HomeMy WebLinkAboutS04-Public Works o Date: 8-08-94 )> '" RDIN6 - IfEQUEST r'R COUNCIL ACTION ~' File No. 1.291 c m ~. Approval of Contract Change Order ~ ~bJect: No. 1 - Improvement of Tippecanoe, ~ ~ .C. Street and Del Rosa Drive, per Plan No. 9053 -- MATICH CORPORATION CITY OF SAN BERN From: ROGER G. HARDGRAVE Dept: Public Works Synopsis of Previous Council action: 06-01-92 -- Authorization granted by CDC to execute a Loan Guaran- tee Agreement with IVDA for loan of $800,000 from SANBAG. 07-06-92 -- Authorization granted for City to assume responsibility of a Consulting Engineer and execution of an Agreement for provision of these services. 12-07-92 -- Resolution No. 92-453 adopted authorizing execution of an Agreement with URS Consultants, Inc. for Phase I of services. 10-04-93 -- Resolution NO. 93-382 adopted authorizing the Mayor to execute application to the Economic Development Agency for a grant. (Continued on second page) Recommended motion: That Change Order No. 1 to the contract with Matich Corporation, for the construction of Street Improvements on Tippecanoe Avenue, "c" Street and Del Rosa Drive, in accordance with Plan No. 9053, be approved; to authorize the relocation of 11 mature oak trees, which are wi thin the street improvement area, at an increase in the contract price of $104,500.00; from $4,113,313.00 to $4,217,8 .00. cc: Bill Bopf, IVDA Shauna Clark Barbara Pachon Contact person: Roger G. Hardgrave Staff Report, amd CCO U Phone: 5025 Supporting data attached: Ward: 1 FUNDING REQUIREMENTS: Amount: $104.500.00 (EDA Grant & IVDA) Source: (Acct. No.) 242-362-57291 (Acct. DescriPtion) Street Improvements - Tippecanoe Finance:,~ /~ Avenue. "c" St. & Del Rosa Avenue Council Notes: 75-0262 Agenda Item No. S - 'I PUBLIC WORKS File No. 1.291 SYNOPSIS OF PREVIOUS COUNCIL ACTION (Continued) 01-24-94 -- Plans approved and authorization granted to advertise for bids. 03-21-94 Resolution No. 94-68 adopted authorizing execution of approval and award of grant. 05-02-94 Resolution No. 94-107 adopted authorizing execution of Second Amendment to Agreement with URS Consultants, Inc., for provision of construction staking services. 06-06-94 -- Resolution No. 94-130 adopted awarding a contract to Matich Corporation for the low bid price of $4,113,313. 8-08-94 CITY OF SAN BERN ~DINO - REQUEST r 'R COUNCIL ACTION STAFF REPORT There are a large number of established mature trees on the former Norton A.F.B. A small percentage of these trees are within the areas of Tippecanoe Avenue, "c" Street (Sheppard Boulevard) and Del Rosa Drive, being improved under a contract with the Matich Corporation. Even though the number of trees in conflict with the proposed improvements ~s relatively small, concern was expressed 'by some members of the community relative to removal of these trees. A certified arborist was, therefore, engaged to inspect the trees in conflict with the improvement of these streets. The arborist identified eleven (11) which could be relocated and have a good chance of survival. IVDA entered into a separate contract with a landscape contractor to box these eleven (11) trees, in preparation for moving. A separate contract was necessary, in order for them to be boxed before spring growth occurred. Matich Corporation was requested to provide a price quote to relocate these eleven (11) trees to designated locations within Norton A.F.B. A price quote of $104,500.00 was submitted in response to this request. We have reviewed the price quote, along with the cost breakdown provided by the sub-contractor who will be doing the relocation, and feel that it is fair and reasonable. The total estimated project cost included an amount of $845,687 for contingencies, which can be used to finance the cost of this additional work. Funds to finance the increase of $104,500 in the contract price, from $4,113,313.00 to $4,217,813.00, will be provided from the following sources: Economic Development Administration Grant - 75% Inland Valley Development Agency - - - 25% This extra work has been discussed with the project representa- tive from the Economic Development Administration, and received concept approval. A copy of Change Order No. One has been faxed to this representative, and we are striving to secure a verbal approval. All costs will be charged to Account No. 242-362-57291. We recommend that Change Order No. One be approved. URGENCY CLAUSE: The Contractor improvements. before roadway has commenced removal These eleven (11) trees grading can be started. of the existing roadway will need to be removed 8-08-94 75.0264 Federal Project No. 07-49-0262 CHANGE ORDER Order No: 1 Date: 7/19/94 Agreement Date: 2/7/94 NAME OF PROJECT: Street lmorovements-Tipoecanoe Avenue. "C" Street and 6th Street (Del Rosa Drive) OWNER: CONTRACTOR: City of San Bernardino Matich Corooration The following changes are hereby made to the CONTRACT DOCUMENTS: The additional work of relocating II adult oak trees that are presently located Within.tbte Street Widening Project area. Justification: An additional requirement to relocate adult oak trees was placed on the project. A certified arborist has stated that many of the existing adult oak trees are in poor condition and the chances of them being relocated and surviving the process are slim. However, there are ll-oak trees that appear to be in good condition and should survive the process. Various factors are taken into consideration in determining if an adult tree can be relocated, such as, the root structure, age of the tree, and the general condition of the tree. Change to CONTRACT PRICE: Original CONTRACT PRICE: $ 104.500.00 $4.113.313.00 . Current CONTRACT PRICE adjusted by previous CHANGE ORDER: $4.113.313.00 The CONTRACT PRICE due to this CHANGE ORDER will be (increased)~eefe85ed) by $104.500.00 The nev CONTRACT PRICE includinq this CHANGE ORDER vill be $ 4.217.813.00 Chanqe to CONTRACT TIME: The CONTRACT TIME vill be (increa.ed) (decrea.ed) by to be determined calendar day.. The date for completion of all vork vill be revi.ed date to be determined (Date). Approval. Required: To be effective, this Order must be approved by the Federal aqency if it chanqe. the scope or objective of the PROJECT, or a. .ay otherwise be required by the SUPPLEMENTAL GENERAL CONDITIONS. Contractor: Matich Corporation Date Requested by: William L. Bopf, Executive Director Date Recommended by: steven Enna, Construction Enqineer Date Approved by: Roqer Hardqrave, Director of Public Date Works/city Enqineer Federal Aqency Approval Date