Loading...
HomeMy WebLinkAbout21-Development Services OR\G\NAl CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION From: Valerie C. Ross, Director Subject: Resolution awarding a contract to Matich Corporation for the Realignment of Viaduct Boulevard between 2nd Street and 3'd Street, per project Plan Nos. 12325 & 12326 and authorization for the Director of Finance to amend the FY 2008/09 Budget. Dept: Development Services Date: February 10, 2009 File Nos. SS07-32,SS04-34, SD08-0 1 & TC08-0 1 MCC Date: February 17,2009 Synopsis of Previous Council Action: 09/02/2008 The Mayor and Common Council adopted the FY 2008/09 to 2012/13 Capital Improvement Program. Recommended Motion: 1. Authorize the Director of Finance to amend the FY 2008/09 Budget by transferring $42,771.00 from Account No. 258-359-5504-7741 "SS07-32 Realignment of Viaduct Boulevard" to Account No. 258- 359-5504-7740 "TC08-01 Install Traffic Signal at Realigned Viaduct Boulevard and 2nd Street"; and 2. Authorize the Director of Finance to amend the FY 2008/09 Budget by transferring $90,482.00 from Account No. 258-359-5504-7741 "SS07-32 Realignment of Viaduct Boulevard" to Account No. 258- 359-5504-7769 "SD08-01 Viaduct Boulevard-Realign Existing Storm Drain"; and 3. Adopt Resolution. fdJAiv (/. KH4-- Valerie C. Ross Contact Person: Robert Eisenbeisz, City Engineer Phone: 5203 Supporting data attached: Staff Report, Resolution & Vicinity Map Ward: 1 &3 FUNDING REQUIREMENTS: Amount: $1.396.224.00 Source: (Acct. No) 258-359-5504-7740; 258-359-5504-7741 & 248-368-5504-7769 Acct. Description: Realignment of Viaduct Boulevard between 2nd Street and 3'd Street Finance: Council Notes: go Za?9-.3o Agenda Item No.---.2J 1-/1-6c:r CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION STAFF REPORT Subiect: Resolution awarding a contract to Matich Corporation for the Realignment of Viaduct Boulevard between 2nd Street and 3rd Street per project Plan Nos. 12325 & 12326 and authorization for the Director of Finance to amend the FY 2008/09 Budget. Backeround: On September 2, 2008, the Mayor and Common Council approved the FY 2008/09 Capital Improvement Program (CIP), which included several projects related to construction of a Metrolink Parking Structure at the Santa Fe Depot. CIP No. SS07-32 is for the realignment of Viaduct Boulevard between 2nd Street and 3rd Street and CIP No. GB04-19 is for construction of a 350 space parking structure for use by Metrolink Riders. This first phase of the work, which is necessary to clear the site for the parking structure, consists ofthe following items: 1. Realignment of Viaduct Boulevard between 2nd Street and 3rd Street (SS07-32 & SS04-34). 2. Realignment of a 42-inch reinforced concrete pipe storm drain (SD08-01). 3. Realignment of an 8-inch San Bernardino Municipal Water Department water main. 4. Installation ofa traffic signal at the intersection of 2nd Street and Metrolink Way (TC08-01). The plans and specifications for this project were completed and the project advertised locally in the San Bernardino County Sun Newspaper, F. W. Dodge, Construction Data Hot Sheet, Reed Construction Data and Bid America, Construction Bid Source, the City's web sites, and the San Bernardino Area Chamber of Commerce. A total of thirteen (13) bids were received and are listed below: Name of Bidder City Amount of Basic Bid Matich Corporation. San Bernardino $ 1,135,311.00 Hillcrest Contracting Corona $ 1,144,045.65 Vance Corporation Rialto $ 1,193,911.00 H&H General Contractors, Inc. Highland $ 1,196,835.75 Palo, Inc. DBA Excel Paving Comoanv. Long Beach $ 1,272,547.00 Griffith Comoanv Santa Ana $ 1,316,772.25 Laird Construction Comoanv, Inc. Rancho Cucamonga $ 1,355,553.00 Edmondson Construction Comoanv Lake Elsinore $ 1,395,666.00 McKenna General Eng., Inc. Corona $ 1,399,494.00 Landmark Site Contractors Perris $ 1,430,204.00 MS Construction Dana Point $ 1,580,234.14 Elite Bobcat Service, Inc. Corona $ 1,647,600.00 Fischer, Inc. San Bernardino $ 1,674,230.25 Eneineer's Estimate $ 1,400,000.00 2 CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION STAFF REPORT - Continued When the bids were initially opened, it appeared that Elite Bobcat Service, Inc. was the lowest bidder. However, on close analysis, it was found that Elite's bid for Item No 4 in Bid Schedule No. 2 "Install 42" RCP to Join Existing, including Plugs of Existing, per Plan, Complete in Place" indicated in handwritten words "seven hundred thirty five Dollars & no Cents" per linear foot, but indicated in numbers "$135.00" per linear foot. The instructions to bidders clearly state that in case of conflict, the written words will take precedence over numbers. After recalculation of Elite's bid using $735.00 per linear foot, their total bid amount equaled $1,647,600.00, ranking them twelfth highest of the thirteen bidders. Matich Corporation was determined to be the lowest bidder at $1,135,311.00. After complete review of the sealed competitive bids received and verification of mathematical calculations and certifications, staff has determined that Matich Corporation of San Bernardino, the apparent low bidder, has met the minimum requirements of the specifications and bid guidelines. Therefore, staff recommends that the Mayor and Common Council award the referenced contract to Matich Corporation. The estimated project costs are as follows: Construction Bid Amount Management Contingencies Total Cost & Inspection Bid Schedule 1: Realignment $ 614,273 $ 54,438 $ 86,732 $ 755,443 of Viaduct Blvd (SS07-32) Bid Schedule 2: Relocate $ 271,288 $ 24,042 $ 38,304 $ 333,634 Storm Drain (S008-0 1) Bid Schedule 3: Traffic Signal at 2nd Street and Metrolink Way $ 162,450 $ 14,397 $ 22,937 $ 199,784 (TC 08-01) Bid Schedule 4: Relocate 8" $ 87,300 $ 7,737 $ 12,326 $ 107,363 Water Line (SS07-32). Total Project Cost $ 1,135,311 $ 100,614 $ 160,299 $ 1,396,224 If approved, this project is expected to begin construction in late March of 2009 and be completed by August of 2009. During construction, Viaduct Boulevard will be closed and approximately 70 parking spaces at the Metrolink Station will be displaced for a period up to 6 months. There is a serious shortage of existing parking for Metrolink riders and the loss of 70 spaces would severely impact the ability of riders to find parking. To compensate for the loss of parking spaces during construction, an Agreement was approved on December 15, 2008, with Placo San Bernardino, LLC, owner and operator of the Carousel Mall, to allow the City use of an existing parking lot located at the northeast corner of "G" Street and 2nd Street. This auxiliary parking lot will offer an alternative for the displaced Metrolink parking and no major improvements will be needed. 3 CITY OF SAN BERNARDINO - REOUEST FOR COUNCIL ACTION STAFF REPORT - Continued Staff is currently working with Omnitrans to provide shuttle service between the auxiliary parking lot and the Metrolink train station Monday through Friday, during the peak morning and evening commute periods. A proposed Agreement has been received from Omnitrans to provide the shuttle service. Staff will be recommending approval of the Agreement at the Mayor and Common Council meeting of March 2, 2009. Caltrans Local Assistance is expected to approve the National Environmental Policy Act (NEPA) document for the parking structure by June of2009. This clearance will allow the City to submit final plans for approval by Caltrans and to submit a Request for Authorization (RF A) to proceed with construction. Approval of the final plans and the RF A will obligate federal Congestion Management and Air Quality (CMAQ) funds for the project. Construction of the structure is expected to start in November of2009 and be completed by November of20l0. Financial Impact: Funding for this project is available in the following Accounts: Acct. Description Acct. No. Amount Prop I-B (SS07-32) 258-359-5504-7741 $ 996,835 Storm Drain (S008-0 I) 248-368-5504-7769 $ 243,152 Proo I-B !TC08-01) 258-359-5504-7740 $ 157,013 Total Available $ 1,397,000 The total funding available is adequate for the project. However, it is necessary to transfer funding from CIP project SS07-32 (Prop I-B) to fully fund the storm drain (SD08-0l) and the traffic signal (TC08-0 1). Please see the attached Attachment "B" spreadsheet for details of the budget adjustment. After adjustment, the project funding will be as follows: Acct. Description Acct. No. Amount Prop I-B (SS07-32)-See Below 258-359-5504-7741 $ 862,806 Storm Drain (S008-01) 248-368-5504-7769 $ 243,152 Storm Drain (S008-0 I ) 258-359-5504-7769 $ 90,482 Prop I-B (TC08-01) 258-359-5504-7740 $ 199,784 Proiect Cost $ 1,396,224 It is anticipated that only $362,806 of the authorized $862,806 amount as noted above for Proposition I-B funds would actually be used on this project. The adjacent La Placita Project has entered into an agreement with the EDA and the developer has committed in this agreement to remit a fair-share contribution of $500,000 towards the CIP Project. CIP Project SS07-32 has the $862,806 available in the event the developer delays or defaults in funding this $500,000 fair- share contribution for off-site improvements. The $500,000 will be included in the construction budget to reduce the amount of Proposition l-B funds. 4 CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION STAFF REPORT - Continued Recommendation: I. Authorize the Director of Finance to amend the FY 2008/09 Budget by transferring $42,771.00 from Account No. 258-359-5504-7741 "SS07-32 Realignment of Viaduct Boulevard" to Account No. 258-359-5504-7740 "TC08-01Install Traffic Signal at Realigned Viaduct Boulevard and 2nd Street"; and 2. Authorize the Director of Finance to amend the FY 2008/09 Budget by transferring $90,482.00 from Account No. 258-359-5504-7741 "SS07-32 Realignment of Viaduct Boulevard" to Account No. 258-359-5504-7769 "SD08-01 Viaduct Boulevard-Realign Existing Storm Drain "; and 3. Adopt Resolution. Attachments: "I" - Attachment "A" - Vicinity Map "2" - Attachment "B" - Cost Distribution Spreadsheet 5 lICk PROJECT LOCATION ~ .., r z I N'ISt ~I .. ::J r Pl'ojl:'ct Location Map I~ .. . Metrolink Way " co ::J a- la - Main 51 {oadway AVe I ~ 1N 2nd . 1r5t ~ f4 W1.d 51 ., ~ .. .. ~. ....... (;J :i! .. " .. ii" ~ 'IV !JianG Ave en" - (/) -J Z ~ ~ z ::E .. '" '" ~ :II i - W 'ngSI ~ :J> c .. ATTACHMENT "A" LOCATION MAP REALIGNMENT OF VIADUCT BOULEVARD (METROLINK WAY) PLAN NOS 12325 & 12326 r- "CC ~ ~ u .. o " ~"C 1>.<( .. N .. N ~ - 'U _ '" " ~ .. a~S ..= .. ::::J c(_~ e. ;;- ~ <( m o _ ~~:2'CI); loOo..~O.5 ~~CI)~g: ~U)QaJ'g - <( uj o Z Z ::3 I>. .... W W '" .... m o '" .. o Z - <( Ill.... , w ,....W Z'" W~ ~O :I:Z ON <Z ~lll <~ w en o '" ~ W ...J ::l o en .... o ::l o <( > U- o .... Z w ::E Z " :J <( w '" ,,- " 0;,2 t;E~ .51~ CD .. .. .. " " " 8;;;0 '- '" ~1:g .g' :::::IN 00(;) ...JE.. -c(N t!-= 0 ..- - c !: 0 ~c(= i_I.. esJ " 0 E z g::::J I>.<(Z <> :;: E ~ E' d> o"lt e ~ ~ ,-0 -lnco _Il) OLt)1O gl.QOOo,N "..:~r!~~ci ~~~ '<t_cbZ NIl)OOIO"E ~~~~~::J '-Od,Q:j080'l J!:!ZI.O-Z<((0 l/)"EC?~col"- ;::l cx:q~ ::::J - ";- .=8~1-8:;:~ .-~SN:i~~ o o <ri .... .... ., o o '" N o ... '" ~ ., I!~ o 0 ....0 o o <ri o '" N <0 '" .. .. u " Ij " o o '" '" ..: "' o '" a> o '" .. .... ~ N <0 ., - " "C " co 0 ~ o o ..; .... "'. ~ o .... ., o o ..; '" '" <D 0> 0> ., " o ~ " .. .. o g .~ 1il 13 :> o. ....-""2'G)~ C1,I;:me::::.:i "S~+M"" -gE'E.!!~ '5 ~~-5S; oo=.!! CD. :2:g5t5~ ccO:::cocno :;: .... .... N..;.co "'o~ ~1.Oa. 01.1(0 Cl)o>~ CI)","- ",- <b "' N E , 0", ",,0 0"' 0"' ~o, -"' ....'" "'_cb N"' ",N ., . .S ~ ~ - .!1 " .." . a;~~ ~-.... ....<(.... o o ci ., o o .... .... N '" e o o .. '" .... '" a> ~ o o .... '" a> N N o o ..: 0> '" ... ~ ., o o ci "' "'. N <0 ~ ., o o ..; ;; '" "' ;;; "C " N "C " <<l~ -.. ~;;: .2' Jol: CI) " ~g1i ~~t) o '" .... ,,- o~~ cO r.n Co 8~e ...."'''- '7- '" "' N :;: ~;; "'"' ~~~ ~"' "' ;;cnM oL()cb N~~ ~_~ ci o .z ~~c - " .!!s8 ~8(.)0l !:!! <((0 I-:t.sr::: o o ci ., o o N '" '" 0; a> e o o .. '" <0 M '" '" o o .. o '" .; '" o o N '" o ... N ., o o a; '" "! ;:: N .. o o N "' M '" N .. " .. 0:: :;; "- .. "c "@ ~ cD o~~ EoN o i5. ~ Ci5E~ a>_ <o"C .... " .... " ......;.LL ~ ~.~ o"'~ ocbo CI)<OE '" ~ , 0 "'- "'CI) N- .. .. .. .... .... .. .. .. .. .... .... .. .. .. .. N N <Ii '" "t ~ o o .,; '" N .. .. ~ ., o o .. ~ .. .. .. ~ ., .; !;! t- o o N >- U- E o ol:: ~ ~ o ?:' t;; " .. '" " U .5 II " " o E .. ~ .. '" '" .. ...J f .. " .. Cl o "! ~ ~ .. on .. "" ~ .. o .. .,; o o ,.: '" "t ~ .. j o Z RESOLUTION NO. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 RESOLUTION OF THE MAYOR AND COMMON COUNCIL OF THE CITY OF SAN BERNARDINO AWARDING A CONTRACT TO MATICH CORPORATION FOR PRECISE GRADING IMPROVEMENTS (SS 07-32), PLAN NO. 12325; STREET IMPROVEMENTS (SS 07-32 & SS 04-34), STORM DRAIN IMPROVEMENTS (SD 08- 01) & TRAFFIC SIGNAL IMPROVEMENTS (TC 08-01), PLAN NO.12326 AND CITY OF SAN BERNARDINO MUNICIPAL WATER DEPARTMENT WATER IMPROVEMENT - METROLlNK PARKING STRUCTURE, PLAN NO. 12576 FOR THE REALIGNMENT OF VIADUCT BLVD. BETWEEN 2ND STREET AND 3RD STREET. BE IT RESOLVED BY THE MAYOR AND COMMON COUNCIL OF THE CITY OF SAN BERNARDINO AS FOLLOWS: SECTION 1. Matich Corporation, 1596 Harry Sheppard Boulevard, San Bernardino, CA 92408 is the lowest responsible bidder for Precise Grading Improvements (SS 07-32), Plan No. 12325; Street Improvements (SS 07-32 & SS 04-34), Storm Drain Improvements (SD 08- 01) & Traffic Signal Improvements (TC 08-01), Plan No.12326 and City of San Bernardino Municipal Water Department Water Improvement - Metrolink Parking Structure, Plan No. 12576 for the Realignment of Viaduct Blvd. between 2nd Street and 3rd Street. A contract is awarded accordingly to said bidder in a total amount of $1,135,311.00, with a contingency amount of $160,299.00, but such award shall be effective only upon being fully executed by both parties. All other bids, therefore, are hereby rejected. The City Manager is hereby authorized and directed to execute said contract on behalf of the City; a copy of the contract agreement is on file in the office of the City Clerk and incorporated herein by reference as fully as though set forth at length. SECTION 2. The Director of Finance is hereby authorized and directed to issue a Purchase Order for services based on said contract. SECTION 3. This contract and any amendment or modifications thereto shall not take effect or become operative until fully signed and executed by the parties and no party shall be obligated hereunder until the time of such full execution. No oral agreements, amendments, ;; - I 7-0~ # bll 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 RESOLUTION... AWARDING A CONTRACT TO MATICH CORPORATION FOR PRECISE GRADING IMPROVEMENTS (SS 07-32), PLAN NO. 12325; STREET IMPROVEMENTS (SS 07-32 & SS 04-34), STORM DRAIN IMPROVEMENTS (SD 08- 01) & TRAFFIC SIGNAL IMPROVEMENTS (TC 08-01), PLAN NO.12326 AND CITY OF SAN BERNARDINO MUNICIPAL WATER DEPARTMENT WATER IMPROVEMENT - METRO LINK PARKING STRUCTURE, PLAN NO. 12576 FOR THE REALIGNMENT OF VIADUCT BLVD. BETWEEN 2ND STREET AND 3RD STREET. modifications or waivers are intended or authorized and shall not be implied from any act or course of conduct of any party. SECTION 4. This resolution is rescinded if the parties to the contract fail to execute it within sixty (60) days of passage ofthe resolution. III III 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 1 2 3 4 5 6 RESOLUTION... AWARDING A CONTRACT TO MATICH CORPORATION FOR PRECISE GRADING IMPROVEMENTS (SS 07-32), PLAN NO. 12325; STREET IMPROVEMENTS (SS 07-32 & SS 04-34), STORM DRAIN IMPROVEMENTS (SD 08- 01) & TRAFFIC SIGNAL IMPROVEMENTS (TC 08-01), PLAN NO.12326 AND CITY OF SAN BERNARDINO MUNICIPAL WATER DEPARTMENT WATER IMPROVEMENT _ METRO LINK PARKING STRUCTURE, PLAN NO. 12576 FOR THE REALIGNMENT OF VIADUCT BLVD. BETWEEN 2ND STREET AND 3RD STREET. I HEREBY CERTIFY that the foregoing Resolution was duly adopted by the Mayor 7 and Common Council of the City of San Bernardino at a meeting thereof, held on the _day of ,2009, by the following vote, to wit: Council Members: AYES NAYS ABSTAIN ABSENT ESTRADA BAXTER BRINKER (VACANT) KELLEY JOHNSON MC CAMMACK City Clerk The foregoing resolution is hereby approved this day of ,2009. Patrick J. Morris, Mayor City of San Bernardino Approved as to form: By: ,J ~Ktb