HomeMy WebLinkAbout12-Development Services CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION Date: April 8, 2009 Authorize the Director of Development Services to execute Contract Change Order No. One with Guzman Construction Co. for the reconstruction of the Storm Drain and Catch Basin at Highland A venue and "H" Street. From: Valerie C. Ross, Director Subject: Dept: Development Services File Nos. 4.7155 MCC Date: May 4, 2009 Synopsis of Previous Council Action: September 2, 2008 The Mayor and Common Council approved the FY 2007-08 CIP Budget. Recommended Motion: Authorize the Director of Development Services to execute Contract Change Order No. One with Guzman Construction Co. for the reconstruction of the Storm Drain and Catch Basin at Highland Avenue and "H" Street. JUwj; (). 1?ffl-' Valerie C. Ross Contact Person: Robert Eisenbeisz, City Engineer Phone: Ext. 5203 Supporting data attached: Staff Report & CCO No. One Ward: FUNDING REQUIREMENTS: Amount: $ 8.027.00 Source: (Acct. Nos.) 248-368-5504-7167 Acct. Description: SD-A Finance: Council Notes: Agenda Item No._' 2. 5".4.oq , CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION STAFF REPORT Subject: Authorize the Director of Development Services to execute Contract Change Order No. One with Guzman Construction Co. for the reconstruction of the Storm Drain and Catch Basin at Highland A venue and "H" Street. Background: On October 13, 2008, a request for an informal bid was sent to Weka Inc., Nikola Construction Corporation, and Guzman Construction. The informal bid request was to repair a box culvert at Highland Avenue and "H" Street. Guzman Construction was the only contractor that responded to the bid at a price of $24,000.00. On December 2,2008 a request for a P.O. was submitted and construction followed thereafter. Change Order: During the repair of the box culvert the contractor encountered unforeseen conditions and utilities as follows: I. The existing soil was over-saturated and unsuitable for back fill. It was necessary to provide new back fill material and haul away the saturated dirt. The cost of new dirt and time to haul away the existing saturated dirt resulted in additional costs of $5,000.00. 2. During construction the contractor encountered an existing concrete roadbed that was not known. To repair the box culvert it was necessary to remove the roadbed and dispose of the concrete. The additional work was completed at a cost of $1 ,900.00 3. During construction the contractor encountered an old signal foundation that was in the path of the proposed storm drain. It was necessary to remove the signal foundation and also the existing sidewalk above the signal foundation. After the work was completed it was necessary to replace the sidewalk. The cost to remove the signal foundation and replace the sidewalk was $1,127.00. Financial Impact: The revised estimated project costs are as follows: TOTAL Original Contract Amount $24,000.00 Contract Change Order No. One $8,027.00 Total Proiect Cost $32.027.00 This change order represents a net increase of 34% of the contract amount. There are sufficient funds in the account for the Change Order. 2 CITY OF SAN BERNARDINO - REOUEST FOR COUNCIL ACTION STAFF REPORT (Continued) Recommendation: Authorize the Director of Development Services to execute Contract Change Order No. One with Guzman Construction Co. for the reconstruction ofthe Storm Drain and Catch Basin at Highland Avenue and "H" Street. Attachments: Change Order No. One 3 DEVELOPMENT SERVICES DEPARTMENT "" 300 North "D" Street. San Bernardino. CA 92418-0001 Planning & Building 909.384.5057 . Fax: 909.384.5080 Public WorkslEngineering 909.384.5111 . Fax: 909.384.5155 www.sbcity.org CONTRACT CHANGE ORDER NO. ONE FILE NO. 4.7166 W.O. NO. 7166 DATE: MAY 4, 2009 PROJECT: INFORMAL BID STORM DRAIN AND CATCH BASIN RECONSTRUCTION AT HIGHLAND & "H" STREET TO: GUZMAN CONSTRUCTION CO. 2137 HIGHLAND AVENUE SAN BERNARDINO, CA 92407 GENTLEMEN: You are hereby compensated for performing the additional work as follows: ITEM NO: DESCRIPTION OF CHANGE COST 1-1 Provide 100 tons of Class II Base $ 3,000.00 1-2 Haul Away Wet Dirt $ 2,000.00 1-3 Remove Concrete Road Bed $ 1,900.00 1-4 Re-Pour Concrete Sidewalk $ 377.00 1-5 Remove Buried Signal Foundation & Re-Compact $ 750.00 TOTAL COST CCO #1 $ 8,027.00 JUSTIFICATION: Item Provide 100 tons of Class II Base 1-1 The existing soil was found to be over-saturated and unsuitable for backfill. It was No. necessary to provide Class II Base to backfill the storm drain trench. 1-2 Haul Awav Wet Dirt The contractor was directed to haul off the over-saturated soils. Remove Concrete Road Bed 1-3 During construction, the contractor encountered an old existing concrete roadbed. The contractor was directed to remove the roadbed and to dispose of the concrete. Re-Ponr Concrete Sidewalk 1-4 An old signal foundation was discovered in the alignment of the proposed storm drain. The contractor was directed to remove the signal foundation. The removal required sidewalk removal. 1-5 Remove Buried Silmal Foundation & Re-Comnact It was necessary to replace the sidewalk after the removal of the signal foundation. .' ceo No. ONE - Guzman Construction Co. Informal Bid - Storm Drain and Catch Basin Reconstruction at Highland & "H" Street SUMMARY OF CONTRACT COSTS The estimated revised contract cost is as follows: Original Bid Amount. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ..... ...................$ 24,000.00 Contract Change Order No. One. . . . . . . . . . . . . . . . . . . . . . . . . . . . . ....................$ 8.027.00 Revised Construction Contract cost. . . . . . . . . . . . . . . . . . . . . . . . .. ....................$ 32,027.00 Additional time to complete Contract due to this Change Order.......................... 0 Working Days This change order represents 34% ofthe original contract amount. GUZMAN CONSTRUCTION CO. CONTRACTOR Accepted By: CITY OF SAN BERNARDINO DEVELOPMENT SERVICES Approved By: Title: VALERIE C. ROSS Director of Development Services Date: Date: Approved By: LORI SASSOON Acting City Manager Date: Item No. May 4, 2009 2