists of an AutoCAD file topography for the use of preparing the walkway design. SCHEDULE OF FEES 1. Fifth Street Sidewalk Survey & Mapping $1,782 2. 3. 4. 5. 6. Fifth Street Sidewalk & Bus Bay Design Storm Drain Survey and Mapping Drainage Report Update Storm Drain Plans and Profiles $2,588 $1,323 Fourth Street Survey and Mapping $3,724 $5,782 $1,623 Reimbursable Expenses $300 TOTAL $17,122 AEI-CASC CONSULTING March 3, 2011 Addendum# 1 / 523-0002-00 ATT~BUTSK.O il:'UTILITY DESIGN, INC. 2011-293 March 3, 2011 Michael Hutchinson RHA LANDSCAPE ARCHITECTS-PLANNERS, INC. 6216 Brockton Avenue, Suite 212 Riverside, CA 92506 RE: PROPOSAL FOR DRY UTILITY COORDINATION & MANAGEMENT SERVICES RUBEN CAMPOS PAVILION - SAN BERNARDINO Dear Michael: Per your request, Butsko Utility Design, Inc. is pleased to provide RHA Landscape Architects- Planners, Inc. with our proposal for dry utility coordination and management services for the Ruben Campos Pavilion project located in the City of San Bernardino. Our experience in the San Bernardino area and standing relationships with the utility companies, place us in an excellent position to be of service. Our proposal for standard services includes Dry Utility Coordination and Management for the following: Verizon - telephone; and Charter Communications - cable television. This includes the coordination of each utility's designs, agreements, and construction scheduling to accommodate the underground conversion of the existing pole line on 5th Street for the proposed sidewalk and bus shelter. Enclosed for your review are: Exhibit A - Project Assumptions; Exhibit A-2 - Dry Utility Coordination & Management Services Scope of Work; Exhibit B - Standard Service Fee & Reimbursement Schedule; Exhibit C - Letter of Understanding. We have enclosed two copies so that you may sign and return one after you have reviewed our proposal. We will proceed upon this authorization. If you have any questions, please do not hesitate to call me at 951.834.9920 x103. Thank you for providing Butsko Utility Design, Inc. with the opportunity to be of service. Sincerely, BUTSKO UTILITY DESIGN, INe. Carl Richards Division Manager Enclosures ~~.,.,''''.,~.k'_'~;'''''''''''''$_'' #,..__"~...._._.___W.w..,l""''''';,"~,,,,>w,,.","_,._._.,,,,.,_.._._"~..._."_~.",,",,,,~.,";,,",.,,._,,~~_,___,,,,,,,,..-~,,~.,,,,,,,...V'.,,- ATTACHMENT 1 2011-293 EXHIBIT A PROJECT ASSUMPTIONS RUBEN CAMPOS PAVILION - SAN BERNARDINO RHA LANDSCAPE ARCHITECTS-PLANNERS, INC. Based on our conversation with RHA Landscape Architects-Planners, Inc., and our understanding of the project, we have identified the specific assumptions of the project to include: I. Utility Underground Conversion Coordination Butsko to coordinate with Verizon and Charter Communications to create two (2) pole line underground conversion work orders in order to facilitate the construction on the new sidewalk and bus shelter on 5th Street. II. Development Team and Field Meetings Butsko will attend development team meetings as requested by the client. r:~BUTSKO illl UTlLlTY DES1GN, INC. RCP012000 Page 2 of 5 March 3,2011 (CR) ATTACHMENT 1 EXHIBIT A-2 UTILITY COORDINATION & MANAGEMENT SERVICES SCOPE OF WORK RUBEN CAMPOS PAVILION - SAN BERNARDINO RHA LANDSCAPE ARCHITECTS-PLANNERS, INC. 2011-293 I. SUBMITTAL PHASE A. Coordinate with utility companies and consulting team members to obtain and review pertinent design information and prepare for utility's submittal. B. Communicate with each utility Company to verify schedule and review conflicts and specific source locations. C. Obtain civil engineer, architectural, landscape plans, project loads, and project schedule from client; prepare plan submittal letters to each utility Company. D. Examine utility design requirements and identify potential issues with consulting team members. E. Obtain work orders required to submit plan package to utility companies and establish schedule for design, review, and completion. II. PRELIMINARY DESIGN PHASE A. Attend utility design/global meeting and continue liaison role with all parties involved. B. Forward preliminary utility design to client and consulting team members for their review, conflict identification, and acceptance. C. Review preliminary design revisions with each utility and ensure all necessary modifications are complete. IV. FINAL DESIGN PHASE A. Forward revised preliminary design to client and project team for final approval/signature and engineering certification. B. Coordinate with utilities, client, and consulting team members for final utility submittal. C. Obtain and review all utility agreements for accuracy of cost methodology and rule application. Process agreements and right-of-way documents. D. Deliver final utility agreements/contracts to client. Provide summary of project costs incurred and potential refunds. E. Coordinate with client, utility companies, and consulting team members for scheduling/attendance of pre-construction meeting. ~~BUTSKO il~ UTILITY DESIGN, INC. RCP012000 Page 3 of5 March 3, 2011 (CR) ATTACHMENT 1 2011-293 EXHIBIT B ST ANDARD SERVICE FEES & REIMBURSEMENT SCHEDULE RUBEN CAMPOS PAVILION - SAN BERNARDINO RHA LANDSCAPE ARCHITECTS-PLANNERS, INC. The following fees will be billed monthly on a fixed fee basis as a percentage of work is completed or on an hourly basis. I. Utility Conversion Coordination (Verizon and Charter Communication) $ 8,800 Fixed Fee II. Development Team and Field Meetings $ 1,100 Hourly (10 hours estimated) TOTAL $ 9,900 Reimbursables: The following will be billed monthly: . Commercial Delivery Services, including Federal Express, UPS, Express Mail, and Messenger Services - direct cost + 10% . Blueprint Services and Printing. - direct cost + 10% . Engineer's Stamp (Stamping will be billed at $80.00 per sheet) . AutoCAD produced plot (36"x 48") at $27.00 per sheet (additional sizes will be billed accordingly) . AutoCAD color produced plot (36"x 48") at $55.00 per sheet (additional sizes will be billed accordingly) . Automobile mileage reimbursement is calculated at current IRS standard mileage rate . Utility Company as-builts . Parking fees associated with attendance at project related meetings Hourlv Rate Schedule: Principal in Charge Project Manager Project Coordinator Designer AutoCAD Drafter $ 135.00 per hour $ 110.00 per hour $ 80.00 per hour $ 95.00 per hour $ 65.00 per hour ~.~BUTSKO .~ UTILITY DESIGN, INC. RCP012000 Page 4 of 5 March 3, 2011 (CR) .~,_,,,,,,,,",,,;~~,,.,,,,..j..,,",,, ""''''"~''''''ic".,--"",,,,_.._,;,....~~.~-,,.,,,,.,",~,,"",,,.-,'~,,"-',,.,,,,.-~;..,ti'l'....""~"...;i"'^... ATTACHMENT 1 2011-293 EXHIBIT C LETTER OF UNDERSTANDING RUBEN CAMPOS PAVILION - SAN BERNARDINO RHA LANDSCAPE ARCHITECTS-PLANNERS, INC. This letter formalizes the agreement between Butsko Utility Design, Inc. and RHA Landscape Architects-Planners, Inc. with regard to Dry Utility Services for the Ruben Campos Pavilion project. These fees are subject to change 90 days from proposal date. SCOPE OF WORK AND FEES: See attached Scope of Work and Fee Schedule Exhibits. COSTS: Butsko Utility Design, Inc. will bill monthly based upon the attached Fee Schedule. Reimbursable costs are not included in these fees and will be billed to RHA Landscape Architects-Planners, Inc. . RETAINER: A retainer in the amount of $-0- is required concurrently with the executed proposal. PAYMENT TERMS: Butsko Utility Design, Inc. bills on a monthly basis with payment due net 30 days from date of invoice. LATE FEES: RHA Landscape Architects-Planners, Inc. shall pay Butsko Utility Design, Inc. compensation for the services rendered by it in accordance with the established fee accounts. Any past due payments will be charged a late fee of 1.5% per month from the date past due until paid. ATTORNEY FEES AND COSTS: This contract is governed by the laws of the State of California. If any action at law or in equity is necessary to enforce or interpret the terms of the contract, or if brought in the form of arbitration, the prevailing party shall be entitled to reasonable attorney fees, costs, and necessary disbursements in addition to other relief to which such party may be entitled. Should any action be taken to collect past due amounts, RHA Landscape Architects-Planners, Inc. agrees to pay for any and all costs of collection including, but not limited to, attorney's fees, court costs, expert fees and expenses incurred in the collection efforts. FAILURE TO PAY: Should any payment become past due, Butsko at its sole discretion can cease performance under this contract until past due balance is brought current and such non- payment will be considered a material breach of the terms of the contract. ~... Name: Title: RHA LANDSCAPE ARCHITECTS-PLANNERS, INC. Division Manager BUTSKO UTILITY DESIGN, INC. Date: Date: March 3, 2011 ~~BUTSKO .~ UTILITY DESIGN, INC. RCP012000 Page 5 of5 March 3, 2011 (CR)