HomeMy WebLinkAbout14-Development Services -lV~~191~O CITY OF SAN BERNARDINO REQUEST FOR COUNCIL ACTION From: Valerie C. Ross, Director Subject: Resolution approving Amendment No. 1 to an Agreement (County Contract No. 07-451) with the County of San Bernardino for pavement rehabilitation on Cajon Boulevard from 0.22 miles northwest of Palm Avenue to 0.05 miles northwest of Rex Cole Road (SS07-06). Dept: Development Services Date: October 23,2008 MCC Date: 11/17/08 Synopsis of Previous Council Action: 08/07/06 Allocated funds in the FY 06/07 CIP for rehabilitation of pavement on Cajon Boulevard from Palm Avenue to the BNSF Overcrossing (SS07-06). Adopted Resolution No. 2007-170 approving an Agreement in the amount of $226,338 with the County of San Bernardino for pavement rehabilitation on Cajon Boulevard from 0.22 miles northwest of Palm Avenue to 0.05 miles northwest of Rex Cole Road (SS07-06). OS/21/07 Recommended Motion: Adopt Resolution. fd1tW V. f?HY Valerie C. Ross Contact person: Robert Eisenbeisz, City Engineer Phone: 5203 Supporting data attached: Staff Report, Location Map, Resolution, & Amendment Ward: 6 FUNDING REQUIREMENTS: Amount: $176.700 Source: (Acct. No.) 126-369-5504-7675 Acct. Description: SS07-06 Cajon Blvd. Pavement Rehab. Council Notes 4.0 20CJd-c/Z(p . Agenda Item No. J'" 11~11~08 CITY OF SAN BERNARDINO REOUEST FOR COUNCIL ACTION Staff Report Subject: Resolution approving Amendment No. I to an Agreement with the County of San Bernardino (County Contract No. 07-451) for pavement rehabilitation on Cajon Boulevard from 0.22 miles northwest of Palm Avenue to 0.05 miles northwest of Rex Cole Road (SS07-06). Background: In early 2007, the County of San Bernardino Department of Transportation proposed a cooperative project with the City to rehabilitate the pavement on Cajon Boulevard from Palm A venue to Rex Cole Road. The County proposed to break the project into two segments. Project I is from 0.22 miles northwest of Palm Ave northwesterly to the centerline of the BNSF Railroad Overcrossing, a length of approximately 1.4 miles, and Project 2 is from the BNSF Railroad Overcrossing to 0.05 miles northwest of Rex Cole Road, a length of approximately 1.3 miles. The total length of the entire project is approximately 2.7 miles (14,000 feet). On May 21, 2007, a Cooperative Agreement (County Contract No. 07-451) for the work was approved by the two Agencies at an estimated cost to the City of $226,338. Sufficient funds were budgeted in the City's FY 2007/08 Capital Improvement Program under Project No. SS 07-06, with the intent that the work would be completed in late 2007. The County was designated the lead agency for the rehabilitation project. Start of the rehabilitation project was delayed due to conflicting work on the new FedEx distribution center. It was necessary for Hillwood, the developer, to extend a sewer main approximately one mile in Cajon Boulevard to serve the project and that necessitated excavating a trench in the middle of Cajon Boulevard within the reach proposed for rehabilitation. The County agreed to hold off the rehabilitation work until the sewer work was completed. The County also reviewed the limits of the work being done for the Project I segment, and determined that the City's share of the cost of the work was somewhat less than originally estimated. The revised City share, based on the revised cost estimate, is $176,700. On October 17, 2008, the County requested approval of Amendment No. I to the Cooperative Agreement (County Contract No. 07-45 I-AI), reflecting the revised cost estimate and cost share distribution. The majority of the City's portion of the overlay work on Cajon Boulevard, from BNSF Railroad to Rex Cole Road, which is the Project 2 segment, is being done to fulfill off-site requirements of the FedEx distribution center project and, therefore, the City will incur no cost for this work. With the assistance of HilIwood Investments and on their behalf, the City successfully applied for and received a grant from the Federal Economic Development Agency (FEDA) to fund the widening improvements on Cajon Blvd. within the limits of the FedEx site. The widening improvements include curb, gutter, sidewalk, landscaping and rehabilitation of existing pavement on Cajon Blvd. These improvements will be constrncted by the City as a Public Works project. HilIwood Investments will fund the constrnction and they will be reimbursed by the City as the City gets reimbursed by FEDA. This reach of Cajon Boulevard from 0.22 miles northwest of Palm Avenue to 0.05 miles northwest of Rex Cole Road is in urgent need of rehabilitation. Claims for damage from potholes along this reach are frequent. The reach from Palm Avenue to the BNSF Railroad Overcrossing is in especially poor condition. 2 CITY OF SAN BERNARDINO REOUEST FOR COUNCIL ACTION Staff Report -Continued Under terms of the Cooperative Agreement and Amendment No. I, the County will design the project, contract out the work and bill the City for its share based upon the percentage of actual cost as indicated in Exhibit "A" attached to the Agreement. The County is proposing to complete the work in two segments as indicated in the attached maps marked Project No. I "Pavement Rehabilitation for Cajon Boulevard from 0.22 miles north of Palm Avenue to the BNSF Railroad overcrossing" and Project No.2 "Pavement Rehabilitation for Cajon Boulevard between the BNSF Railroad Overcrossing and 0.05 miles north of Rex Cole Road." The proposed rehabilitation strategy is to remove and replace failed areas of pavement, grind the existing roadway full width and overlay with at least 1.5 inches of new asphalt pavement. Although Project No. 2 "Pavement Rehabilitation for Cajon Boulevard between the BNSF Railroad Overcrossing and 0.05 miles north of Rex Cole Road" is shown in the original Agreement and Amendment No. I, the City's share of the cost for that reach will be zero since it is covered by the FEDA grant project. The original agreement indicated an estimated cost to the City of $226,338. Amendment No. I indicates an estimated cost to the City of$176,700, which is a reduction of $49,638. Staff believes this cooperative project will be beneficial to both agencies. Cooperative projects with the County typically have elements under the jurisdiction of both the City and County of San Bernardino and, therefore, lend themselves well to such a cooperative effort. Approval of this Agreement will allow the County to proceed with bidding the project. Construction is expected to start prior to the end of FY 08/09. The County is requesting that three (3) copies of Amendment No I be executed and returned to them for processing before the Board of Supervisors. The County will return one fully executed copy to the City after approval. Financial Impact: Sufficient funds for this project are available in Capital Improvement Project No. SS07 -06 "Cajon Boulevard Pavement Rehabilitation from 0.22 miles north of Palm Avenue to BNSF Railroad Overcrossing" in Account No. 126-369-5504-7675. Recommendation: Adopt Resolution. Attachments: I - Vicinity Map, Project I 2 - Vicinity Map, Project 2 3 - Resolution 3 City of San Bernardino, California Department of Public Works, Division of Engineering PROJECT-l PAVEMENT REHABILIATION FOR CAJON BOULEVARD FROM 0.22 MILES NORTH OF PALM A VENUE TO BNSF RAILROAD OVERCROSSING VICINITY MAP N.T.S. 5507-06 , City of San Bernardino, California Department of Public Works, Division of Engineering PROJECT-2 PAVEMENT REHABILIATION FOR CAJON BOULEVARD FROM BNSF R-R OVERCROSSING TO 0.05 MILES NORTH OF REX COLE ROAD \ ... - ... ~r ' / , / VICINITY MAP N.T.S. SS07-06 11 12 13 14 15 16 17 18 19 20 III 21 22 23 24 25 26 27 28 1 2 \,\,,-.',/'/ if u RESOLUTION NO. RESOLUTION OF THE CITY OF SAN BERNARDINO AUTHORIZING 3 EXECUTION OF AMENDMENT NO.1 TO A COOPERATIVE AGREEMENT (COUNTY CONTRACT NO. 07-451) BETWEEN THE CITY OF SAN BERNARDINO 4 AND THE COUNTY OF SAN BERNARDINO FOR PAVEMENT REHABILITATION ON CAJON BOULEVARD FROM 0.22 MILES NORTHWEST OF PALM AVENUE TO 5 0.05 MILES NORTHWEST OF REX COLE ROAD (SS07-06). 6 BE IT RESOLVED BY THE MAYOR AND COMMON COUNCIL OF THE CITY OF 7 SAN BERNARDINO AS FOLLOWS: 8 SECTION 1. The City Manager of the City of San Bernardino is hereby authorized and 9 directed to execute on behalf of said City, Amendment No. I to a Cooperative Agreement 10 (County Contract No. 07-451) between the City of San Bernardino and the County of San Bernardino for pavement rehabilitation on Cajon Boulevard from 0.22 miles northwest Of Palm Avenue to 0.05 miles northwest of Rex Cole Road (SS07-06) as shown in this Amendment. A copy of said Amendment No. I is attached as Attachment "A" and made a part hereof. SECTION 2. The authorization to execute the above-referenced Amendment No. I is rescinded if the parties to the Amendment fail to execute it within sixty (60) days of the passage of this resolution. III - I - 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 1 RESOLUTION...AUTHORIZING EXECUTION OF AMENDMENT NO. 1 TO A COOPERATIVE AGREEMENT (COUNTY CONTRACT NO. 07-451) BETWEEN THE 2 CITY OF SAN BERNARDINO AND THE COUNTY OF SAN BERNARDINO FOR 3 PAVEMENT REHABILITATION ON CAJON BOULEVARD FROM 0.22 MILES NORTHWEST OF PALM AVENUE TO 0.05 MILES NORTHWEST OF REX COLE 4 ROAD (SS07-06). 5 6 7 8 I HEREBY CERTIFY that the foregoing Resolution was duly adopted by the Mayor and Common Council of the City of San Bernardino at a meeting thereof, held on the day of , 2008, by the following vote, to wit: Council Members: AYES NAYS ABSTAIN ABSENT ESTRADA BAXTER BRINKER DERRY KELLEY JOHNSON MC CAMMACK City Clerk The foregoing resolution is hereby approved this day of ,2008. Patrick 1. Morris, Mayor City of San Bernardino Approved as to form: JAMES F. PENMAN, City Attorney By: ~~ 1.fe~ tI -2- FAS tK New Vendor Code Dept. Contract Number Change SC TRA A 07.451.A1 Cancel County Department Dept. Orgn. Contractor's License No. Public Works - TransDortation TRA TRA County Department Contract Representative Telephone Total Contract Amount Brendon Biaas (909) 387-8167 949,460 Contract Type . D Revenue D Encumbered Iiil Unencumbered D Other: If not encumbered or revenue contract type, provide reason: Lead Aaencv Commodity Code I Contract Start Date Contract End Date Original Amount This Amendment $949,460 Fund Dept. Organization Appr. Obj/Rev Source GRC/PROJ/JOB No. Orig. Amount SWW TRA TRA 200 2445 14T01574 $751,900 Fund Dept. Organization Appr. Obj/Rev Source GRC/PROJ/JOB No. Orig. Amount SWW TRA TRA 200 2445 34T01575 $197,560 Project Name Estimated Payment Total by Fiscal Year CaJon Boulevard FY Amount 110 FY Amount 110 Rehabilitation - - Contract Type - Special - - (Risk Management Approved) A TTACHMENT "A" FOR COUNTY USE ONLY COUNTY OF SAN BERNARDINO STANDARD CONTRACT THIS CONTRACT is entered into in the State of California by and between the County of San Bernardino, hereinafter called the County, and Name City of San Bernardino 300 North "0" Street San Bernardino. CA 92418 Telephone FaderallD No. or Social Security No. (909) 384-5211 hereinafter called: CITY Address IT IS HEREBY AGREED AS FOllOWS: WITNESSETH WHEREAS, the COUNTY and CITY have previously entered into an Agreement, Contract No. 07-451; and WHEREAS, the COUNTY and the CITY now desire to amend this Agreement. NOW, THEREFORE, it is hereby agreed to amend County Contract No. 07-451 between the County and the City as follows: 1. CHANGE the description of limits of PROJECT-1 and PROJECT-2, to the following: PROJECT-1: From .22 mile northwest of Palm Avenue, northwesterly to .32 mile northwest of the Burlington Northern and Santa Fe railroad over-crossing (BNSF). PROJECT-2: From .32 mile from BNSF, northwesterly to .05 miles northwest of Rex Cole Road. 2. CHANGE percentage of PROJECT-1 within each jurisdiction, to the following: Page 1 of 3 ATTACHMENT "A" . PRGlJECT-1 is partially (76.5%) in the unincorporated area of the COUNTY and partially (23.5%) within the incorporated area of the CITY; and 3. DELETE the existing fourth WHEREAS statement, and SUBSTITUTE the following as a new fourth WHEREAS statement: WHEREAS, the PROJECTS overall total cost is estimated to be $949,460. PROJECT-1 and PROJECT- 2's estimated total costs are $751,900 and $197,560, respectively. The COUNTY's proportionate share of cost for PROJECT-1 is $575,200 (76.5%), while the CITY's proportionate share of cost is $176,700 (23.5%). PROJECT-2 shall be within 100% COUNTY area. The COUNTY's proportionate share of cost for PROJECT-2 will be $197,560 (100%) and the CITY's share will be (0%), as more particularly set forth in Exhibit "A", attached hereto and incorporated herein by reference 4. DELETE the existing paragraph 1.9 and SUBSTITUTE the following as a new paragraph 1.9: Pay for its proportional share of the costs for the PROJECTS. The costs of the PROJECTS shall include the cost of design, construction, construction engineering, and overhead. COUNTY's proportionate share of cost for PROJECT-1 is estimated at $751,900 (76.5%) and PROJECT-2 is estimated at $197,560 (100%). COUNTY shall be responsible for the sum of $772,760, plus its proportionate share of any PROJECT cost increases pursuant to paragraph 3.5 below and pay such costs from COUNTY road funds. 5. DELETE the existing paragraph 2.1 and SUBSTITUTE the following as a new paragraph 2.1: Pay for its proportionate share of costs for the PROJECTS. The costs of the PROJECTS shall include the cost of design, construction, construction engineering, and overhead. CITY's proportionate share of cost for the PROJECT-1 is estimated at $176,700 (23.5%). 6. DELETE the existing paragraph 3.5 and SUBSTITUTE the following as a new paragraph 3.5: The Parties acknowledge that final costs of the PROJECTS may ultimately exceed current estimates of the PROJECTS' cost. Any additional costs resulting from increased bid prices, change orders, or arising from unforeseen site conditions, including Utility relocation (but not from requested additional work by the CITY or COUNTY, which is addressed in paragraph 3: 7 below) over the estimated total of the PROJECTS' cost of $949,460 (which is the sum of $772,760 from COUNTY and $176,700 from CITY), shall be borne by each Party in proportion to where the work actually lies (based on jurisdiction), as part of the Parties' respective obligations to pay the cost for the PROJECTS. 7. Replace Exhibit "A" with the attached Exhibit "A" (Revision 1). /1/ Page 2 of 3 ATTACHMENT "A" 11-.1 WITNESS WHEREOF, the Parties to these presents have hereunto set their hands. Approved as to Form: James F. Penman, BCyit..y Altor7fY ~ -:J~/~ U COUNTY OF SAN BERNARDINO CITY OF SAN BERNARDINO (Print or type name of corporation, company, contractor, ete.) ~ Paul Biane, Chairman, Board of Supervisors By ~ (Authorized signature - sign in blue ink) Dated: Name (Print or type name of person signing contract) SIGNED AND CERTIFIED THAT A COPY OF THIS DOCUMENT HAS BEEN DELIVERED TO THE I":HAIRMAN OF THE BOARD Dena M. Smith Clerk of the Board of Supervisors of the County of San Bemardino. Title (Print or Type) Dated: By Address Deputy Reviewed by Contract Compliance Presented to BOS for Signature Approved as to Legal Form ~ County Counsel ~ ~ Department Head Date Date Date Page 3 of 3 ATTACHMENT "A" EXHIBIT "A" - Work Orders T01574 & T01575 (REVISION 1) ESTIMATE OF PROJECTS COSTS FOR COUNTY OF SAN BERNARDINO/CITY OF SAN BERNARDINO FOR REHABILITATION and OVERLAY OF CAJON BOULEVARD IN THE SAN BERNARDINO AREA DESCRIPTION LIMITS TOTAL COUNTY OF %OF CITY OF -I. OF COST OF SAN PROJECT SAN PROJECT PROJECT BERNARDINO PAID FOR BERNARDINO PAID FOR SHARE BY SHARE BY CITY COUNTY .22 mile northwest of Palm Ave PROJECT 1 northwesterly $751,900 $575,200 76.5% $176,700 23.5% to 0.32 mile northwest of BNSF railroad overcrossing 0.32 mile northwest of BNSF railroad o (see o (see PROJECT 2 overcrossing $197,560 $197,560 100% to .05 mile footnote) footnote) northwest of Rex Cole Rd TOTAL $949,460 $772,760 81.39% $176,700 18.61% Footnote: The City portion of the overlay work on Cajon Boulevard, from BNSF Railroad to Rex Cole Road, will be done by others (Hillwood Investments), on behalf of the City, and therefore the City will incur no cost to do this work. PROJECT costs may be increased or decreased based on accepted contractor's bid. ATTACHMENT "A" ... " .. EXHIBIT "B" CONTRACT CHANGE ORDER REVIEW/APPROVAL PROJECT: COUNTY OF SAN BERNARDINO CONTRACT # File: T01574 & T01575 Proposed Contract Change Order No. has been reviewed in accordance with the existing agreements with the City of San Bernardino and the County of San Bernardino for the above project and the following shall apply: DATE OF CITY OF SAN BERNARDINO ACTION: _/~- D APPROVED for Implementation with 100% Participation by CITY OF SAN BERNARDINO D APPROVED Subject to Comments/Revisions Accompanying This Document D APPROVED With Limited Funding Participation by CITY OF SAN BERNARDINO D % of Actual Cost to be Funded by CITY OF SAN BERNARDINO D CITY OF SAN BERNARDINO Participation Not to Exceed $ D DISAPPROVED -Not Acceotable to CITY OF SAN BERNARDINO Note: Approval under any of the above conditions shall in no case be construed as agreement to increase the total financial participation beyond that prescribed in the existing CITY OF SAN BERNARDINO agreements without separate amendment to said agreements. Net increases in costs deriving from this and previously approved Contract Change Orders shall not cause the total construction costs to exceed the sum of the authorized contract total and contingency amounts. Comments, as follows and/or attached, are conditions of the above action? DYES DNO SIGNED: TITLE: Distribution: Signed Original Returned to Resident Engineer (FAX # 909-387.7920) Signed Original for CITY OF SAN BERNARDINO File COUNTY OF SAN BERNARDINO FAS STANDARD CONTRACT FOR COUNTY USE ONLY :x New Vendor Code Dept. Contract Number Change SC TRA A 07-451-A1 Cancel County Department Dept. Orgn. Contractor's License No. Public Works - Transnortation TRA TRA County Department Contract Representative Telephone Total Contract Amount Brendon Biaas (909) 387-8167 949,460 Contract Type o Revenue 0 Encumbered !Xl Unencumbered o Other: If not encumbered or revenue contract type, provide reason: Lead Aoenev Commodity Code I Contract Start Date Contract End Date Original Amount This Amendment $949,460 Fund Dept. Organization Appr. Obj/Rev Source GRC/PROJ/JOB No. Orig. Amount SWW TRA TRA 200 2445 14T01574 $751,900 Fund Dept. Organization Appr. Obj/Rev Source GRCIPROJ/JOB No. Orig. Amount SWW TRA TRA 200 2445 34T01575 $197,560 Project Name Estimated Payment Total by Fiscal Year Calon Boulevard FY Amount lID FY Amount 110 Rehabilitation - - Contract Type - Special - - (Risk Management Approved) THIS CONTRACT is entered into in the State of California by and between the County of San Bernardino, hereinafter called the County, and Name Address Citv of San Bernardino 300 North "D" Street hereinafter called: CITY San Bernardino, CA 92418 Telephone FederallD No. or Social Security No. (909) 384-5211 IT IS HEREBY AGREED AS FOllOWS: WITNESSETH WHEREAS, the COUNTY and CITY have previously entered into an Agreement, Contract No. 07-451; and WHEREAS, the COUNTY and the CITY now desire to amend this Agreement. NOW, THEREFORE, it is hereby agreed to amend County Contract No. 07-451 between the County and the City as fallows: 1. CHANGE the description of limits of PROJECT-1 and PROJECT-2, to the following: PROJECT-1: From .22 mile northwest of Palm Avenue, northwesterly to .32 rnile northwest of the Burlington Northern and Santa Fe railroad over-crossing (BNSF). PROJECT-2: From .32 mile from BNSF, northwesterly to .05 miles northwest of Rex Cole Road. 2. CHANGE percentage of PROJECT-1 within each jurisdiction, to the following: Page 1 of3 P~OJECT-1 is partially (76.5%) in the unincorporated area of the COUNTY and partially (23.5%) within the incorporated area of the CITY; and 3. DELETE the existing fourth WHEREAS statement, and SUBSTITUTE the following as a new fourth WHEREAS statement: WHEREAS, the PROJECTS overall total cost is estimated to be $949,460. PROJECT-1 and PROJECT- 2's estimated total costs are $751,900 and $197,560, respectively. The COUNTY's proportionate share of cost for PROJECT-1 is $575,200 (76.5%), while the CITY's proportionate share of cost is $176,700 (23.5%). PROJECT-2 shall be within 100% COUNlY area. The COUNlY's proportionate share of cost for PROJECT-2 will be $197,560 (100%) and the CllY's share will be (0%), as more particularly set forth in Exhibit "A", attached hereto and incorporated herein by reference 4. DELETE the existing paragraph 1.9 and SUBSTITUTE the following as a new paragraph 1.9: Pay for its proportional share of the costs for the PROJECTS. The costs of the PROJECTS shall include the cost of design, construction, construction engineering, and overhead. COUNlY's proportionate share of cost for PROJECT-1 is estimated at $751,900 (76.5%) and PROJECT-2 is estimated at $197,560 (100%). COUNlY shall be responsible for the sum of $772,760, plus its proportionate share of any PROJECT cost increases pursuant to paragraph 3.5 below and pay such costs from COUNTY road funds. 5. DELETE the existing paragraph 2.1 and SUBSTITUTE the following as a new paragraph 2.1: Pay for its proportionate share of costs for the PROJECTS. The costs of the PROJECTS shall include the cost of design, construction, construction engineering, and overhead. CllY's proportionate share of cost for the PROJECT -1 is estimated at $176,700 (23.5%). 6. DELETE the existing paragraph 3.5 and SUBSTITUTE the following as a new paragraph 3.5: The Parties acknowledge that final costs of the PROJECTS may ultimately exceed current estimates of the PROJECTS' cost. Any additional costs resulting from increased bid prices, change orders, or arising from unforeseen site conditions, including Utility relocation (but not from requested additional work by the CllY or COUNlY, which is addressed in paragraph 3.7 below) over the estimated total of the PROJECTS' cost of $949,460 (which is the sum of $772,760 from COUNlY and $176,700 from CllY), shall be bome by each Party in proportion to where the work actually lies (based on jurisdiction), as part of the Parties' respective obligations to pay the cost for the PROJECTS. 7. Replace Exhibit "A" with the attached Exhibit "A" (Revision 1). III Page 2 of 3 ,,~ WITNESS WHEREOF, the Parties to these presents have hereunto set their hands. Approved as to Form: James F. Penman, City Attorney By: 7-.~ COUNTY OF SAN BERNARDINO CITY OF SAN BERNARDINO (Print or type name of corporation, company, contractor, etc.) ~ Paul Biane, Chairman, Board of Supervisors By ~ (Authorized signature - sign in blue ink) Dated: Name (Print or type name of person signing contract) SIGNED AND CERTIFIED THAT A COPY OF THIS DOCUMENT HAS BEEN DELIVERED TO THE CHAIRMAN OF THE BOARD Dena M. Smith Clerk of the Board of Supervisors of the County of San Bernardino. Title (Print or Type) Dated: By Address Deputy Approved as to Legal Fonn Reviewed by Contract Compliance Presented to BOS for Signature ~ County Counsel ~ ~ Department Head Date Date Date Page 3 of 3 EXHIBIT "An - Work Orders T01574 & T01575 (REVISION 11 ESTIMATE OF PROJECTS COSTS FOR COUNTY OF SAN BERNARDINO/CITY OF SAN BERNARDINO FOR REHABILITATION and OVERLAY OF CAJON BOULEVARD IN THE SAN BERNARDINO AREA DESCRIPTION LIMITS TOTAl COUNTY OF %OF CITY OF %OF COST OF SAN PROJECT SAN PROJECT PROJECT BERNARDINO PAID FOR BERNARDINO PAID FOR SHARE BY SHARE BY CITY COUNTY .22 mile northwest of Palm Ave PROJECT 1 northwesterly $751,900 $575,200 76.5% $176,700 23.5% to 0.32 mile northwest of BNSF railroad overcrosslnn 0.32 mile northwest of BNSF railroad o (see o (see PROJECT 2 overcrossing $197,560 $197,560 10011/0 to .05 mile footnote) footnote) northwest of Rex Cole Rd TOTAL $949,460 $772,760 81.39% $176,700 18.61% Footnote: The City portion of the overlay work on Cajon Boulevard, from BNSF Railroad to Rex Cole Road, will be done by others (Hillwood Investments), on behalf of the City, and therefore the City will incur no cost to do this work. PROJECT costs may be increased or decreased based on accepted contractor's bid. EXHIBIT "B" CONTRACT CHANGE ORDER REVIEW/APPROVAL PROJECT: COUNTY OF SAN BERNARDINO CONTRACT # File: T01574 & T01575 Proposed Contract Change Order No. has been reviewed in accordance with the existing agreements with the City of San Bernardino and the County of San Bernardino for the above project and the following shall apply: DATE OF CITY OF SAN BERNARDINO ACTION: ---1_/_ o APPROVED for Implementation with 100% Participation by CITY OF SAN BERNARDINO o APPROVED Subject to Comments/Revisions Accompanying This Document o APPROVED With Limited Funding Participation by CITY OF SAN BERNARDINO 0 % of Actual Cost to be Funded by CITY OF SAN BERNARDINO o CITY OF SAN BERNARDINO Participation Not to Exceed $ o DISAPPROVED -Not Acceptable to CITY OF SAN BERNARDINO Note: Approval under any of the above conditions shall in no case be construed as agreement to increase the total financial participation beyond that prescribed in the existing CITY OF SAN BERNARDINO agreements without separate amendment to said agreements. Net increases in costs deriving from this and previously approved Contract Change Orders shall not cause the total construction costs to exceed the sum of the authorized contract total and contingency amounts. Comments, as follows and/or attached, are conditions of the above action? DYES ONO SIGNED: TITLE: Distribution: Signed Original Returned to Resident Engineer (FAX # 909-387-7920) Signed Original for CITY OF SAN BERNARDINO File