Loading...
HomeMy WebLinkAbout11-Public Works F--e No. 13.63 CITY OF SAN BERNARDfltO - REQUE~T FOR COUNCIL ACT~\JN From: ROGER G. HARDGRAVE R!'~~~H]~ion of $20.000 from Traffic '~yste~S Fee Fund --Constructing 1988 SEP 22 tWJ lt~~tb Retu rn a t Sou thea s t Corner of ~ar~rman Avenue and Gilbert Street ~ Dept: Publ i c Works/ Eng i neer i ng Date: 9-20-88 Synopsis of Previous Council action: 05-18-88 -- Resolution No. 88-140 adopted establishing the amount of the Traffic Systems Fee. Recommended motion: 1. That the estimated revenue of $20.000 in Account No. 242-000-41803 be approved. 2. That the budget appropriation of $20.000. for construct- ing a new curb return at the southeast corner of Waterman Avenue and Gilbert Street. be approved. cc: Jim Robbins Andy Green Jim Richardson Contact person: R 0 g p r G. H a r d g r a v P. Supporting data attached: S t a f f R e p 0 r t & Map Ward: 5025 2 Phone: FUNDING REQUIREMENTS: Amount: $20.000 Source: (Acct. No.) 242-000-41803 (Acct. DescriPtion) Traffic Systems Fee Finance: /24UtutJ lLfJ-I # Council Notes: 75-0262 Agenda Item No. 1/ . N/W ~blll. j_ ~ . '. ,.~ r _ _. _ ., _ _ _ ~"-hoC.:>-." _ ~ _,_ 'i ==! _ 1:-:;:' _ _ -.= ==== =-..: -=--==: === ======z====T- -1 w'---- - - --- - v... Atl t;"1 I ~-" I I II I E.I". 4-': 1\ I EIIII. dJ.e I I II I I W A TERMAN 1" AVENUE PAINTED' ~ I I ~ ' I I 1 Ilj 1~1 \I,t' II .J~\1 ...~~ ___n_ -- ------- -_ -'-7:Ji, -~:=_-_-:.==_-_=-:.===. ">""'V~_ - ----:J.: ,~ r;:--.r<P"t- . 1'1( , I~ J: I L_J IJ L.\J:/_ I I r-~:r :--1, I I 11 II L_Jlllj -- ~I I II II. II----.Jr -r I r--n I'l! II ~L. -' I ~ _ J 'I IIII II I I~ I: I I I II J I ~ II It: I r -1 I;u- l: If!; I 1 I L-1 II ~ II I~"': 'I III. ~ ~ II ..J 01 I Clf II c:; I 3~' I R/W R/W EIIII. r". I() e.".".,. EXISTING _ _ ~UR~ ~G~T~E~ ------ - EIIII. S.'.'N SCALE: '-.20' NOTES: tj'\ RELOCATE EXIST. T.S. POLE \V AS SHOWN. @ INSTALL NEW .~ PULL BOX '3' INSTALL NEW PEDESTRIAN PUSH \:fV BUTTON POST @ INSTALL NEW TYPE I-A T.S. POLE @ NEW CURB RETURN @ INSTALL NEW HANDICAP RAMP II Ir-'f r-( I II L.JJ I ~-J II l . TRAFFIC SIGNAL RELOCATION PLAN CIT.. OF SAN. BERNARDI~D - REQUE~ I FOR COUNCIL AC1..~N STAFF REPORT Councilman Reilly requested that we investigate the damage to the curb return, at the southeast corner of Waterman Avenue and Gilbert Street, due to busses running over it while making turns. We found that the existing curb return was constructed on a radius of 15 feet, and showed considerable evidence of wheel tracks of busses and large trucks running over the curb. The painted centerline on Gilbert Street ~as been shifted about 5 feet to the south, in order to accommodate three westbound traffic lanes. This was done while the welfare office was located adjacent to the County Hospital, and the traffic volume was con- siderably higher than at present. Omnitrans' new 40-foot busses may be unable to turn within the area provided for eastbound traffic~ even with the larger curb return. Therefore, it may prove to be necessary for the painted centerline to be shifted back to the original centerline, and the number of eastbound lanes to be re- duced from three to two. Constructing a new curb return, on a radius of 25 feet, will reduce the potential for an accident, due to turning busses being rear-ended, or them side-swiping a car in the southerly lane of Gilbert Street. Also, provisions will be provided for handi- capped access by constructing a standard ramp. The total estimated cost is $20,000. It is proposed that $20,000 of the revenue collected for the Traffic System Fee be budgeted to finance the cost of this project. Construction df a 25-foot curb return will necessitate relocating one traffic signal pole and installing an additional one. COMMENT: The Traffic Engineer has been in touch with Omni Trans on the proposed improvement and they concur with the proposed action. 9-20-88 75-0264