Loading...
HomeMy WebLinkAbout16-Public Works . ... CITY OF SAN BERN~DINO - REQUEST FO COUNCIL ACTION Fi1e 110. 1...306 Approval of Contract Change Order Su~~: No. 4 - Interconnection & Modifi- cation of Traffic Signals in Central Business District, per Plan No. 8805 -- SUPERIOR SIGNAL SERVICE CORP. From: ROGER G. HARDGRAVE Dept: Public Works Date: 7-6-94 Synopsis of Previous Council ~ion: June, 1992 - Allocation of $778,000, for completing the interconnect and upgrading of traffic signals in CBD approved in 1992/93 Federal-Aid Surface Transportation Program. 09-08-92 -- Resolution No. 92-372 adopted authorizing execution of an AgreeMent with MGA for Professional Engineering Design Services. 04-19-93 -- Allocation of $778,000 of Federal-Aid CMAQ funds, under Account No. 242-362-57306, and plans approved, and authorization granted to advertise for bids. 06-21-93 -- Resolution No. 93-212 adopted, awarding a contract to Superior Signal Service Corp. for low bid price of $695,878. (Continued on second page) Recommended motion: That Change Order No. FOUR to the contract with Superior Signal Service, for modification of Traffic Signals in the Central Business District, be approved, to authorize the installation of additional conduit and wiring at various locations, at a cost not to exceed $56,000.001 for an increase in the contract price from $706,878 to $762,878. cc: Shauna Clark ~rL~ Signature ::ontect penon: Roger G. Hardgrave Phone: 5025 :lupporting data attached: Staff Report & CCO f3 Ward: 1 =UNDING REQUIREMENTS: Amoum: $56,000 (Street Construction Fund) Source: (Acct. No.1 242-362-57306 Interconnect Siqnals - CBD Finance: Traffic - :OUncil Notes: r.:J '" u 0 .... ;,j r~ b. 0 )t 2: =1 .... '" Q <:: ..... 5-0262 Agenda Item No~ - - . ... CITY OF SAN BERNODINO - REQUEST FOICOUNCIL ACTION. STAFF REPORT The plans for modification of traffic signals Central Business District direct the Contractor to pedestrian signals and push buttons to regulate the pedestrian traffic. in the install flow of Additional conductors will need to be pulled into the condui ts in order to power these pedestrian signals. There are 17 conduit runs for which the Contractor is unable to remove the existing conductors. It will, therefore, be necessary for the Contractor to install new conduit runs at these 17 locations, and pull in new conductors. The Contractor has agreed to perform this extra work on a time and materials basis, at a cost not to exceed $56,000.00. Federal-Aid Congestion Management Air Quality (CMAQ) Funds have been approved, under Account No. 242-362-57306, to finance the costs that will be incurred for this project. Ca1trans has reviewed and concurred with this change order. The total estimated project cost included an amount of $102,945 for contingencies, which can be used to finance the cost of this extra work. We recommend that Change Order No. Four be approved. SYNOPSIS OF PREVIOUS COUNCIL ACTION Continued: 02-07-94 - Change Order No. Four approved to authorize relocation .of traffic signals at Ria1to Avenue and "E" Street, at a cost not to exceed $11,000.00. 7-6-94 75-0ZM .. -0 o COftDC'f CDIIG. 01lDmt BOo 4 UV BOo IOU Traffic Signal Interconnect-Downtown nD BOo CllAQLG-!5033 (006) 'lO1 SUPERIOR SIGNAL SERVICE CORPORATION You are hereby directed to make the herein described changes from the planR and specifications or do the following described work not included in the plans and specifications on this contract. NOT!: This change orcler is not effective until aooroved bv the State Hiahwav Enaineer Description of work to be done, estimate of quantities, and prices to be paid. S8CJ%'egate between additional work at contract price, agreed price and. force account. Unless otherwise stated, rates for rental of equipaent cover only such ti.. a. .aui~n~ i. ac~ual1v u..d and no allow_nca will be mad. for idle ~i... The last percentage shown is not aCCUllulated increase of decrease frOll the original quantity in the Engineers Estimate. IUPPLo BOo IUI'I' 1 01' 1 CO~ 110. 8805 .non WOK A'1' M~ ACC01JII'1' 1 Install 2-inch conduit and wiring at 17-locations, located at the intersections of 4th and "0", 3rcl and "0", 4th and "H", 4th and Arrowhead, 4th and Sierra Way, 3rcl and Arrowhead, 2nd and Arrowhead, 2nd and "0" and Court and Arrowhead, in orcler to provide for the installation of the Peelestrian Push Buttons ~ at each location, at a cost of $27.60 per lineal foot, with the wiring to be installed on a time and material basis, as directed by the Resident Engineer, at a cost not to exceed $72,000.00. .S'1'XMA~ CDS'1' D.~....' By reason of this orcler the tiae INOETERMINATE - working day lu!lIIi Uec1 b)'1 X~.__.' 5~oooooOO of caapletion will be adjusted as follows: "sic1..~ "viDeer, Da~el Approval .eacmaeDc1ec11 Da~el Approvec11 Ci~7 "viDeer Da~el We the undersigned contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all material, except as may otherwise be noted above, and perform all services necessary for the work above specified, and will accept as full D.vm8Jl~ 1:her.far 'the aria.. ahown above. Aooep~ec1 Da~el CODt1'ao~orl 8}'1 'li~lel If the contractor does not sign acceptance of this orcler, his attention is directed to the requir_ents of the specifications as to proceeding with the work and filing a written protest within the tiae therein specified.