CITY OF SAN BERNARDINO
ECONOMIC DEVELOPMENT AGENCY
FROM: Emil A. Marzullo
Interim Executive Director
SUBJECT:
Amendment No. 1 to the Agreement for
Professional Services with Joseph E. Bonadiman
and Associates, Inc. for the Northpark Boulevard
and University Parkway Street Improvements
Project (State College Redevelopment Project
Area)
DATE: July 22, 2011
Svnonsis of Previous Commission/Council/Committee Action(s):
On December 20, 2010, the Community Development Commission approved an Owner Participation Agreement ("OPA")
between the Agency and Promenade and Shops, LLC for street improvements at Northpark Boulevard and University Parkway.
On July II, 20 II, the Community Development Commission of the City of San Bernardino ("Commission") approved and
authorized the Interim Executive Director of the Redevelopment Agency of the City of San Bernardino ("Agency") to execute
an Agreement for Professional Services by and between the Agency and Joseph E. Bonadiman and Associates, Inc. for the
Northpark Boulevard and University Parkway Street Improvements Project (State College Redevelopment Project Area).
On July 21, 2011, Redevelopment Committee Members Marquez and Brinker unanimously voted to recommend that the
Community Development Commission of the City of San Bernardino ("Commission") execute Amendment No. I to the
Agreement for Professional Services by and between the Agency and Joseph E. Bonadirnan and Associates for the Northpark
Boulevard and University Parkway Street Improvements Project (State College Redevelopment Project Area),
Recommended Motion(s):
(Community Develonment Commission)
Resolution of the Community Development Commission of the City of San Bernardino approving and authorizing
the Interim Executive Director of the Redevelopment Agency of the City of San Bernardino ("Agency") to execute
Amendment No. I to the Agreement for Professional Services by and between the Agency and Joseph E.
Bonadiman and Associates, Inc. ("Consultant") for Northpark Boulevard and University Parkway Street
Improvements Project (State College Redevelopment Project Area).
Contact Person(s):
Brian Turnbull
Phone:
(909) 663-1044
Project Area(s):
State College Redevelopment Project
Area
Ward(s):
5th, 6th
Supporting Data Attached:
Ii'! Staff Report Ii'! Resolution(s) G!l Agreement(s)/Contract(s) Ii'! Map(s) 0 Letter(s)
FUNDING REQUIREMENTS:
Amount: $ $10,500
Source:
EB-5
Budget Authority:
'efFinancialOfficer
Executive Director
Commission/Council Notes:
P:\Agendas\Conun Dcv CommissionlCDC 2011\08-0].\] Joseph Bonadiman PSA Amendment No. ] SR.doc
COMMISSION MEETING AGENDA
Meeting Date: 08/01/2011
Agenda Item Number: '12-1-1
ECONOMIC DEVELOPMENT AGENCY
STAFF REPORT
AMENDMENT NO.1 TO THE AGREEMENT FOR PROFESSIONAL SERVICES WITH
JOSEPH E. BONADIMAN AND ASSOCIATES, INC. FOR THE NORTHP ARK BOULEVARD
AND UNIVERSITY PARKWAY STREET IMPROVEMENTS PROJECT (STATE COLLEGE
REDEVELOPMENT PROJECT AREA)
BACKGROUND:
On March 3, 2011, the Community Development Commission of the City of San Bernardino
("Commission") approved a loan agreement with CMB Export, LLC in the amount of $10,000,000 to
fund construction of various infrastructure projects Citywide.
CMB Exports, LLC, was formed in the mid-1990's to establish a "regional center" for the counties of
San Bernardino, Riverside and Sacramento to assist in financings for the closed military bases in these
counties. The Inland Valley Development Agency ("IVDA") entered into the initial loan transaction
with CMB in 1997 for the first loan of this type pursuant to the EB-5 program administered initially by
the Immigration and Naturalization Services ("INS") which has since been restructured into the United
States Citizenship and Immigration Services ("USCIS"). The loan proceeds have been used by the
IVDAlSBIAA in part for various Airport and roadway infrastructure projects.
On July II, 2011, an Agreement for Professional Services with Joseph E. Bonadiman and Associates,
Inc. in the amount of $61,200 was approved by the Commission for the Northpark Boulevard and
University Parkway Street Improvement Project. Professional design and engineering services are
required to develop the plans, specification and estimates (P,S,E's) required for the Project. The
Project will be funded through proceeds of the 2011 CMB Export, LLC loan. The Project will consist
of various street improvements including slurry seal and striping, grind and overlay, street
reconstruction and curb, gutter and sidewalk construction and rehabilitation depending on the needs
identified by City staff. Improvements will be made on University Parkway, Northpark Boulevard,
Hallmark Avenue, State Street and College Avenue.
CURRENT ISSUE:
Subsequently, the City's Field Engineering Section determined that an aerial survey of the Project is
necessary. The aerial survey was not included in the original scope of services requiring an
amendment to the Agreement for Professional Services. Therefore, staff is recommending an
amendment to the Agreement to include these services.
P:\Agendas\Cornm Dev Comrnission\CDC 2011 \08-0] -J I Joseph. Bonadiman PSA Amendment No. I SR.doc
COMMISSION MEETING AGENDA
Meeting Date: 08/0112011
Agenda Item Number: f:2--"2..1
Economic Development Agency Staff Report
Joseph Bonadiman Professional Services Agreement Amendment No.1
Page 2
ENVIRONMENTAL IMPACT:
None. This activity does not meet the definition of a "Project" under Section 15378 of the California
Environmental Quality Act, which states that a "Project" means the whole of an action, which has a
potential for resulting in either a direct physical change in the environment, or a reasonably foreseeable
indirect physical change in the environment. Prior to the commencement of construction of the
infrastructure improvements, the Agency will obtain the environmental clearance necessary to proceed
with said construction.
FISCAL IMPACT:
The cost of the aerial survey is $10,500 bringing the total cost ofthe Agreement for Professional
Services to $71,700 and will be paid for by EB-5 funds.
RECOMMENDATION:
That the Community Development Commission adopt the attached Resolution.
Executive Director
P:\AgendasIComm Dev Commission\CDC 201 1\08-01-1\ Joseph Bonadiman PSA Amendment No.1 SRdoe
COMMISSION MEETING AGENDA
Meeting Date: 08/0112011
Agenda Item Nnmber: t2 '2-1
City of S.n Sern.rdlno
Redevelopment Project Are. . St.t. College
1
2
3
4
5
6
7
8
9
10 WHEREAS, the Redevelopment Agency of the City of San Bernardino (the "Agency") is a
RESOLUTION NO.
RESOLUTION OF THE COMMUNITY DEVELOPMENT COMMISSION OF
THE CITY OF SAN BERNARDINO APPROVING AND AUTHORIZING
THE INTERIM EXECUTIVE DIRECTOR OF THE REDEVELOPMENT
AGENCY OF THE CITY OF SAN BERNARDINO ("AGENCY") TO
EXECUTE AMENDMENT NO. 1 TO THE AGREEMENT FOR
PROFESSIONAL SERVICES BY AND BETWEEN THE AGENCY AND
JOSEPH E. BONADIMAN AND ASSOCIATES, INC. ("CONSULTANT")
FOR PROFESSIONAL DESIGN AND ENGINEERING SERVICES FOR
NORTHPARK BOULEVARD AND UNIVERSITY PARKWAY STREET
IMPROVEMENTS PROJECT (STATE COLLEGE REDEVELOPMENT
PROJECT AREA)
11 community redevelopment agency duly created, established and authorized to transact business and
12 exercise its powers, all under and pursuant to the California Community Redevelopment Law (the
13 "CRL"), codified under Division 24, Part I of the California Health and Safety Code commencing
14 at Section 33000 and is authorized to construct infrastructure improvements for redevelopment
15 purposes located within the approved redevelopment project areas in the City of San Bernardino
16 (the "City") in accordance with the CRL; and
17 WHEREAS, the Community Development Commission of the City of San Bernardino (the
18 "Commission"), as the governing board of the Agency, has authorized the Agency to design and
19 construct the Northpark Boulevard and University Parkway Street hnprovements Project; and
20 WHEREAS, the State College Redevelopment Project Area displays substantial and
21 pervasive symptoms of blight that cannot be remedied by private parties acting alone without
22 community redevelopment assistance; and
23 WHEREAS, the Northpark Boulevard and University Parkway Street Improvements Project
24 is funded by proceeds from the 2011 CMB Export, LLC loan; and
25 WHEREAS, the scope of work will include data and field survey, preparation of plans and
26 project specifications and preparation of all bid documents; and
27 WHEREAS, on July 11, 2011, the Agency and Joseph E. Bonadiman and Associates, Inc.
28 (the "Consultant") entered into an Agreement ("Agreement") for Professional Services by and
1
P:\AgendasIResolutions\Resolutioos\2011\08-01-11 Joseph Boosdiman PSA Amendment NO.1 CDC Reso.doc
1 between the Agency and for Professional Design and Engineering Services for Northpark
2 Boulevard and University Parkway Street Improvements Project and the Agency desires to amend
3 said Agreement in the amount of $1 0,500 for the completion of an aerial survey in accordance with
4 the terms and conditions of said Agreement.
5 NOW, THEREFORE, THE COMMUNITY DEVELOPMENT COMMISSION OF THE
6 CITY OF SAN BERNARDINO DOES HEREBY RESOLVE, DETERMINE AND ORDER, AS
7 FOLLOWS:
8
Section 1.
The information set forth in the above recitals of this Resolution is true and
9 correct.
10
Section 2.
The Commission hereby approves Amendment No. 1 to the Agreement by
11 and between the Agency and the Consultant attached hereto, incorporated herein by reference, and
12 waives any irregularities in the bid as submitted by the Consultant as permitted by the bid
13 documents.
14
Section 3.
The Interim Executive Director of the Agency is hereby authorized to
15 execute Amendment No. I to the Agreement on behalf of the Agency in substantially the form
16 attached hereto as Exhibit "A", together with such changes therein as may be approved by the
17 Interim Executive Director of the Agency, City Attorney and Agency Counsel. The Interim
18 Executive Director of the Agency or such other designated representative of the Agency is further
19 authorized to do any and all things and take any and all actions as may be deemed necessary or
20 advisable to effectuate the purposes of Amendment No. I to the Agreement, including making non-
21 substantive modifications to the Agreement.
This Resolution shall take effect from and after its date of adoption by this
2
P:\AgendaslR.esolulionslResolutions\20l1 \08-01-1] Joseph Bonadiman PSA Amendment No. ] CDC Reso.doc
1
2
3
4
5
6
7
8
RESOLUTION OF THE COMMUNITY DEVELOPMENT COMMISSION OF
THE CITY OF SAN BERNARDINO APPROVING AND AUTHORIZING
THE INTERIM EXECUTIVE DIRECTOR OF THE REDEVELOPMENT
AGENCY OF THE CITY OF SAN BERNARDINO ("AGENCY") TO
EXECUTE AMENDMENT NO. 1 TO THE AGREEMENT FOR
PROFESSIONAL SERVICES BY AND BETWEEN THE AGENCY AND
JOSEPH E. BONADIMAN AND ASSOCIATES, INC. ("CONSULTANT")
FOR PROFESSIONAL DESIGN AND ENGINEERING SERVICES FOR
NORTHPARK BOULEVARD AND UNIVERSITY PARKWAY STREET
IMPROVEMENTS PROJECT (STATE COLLEGE REDEVELOPMENT
PROJECT AREA)
I HEREBY CERTIFY that the foregoing Resolution was duly adopted by the Community
meeting
9 Development Commission of the City of San Bernardino at a
10 thereof, held on the day of
11 Commission Members: Aves
12 MARQUEZ
13 JENKINS
14 BRINKER
15 SHORETT
KELLEY
16
JOHNSON
17
MC CAMMACK
18
19
20
21 The foregoing Resolution is hereby approved this
22
23
24
25
26 Approved as to Form:
27
28
,2011, by the following vote to wit:
Navs
Abstain
Absent
Secretary
day of
,2011.
Patrick J. Morris, Chairperson
Community Development Commission
of the City of San Bernardino
By:
~~n:k~
3
P:\Agendas\Resolulions\ResolulionsI1011 \08.01-11 Joseph Bonadiman PSA Amendment No.1 CDC Reso,doc
10
11
12
1
EXHIBIT "A"
2
Amendment No.1 to the Agreement for Professional Services
Joseph E. Bonadiman and Associates, Inc.
3
4
5
6
7
8
9
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
4
P:\Agendas\Resolutions\Resolutions\2011\08-0l-11 Joseph Bonadiman PSA Amendment No_ I CDC Reso,doc
EXHIBIT "A"
SCOPE OF SERVICES
Joseoh E. Bonadiman and Associates. Inc.
I. Consultant agrees to perform the following Scope of Services:
This estimate is based on the following:
. Utilizing existing County base map data, aerial photos and random field work to prepare
improvement plans based on the needed improvements listed below.
ENGINEERING SERVICES:
TASK 01
TASK 02
TASK 03
TASK 04
PROJECT MEETINGS AND CONSULTATION
Attend meetings with client and/or agencies as required to review and coordinate project progress.
Coordinate project through planning.
PROJECT MANAGEMENT AND COORDINATION
Provide general project management and administration for this phase of project development.
Monitor, coordinate, and communicate project progress between Client, consultant and Agencies.
Coordinate project through planning.
RESEARCH AND INVESTIGATION
Conduct research and investigation of existing ad probable constraints and opportunities affecting
the project.
STREET IMPROVEMENT PLANS
Prepare street improvement plans based on the existing conditions. Plans will be horizontal18ine
drawings only, any vertical data will be shown in details. Show work needed based on the
preliminary scope below. Plans will also include traffic control plans, sign and striping. Plans
will be based on client input, City standards and site restrictions, in compliance with the
requirements and guidelines of the City.
PRELIMINARY SCOPE OF WORK (per site visit notes)
I. Hallmark Avenue: Overall Street was in good condition.
. Repair inlet at 4595 Hallmark
. Slurry Seal/Stripe the whole street or just specific areas.
. Street needs weed abatement. LMD not looking very well.
. Patches need to be sealed
2. University Avenue:
. Medians need some work
. Several areas are crazinglbreaking up.
. Roots from pine trees are lifting up the bike lane. Several areas.
. Intersection of University & College. Very bad.
. Intersection of Kendall & University. Look need, need repair. Grind/Overlay
. Dangerous condition at Flood Control Head wall. Need fencing and diversion fence.
. Several trees are dying. Need to be removed.
3. North Park: Overall ok. But entire street to receive Slurry Seal.
. Some Grind and Overlay.
P:\Aiendas\Alenda Attilchments\Exhibits\2011\08-01-11 Bonadlman bhlbit A.doCK
. University ParkINorth Park. Grind/Overlay
4. College: Entire street is a Grind/Overlay
. Some Curb and Gutter replacement. Sidewalk replacement
5. State Street: entire street is a Grind/Overlay
. Some curb replacement.
. Some Sidewalk replacement.
All streets. Assess if handicap Access needs to be included in scope of work.
TASK 09
BID ASSISTANCE
Provide personnel to assist with the bid phase of the project. Constructability review, pre-bid
services, Answer RFIs and pre-construction meeting.
CONSTRUCTION PHASE ASSISTANCE
Provide engineer to visit site and answer contractor questions during construction phase.
CONSTRUCTION STAKING
Provide survey crew to set nails at 100 foot stations along the centerlines of the streets. If there is
a median points will be set along the existing curbs.
GEOTECHNICAL
Hilltop Geotechnical will provide as-needed compaction testing during construction phase.
AERIAL SURVEY
TASK 05
TASK 06
TASK 07
TASK 08
EXIBIT "B"
SCHEDULE OF FEES
ENGINEERiNG SER VICES
Task 01 - project Meetings and Consultation
Task 02 - project Management & Coordination
Task 03 - Research and Investigation
Task 04 - Update Street Improvement Plans
Task 05 - Bid Assistance
Task 06 - Construction Phase Assistance
Task 07 - Construction Staking
Task 08 - Geotechnical
Task 09 - Aerial Survey
TOTAL:
$3,200.00
$3, I 00.00
$1,600.00
$29,100.00
$3,200.00
$2,200.00
$4,600.00
$14,200.00
$10,500.00
$71,700.00
p;\Ager.das\AeendaAttachments\Exhiblts\2011\Oa-ol-l1 BonadimilnExhib itA.doCll
AMENDMENT NO.1
TO THE
REDEVELOPMENT AGENCY OF THE CITY OF SAN BERNARDINO
AGREEMENT FOR PROFESSIONAL SERVICES
JOSEPH E. BONADIMAN AND ASSOCIATES, INC.
This Amendment No.1 ("Amendment No.1") to the Joseph E. Bonadiman and Associates, Inc.
Agreement ("Agreement") for Professional Services is made and entered into as of August 1, 2011, by
and between the Redevelopment Agency of the City of San Bernardino (the "Agency"), a public body,
corporate and politic, and Joseph E. Bonadiman and Associates, Inc., a California corporation (the
"Consultant").
WHEREAS, on July 11,2011, the Agency and the Consultant entered into an Agreement for
Professional Services Resolution No. CDC/2011-48 for design and engineering services for the North
Park Boulevard and University Parkway Street Improvements Project; and
WHEREAS, the Agency desires to amend said Agreement in the amount of $10,500 for the
preparation of an aerial survey as requested by the City's Field Engineering Section in accordance with
the terms and conditions of the Agreement.
NOW, THEREFORE, IN CONSIDERATION OF THE PROMISES AND MUTUAL
PROMISES CONTAINED HEREIN AND FOR SUCH OTHER GOOD AND VALUABLE
CONSIDERATION, THE RECEIPT AND SUFFICIENCY OF WHICH ARE HEREBY
ACKNOWLEDGED, THE PARTIES HERETO AGREE AS FOLLOWS:
1. Amend Section 3, "Scope of Consultant Services", to read as follows:
A. The Agency hereby retains the Consultant to provide the professional consulting
services set forth in the Scope of Services attached hereto as work set forth in the
Scope of Services including an aerial survey, in accordance with the terms of this
Amendment No. I to the Agreement. The Consultant shall perform the services as
set forth on said Scope of Services within the time periods to be identified by the
appropriate Agency representative.
2. Amend Section 4, "Payment by Agency for Work Performed by Consultant", to read as
follows:
A. The Agency shall compensate the Consultant in an aggregate amount not to exceed
Seventy-One Thousand Seven Hundred Dollars ($71,700) for completion of the
services described in the Scope of Consultant Services set forth in Exhibit "A".
Consultant compensation shall be paid pursuant to the hourly rates described in
Scope of Services, Exhibit "A".
All other terms and conditions of the Contract shall remain in effect.
-1-
P:\Agendas\Agenda Attachmerns\Agenda Anachments\AgrmlS..Amend 2011108-01-11 Bonadiman-Amendment No.] 10 Professional Services Contract,doc
IN WITNESS WHEREOF, the parties hereto have caused this Amendment No. I to this
Agreement to be executed as of the date indicated next to the authorized signatures of the officers of
each ofthem as appear below.
AGENCY
Dated:
Redevelopment Agency of the City of San
Bernardino, a public body, corporate and politic
By:
Emil A. Marzullo, Interim Executive Director
Approved as to Form:
By: c..~
Agency Co sel
CONSULTANT
Joseph E. Bonadiman and Associates, Inc., a California
corporation
Dated:
By:
Name:
Title:
Dated:
By:
Name:
Title:
-2-
P:\Agendas\Agenda Attachmcnts\Agenda Attachments\Agrmts-Amend 2011\08-01-11 Bonadiman-Amendrnem No.1 to Professional Services Contract doc