RESOLUTION NO. 2011-222
RESOLUTION OF THE MAYOR AND COMMON COUNCIL OF THE CITY
OF SAN BERNARDINO AUTHORIZING THE DIRECTOR OF FINANCE TO ISSUE
A CHANGE ORDER TO INCREASE PURCHASE ORDER NO. 303757 BY $223,662
TO $606,577 FOR ROADWAY ENGINEERING AND CONTRACTING INC. FOR
CONSTRUCTION OF THE VERDEMONT COMMUNITY CENTER AND
LANDSCAPING AT AL GUHIN PARK PER CAPITAL IMPROVEMENT PROGRAM
PROJECT PR04-28.
WHEREAS, Mayor and Common Council approved Resolution 2011-9 approving an
agreement for services with Roadway Engineering and Contracting Inc. for construction of the
Verdemont Community Center and landscaping at Al Guhin Park per Capital Improvement
Program project PR04-28 and;
WHEREAS, Roadway Engineering and Contracting Inc. will provide expanded
services to include street repair, sewer manhole installation, and an elevated amphitheater stage
to the City.
BE IT RESOLVED BY THE MAYOR AND COMMON COUNCIL OF THE
CITY OF SAN BERNARDINO AS FOLLOWS:
SECTION 1. The City Manager of the City of San Bernardino is hereby authorized to
accept on behalf of said City a change order request between the City of San Bernardino and
Roadway Engineering and Contracting Inc., a copy of which is attached hereto, marked as
Exhibit "A", and incorporated herein by this reference as fully as though set forth at length, as
an addendum to the existing agreement previously executed.
SECTION 2. That pursuant to this determination the Director of Finance or her
designee is hereby authorized to issue a change order to Purchase Order No. 303757 from
$382,915 to $606,577 for Roadway Engineering and Contracting Inc. for construction of the
Verdemont Community Center and landscaping at Al Guhin Park per Capital Improvement
Program project PR04-28.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
RESOLUTION NO. 2011-222
RESOLUTION OF THE MAYOR AND COMMON COUNCIL OF THE CITY
OF SAN BERNARDINO AUTHORIZING THE DIRECTOR OF FINANCE TO ISSUE
A CHANGE ORDER TO INCREASE PURCHASE ORDER NO. 303757 BY $223,662
TO $606,577 FOR ROADWAY ENGINEERING AND CONTRACTING INC. FOR
CONSTRUCTION OF THE VERDEMONT COMMUNITY CENTER AND
LANDSCAPING AT AL GUHIN PARK PER CAPITAL IMPROVEMENT PROGRAM
PROJECT PR04-28.
I HEREBY CERTIFY that the foregoing Resolution was duly adopted by the Mayor and
joint
Common Council of the City of San Bernardino at aregular meeting thereof, held on the 18th
day of July
,2011, by the following vote, to wit:
Council Members:
AYES
NAYS
ABSTAIN
ABSENT
MARQUEZ
x
VACANT
BRINKER
x
SHORETT
x
x
KELLEY
JOHNSON
x
x
McCAMMACK
a~/~.~
-
Rachel Clark, City Clerk
The foregoing resolution is hereby approved this,~,(, I- day of July ,2011.
~~
~ J. Morris, Mayor
City of San Bernardino
Approved as to Form:
.cd
2011-222
EXHIBIT A
ROADWAY ENGINEERING & CONTRACTING INC.
General Engineering Contractor
License #874044
June 15,2011
Evans Construction Management Services
P.O.Box 1330
Redlands, CA 92373
Attention: Chris Evans
Reference: Verdemont Community Center
San Bernardino, CA
Regarding: Change Order Request #002 - Sewer Manhole
Dear Mr. Evans,
As per your request, the prices for a new sewer manhole including the needed street
closure traffic control and asphalt street repair for the above referenced project is
$32.430.00.
If the above price is acceptable, please issue a contract change order for this amount.
Please call me at (951) 360-6834 if you have any questions.
Sincerely,
ROADWAY ENGINEERJNG
8861 A Jurupa Road . Riverside, California 92509 . (951) 360-6834 . FAX (95\) 360-7634
2011-222
EXHIBIT A
ABBCO PLUMBING
CHANGE ORDER
Page 1 of 1
Date: 6/15/2011 CO # 1 Job #
Contractor: Roadway Engineering Contact: Eric
Job Name: Site / Bldg
Regarding: Install Sewer Manhole and 6" SDR-26 Sewer Piping into Property,
Ref#
RFI #
CORN
excludes asphalt saN cut, removal& patchina and traffic control
Material labor E ui ment
Quani Descritoion Unit Cost Unit Rate Cost Unit Cost
40 6" SDR-26 Pipe $ 3.87 $ 154.80 $ $ -
1 Mise Materials $ 50.00 $ 50.00 $ $ - $ -
40 Apprentice Helper $ - 1 $ 58.00 $ 2,720.00 $ -
40 Journeyman Plumber $ - 1 $ 87.00 $ 3,480.00 $ -
$ - $ $
$ - $ $
$ $ $
$ $ $
$ $ $
$ $ $
$ $ $
$ $ $ -
$ $ - $
$ $ $ -
$ - $ $ -
$ $ $ -
$ $ - $
$ $ $
$ $ - $
$ $ $
$ - $ $ -
$ - $ $
$ - $ $
$ $ $
$ $ $
$ $ $
$ $ $
$ $ - $
$ $ - $
Subtotal Matenal
7.75% Tax
Total Material
$204.80
$ 15.87
$220.67
Labor
$ 6.200.00 Equip.
$
Sub Contractors Unit Rate Cost I
Man Hole Shoring Box Rental 7 $ 550.00 $ 3.850.00 I
Manhole Builders 1 $ 4.200.00 $ 4,200.00
Excavator Rental 1 $ 5,024.78 $ 5.02478
Truck & Transfer base , gravel 2 $ 437.00 $ 874.00
Spoils Haul Off 50 $ 10.00 $ 50000
$ -
$ -
Sub Contract Subtotal $ 1444878
Cost $ 6,420.67
Overhead & Profit 15% $ 963.10
0% $
Sub Contract 15% $ 2,167.32 $ 16.616.10
Subtotal $ 23,999.87
Bond $ $
Grand Total $ 23.999.87
1-
$%
-:: It C S 2,.00
)
\VCf<::,\_ ~~\
~ A~ (1<~ ~
_ At 1- z.. ::..:>
3 ~ 4-30 -=>
2011-222
EXHIBIT A
Details Report For: VERDEMONT COMMUNITY CENTER
Roadway Engineering
6/15/2011
ERIC ALVAREZ
Ph. Item Dncription
CO 5 SEWER MANHOLE
Activity TRAFFIC CONTROL
---- Rate:
DRY: 1.00 LS
Hour: 0.10 LS
Lobor
GENFO
LAB 1
GENERAL FOREMAN
LABORER GROUP 1
Equipment
TRPU PICKUP TRUCK
ABD ARROWBOARD
Other
TRCMA TRAFFIC CONTROL MA
Quantity VIM
1.00 LS
Unit eo:.,
Total Cor>t Mtll'gin%
$6.291.16 14.92
Un;' Pricet Total Price
7.230.00 ~
1.00 LS
$6.291.16
Crew TRAFFIC CONTROL
DaY,<i:
Labor 1.00
Equipment 1.00
Actual: 1.00
Quantity HOllrs
1.00 8.00 HR
1.00 8.00 HR
Quantity Hours
1.00 8.00 HR
2.00 1.00 HR
Activity Qty
Tota/Cost:
UnitCost:
2.217.61
2.217.610
Days Unit Cost
1.00 $93.00 $744.00
1.00 $57.70 $461.61
Total $1.205.61
Days Unit Cost
1.00 $14.00 $112.00
1.00 $200.00 $400.00
--..----
Total $512.00
Quantity Unit Cost
1.00 $500.00 $500.00
Total $500.00
Act Note:
Page1013
2011-222
EXHIBIT A
Details Report For: VERDEMONT COMMUNITY CENTER
Roadway Engineering
ERIC ALVAREZ
6/1512011
Ph. Item Description
CO 5 SEWER MANHOLE
Quantity VIM
1.00 LS
UnitCosl
$6,291.16
Total Cost Margin% Unit Price!
$6,291.16 14.92 7,230.00
Tota/Price
$7,230.00
29TN
Days:
Labor 0.50
Equipment 0.50
Activity Qty
Tota/Cost:
UnltCost:
1,200.00 SF
Activity AC PAVE STREET
~ Rate:----
Da)': 2,400.00 SF
Hour: 300.00 SF
Crew PAVING CREW SKIPLOAD
4,073.55
3.395
Actual: 0.50
Labor Quantity Hours Days Unit Cost
GENFO GENERAL FOREMAN 1.00 9.00 HR 0.50 $93.00 $418.50
LAB 1 LABORER GROUP 1 1.00 8.00 HR 0.50 $57.70 $230.80
LAR ASPHALT RAKER LABO 1.00 8.00 HR 0.50 $69.75 $279.00
-------...-----
The total contains overtime cost of . $23.25 Total $951,55
Equipment Quantity Hours Days Unit Cost
TRPU PICKUP TRUCK 1.00 8.00 HR 0.50 $14.00 $56.00
SKIP SKIPLOADER 1.00 8.00 HR 0.50 $110.00 $440.00
RLGBV ROLLER GRADE VIBRA 1.00 8.00 HR 0.50 $55.00 $220.00
Total $716.00
Material Quantity Unit Cost
AC ASPHALT CONCRETE 35.00 $60.00 $2,100.00
TAC SS 1-H EMULSION 1.00 $100.00 $100.00
ACENV ASPHALT ENVIRONME 3.00 $2.00 $5.00
Total $2,206.00
Other Quantity Unjl' Cost
EQM1 EQUIPMENT MOVE RA 1.00 $200.00 $200.00
Total $200.00
Act Note:
Item Note:
Page 2 of3
2011-222
EXHIBIT A
ROADWAY ENGINEERING & CONTRACTING INC.
General Engineering Contractor
License #874044
June 28, 2011
Evans Construction Management Services
P.O.Box 1330
Redlands, CA 92373
Attention: Chris Evans
Reference: Verdemont Community Center
San Bernardino, CA
Regarding: Change Order Request #003 - Amphitheater Elevated Stage
Dear Mr. Evans,
As per your request, the prices to construct an 18" tall amphitheater stage, as discussed in
the field, on the above referenced project is $40,280.00. Please note that this is just the
additional price to build 174LF of 2' masonry wall, import soil & backfill the stage area
18", construct 2EA sets of stairs and 2EA ramps both with handrails. The stage flatwork
would still be charged out as per the contract unit prices.
If the above price is acceptable, please issue a contract change order for this amount.
Please call me at (951) 360-6834 if you have any questions.
Sincerely,
ROADWAY ENGINEERING
8861A Jurupa Road . Riverside. California 92509 . (951) 360-6834 . FAX (951) 360-7634
2011-222
EXHIBIT A
Details Report For: VERDEMONT COMMUNITY CENTER
Roadway Engineering
6/28/2011
ERIC ALVAREZ
Ph. Item Description
CO 6 ELEVATED STAGE
Quantity VIM
1.00 LS
UnilCost
$35,030.43
Total Cost Margin% Unit Pricet
Total Price
$35.030.43 14.98
40,280.00 $40,280.00
Activity 24" BLOCK WALL
Rate:
DRY: 118.00 LF
Hour: 14.50 LF
Labor
GENFO
MAS
LAB 1
GENERAL FOREMAN
CEMENT MASON
LABORER GROUP 1
Equipment
TRPU PICKUP TRUCK
Material
BLOCK CONCRETE BLOCKS
CEMEN MORTAR
REBAR REBAR
GROUT GROUT
Crew BLOCK WALL
Days:
Labor 150
Equipment 1.50
Actual: 150
Quanlity Hours
1.00 8.00 HR
1.00 8.00 HR
1.00 800 HR
Quantity Hours
1.00 8.00 HR
174.00 LF
Activity Qty
Tota/Cost:
UnitCost:
5,451.59
31.331
Days Unit Cost
1.50 $93.00 $1,116.00
1.50 $66.27 $795.18
1.50 $57.70 $692.41
"...-.-
Total $2,603.59
Days Unit Cost
1.50 $14.00 $168.00
~.._-.----
Total $168.00
Quantity Unit Cost
400.00 $4.00 $1,600.00
20.00 $8.00 $160.00
1.00 $350.00 $350.00
6.00 $95.00 $570.00
Total $2,680.00
Act Note:
Page 1 015
2011-222
EXHIBIT A
Details Report For: VERDEMONT COMMUNITY CENTER
Roadway Engineering
6/2812011
ERIC ALVAREZ
Ph. Item Description
CO 6 ELEVATED STAGE
Quantity VIM
1.00 LS
Unit Cost
$35,030.43
Total Cnst Margin% Unit Pricet Total Price
$35,030.43 14.98 40,280.00 $40,280.00
Activity DIG/POUR FOOTING
Rate:
0.70 LS
0.10 LS
Day:
Hour:
Labor
GENFO
LAB 1
GENERAL FOREMAN
LABORER GROUP 1
Crew EXCAVATION WITH BACK
Days:
Labor 1.50
Equipment 1.50
ActUlII: 1.50
Quantity Hour.; Days
1.00 9.00 HR 1.50
2.00 8.00 HR 1.50
The total contains overtime cost of. $69.75
Equipment
TRPU PICKUP TRUCK
BKHOE BACKHOE
Material
REBAR
CON6S
Other
EQM1
REBAR
CONCRETE 6 SACK
EQUIPMENT MOVE RA
Quantity
1.00
1.00
Hours
8.00 HR
8.00 HR
Oays
1.50
1.00
1.00 LS
Activity Qty
Tota/Cost:
UnitCost:
5,878.07
5,878.070
Unit Cost
$93.00 $1,255.50
$57.70 $1,384.82
Total $2,710.07
Unit Cost
$14.00 $168.00
$125.00 $1,000.00
_._-~--
Total $1,168.00
Quantity Unit Cost
1.00 $400.00 $400.00
20.00 $70.00 $1,400.00
------------
Total $1,800.00
Quantity Unit Cost
1.00 $200.00 $200.00
Total $200.00
Act Note:
Page 2 of 5
2011-222
EXHIBIT A
Details Report For: VERDEMONT COMMUNITY CENTER
Roadway Engineering
ERIC ALVAREZ
612812011
Ph. Item Description
CO 6 ELEVATED STAGE
Quantity VIM
1.00 LS
Uni,Cost
$35,030.43
100.00 CY
Total Cost Margin% Unit Pricet Total Price
$35,030.43 14.98 40,280.00 $40,280.00
Crew GRADING SKIPLOADER CR Activity Qty
Activity BACKFILl/GRADE WALL FOR PC
Rate:
66.70 CV
8.30 CY
Labor
Equipment
Da)':
Hour:
Actual: 1.50
Labor
GENFO
LAB 1
Quantity
1.00
2.00
9.00 HR
8.00 HR
Hours
GENERAL FOREMAN
LABORER GROUP 1
The total contains overtime cost of: $69.75
Equipment Quantity Hours
TRPU PICKUP TRUCK 1.00 8.00 HR
SKIP SKIPLOADER 1.00 8.00 HR
TRW20 WATER TRUCK 2000 B 1.00 8.00 HR
RLGBV ROLLER GRADE VI BRA 1.00 8.00 HR
Trucks
SEMI SEMI DUMP TRUCK
Other
EQM 1 EQUIPMENT MOVE RA
Days:
1.50
1.50
Days
1.50
1.50
Days
1.50
1.50
1.50
1.50
TotalCost:
UnitCost:
8,878.07
88.781
Unit Cost
$93.00 $1,255.50
$57.70 $1,384.82
---
Total $2,710.07
Unit Cost
$14.00 $168.00
$110.00 $1,320.00
$35.00 $420.00
$55.00 $660.00
Total $2,568.00
Quantity llnitCost
40.00 $85.00 $3,400.00
Total $3,400.00
Quantity Unit Cost
1.00 $200.00 $200.00
Total $200.00
Act Note:
Page 30t5
2011-222
EXHIBIT A
Details Report For: VERDEMONT COMMUNITY CENTER
Roadway Engineering
ERIC ALVAREZ
6/2812011
Ph. Item Description
CO 6 ELEVATED STAGE
Quantity VIM
1.00 LS
Unit Cost
$35,030.43
Total Cost Margin% Unit Pried Total Price
$35,030.43 14.98 40,280.00 540,280.00
Activity FORM/POUR PCC WITH STAIRS
Crew TEN (10) MEN CONCRETE
Activity Qty
Tota/Cost:
Un/tCost:
1.00 LS
Rate: Days:
Da)': 1.00 LS Labor 1.00
Hour: 0.10 LS Equipment 1.00
Actual: 1.00
8,322.70
8,322.700
Labor Quantity Hours Days Unit Cost
MAS' CEMENT MASON 6.00 8.00 HR 1.00 566.27 53,180.72
TEAMS TEAMSTER III 1.00 12.00 HR 1.00 564.12 5769.44
4MPCC FOREMAN CONCRETE 1.00 8.00 HR 1.00 $66.59 5532.72
LABPC LABOR CONCRETE W 3.00 8.00 HR 1.00 $57.70 51,384.82
The total contains overtime cost of : 59300 Total $5,950.70
Equipment Quantity Hours Days UnitCosl
TRPU PICKUP TRUCK 1.00 8.00 HR 1.00 514.00 5112.00
TRFOR FORM TRUCK 1.00 8.00 HR 1.00 $40.00 $320.00
PCCPM CONCRETE PUMP 1.00 8.00 HR 1.00 5150.00 51,200.00
Total 51,532.00
Material Quantity Unit Cost
CON5.5 CONCRETE 5.5 SACK 10.00 570.00 5700.00
CONLO CONCRETE LOAD ENVI 1.00 530.00 530.00
Total 5730.00
Act Note:
Activity HANDRAILS
Rafe:
Oa)': 1.00 LS
Hour: 0.10 LS
Crew MISCELLANEOUS
Days:
Labm 1.00
Equipment 1.00
Artual: 1.00
Activity Qty
TotalCost:
Un/tCost:
1.00 LS
5,500.00
6,500.000
Other
PLUG PLUG DETAILS
Quantity Unit Cost
100.00 555.00
$5,500.00
Total $5,500.00
Ad Nole:
Item Nute:
Page 4 of 5
2011-222
EXHIBIT A
ROADWAY ENGINEERING & CONTRACTING INC.
General Engineering Contractor
License #874044
July 2,2011
Evans Construction Management Services
P.O.Box 1330
Redlands, CA 92373
Attention: Chris Evans
Reference: Verdemont Community Center
San Bernardino, CA
Regarding: Change Order Request #004 - Scrub Seal & 0.10' Overlay W. Little
League Drive
Dear Mr. Evans,
As per your request, the prices to install a scrub seal and overlay W. Little League Drive
from Palm to Little League, on the above referenced project, is as follows:
I) Traffic Control for Full Street Closure
2) Scrub Seal per specifications =
3) 0.10' Hot Mix Asphalt Overlay
$2,500.00
$60,000.00
$88,452.00
If the above price is acceptable, please issue a contract change order for this amount.
Please call me at (951) 360-6834 if you have any questions.
Sincerely,
ROADWAY ENGINEERlNG
8861A Jumpa Road . Riverside, California 92509 . (951) 360-6834 . FAX (951) 360-7634
07/01/2011 08:35
7148263129
2011-222
PAVEMENT COATINGS CO
EXHIBIT A
Proposal and Contract
PAVEMENT COATINGS CO"
PAGE 01/02
AIf/III4
Pavement
Coatings Co.
t:J1IIII'"
TIle Road 10 smart SoIulJons
An EmPloYee Own", ComPM'Y
CA Llcenslfl:JO~ - Type A anli Type en
10240 San 5e\taine W.y. Mira lorna, CA 91752
Phone: (714) 826-3011 FAX: (714) 826-3129
Van Duncan Emall: van@pavementcoating..com
To: Eric Alvarez Quote No: 1055801
Roadway Engineering & Conh'8cting Inc. Pax No: 951-360-7634
10247 Bellgmv. Ave. Ste 122.. Phone: 951-380-6834
Mira Loma, CA 91752 Bid Dog,: 613012011
We propose to furnish you with labor and material per your representation of job requirements as follows:
Wl!S1 LillJe Leafl/le Rd
From:
$o.ft Bun"l'fljno
Item No.
SeIlodulo 1
,
088cription
Quantity UIM
Unitprice
Total Price
MediUM Fine Scrub Seal
135.000 SF
0.423
57,105.00
I Totalll'roposal Price:
GetJeral Conditions
1 pavemsnt Coatings Co is Signatory to the Master Labor Agreement
2 Prk:e basl!ld on one move-in only
3 Slurry Seal application in one (1) working day ONLY
4 p~oo good t~ru 9t:l012011
$57,10S.00 I
t
<;"~
{" K,0'lt/)'
Job Inclusions
1 Mobilil.ltion
2 Traffic control
3 Protection ofwatervliINes .and milnhole covers
4 Application of Scrub Seal
5 Clean-up of cur portion of wOT1<
6 Clelf1ing wiUl.weeper. Scrub Seal portion only
7 Includes one (1) post sweeping of chip Haled streets one: day after i1ppfication
Job Exclusions
1 Asphalt repair. weed spray. crack sealing, hesvy cleaning. rlJfT10val Of replacemen1 of stripil'l9, merkinse 01 markers. raes,
perm Ita 01 inspection.
2 Post_ping
3 Sepe"'te move-il'l fol celibration or te$trl'lg
4 Rmnoval of temporary tabs
5 Ctrtifled TratIIe Control Plan.
6 POSTING OF NO PARKING SIGNS OR ADVANCED NOTIFICATION
ChiD Seal
1 Application of Asphalt Retuvenlll:ing EmulsiQn ( Scrub Seal)
2 Appllc3tton of 5116" Screening:!!
3 Includes onl day of post &WHpl"9
Date:
(CoRlinued on ne.t page)
Accepted by:
Page 1 of2
From: Van Duncan
TERMS & INSURANCE
Te"",' Net 30 days. Insurance inclu_1n proposal: S 1.000,000 per ."""",nee I $ 2,000,000 aggregate: $ 2.000.000 products ond
opMBlions 89Qrsgata; $1,000,000 personal & ad\,'lllrtlsemem: Injury: $ 50,000 f1ra d;maglt (anyone fire)