CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION
Date: April 8, 2009
Authorize the Director of
Development Services to execute
Contract Change Order No. One with
Guzman Construction Co. for the
reconstruction of the Storm Drain and
Catch Basin at Highland A venue and
"H" Street.
From: Valerie C. Ross, Director Subject:
Dept: Development Services
File Nos. 4.7155
MCC Date: May 4, 2009
Synopsis of Previous Council Action:
September 2, 2008 The Mayor and Common Council approved the FY 2007-08 CIP
Budget.
Recommended Motion:
Authorize the Director of Development Services to execute Contract Change Order No. One
with Guzman Construction Co. for the reconstruction of the Storm Drain and Catch Basin at
Highland Avenue and "H" Street.
JUwj; (). 1?ffl-'
Valerie C. Ross
Contact Person: Robert Eisenbeisz, City Engineer
Phone: Ext. 5203
Supporting data attached: Staff Report & CCO No. One
Ward:
FUNDING REQUIREMENTS: Amount: $ 8.027.00
Source: (Acct. Nos.) 248-368-5504-7167
Acct. Description: SD-A
Finance:
Council Notes:
Agenda Item No._' 2.
5".4.oq
,
CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION
STAFF REPORT
Subject:
Authorize the Director of Development Services to execute Contract Change Order No. One with
Guzman Construction Co. for the reconstruction of the Storm Drain and Catch Basin at Highland
A venue and "H" Street.
Background:
On October 13, 2008, a request for an informal bid was sent to Weka Inc., Nikola Construction
Corporation, and Guzman Construction. The informal bid request was to repair a box culvert at
Highland Avenue and "H" Street. Guzman Construction was the only contractor that responded
to the bid at a price of $24,000.00. On December 2,2008 a request for a P.O. was submitted and
construction followed thereafter.
Change Order:
During the repair of the box culvert the contractor encountered unforeseen conditions and
utilities as follows:
I. The existing soil was over-saturated and unsuitable for back fill. It was necessary to provide
new back fill material and haul away the saturated dirt. The cost of new dirt and time to haul
away the existing saturated dirt resulted in additional costs of $5,000.00.
2. During construction the contractor encountered an existing concrete roadbed that was not
known. To repair the box culvert it was necessary to remove the roadbed and dispose of the
concrete. The additional work was completed at a cost of $1 ,900.00
3. During construction the contractor encountered an old signal foundation that was in the path
of the proposed storm drain. It was necessary to remove the signal foundation and also the
existing sidewalk above the signal foundation. After the work was completed it was
necessary to replace the sidewalk. The cost to remove the signal foundation and replace the
sidewalk was $1,127.00.
Financial Impact:
The revised estimated project costs are as follows:
TOTAL
Original Contract Amount $24,000.00
Contract Change Order No. One $8,027.00
Total Proiect Cost $32.027.00
This change order represents a net increase of 34% of the contract amount. There are sufficient
funds in the account for the Change Order.
2
CITY OF SAN BERNARDINO - REOUEST FOR COUNCIL ACTION
STAFF REPORT (Continued)
Recommendation:
Authorize the Director of Development Services to execute Contract Change Order No. One with
Guzman Construction Co. for the reconstruction ofthe Storm Drain and Catch Basin at Highland
Avenue and "H" Street.
Attachments:
Change Order No. One
3
DEVELOPMENT SERVICES DEPARTMENT
""
300 North "D" Street. San Bernardino. CA 92418-0001
Planning & Building 909.384.5057 . Fax: 909.384.5080
Public WorkslEngineering 909.384.5111 . Fax: 909.384.5155
www.sbcity.org
CONTRACT CHANGE ORDER NO. ONE
FILE NO. 4.7166
W.O. NO. 7166
DATE: MAY 4, 2009
PROJECT: INFORMAL BID STORM DRAIN AND CATCH BASIN
RECONSTRUCTION AT HIGHLAND & "H" STREET
TO:
GUZMAN CONSTRUCTION CO.
2137 HIGHLAND AVENUE
SAN BERNARDINO, CA 92407
GENTLEMEN:
You are hereby compensated for performing the additional work as follows:
ITEM NO: DESCRIPTION OF CHANGE COST
1-1 Provide 100 tons of Class II Base $ 3,000.00
1-2 Haul Away Wet Dirt $ 2,000.00
1-3 Remove Concrete Road Bed $ 1,900.00
1-4 Re-Pour Concrete Sidewalk $ 377.00
1-5 Remove Buried Signal Foundation & Re-Compact $ 750.00
TOTAL COST CCO #1 $ 8,027.00
JUSTIFICATION:
Item Provide 100 tons of Class II Base
1-1 The existing soil was found to be over-saturated and unsuitable for backfill. It was
No. necessary to provide Class II Base to backfill the storm drain trench.
1-2 Haul Awav Wet Dirt
The contractor was directed to haul off the over-saturated soils.
Remove Concrete Road Bed
1-3 During construction, the contractor encountered an old existing concrete roadbed. The
contractor was directed to remove the roadbed and to dispose of the concrete.
Re-Ponr Concrete Sidewalk
1-4 An old signal foundation was discovered in the alignment of the proposed storm drain.
The contractor was directed to remove the signal foundation. The removal required
sidewalk removal.
1-5 Remove Buried Silmal Foundation & Re-Comnact
It was necessary to replace the sidewalk after the removal of the signal foundation.
.'
ceo No. ONE - Guzman Construction Co.
Informal Bid - Storm Drain and Catch Basin Reconstruction at Highland & "H" Street
SUMMARY OF CONTRACT COSTS
The estimated revised contract cost is as follows:
Original Bid Amount. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ..... ...................$ 24,000.00
Contract Change Order No. One. . . . . . . . . . . . . . . . . . . . . . . . . . . . . ....................$ 8.027.00
Revised Construction Contract cost. . . . . . . . . . . . . . . . . . . . . . . . .. ....................$ 32,027.00
Additional time to complete Contract due to this Change Order.......................... 0 Working Days
This change order represents 34% ofthe original contract amount.
GUZMAN CONSTRUCTION CO.
CONTRACTOR
Accepted
By:
CITY OF SAN BERNARDINO
DEVELOPMENT SERVICES
Approved
By:
Title:
VALERIE C. ROSS
Director of Development Services
Date:
Date:
Approved
By:
LORI SASSOON
Acting City Manager
Date:
Item No.
May 4, 2009
2