Loading...
HomeMy WebLinkAbout10-Community Development ul CITY OF SAN BERNARDINO REQUEST FOR COUNCIL ACTION From: M. Margo Wheeler Subject: Resolution authorizing execution of the National Pollutant Discharge Elimination Dept: Community Development System Stormwater Permit Implementation Agreement, Santa Ana Region. Date: February 3, 2011 MCC Date: February 22, 2011 Synopsis of Previous Council Action: 02/17/92 Reso. No. 92-59 Adopted authorizing execution of a National Pollutant Discharge Elimination System (NPDES) Storm Water Permit Implementation Agreement. Recommended Motion: Adopt Resolution. M. Margo Wheeler Contact Person: M. Margo Wheeler, Director Phone: 5357 Supporting data attached: Staff Report; & Guidelines Ward(s): Citywide FUNDING REQUIREMENTS: Amount: $302,844.38 Source: General Fund, substantially reimbursed for FY 2011-12 through fees. Acct. Description: Finance: Council Notes: /1ST ��� Agenda Item No. IO 04�'2q"a -�0 rl CITY OF SAN BERNARDINO REQUEST FOR COUNCIL ACTION STAFF REPORT Subiect: Resolution authorizing execution of the National Pollutant Discharge Elimination System Stormwater Permit Implementation Agreement, Santa Ana Region. Background: In 1987, Congress amended the Clean Water Act to require the permitting of Stormwater discharges from municipal storm drain systems under the National Pollutant Discharge Elimination System (NPDES) Program. The Environmental Protection agency (EPA) promulgated regulations in November 1990, to enact the new law. In the regulations, EPA listed the County of San Bernardino as a county that must obtain an NPDES permit. The EPA has designated the State Water Resources Control Board (SWRCB) to administer the EPA regulations and the Clean Water Act in California. SWRCB, in turn, has designated the nine different Regional Water quality Control Boards within the state to enforce these regulations. The Santa Ana Regional Water Quality Control Board (Regional Board) enforces the regulations by issuing NPDES Municipal Stormwater Permits (Permits) to the municipalities under its jurisdiction. The Regional Board has required the unincorporated areas of San Bernardino County, the sixteen incorporated cities of the county within the Santa Ana River watershed, and the San Bernardino County Flood Control District(District), as Co-permittees, to be included in the San Bernardino County NPDES Permit. Analysis: The proposed Agreement establishes the responsibilities of each party with respect to compliance with National Pollutant Discharge Elimination System Stormwater regulations administered by the Regional Board, by the authority granted in the Federal Clean Water Act and its 1987 amendments and the Water Quality Act. The City's cost share is 12.13 percent, which is actually less than years past, and will continue to go down based on the new calculations in Appendix "A"of the Implementation Agreement. The Annual budget is required to separate program costs into four program areas: (1) Monitoring, which includes any water quality and hydrographic monitoring and laboratory analyses. (2) Public Education, which includes all public outreach programs. (3) Program Management and Regulatory Activities, which includes administrative, reporting, and regulatory activities. (4) Training, which addresses any training conducted to implement the Stormwater Management Program. 2 Other cities have requested their Council and/or City Manager to approve the Implementation Agreement. Execution of the Agreement will allow the City to continue as a Co-permittee under the MS4 permit and to continue sharing the costs of the program with the other 16 Co- permittees. For FY 2010-11 $250,000 was estimated for revenue for this program and based upon incoming revenue of$151,915 as of February 15, 2011 year end estimate is $231,239.00. Financial Impact: The financial impact to the City is $302,844.38 paid to the County and the State to continue as a Co-permittee under the San Bernardino County Stormwater Program as required by the State for FY 2011-12. Adequate revenue will be budgeted to pay for this program. Recommended Motion: That the Mayor and Common Council approve the attached Resolution authorizing execution of the National Pollutant Discharge Elimination System Stormwater Permit Implementation Agreement, Santa Ana Region. 3 Son Bomordino County STORMWATER PROGRAM SAN - BERNARDINO COUNTY STORMWATER PROGRAM A Consortium of Local Agencies GUIDELINES for NEW DEVELOPMENT & REDEVELOPMENT JUNE 2000 TABLE OF CONTENTS 1.0 INTRODUCTION • 1 2.0 BACKGROUND 1 • DEFINITIONS • 2 3.0 DEVELOPMENT PLANNING 3 GENERAL CONDITIONS 4 SPECIAL CONDITIONS 5 4.0. CONSTRUCTION REGULATORY REQUIREMENTS 6 5.0 BMP SELECTION 7 5.1 NON-STRUCTURAL BMPs 8 5.2 ROUTINE STRUCTURAL BMPs 10 6.0 EDUCATIONAL PROGRAM FOR DEVELOPERSAND CONTRACTORS 12 TABLES Table 1 Non-Structural BMPs 13 Table 2 Structural BMPs 14 ATTACHMENTS Attachment A Water Quality Management Plan Outline Attachment B Best Management Practices Guide Retail Gasoline Outlets i NEW DEVELOPMENT/REDEVELOPMENT GUIDELINES 1.0 INTRODUCTION The New Development/Redevelopment Guidelines(Guidelines) is to be used by the permittees of the San Bernardino County Stormwater Program as a supplement to the Drainage Area Management Program(DAMP)and the Report of Waste Discharge(ROWD). It was developed by the New Development/Redevelopment Sub-committee, and approved by the NPDES General Committee.' The NPDES Municipal Stormwater Permit and Section 4 of the Report of Waste Discharge, dated April 1995, require the development and adoption of this document. The objective in preparing these guidelines was to identify pollutant prevention and treatment measures that could be incorporated into development projects. This supplement recommends which Best Management Practices (BMPs) should be required as standard practice. For projects with'unique water quality issues, additional applicable solutions may be required on a case by case basis. The ROWD does not specify a minimum development size to be considered for BMP applications, nor does it specify which land uses should receive the most attention. In general, BMPs are required on a wide variety of land uses, both residential and non-residential. BMPs should also be required on accessory uses of concern (such as outdoor material/equipment storage, vehicle/equipment fueling and service) and certain low intensity,.but potentially high polluting uses (such as golf courses and plant nurseries). For purposes of these guidelines, redevelopment will be considered as new development. 2.0 BACKGROUND In 1987, Congress amended the Clean Water Act to require the permitting of stormwater discharges from municipal storm drain systems under the National Pollutant Discharge Elimination System (NPDES) Program. The Environmental Protection Agency (EPA)promulgated regulations in November 1990, to enact the new law. In the regulations, EPA listed the County of San Bernardino as a county that must obtain an NPDES permit. The EPA has designated the State Water Resources Control Board (SWRCB) to administer the EPA regulations and the Clean Water Act in California. SWRCB, in turn, has designated the nine different Regional Water Quality Control Boards within the state to enforce these regulations. The Santa Ana Regional Water Quality Control Board (Regional Board) enforces the regulations by issuing NPDES Municipal Stormwater Permit(Permit) to the municipalities within its jurisdiction. The Regional Board has required the unincorporated areas of San Bernardino County, the sixteen incorporated cities of the county within the Santa Ana River watershed, and the San Bernardino County Flood Control District (District), as permittees,to be included in the Permit. The Permit requires the permittees to reduce, to the maximum extent practicable, the discharge of pollutants to the waters of the United States by the implementation of BMPs. The members of 1 the NPDES General Committee recognized the sensitive issue of imposing development and construction BMPs on the building industry. They, therefore, formed the New Development/Redevelopment Sub-Committee. This sub-committee, which included representatives from some of the member permittees, developed this document with particular insight from and cooperation of the Building Industry Association, the development industry, the California Restaurant Association, and the Western States Petroleum Association. The BMPs proposed herein would meet the permit requirements while not imposing undue burden on those that are to implement the actions called for. DEFINITIONS Automotive Repair Shop: a facility that is categorized in any one of the following Standard Industrial Classification(SIC)codes -5013, 5014, 5541, 7532-7534, or 7536-7539. Best Management Practice (BMP): any program,technology,process, siting criteria, operational methods or measures,or engineered systems; which when implemented, prevent, control, remove, or reduce pollution. Commercial Development: any development on private land that is not heavy industrial or residential. The category includes; but is not limited to, hospitals, laboratories and other medical facilities, educational institutions, recreational facilities, plant nurseries, multi-apartment buildings, car wash facilities, mini-malls and other business complexes, shopping malls, hotels, office buildings, public warehouses and other light industrial complexes. Impervious Area: the area covered by a building, impermeable pavement, and/or other impervious surfaces, which drains directly into the storm drain without first flowing across permeable land area (e.g. lawns). Discretionary Project: a project which requires the exercise of judgement or deliberation when the public agency or public body decides to approve or disapprove a particular activity, as distinguished from situations where the public agency or body merely has to determine whether there has been conformity with applicable statutes, ordinances, or regulations. Infiltration: the downward entry of water into the surface of the soil. Maximum Extent Practicable: maximum extent possible,taking into account equitable considerations of synergistic, additive, and competing factors; including, but not limited to, gravity of the problem, fiscal feasibility, public health risks, societal concerns, and social benefits. New Development: land disturbing activities; structural development, including construction or installation of a building or structure, creation of impervious surfaces; and land subdivision. - Parking Lot: land area or facility for the temporary parking or storage of motor vehicles used personally, for business or for commerce with a lot size of 5,000 square feet or more, or with 25 or more parking spaces. 2 Redevelopment: on an already developed site, the creation or addition of at least 5,000 square feet of impervious surfaces or the creation or addition of fifty percent or more of impervious surfaces or the making of improvements to fifty percent or more of the existing structure. Redevelopment includes, but is not limited to: the expansion of a building footprint or addition or replacement of a structure; structural development including an increase in gross floor area and/or exterior construction or remodeling;replacement of impervious surface that is not part of a routine maintenance activity; and land disturbing activities related with structural or impervious surfaces. _ Restaurant: a stand-alone facility that sells prepared.foods and dririks for consumption, including stationary lunch counters and refreshment stands selling prepared foods and drinks for immediate consumption. (SIC code 5812). Retail Gasoline Outlet: any facility engaged in selling gasoline and lubricating oils. Source Control BMP: any schedules of activities,prohibitions of practices, maintenance procedures, managerial practices or operational practices that aim to prevent storm water pollution by reducing the potential for contamination at the source of pollution. Storm Event: a rainfall event that produces more than 0.1 inch of precipitation and that, which is separated from the previous storm event by at least 72 hours of dry weather. Structural BMP: any structural facility designed and constructed to mitigate the adverse impacts of storm water and urban runoff pollution(e.g. canopy, structural enclosure). The category may include both Treatment Control BMPs and Source Control BMPs. Treatment: the application of engineered systems that use physical, chemical, or biological processes to remove pollutants. Such processes include, but are not limited to, filtration, gravity settling, media adsorption, biodegradation, biological uptake, chemical oxidation and UV radiation. Treatment Control BMP: any engineered system designed to remove pollutants by simple gravity settling of particulate pollutants, filtration, biological uptake, media adsorption or any other physical, biological, or chemical process. -3.0 DEVELOPMENT PLANNING The NPDES Municipal Stormwater Permit compliance requires that storm water quality management be considered during a project's planning phase, implemented during construction, and ultimately maintained for the life of the project. In addition, the program must be adopted and uniformly implemented by all municipalities. Applying this concept to new development,it is intended that each new development will incorporate the approved program of BMPs to minimize the amount of potential pollutants entering the drainage system. 3 Standard Conditions of Approval were developed to be implemented area-wide to address Iand use areas of concern. The requirement for a pre-through post-construction stormwater quality management plan will be specified in each permittee's standard conditions of approval. These conditions will require project proponents to submit, for approval by the agency, a proposal identifying the BMPs that will be incorporated into the project to control non-point source pollutants during and after construction. Each municipality will require BMPs for specified new development through similar processes. The typical process is outlined as follows: 1. The present municipal procedure for approval of grading, building, and similar permits will be modified to include incorporation of the BMPs listed in Tables 1 and 2, as applicable. 2. Municipalities will make these Guidelines, detailing implementation of BMPs, available to applicants through the permitting process. Applicants will be informed at the earliest possible point of processing of these requirements. 3. Applicants will be required to subrait a Water Quality Management Plan (WQMP) (see Attachment A) at appropriate discretionary and ministerial permit issuance levels. The WQMP shall include a description of the project and an outline of which BMPs apply to the project pursuant to these guidelines. A sample WQMP outline is provided in Attachment A. The WQMP shall also include a location map and a project map identifying storm runoff conveyance facilities and receiving waters that will be impacted by the project. 4. As increasing details concerning the nature of specific uses within the project become available, the WQMP shall be refined during the life of the project to build out. 5. Upon review of the WQMP, each municipality will require project incorporation of the identified routine structural and non-structural BMPs. GENERAL CONDITIONS to be applied by municipalities: 1. For discretionary actions that include a precise plan of development: Prior to issuance of building permits, permit applicant shall submit, if one is required by conditions of approval, to the County/City Official(s) for approval, a water quality management plan (WQMP) specifically identifying Best Management Practices (BMPs) that will be used on site to reduce the pollutants into the storm drain system to the maximum extent practicable. This WQMP shall identify the structural and non-structural measure specified in these Guidelines, detailing implementation of BMPs whenever they are applicable to the project (when the project has a vehicle wash rack, for example); assign long-term 4 maintenance responsibilities(specifying the developer, parcel owner, lessee, maintenance association, local agency, etc.); and reference the location(s)of structural BMPs. 2. For Subdivision of Land: Prior to recordation,the applicant shall submit a WQMP for review and approval by the agency. The WQMP shall be prepared in accordance with the agency standards. 3: For projects that require coverage under the NPDES General Construction Activities Storm Water Permit (NPDES General Construction Permit): Prior to issuance of grading, surface mining, or paving permits, applicant shall submit to the permitting agency, a copy of the Waste Dischargers Identification Number(WDID) for coverage under the NPDES General Construction Permit. All three conditions also functionally apply to public projects where the local jurisdiction technically chooses not to issue formal permits to itself or hired-contractors, but nonetheless undertakes the work. SPECIAL CONDITIONS When a building is being proposed for which no anticipated use is designated or when an unanticipated element of land use or occupancy is proposed after a basic building has already been completed, use of language similar to the following conditions is recommended for inclusion in the conditions which must be satisfied prior to issuance of the appropriate permit` • Prior to issuance of certificates of use and occupancy or building permits for individual tenant improvements or construction permits for a tank or pipeline, uses shall be identified and, for specified uses (where the proposed improvements will store, generate, or handle hazardous materials in quantities that will require permitting and inspection, once operational), the applicant shall propose plans and measures for chemical management (including, but not limited to, storage, emergency response employee training, spill contingencies and disposal)to the satisfaction of the County/City Building Official(s). • Chemical management plans shall be approved by the County/City and other appropriate agencies such as County/City Fire Department, the Health Care Service's Public Health Department, and sewering and/or water agencies to ensure implementation of each agency's respective requirements. Further, a copy of the approved "Chemical Management Plans"by the appropriate agencies shall be furnished to the County/City Building Department, prior to the issuance of any certificates of use and occupancy. 5 ON • Certificates or permits may be ministerially withheld if features needed to properly manage chemicals cannot be incorporated into a previously completed building, center, or complex. A list of specified uses and occupancies of concern should be developed by each jurisdiction according to its needs. 4.0 CONSTRUCTION REGULATORY REQUIREMENTS Section 4, §4.1 of the ROWD states --"Each permittee must have a plan for managing stormwater runoff from new construction and redevelopment. The plan must cover construction covered by the NPDES General Construction Permit as well as construction under five acres. The plan must emphasize pollution prevention, especially erosion prevention.". Construction activities disturbing five acres or more of land will be required to comply with the NPDES General Construction Storm Water Permit from the State Water Resources Control Board. The following, therefore, applies only to construction operations disturbing land areas of less than five acres. Permittees shall ensure that the following requirements are defined on permit plan cover sheets as either general or special notes. • All grading projects, regardless of size, will require an erosion control plan to prevent sediment from entering storm drains or water bodies. • Constriction sites shall be maintained by implementation of BMPs in such a manner that pollutants are not discharged from the site to the maximum extent practicable. • The following discharges into the storm drain system are prohibited: discharges that could have an impact on human health or the environment, cause or threaten to cause pollution, contamination, or nuisance; discharges that exceed any applicable waver quality standard contained in a Statewide Water Quality Control Plan or local Basin Plan; and discharges containing hazardous substance equal to or in excess of a reportable quantity listed in Federal Regulations 40 CFR Parts 117 and 302. • Materials that can cause or contribute to pollution or a violation of any applicable water quality standard include, but are not limited to, sediments, solid or liquid chemicals spills; wastes from paints, stains, sealants, glues, limes, pesticides or herbicides, wood preservatives or solvents; asbestos fibers,paint flakes or stucco fragments; fuels,oils, lubricants, or hydraulic, radiator and battery fluids; fertilizers; vehicle/equipment wash water or concrete wash water; concrete, detergent or floatable wastes; wastes from any engine/equipment steam cleaning or chemical degreasing; and chlorinated potable water line flushings. 6 • Unless exempted or authorized by an NPDES permit, all non-stormwater discharges require prior approval by the local storm water agency or the State Water Resources Control Board. • During construction,temporary storage of such materials;identified above, must occur in a designated area, physically separated from potential storm water run off, with ultimate disposal in accordance with local,state, and federal requirements. • Dewatering of contaminated groundwater, or discharging contaminated soils via surface erosion is prohibited. 5.0 BMP SELECTION The ROWD requires identification and implementation of BMPs for new development via regulatory and enforcement activities. Tables 1 and 2 list particular routine structural and non- structural BMPs that will be evaluated for application and intensity for the activities listed therein. Thus, some of the BMPs listed herein will become conditions of approval for new development and construction. The measures identified in Tables 1 and 2 are to be deemed "standard practice" to be required on new developments, as specified. Two general terms used in these guidelines are defined by example as follows: Structural Controls: First flush diversion, detention/retention basins, infiltration trenches or basins, porous pavements, grass swales, swirl concentrators, and engineering and design modification of existing structures. Non-structural Controls: Programs to educate the public on proper storage and disposal of hazardous or toxic wastes, regulatory approaches, street sweeping, and facility maintenance, and detection and elimination of illicit connections and illegal dumping. Each new development will be required to implement appropriate non-structural BMPs in keeping with the size and type of development to minimize the introduction of pollutants into the drainage system. Each new development will also be required to implement appropriate"routine"structural BMPs in keeping with the size and type of development. "Routine"structural BMPs are economical,. practicable, small scale-measures that can be feasibly applied. A major concept of the County's NPDES stormwater quality program, as set forth in the ROWD, is a regional approach to stormwater quality planning and management on a watershed basis. Later, "special"structural BMPs may be installed to address specific water quality problems identified in the watershed planning process. "Special"structural BMPs are engineered facilities designed to address specific pollutant problems identified in the watershed planning process, runoff 7 management plan, CEQA process, or similar watershed planning. Thus, there will be the future need to revisit these requirements at an as-yet unspecified date or frequency. Efforts will be directed toward determining the effectiveness of structural BMPs before they are required. Those measures which demonstrate superior cost-effectiveness,considering right-of-way, construction,operation, maintenance,monitoring, and pollutant removal, may be adopted as special structural BMPs for application as indicated during the watershed planning studies. 5.1 NON-STRUCTURAL BMPs NI. Education for Property Owners, Tenants and Occupants- For developments with no Property Owners Association (POA)'or POAs of less than fifty (50) dwelling units, practical information materials will be provided to the first residents/occupants/tenants of each home sold on general good housekeeping practices that contribute to protection of storm water quality. Initially, these materials will be provided by the developer. Thereafter, such materials will be available through the permittees' education program. For developments with POA and residential projects of more than fifty (50) dwelling units, project conditions of approval will require that the POA provide environmental awareness education materials, made available by the permittees to all members periodically. Among other things, these materials will describe the use of chemicals - (including household type) that should be limited to the property, with no discharge of specified wastes via hosing or other direct discharge to gutters, catch basins and storm drains. N2. Activity Restrictions - If a POA is formed, conditions, covenants, and restrictions shall be prepared by the developer for the purpose of surface water quality protection. Alternatively, use restrictions may be developed by a building operator through lease terms, etc. N3. Common Area Landscape Management - Ongoing maintenance consistent with County Administrative Design Guidelines or city equivalent, plus fertilizer and pesticide usage consistent with the instructions contained on product labels and with the regulations administered by the State Department of Pesticide Regulations, or city equivalent. N4. Common Area Catch Basin Inspection - For developments with POAs and privately maintained drainage systems, require the POA to have privately owned catch basins(if applicable) cleaned and maintained, as frequently as necessary, to prevent sediment, garden waste, and trash, or other pollutants from entering the public streets and storm drain systems. The term"Property Owners'Association"or POA,as used herein,means a nonprofit corporation or unincorporated association created for the purpose of managing a common interest development[from California Civil Code Sec. 1351(a)]. 8 N5. Common Area Litter Control -For developments with POAs, the POA will be required to implement trash management and litter control procedures in the common areas aimed at reducing pollution of drainage water. The POAs may contract with their landscape maintenance firms to provide this service during regularly scheduled maintenance, which should consist of litter patrol,proper disposal of pet litter, emptying of trash receptacles in common areas, and noting trash disposal violations by homeowners or businesses and reporting the violations to the Association for investigation. N6. Street Sweeping Private Streets and Parking Lots -For developments with POAs and privately owned streets and parking lots, require the streets and parking lots be swept as frequently as necessary, to prevent sediment, garden waste, and trash from entering the public streets and storm drain systems. N7. Underground Storage Tank Compliance - Compliance with State regulations dealing with underground storage tanks will be enforced by the County Department of Environmental Health on behalf of the State. N8. Spill Contingency Plan -A"Spill Contingency Plan"(Business Emergency/Contingenc Plan Guidelines and Forms shall be y Section 6.95 of the California Health and Safety ode. Spills beli accordance with cleaned up according to the Spill Contingency Plan, p immediately N9. Hazardous Materials Disclosure Compliance- Compliance with County and comparable City ordinances typically enforced by respective fire protection agency. NI 0. Uniform Fire Code Implementation - Compliance with Article 80 of the Uniform Fire Code enforced by fire protection agency. NIL Title 22 CCR Compliance - Compliance with Title 22 of the California Code of Regulations and relevant sections of the California Health & Safety Code regarding hazardous waste management, to be enforced by County Environmental Health on behalf of State. N12. Housekeeping of Loading Docks - Loading docks for grocery, drug and discount stores, and warehouse-type commercial and industrial buildings must be kept in a clean and orderly condition through a regular program of sweeping, litter control, and immediate cleanup of spills and broken containers. Polluted material or wash waters shall not be allowed to discharge into a storm drain. N13. Employee Training/Education Program (see N1) as it would apply to future employees of individual businesses-Based on information provided through the county-wide education program, developer either prepares manual(s) for initial purchasers of business sites or . conveys, for development that is constructed for an unspecified use, commitment for this responsibility to POA or purchaser. 9 N14. BMP Maintenance-The responsible party(owper, agency name,phone number, and address) for implementation of each non-structural BMP and scheduled cleaning of all structural BMP controls shall be identified in the Water Quality Management Plan (WQMP) (Attachment A). 5.2 STRUCTURAL BMPs S1. Control of Impervious Runoff- Surface runoff shall be directed to landscaped or pervious areas to the maximum extent practicable. S2. Common Area Efficient Irrigation- Physical implementation of landscape plan consistent with County Administrative Design Guidelines or city equivalent, which may include provision of water sensors,programmable irrigation times(for short cycles), etc. S3. Common Area Runoff-minimizing Landscape Design-Group plants with similar water requirements in order to reduce excess irrigation runoff and promote surface filtration. S4. Community Car Wash Racks - In high density multi-family developments (apartments, stacked flats) larger than 100 units whcre car washing is allowed, or developments having a common parking area, a designated car wash area that does not drain directly to a storm drain shall be provided for common usage. An example of such an area would be joint use of an open space or visitor parking area. 'Wash waters from this area may either be directed to the sanitary sewer(with prior approval of the sewering agency),to an engineered filtration system, or an equally effective alternative. S5. Wash Water Controls for Food Preparation Areas - Food establishments (per State Health and Safety Code 27520) shall have contained areas, floor sink(s) and/or mop sink(s) with sanitary sewer connections for cleaning of kitchen floor mats and for disposal of wash waters containing kitchen and food wastes, if located outside. The contained area shall also be covered to prevent entry of stormwater. S6. Trash Container(dumpster)Areas -Trash container(dumpster)areas shall have drainage from adjoining roofs and pavements diverted around the area(s), and: a. Dumpsters shall be leak proof and have attached workable covers. b. For trash container areas associated with fuel dispensing, vehicle repair/maintenance, and industry, grade and pave the area to prevent run-on of storm water to the maximum extent practicable. c. Trash compactors shall be roofed and set on a concrete pad. The pad shall be a minimum of one foot larger all around than the trash compactor and sloped to drain-to a sanitary sewer line. 10 S7. Self-contained Areas for Vehicle or Equipment Washing/Steam Cleaning/Maintenance/ Repair/Material Processing - Self-contained areas are required for washing/steam cleaning,wet material processing, and maintenance activities, specifically: a. For businesses where washing of vehicles or equipment without steam cleaning occurs, provide wash racks constructed in accordance with local sewering agency guidelines or other acceptable standard and with the prior approval of the sewering agency (Note: Discharge monitoring may be required by the sewering agency). Surface runoff and roof drains shall be directed away from these wash racks. b. Where steam cleaning occurs, provide wash racks as in S7.a, and/or structurally contain (with a cover to restrict the entry of stormwater during rain events) runoff from such areas onsite for commercial waste removal. - c. Where wet material processing occurs (e.g., electroplating), secondary containment structures shall be provided to hold spills resulting from accidents, leaking tanks or equipment, or any other unplanned releases (Note: If these ate plumbed to the sanitary sewer, the structures and plumbing shall be in accordance with State and local spill containment and reporting requirements and have the prior approval of the sewering agency). Also see N 10. d. Where vehicle or equipment repair/maintenance occurs, impermeable berms, drop inlets, trench catch basins, or containment structures shall be provided around repair bays to prevent spilled materials and wash-down waters from entering the storm drain system. Surface runoff or roof drains shall be directed away from these spill containment structures. S8. Outdoor Storage - Where a plan of development proposes; or building plans incorporate; outdoor containers of oils, fuels, solvents, coolants, wastes, and other chemicals, the areas where these materials are to be used or stored must be protected by secondary containment structures such as a low containment berm, dike, or curb, designed to the satisfaction of the approving agency (see N10 &N11). For commercial outdoor vehicle and equipment salvage yards, and commercial outdoor recycling facilities, the entire facility must comply with the NPDES General Industrial Activities Storm Water Permit. Piles of materials or products, that are stored outside and that have the potential to cause pollutant discharges, shall be protected from rainfall, runoff, run-on, and wind erosion. S9. Motor Fuel Concrete Dispensing Areas' - Areas used for fuel dispensing shall be paved with Portland cement concrete (or; equivalent smooth, impervious surface, but use of asphalt prohibited) with a 2% to 4% slope to prevent ponding, and must be separated from the rest of the site by a grade break that prevents run-on of storm water to the extent practicable. Concrete surfacing must extend a minimum of 6.5 feet from the comer of each fuel dispenser, or the length at which the hose and nozzle assembly may be operated =Refer to the"Best Management Practice Guide,Retail Gasoline Outlets,"prepared for California Stormwater Quality Task Force(Attachment B). 11 plus one foot,whichever is less. The fuel dispensing area shall be graded and constructed so as to prevent drainage flow through the concrete fueling area. Spilled material within the fuel dispensing area is prohibited from draining to the street or storm drain system. Spills will be immediately cleaned up according to Spill Contingency Plan. S 10. Motor Fuel Dispensing Area Canopy'- All motor fuel concrete dispensing areas are to have a canopy structure, and the canopy's minimum dimensions must be equal to or greater than the area within the grade break or the fuel dispensing area, as defined above. Canopy roof downspouts are to be routed to prevent drainage across the concrete fueling area. S l 1. Air/Water Supply Area Drainage'-Area used for air/water supply will be graded and constructed so as to prevent draining of stormwater or spilled material (e.g. radiator coolant)therefrom into the street or storm drain system. S12. Energy Dissipators -Energy dissipators such as riprap, are to be installed at the outlets of new storm drains that enter unlined channels in accordance with applicable agency specifications. S13. Catch Basin Stenciling - Phrase "No Dumping - Flows to Creek" or equally effective phrase, as approved by the NPDES General Committee, is to be stenciled on catch basins to alert the public as to the destination of pollutants discharged into storm drains. S14. Inlet Trash Racks- Where appropriate to reduce intake and transport through the storm drain system of large floatable debris, trash racks shall be provided Where drainage from open areas enters storm drains (Caltrans Standard Plan D96 and D98-C, or equivalent). 6.0 EDUCATIONAL PROGRAM FOR DEVELOPERS AND CONTRACTORS The following defines the required educational program for developers and contractors per Section 4, § 4.8 of the ROWD. These guidelines, with its attachments, will contain the legal, administrative, and technical information needed to acquaint developers and contractors with the NPDES program. San Bernardino County developers and contractors have been implementing erosion control plans for many years and are familiar with that portion of the program. New requirements resulting from the NPDES Permit and the ROWD are contained herein. The Building Industry Association and the Associated General Contractors have been asked to assume responsibility for alerting their members of the information contained in these Guidelines, which will be made available by the-County and Cities as a part of the development review process. 12 u �d x x x x c 0 h x x x x x x x x x • u Vu _5N rrO.� ` V x x x x x x x x x v ° Ct u 3 u x x x x x aH . x x x x x x x x x x x x x F z o z X X X X X x x Vl ' FS b z z z tZ vi � v u • � m 'n o as ° 5 c v> ; y v u n �e ` a° C ° E Z U u E ; U E u u m c a c .� v7 o ` u n ° a"us a ., .a o O �, °. � C c u .2 U u u ` E < u e c `x °r c Zs u < o kl ° m ° 0 o a U u u A u E t E u U € N .x a. < U U U u ar$ m c .y A2 x x c x x x x x x Li u H EV u � 3 u c u U u y O x X X x 4, x X X u N � � E.� U x x X x x x x x X a F CC x x x x X x x x .. Cn Cv fv H y !n Cv N y N M N m CL !n d O u O 4 Ltd _A `a o o I- < �, E U U y a0 U a > ° v� A e e c 40 cn u u E E E 3a U o .c g a m c E E °c E $ .Y v u v 0 a' 0 ATTACHMENT A WATER QUALITY MANAGEMENT PLAN-OUTLINE WATER QUALITY MANAGEMENT PLAN OUTLINE COVER PAGE Name of Project - Name of Company Date NEXT PAGE Signed statement (with date) certifying that the provisions of the WQMP have been accepted by the applicant and that the applicant will strive to have the plan carried out by all future successors. REPORT TABLE OF CONTENTS I. Tract or Discretionary permit number(s) and condition number(s). Spell out conditions verbatim. II. Project Description 1. Type of project. 2. Project Size 3. Homeowners Association or Property Owner's Association Formation. III. Site Description 1. Identify the watershed the project is in. 2. Is there a pre-existing water quality problem that has been identified in the watershed planning process? IV. Best Management Practices (BMPs) 1. List and describe applicable structural and non-structural BMPs from Tables 1 and 2 that are applicable to your project, depending on the proposed land use, size, and use of a property owners' association. V. Inspection/Maintenance Responsibility For BMPs VI. Figures 1. Location Map 2: Site Plan (acceptable reduced drainage map) identifying storm drain facilities and receiving waters. ATTACHMENT B BEST MANAGEMENT PRACTICE GUIDE RETAIL GASOLINE OUTLETS ' . . Best Maria .. : . : . . g e meet Practice--Guiide Retail Gasoline e Outlets California Stormwater uali Q fy Task Forc• e Prepared by Retail Gasoline Outlet Work Group • March 1997 Acknowledgments The Stormwater Quality Task Force would like to thank the following individuals for their extra efforts developing these best management practices. Richard Boon County of Orange Environmental Management Agency Geoff Brosseau Bay Area Stormwater Management Agencies Association Linda Cohu ARCO Chris Crompton County of Orange E* nvironmental Management Agency Bruce Fujimoto State Water Resources Control Board Robert Hale Alameda Countywide Clean Water Program John Norton State Water Resources-Control Board Tim Simpson Geomatrix Xavier Swamikannu Regional Water Quality Control Board-Los Angeles Pavlova Vitale Regional Water Quality Control Board-Santa Ana Ron Wilkniss Western States Petroleum Association Jean Young Unocal Nancy Zavesky Chevron Don Zedrick Environmental Resource Council Disclaimer The statements and conclusions of this guide are those of the California Stormwater Quality Task Force (Task Force) and not necessarily those of the State of California. The mention of commercial products, their source, or their use in connection with material reported herein is not to be construed as either an actual or implied endorsement of such products. The guide was produced and published by the California Stormwater Quality Task Force, an advisory body of municipal agencies regulated by the storm water program. This guide is not a publication of the State Water Resources Control Board or any Regional Water Quality Control Board, and none of these Bo*ards has specifically endorsed the contents thereof. The purpose of this guide is to assist municipal agencies and retail gasoline outlets subject to storm water regulations,in attaining compliance with such regulations. intended for use in geographic areas not subject to f decal or state o�`,�,ot specifically at facilities that do not discharge storm water either directly to surface waters or nddirecotllyy,or in through municipal separate storm drain systems. Implementation of these best management practices can not be construed as compliance with all other applicable regulations,including local requirements. BMP Guide California�� Retail Gasoline Outlets March 1997 Introduction This guide represents the work of the California Stormwater Quality Task Force's (SWQ Retail Gasoline Outlet Work Group. The Work Group formed in May 1996 and met on a regular basis to review and discuss appropriate best management practices for fueling and other closely related activities likely to be found at retail fueling operations. Representatives from industry,municipalities, and regulatory agencies participated. Best manag t emen practices (BMPs)from throughout California,and elsewhere,were reviewed and considered for inclusion in this guide. The Work Group worked in the tradition of the SWQTF by raising and discussing issues in an open forum,and working to reach consensus on each issue. The Work Group worked in parallel and communicated with State and Regional Board staff responsible for storm water permit compliance. These best management practices were developed with retail gasoline outlets mind, and may or may not have applicability to other facility es e. primarily m fleet operations). The need for and application of these BMPs too other gfacility-types Blocks,bulk plants, carefully reviewed on a case-by-case basis. During should be and wastewater issues were addressed together to avoid cross-media development of this guide, � . gu storm water addition, edla fz'ansfers of waste. In the potential of these BMPs to affect other environmental media/regulations (e.g., hazardous waste) was considered before their inclusion in this guide. Regulatory Context The Federal Clean Water Act, as amended in 1987,and the State Porter-Cologne Act are the principle regulations for control of storm water pollutants. There are,however, other regulations that deal with the control of storm water pollutants, .Examples include the Federal Coastal Zone Act Reauthorization Amendments of 1990, and the State Hazardous Waste source Reduction and Management Review Act. The 1987 amendments to the Federal Clean Water Act added section 402(p) which establishes a framework for regulating Municipal, industrial, and construction-storm water discharges under the National Pollutant Discharge Elimination System(NPDES)program. On November 16,1990, the USEPA published final regulations that establish application requirements for storm water permits from five classes of discharges (Phase 1) including storm water associated with industrial activity (industrial storm water) that discharges either directly to surface waters or indirectly through munici drain systems. Municipalities with a population over 00,000 or those that have ate storm determined to be a significant contributor of pollutants are also required to obtain eNPDES storm water permit. BMP Guide California SWQTF Retail Gasoline Outlets March}997 3 As part of its storm water management program,a municipality is required to develo a program to monitor and control pollutants in storm water p discharges from its municipal system. These programs must include structural and source control measures to reduce pollutants from runoff from commercial and industrial areas. Thus it is important for commercial and industrial facilities located within municipaliti es to realize that there maybe municipal requirements on storm water discharges from their facilities. In addition to the storm water requirements,both the Federal Clean Water Act and the State Porter-Cologne Act require the control of pollutants in wastewater discharges. The Porter- Cologne Act requires the development of Basin Plans for drainage basins in California. These basin plans are used in turn to identify more specific controls for discharges (e.g.,wastewater. treatment plant effluent). The basin plans are implemented through the NPDES program. Many municipalities,being subject to both storm water and wastewater regulations,will develop water quality protection programs that deal with both types of discharges in a coordinated and integrated way. Purpose and Intent . The purpose of this guide is two-fold. First, to be a compilation of peer-reviewed best management practices for fueling and other closely related activities found at retail fueling operations. Second, to be a reference for municipalities,regulators,and facility owners and operators. The intent of the SWQTF is that these best management practices serve as a "default" set of BMPs for use throughout California. Municipalities and retail gasoline outlets that have not yet adopted best management practices for these activities should give these practices strong consideration. Municipalities and retail gasoline outlets that do have and use BMPs should compare their current practices with those presented here. Substantive differences should be identified and re-evaluated. Successful implementation of these BMPs depends on a partnership between miuucipalities,regulators, and facility owners and operators. Each has a role to play: • Municipalities should become familiar with these BMPs and incorporate them into their water quality protection programs,as appropriate. • ReguIators and inspectors should use these or similar BMPs to measure the pollution prevention efforts of facilities. BMP Guide California SWQTF Retail Gasoline Outlets March 1997 4 • Facility owners and operators should become f employees about them,and ensure that thee tthese BMps,teach their y are used on-site. How to Use the Best Management Practices Coverage-These est management practices cover three'activities or areas: • FueI dispensing • Air/water supply • Outdoor waste receptacles Retail gasoline outlets will have every combination of these acti vities/areas on- other activities not covered b site, including y this guide. For example,a facility may area,air/water supply area,indoor service bay,but no Outdoor aste re ee des dispensing cover the first two areas but not the indoor service bay: Best P These BMPs indoor service bay may be found elsewhere. The inclusion of management practices for the air/water supply areas is not intended to suggest that air and/or water m t be practices for retail gasoline outlets in geographic areas not otherwise required to do so. supplied by Design -The design of this guide is purposely different from man as a menu of BMPs from which the facility owner Y BMp Iis is that are designed some but not necessarily all BMPs. These BMP lists are for and the inspector,may choose on-site, each numbered BMP listed below the activity should e implemented. For activity/area is as described below, several implementation Options are provided. For some BMPs, practices are meant to be implemented, monitored and maintained best management P � aintained on a year round basis. The guide also makes an • ' important distinction between existing facilities and new or substantially remodeled facilities. A definition of new or substantially remodeled is also provided. Work Group used these design elements to help larify P d The P and�Y expectations. - Options -Several of the best management practices provide facility options for compliance. For example,one best management practice owners and operators Minimize the Possibility P s: . P ty of storm water pollution from outside waste receptacles by doing at least one of the following: a) use only watertight waste receptacIe(s) and keep the lids closed,or b) grade and pave the waste receptacle area to prevent run-on m P P run-on of storm water, or c) install a roof over the waste receptacle area,or d) install a low containment enn around the waste receptacle area or e) use and maintain drip pans under waste receptacles. BMP Guide Retail Gasoline Outlets California SWQTF March 1997 S It is the intent of these BMPs that a) through e)are o__pti_OnS. )affective implementation one of these options,chosen by the facility owner/o p ementation of at least of this best mans perator,should be deemed implementation Bement practice. Other BMPs-The Work Group considered other BMPs not listed here%ncludin . • Oil/water separators Catch basin inserts The evidence reviewed by the Work Group indicated that the effectiveness and efficiency of these and other BMPs not listed was insufficient for them to pass peer review and therefore these BMPs can not be generally recommended for use statewide There may be situations in which these BMPs would be effective and efficient(as evidenced by research),and therefore appropriate,but these situations should be the exception,not the rule. Members of the SWQTF are conducting studies on these and other BMPs. If that research shows that a particular BMP is effective and efficient, the SWQTF will consider adding it to this guide. Best Management Practices - Existing Facilities Fuel Dispensing Areas 1. Maintain fuel dispensing areas using dry cleanup methods such as sweeping for removal of litter and debris, or use of rags and absorbents for leaks and spills. Fueling areas should never be washed down unless the wash water is collected and disposed of properly. 2. Fit underground storage$ tanks with spill containment and overfill prevention systems meeting the requirements of Section 2635(b) of Title 23 of the California Code of Regulations. I Fit fuel dispensing nozzles with"hold-open latches" (automatic shutoffs) except where proltibited.by local fire departments. 4. Post signs at the fuel dispenser or fuel island warning vehicle owners/operators against "topping off" of vehicle fuel tanks. Facility-.GeneraI 1. "Spot clean" leaks and drips routinely. Leaks are not cleaned up until the absorbent is picked up and disposed of properly. BMP Guide California SWQTF Retail Gasoline Outlets March 1997 6 �. Maintain and keep Mrrent,as r • ensure that employees are equsred�other regulations,a spill response trained on the elements of the plan. p° e P and 3' Manage materials and waste to reduce adverse im a p cts on storm water quality, 4. Train all employees upon hiring nd annually wally thereafter on proper methods for handling and disposing of waste. Make sure that all employees n g prohibitions, wastewater discharge r Y understand storm water discharge g eq�rements,and these best g Use a training log or similar method to document training management Practices. 5• Label drains within the facility . whether they flow to an oil/wale seda�rator paint/stencil (or equivalent),to indicate Labels are not necessary separator, directly to the sewer,or to a storm drain ary for Plumbing fixtures or connected to the sanitary sewer. 6. Inspect and clean if necessary,storm drain m basins within and catch basi boundary before October 1 each year. tlun the facility Outdoor Waste Receptacle Area 1. Spot clean leaks and drips routinely to prevent runoff of spillage'. 2. Minimize the possibility of storm water pollution from outside waste re at least one of the following: ceptacles by doing a) use only watertight waste receptacles) and keep the lids closed, b) grade and pave the waste receptacle area to prevent run-on of storm w C) install a roof over the waste receptacle area,or ater,or d) install a low containment berm around the waste receptacle area,or e) use and maintain drip pans under waste receptacles. Air/Water Supply Area 1. Minimize the possibility of storm water pollution from air/water su 1 a least one of the following PP y areas by doing at a) spot clean leaks and drips routinely to prevent runoff of b) grade and pave the air/water supply a spillage,or - C) install a roof over the air/water sulrea to prevent run-on of storm water,or pp y area, or d) install a low containment berm around the air/water suPY p I area. BMP Guide Retail Gasoline Outlets California SWQ1T March 1997 New or Substantially Remodeled Facilities The elements listed below should be included in the design and construction of new or substantially remodeled facilities. Fuel Dispensing Areas 1. Fuel dispensing areas must be paved with Portland cement concrete(or, equivalent smooth impervious surface),with a 2% to 4% slope to prevent ponding,and must be separated from the rest of the site by a grade break that prevents run-on of storm water to the extent Practicable. The fuel dispensing area is defined as extending 6.5 feet from the corner of each fuel dispenser or the length at which the hose and nozzle assembly may be operated Plus 1 foot,whichever is less. The paving around the fuel r Y c -Z th ulirumum dimensions of the"fuel ��mg area may exceed the dispensing area"stated above. 2. The fuel dispensing area must be covered,and the cover's minimum dimensions equal to or greater than the area within the grade break or the fuel dispensing eauas be defined above. The cover must not drain onto the fuel dispensing area. Outdoor Waste Receptacle Area 1. Grade and pave the outdoor waste receptacle area to prevent run-on of storth water to the extent practicable. Air/Water Supply Area 1. Grade and pave the air/water supply area to prevent run-on of storm water to the extent ent Substantially Remodeled Facilities One of the following criteria must be met before a facility is deemed to be substantially remodeled and the design elements described above are required to be included in th design and construction: a new • the canopy cover over the fuel dispensing area is new or is being substantially replaced not including cosmetic/facial appearance changes only) and the footing is structurally sufficient to support a cover of the minimum dimensions described above,or • one or more fuel dispensers are relocated or added in such a way concrete (or,equivalent) paving and grade break or the canopy cover over Portland cement BMP Guide California�� Retail Gasoline Outlets March 1997. dispensing area do not meet the aiuiimum li meting dispensers or underground s ons as defined above. Replacement of torage tanks do not,by themselves substantial remodel. ,constitute a S ecial note on the pavin BMp #1 onI addr Substantiall Remodeled Facilities essin Fuel Dis ensin Areas under New or This best management practice is not new canopy where no canopy specifically intended to apply to facilities that:install a py existed. S ecial note on the cano B Substantiall Remodeled Facilities 2 onl addressin Fuel Dis ensin areas under lVew or This best management practice is not • are located in eo specifically intended to apply to facilities that g $mphic areas not subject to federal or state storm water regulations • do not discharge storm water either directly to surface waters municipal separate storm drain systems or indirectly, through • do not add fuel dispensers • replace,relocate,or add P thin ensers fuel dispensers within the' . paramete increase their throughput of fuel dispensed without mo rs described in the BMP • make only cosmetic or facial appearance �'mg their equipment PP changes to their existing canopy For the purposes of the waste receptacle area and air/water supply area is considered substantially remodeled if the area around the waste rece MPs only, the facility supply area is being regraded or repaved. P cle area or air/water Help For assistance with implementation of these best management practices or facility owners and operators should contact their local storm water Program rep al staff i RegionaI Board or State Board storm water contact, or the Stormwat a giam representative, _ Quality Task Force. BMP Guide • Retail Gasoline Outlets on111 March 1997 1 RESOLUTION NO. 2 3 RESOLUTION OF THE MAYOR AND COMMON COUNCIL OF THE CITY OF SAN BERNARDINO AUTHORIZING THE EXECUTION OF THE 4 NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM STORMWATE PERMIT IMPLEMENTATION AGREEMENT, SANTA ANA REGION. 5 6 7 BE IT RESOLVED BY THE MAYOR AND COMMON COUNCIL O 8 THE CITY OF SAN BERNARDINO AS FOLLOWS: 9 10 SECTION 1. The City Manager is hereby authorized and directed to execute, on behalf 11 of the City, the National Pollutant Discharge Elimination System Stormwater Permit 12 Implementation Agreement, Santa Ana Region. 13 SECTION 2. This agreement and any amendment or modification thereto shall not take 14 effect or become operative until fully signed and executed by all parties. The City shall not be 15 obligated hereunder unless and until the agreement is fully executed and no oral agreement 16 relating thereto shall be implied or authorized. 17 SECTION 3. This resolution is rescinded if the parties to the agreement fail to execute it 18 within one hundred and twenty(120) days of the passage of this resolution. 19 20 21 22 23 24 25 26 27 28 - 1 1 COMMON COUNCIL OF THE RESOLUTION OF THE MAYOR AND CITY OF SAN BERNARDINO AUTHORIZING THE EXECUTION OF THE 2 NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM STORMWATE 3 PERMIT IMPLEMENTATION AGREEMENT, SANTA ANA REGION. 4 I HEREBY CERTIFY that the foregoing resolution was duly adopted by the Mayor and 5 Common Council of the City of San Bernardino at a meeting thereof, held 6 on the day of , 2011, by the following vote, to wit: 7 s Council Members: AYES NAYS ABSTAIN ABSENT 9 MARQUEZ 10 VACANT BRINKER 11 SHORETT 12 KELLEY 13 JOHNSON 14 MC CAMMACK 15 16 17 18 Rachel Clark, City Clerk 19 The foregoing resolution is hereby approved this day of , 2011. 20 21 Patrick J. Morris, Mayor 22 City of San Bernardino 23 Approved as to form: 24 JAMES F. PENMAN, 25 City Attorney 26 27 ! 28 By. -2 I NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM 2 STORMWATER PERMIT IMPLEMENTATION AGREEMENT 3 SANTA ANA REGION 4 5 6 This AGREEMENT entered into as of this [DATE] by the County of San Bernardino, (herein 7 called the COUNTY), the San Bernardino County Flood Control District (herein called the 8 DISTRICT),and the Cities of Big Bear Lake,Chino,Chino Hills,Colton, Fontana,Grand Terrace, 9 Highland, Loma Linda, Montclair, Ontario, Rancho Cucamonga, Redlands, Rialto, San 10 Bernardino, Upland, and Yucaipa (herein called the CITIES) establishes the responsibilities of 11 each party with respect to compliance with National Pollutant Discharge Elimination System 12 (NPDES) Stormwater regulations administered by the California Regional Water Quality 13 Control Board, Santa Ana Region (SARWQCB) by the authority granted by the federal Clean 14 Water Act (CWA) and its 1987 amendments and the Water Quality Act(WQA). 15 16 RECITALS 17 18 Whereas 19 Congress in 1987 amended Section 402 of the Federal Clean Water Act (33 U.S.C.A. 1342 20 (p)) to require the federal Environmental Protection Agency (EPA) to promulgate regulations 21 for applications for permits for stormwater discharges;and Whereas 24 These permit regulations require the control of pollutants from stormwater discharges 25 by requiring a National Pollutant Discharge Elimination System (NPDES) Permit for the 26 discharge of stormwaters into waters of the United States;and 27 28 Whereas 29 These EPA regulations require NPDES permits for discharges from municipal separate 30 storm sewer systems (MS4 Permit)on a system-wide or jurisdiction-wide basis;and 31 32 Whereas 33 The State Legislature,in enacting the San Bernardino County Flood Control Act, created 34 the San Bernardino County Flood Control District to provide for the control of flood and storm 35 waters; and 36 37 Whereas 38 The Powers granted to the DISTRICT by the San Bernardino County Flood Control Act 39 include carrying on technical and other investigations, examinations, or tests of all kinds, 40 making measurements, collecting data, and making analyses, studies, and inspections 41 pertaining to water supply, control of floods, use of water, water quality, nuisance, pollution, 42 waste,and contamination of water both within and without the DISTRICT;and 43 44 Whereas / The CITIES, the COUNTY and 'the DISTRICT desire to develop and implement an integrated stormwater discharge management program with the objective of improving water 47 quality in the Santa Ana Watershed portion of San Bernardino County;and June 8 2010 MS4 Implmentation Dral Final—dean.doc I 48 49 Whereas 50 The California State Water Resources Control Board (SWRCB) as designee of the EPA 51 has delegated authority to the Regional Water Quality Control Board - Santa Ana Region 52 (SARWQCB) for administration of the MS4 Permit program and issuance of M54 Permits within 53 the boundaries of their Region;and 54 55 Whereas 56 The DISTRICT, COUNTY, and CITIES have been designated as joint permittees 57 (Permittees)by the SARWQCB for the MS4 Permit issued to the County of San Bernardino;and 58 59 Whereas 60 The DISTRICT has been designated as the Principal Permitee in the MS4 Permit;and 61 62 Whereas 63 The COUNTY and the CITIES have been designated as the Co-permittees in the MS4 64 Permit;and 65 66 Whereas 67 Cooperation between the CITIES, the COUNTY, and the DISTRICT to jointly file an application for the MS4 Permit is in the best interest of the CITIES, the COUNTY, and the DISTRICT; and !V 71 Whereas 72 The Permittees shall establish and maintain a Management Committee to coordinate 73 compliance with MS4 Permit requirements and implement a Stormwater Management Program 74 across all jurisdictions covered by this MS4 Permit; and 75 76 NOW THEREFORE,the parties hereto do mutually agree as follows: 77 78 I. Filing Status. The COUNTY, DISTRICT, and CITIES will jointly file the application for 79 an area-wide storm water permit. The COUNTY, the DISTRICT, and each individual 80 CITY will be a Permittee. 81 82 83 II. Management Committee. The DISTRICT, as Principal Permittee, and COUNTY and 84 CITIES, as Co-permittees, shall support and facilitate compliance with area-wide MS4 85 Permit requirements and implementation of the Stormwater Management Program 86 through the workings of the Management Committee. The responsibilities and structure 87 of this committee shall include: 88 89 90 01 A. The purpose of the Management Committee shall be to develop policies, (including goals, needs, and priorities) budgets, and implementation >,, strategies and plans for the area-wide Stormwater Management Program 94 to ensure compliance with the M54 Permit. The Management Committee June 8 2010 MS4 tmptmenlafion Draft Final—dean.doc 2 "5 shall evaluate implementation options and strategies and recommend 96 implementation actions to the DISTRICT. 97 98 B. Each Permittee shall designate in writing at least one authorized 99 representative and one alternate to participate on the Management 100 Committee. Management Committee designees and alternates shall be 101 authorized by their respective city council or governing board to cast 102 votes on behalf of their jurisdiction to determine Stormwater 103 Management Program budgets and all other program elements required 104 to implement the areawide Municipal Stormwater Management Plan 105 (MSWMP). 106 107 C. The Principal Permittee shall serve as the chairperson for the 108 Management Committee. 109 110 D. The Management Committee shall meet at least once each month, except I 1 l during the month of December. 112 113 E. Ten (10) authorized representatives present in person at a scheduled 114 meeting constitute a quorum for the transaction of business of the 115 Management Committee. if a quorum is not present at a scheduled ' Management Committee meeting, less than a quorum may adjourn the meeting. For all Management Committee actions other than approval of 1 1 6 the budget as set forth in Section VII.C.1. of this AGREEMENT, a 119 majority vote of the quorum shall decide any question brought before the 120 Management Committee for decision. 121 122 F. The Management Committee shall support Stormwater Management 123 Program implementation by providing guidance to the Principal Permittee 124 with respect to stormwater program administration and approving 125 elements of the area-wide MS WMP. 126 127 G. The Management Committee may establish subcommittees to support 128 the work of the Management Committee. Subcommittees shall include 129 interested members of the Management Committee, and/or other 130 Permittee staff with necessary expertise. Subcommittees may develop 131 recommendations for Management Committee consideration. Such 132 recommendations require majority approval by members of the 133 subcommittee on a one vote per Permittee basis. 134 135 H. Approval of Management Committee decisions will require a majority 136 vote of the authorized representatives or alternates in attendance, on a one 137 vote per Permittee basis. In the event that the Management Committee 138 does not approve a subcommittee recommendation, the item will be 13r' directed back to the subcommittee for reconsideration. June B 2010 MS4 lmpimentetion Draft Final-deanboc 3 140 I. All parties to this AGREEMENT achieve cost savings by working 141 collectively to implement the areawide stormwater program. To 142 maximize these cost savings,the Permittees agree that: 143 144 1. Each authorized representative shall actively participate in at least 145 9 of 11 monthly Management Committee meetings; 146 147 2. Each Permittee shall actively participate in at least one 148 subcommittee, either through the authorized representative or 149 other authorized designee. Participation will be defined as 150 attendance at fifty percent (50°x) or more of subcommittee 151 meetings held in a given fiscal year. 152 153 154 III. Principal Permittee Responsibilities. 155 156 The DISTRICT,acting through its Board of Directors, is the Stormwater Program Administrator 157 for purposes of this AGREEMENT. The District shall have administrative responsibilities and 158 shall be reimbursed for its time expended on behalf of the Stormwater Program. These rates 159 include actual hourly rate plus overhead. Materials are to be reimbursed at direct cost. 1<� The DISTRICT,while acting as administrator,will strive to implement the policies,budget,and 1u/- required program elements according to the recommendations of the Management Committee. 163 In turn,the Management Committee will work in good faith with the DISTRICT to make 164 reasonable policy,budget and required program element recommendations to the 165 DISTRICT. The Parties recognize and acknowledge,however, that the DISTRICT,as governed 166 by the San Bernardino County Board of Directors,retains final authority regarding the nature 167 and manner in which the recommendations of the Management Committee shall be executed. 168 169 In the event that the DISTRICT proposes to implement an approach different than the one 170 recommended by the Management Committee,the DISTRICT's proposed alternative action 171 shall be communicated to the Management Committee at the next available meeting of the 172 Management Committee. If the Management Committee approves the alternative action,then 173 the cost sharing provisions of this AGREEMENT shall govern the allocation of any costs 174 associated with that alternative action. If,in good faith,the Management Committee does not 175 approve the alternative action,the DISTRICT may implement the alternative action,but the 176 DISTRICT shall be solely responsible for paying the increased costs, if any,resulting from the 177 alternative action. This increased cost shall be measured by the difference between the cost of 178 the alternative action and the estimated cost of the action as reasonably recommended by the 179 Management Committee. 180 181 If the DISTRICT'S proposed alternative implementation action involves an increase in program 182 costs, that alternative implementation action shall not be adopted until such time as each 18-1 authorized representative of the Management Committee has had 45 days to relay that 1 alternative implementation action to its various governing bodies for approval.CITIES and 16- COUNTY shall have no responsibility for the incremental increase in cost associated with an June 8 2010 M54 Implmentation Draft Final-clean.0oc 4 186 alternative action that is not approved by the Management Committee after 45 days has passed 187 with the governing bodies failing to approve the alternative implementation action. 188 189 190 191 The DISTRICT will act as the contracting party, on behalf of the Co-permittees for Stormwater 192 Management Program contracts and agreements with all consultants, contractors, vendors or 193 other entities as recommended by the Management Committee. 194 195 The DISTRICT, if recommended by the Management Committee, may act on behalf of the Co- 196 permittees as applicant in preparing and submitting grant proposals, and may act as 197 administrator for any awarded grant funds. 198 199 The DISTRICT, if recommended by the Management Committee, will act on behalf of the 200 Stormwater Program as the contracting party and signatory in joint agreements with other 201 municipal stormwater programs and stakeholders for regional benefits and cooperation. 202 203 As the Principal Permittee under the MS4 Permit, the DISTRICT shall coordinate all area-wide 204 MS4 Permit activities and manage the Stormwater Management Program by: 205 206 A. Conducting chemical, biological and bacteriological water quality monitoring on behalf of the areawide program as required by the MS4 2L,_ Permit. 209 210 B. Implementing management programs, monitoring programs, and related 211 plans as required by the MS4 Permit. 212 213 C. Preparing and submitting to the Executive Officer (SARWQCB) unified 214 reports,plans,and programs necessary to comply with the MS4 Permit. 215 216 D. Coordinating and conducting Management Committee meetings as 217 specified in the MSWMP. 218 219 E. Taking the lead role in initiating and developing area-wide programs and 220 activities necessary to comply with the MS4 Permit. 221 222 F. Participating, as needed, in any subcommittees formed to facilitate MS4 223 Permit requirements. 224 225 G. Providing technical and administrative support and inform the Co- 226 permittees of the progress of other pertinent municipal programs, pilot 227 projects, research studies, and other information to facilitate 228 implementation of Co-permittees' stormwater program. Z2c' June 8 2010 MS4 Implmentallan Draft FkW- hondoc 230 H. Coordinating the implementation of area-wide Stormwater Management 231 Program activities such as a monitoring program, public education, and 232 pollution prevention. 233 234 I. Gathering and disseminating information on the progress of statewide 235 municipal stormwater programs and evaluate the information for 236 potential use in the execution of the MS4 Permit. 237 238 J. Monitoring the implementation of the plans and programs required by 239 the M54 Permit and determine their effectiveness in attaining eater 240 quality standards. 241 242 K. Coordinating with SARWQCB activities pertaining to implementation of 243 the MS4 Permit,including the submittal of all required reports,plans, and 244. programs. 245 246 L. Soliciting and coordinating public input for any major proposed 247 stormwater management programs and implementation plans. 248 ?An M. Developing and implementing mechanisms, performance standards, etc., to promote consistent implementation of Best Management Practices 2;1 among the Permittees. 252 253 N. Cooperating in watershed management programs and regional and/or 254 statewide monitoring programs. 255 256 IV. Co-permittee Responsibilities. The Co-permittees shall support the Principal Permittee 257 by: 258 259 A. Preparing and submitting to the Principal Permittee in a timely manner 260 all required information necessary to comply with permit reporting 261 requirements. Timely completion of Permittee annual report 262 information is considered meeting the deadline if received on or before 263 September 15th of each reporting year. 264 B. Notifying the Principal Permittee immediately,in writing,of any 265 changes to the designated representative to the Management 266 Committee. 267 C. Reviewing and commenting on all plans,strategies,management 268 programs,and monitoring programs, as developed by the Principal 269 Permittee or a subcommittee of the Management Committee. 270 D. Conducting and/or coordinating with the Principal Permittee on any surveys or characterizations needed to identify pollutant sources from specific drainage areas. 273 June 6 2010 MS4 Implmentatlon Draft Final--clean.doc 6 274 V. Compliance Responsibilities. The DISTRICT, COUNTY and CITIES are individually 275 responsible for implementing all MS4 Permit requirements within their respective 276 jurisdictions. The Management Committee does not assume any responsibility for 277 implementing the Stormwater Management Programs for the Principal Permittee or any 278 other Permittee or for ensuring that the Principal Permittee or the Co-permittees 279 implement programs consistent with the recommendations of the Management 280 Committee. 281 282 VI. Indemnification and Insurance. Each party shall indemnify, defend, and hold harmless 283 the other parties to this AGREEMENT from and against any and all liability and expense 284 arising from any act or omission of the indemnifying party, its authorized officers, 285 employees, agents, and volunteers in connection with the performance of this 286 AGREEMENT, including, but not limited to reasonable defense costs, reasonable legal 287 fees, claims, actions, damages, liability, and causes of action for damages of any nature 288 whatsoever; provided, however, that no party shall indemnify another party for that 289 party's own negligence or willful misconduct. 290 In the event a party,or parties, to this AGREEMENT is/are found to be comparatively at 291 fault for any claim,action,loss or damage which results from their respective obligations 292 under this AGREEMENT,the party,or parties shall indemnify the other party/parties to 293 the extent of its/their comparative fault. Furthermore, if a party attempts to seek 204 recovery from the other for Workers' Compensation benefits paid to an employee, the parties agree that any alleged negligence of the employee shall not be construed against 21„ the employer of that employee. 297 The parties to this AGREEMENT are authorized self-insured public entities for purposes 298 of Professional Liability, Automobile Liability, General Liability, and Workers' 299 Compensation and warrant that through their programs of self-insurance, they have 300 adequate coverage or resources to protect against liabilities arising out of their 301 performance under this Agreement. 302 303 304 305 306 VII. Program Costs. The responsibilities for payment of all shared costs of equipment, 307 services, contracted analytical services, and the cost of implementing the MS4 Permit, 308 shall be distributed among the DISTRICT, COUNTY,and CITIES as follows: 309 310 A. The DISTRICT shall contribute 5% of the annual Program Costs; the other 311 Permittees shall be responsible for the remaining 95% of the Program 312 Costs. 313 314 B. The annual budget shall separate program costs into four Program Areas: 315 316 1. Monitoring, which shall include any water quality and 317 hydrographic monitoring and laboratory analyses. 3.- 2. Public Education,which shall include all public outreach programs. 320 June 8 2010 MS4 Implmentabon Drsfl Flnel-ism.doc 7 321 3. Program Management & Regulatory Activities, which includes 322 administrative,reporting and regulatory activities. 323 324 4. Training, which addresses any training conducted to implement 325 the stormwater management program. 326 327 C. The Principal Permittee shall prepare and implement an annual operating 328 budget with the participation of the Permittees. The budget year shall 329 coincide with the fiscal year of the DISTRICT,July 1 -June 30. 330 331 1. The Principal Permittee will forward the annual operating budget 332 for the forthcoming year to the Co-permittees for review and 333 approval. The review period shall be from the first business day of 334 November to the first business day of December of each year. 335 During the review period, the Co-permittees may provide written 336 comments on the budget to the Principal Permittee. The Fiscal 337 Subcommittee will review the comments on the budget and 338 endorse a draft budget for Management Committee approval. The 339 Management Committee will consider the draft budget for 340 approval at the January meeting. An affirmative response from a majority of the total number of authorized representatives or authorized alternates is required for approval. 343 344 D. For Fiscal Year 2010/11, the Permittees cost share shall be as follows: PERMITTEE PERCENTAGE SHARE Big Bear Lake 1.98 Chino 4.59 Chino Hills 5.08 Colton 3.48 Fontana 7.45 Grand Terrace 0.80 Highland 2.21 Loma Linda 1.36 Montclair 2.19 Ontario 11.99 Rancho Cucamonga 9.81 Redlands 4.84 Rialto 5.58 San Bernardino 12.13 Upland 5.05 June 8 2010 MS4 lmOrnentation Omh Finer-dean.doc 8 PERMITTEE PERCENTAGE SHARE Yucaipa 3.42 County 13.04 District 5.00 TOTAL 100 345 346 E. For Fiscal Year 2011/12, and all subsequent fiscal years the Permittees 347 cost share shall be determined annually according to the methodology 348 provided in Appendix A. 349 F. For Fiscal Year 2011/12, and all subsequent fiscal years, the Permittees 350 annual cost share shall be calculated by November 1 of each year and 351 shall be included in the annual budget proposal. 352 G. The DISTRICT shall invoice each CITY and the COUNTY for its annual 353 deposit after July 1, the start of the fiscal year. Each CITY and the 354 COUNTY shall pay the deposit within 30 days of the date of the invoice. 3S5 Each CITY's and the COUNTY's deposit shall be based on their prorated share of the approved annual budget, reduced for any surplus identified _ . in the prior fiscal year-end accounting. 358 H. The DISTRICT shall make reasonable efforts to inform the Management 359 Committee during the fiscal year of potential exceedances of the approved 360 budget that may require the Parties to increase the deposits. If at any time 361 during a fiscal year the program costs exceed the sum of the deposits, the 362 DISTRICT shall submit invoices to the CITIES and the COUNTY to 363 recover the deficit. The share for each CITY and the COUNTY shall be 364 prorated according to the formula above (see Paragraphs D and E of this 365 Section). Each CITY and COUNTY shall pay the invoice within 30 days of 366 the billing date. 367 368 I. The DISTRICT shall prepare a fiscal year end accounting at the end of 369 each fiscal year and distribute copies to the Permittees for their review by 370 October 31 of that year. Permittees shall have 30 calendar days from the 371 date of their receipt of the fiscal year end accounting to dispute in writing 372 or concur with the findings. If the fiscal year end accounting results in 373 costs exceeding the sum of the deposits (including interest earnings), the 374 DISTRICT shall invoice each CITY and the COUNTY for its prorated 375 share of the excess cost. Each CITY and the COUNTY shall pay the billing I within 30 days of the date of the invoice. If the fiscal year end accounting 3 results in the sum of the deposits (including interest earnings) exceeding June 8 2010 MS4 Implmentalion Draft Rnal--Wean.doc 9 378 costs, the excess deposits will carry forward to reduce the billings for the 379 following year. 380 381 J. Upon termination of the program, a final accounting shall be performed 382 by the DISTRICT. If costs exceed the sum of the deposits (including 383 interest earnings), the DISTRICT shall invoice each CITY and the 384 COUNTY for its prorated share of the excess. Each CITY and the 385 COUNTY shall pay the invoice within 30 days of the date of the invoice. 386 If the sum of the deposits (including interest earnings) exceeds the costs, 387 the DISTRICT shall reimburse to each CITY and the COUNTY its 388 prorated share of the excess (including any interest earnings remaining), 389 within 30 days of the final accounting. 390 391 K. Each CITY and the COUNTY shall bear the financial responsibility for 392 implementing the program within its jurisdictional boundaries, including 393 any applicable MS4 permit fees,as outlined in Section V . 394 395 L. The annual administrative costs (includes actual hourly rate plus 396 overhead) incurred by the DISTRICT shall be included in the budget for 397 the Areawide Program Costs and paid according to this Section, Section 398 111 and Appendix A. 4 M. The financial responsibility for this AGREEMENT will be effective on the 401 date this AGREEMENT takes effect. 402 403 VIII. Term of the AGREEMENT. The term of the AGREEMENT coincides with the term of 404 the current MS4 Permit (Order No. R8-2010-0036). The renewal process of the 405 Implementation Agreement shall begin at the same time as the initiation of the Report of 406 Waste Discharge renewal and shall be completed within 6 months from the SARWQCB 407 approval date of the MS4 Permit that follows Order No. R8-2010-0036. This 408 AGREEMENT shall therefore take effect on the date it is approved by all parties and 409 shall terminate 6 months after SARWQCB approval of the MS4 Permit that follows 410 Order No. RS-2010-0036. 411 IX. Additional Parties. Any city or other entity which wishes to be a Permittee on the San 412 Bernardino County MS4 Permit that was issued by SARWQCB shall agree to the 413 provisions in this funding agreement and shall sign this AGREEMENT prior to being 414 included in the permit. The date of initiation, for determining participant costs for any 415 new Permittee shall be the date of inclusion in the San Bernardino County MS4 Permit 416 issued by SARWQCB. The cost for adding any additional Permittee to the program, 417 including additional permit and processing fees, shall be paid by the added Permittee. 418 Monies, if any, to be reimbursed to the existing Permittees shall be credited to their 419 respective annual program operating fees for the following budget year. 420 421 X. Withdrawal from the AGREEMENT. A Permittee may withdraw from this 42 AGREEMENT at the end of any fiscal year with written notice being received by the 42, DISTRICT 90 days prior to the end of the fiscal year. A withdrawing Pemuttee will not 424 be allowed refunds for tasks, projects or studies already underway in which funds have June 8 2010 MS4 Implmentalion Draft Final--lean doc 10 C 425 been obligated for the fiscal year. Upon completion of tasks, projects or studies 426 undertaken or on-going, if any funds are not expended, a refund of the share of the 427 balance shall be paid within sixty (60) days thereafter to the withdrawing Permittee. 428 429 The withdrawing Permittee shall be responsible for all assessed penalties as a 430 consequence of withdrawal. The cost allocations to the remaining members will be 431 calculated in the following budget year. 432 433 XI. Breach. Failure to comply with the terms of this AGREEMENT is a breach of the 434 agreement. If a breach is not cured within ninety (90) days after receiving a notice to 435 cure the breach by a pernvttee, permittee in breach may be terminated from this 436 AGREEMENT by a majority vote of the Management Committee. 437 438 XH. Non-compliance with M54 Permit Requirements. Any Permittee found in non- 439 compliance with the conditions of the MS4 Permit within their jurisdictional 440 responsibilities shall be solely liable for any assessed penalties, pursuant to Section 441 13385 of the Water Code. Penalties that apply to all the Permittees shall be assessed 442 according to the formula in Appendix A. 443 444 XIH. Legal Action/Costs/Attorney Fees. Where any legal action is necessary to declare any 4.6 c party's rights hereunder or enforce any provision hereof for any damages by reason of an alleged breach of any provisions of this AGREEMENT, each party shall bear its own 44, attorney's fees and costs incurred in conjunction with such legal action regardless of 448 who is found to be the prevailing party. This section shall not apply to those costs and 449 attorney's fees arising from any third party legal action against a party hereto and 450 payable under Section VI,Indemnification and Insurance. 451 452 XIV. Amendments to the AGREEMENT. This AGREEMENT may be amended by consent to 453 a two-thirds majority of the Permittees (rounded to the nearest whole number). 454 Amendments to this AGREEMENT may be adopted and executed concurrently, and 455 shall become effective upon its execution by a majority of the Permittees as defined 456 above. 457 458 XV. Authorized Signatories: Each Permittee will determine by either resolution or ordinance 459 who will be the authorized signatory. This person shall be authorized to execute the 460 application(s) for MS4 Permit(s) and take all other procedural steps necessary to file the 461 application(s)for M54 Permits. 462 463 XVI. Notices. All notices shall be deemed duly given if delivered by hand;or five (5)working 464 days after deposit in the U.S. Mail,certified mail,return receipt requested. 465 466 XVH. Governing Law. This AGREEMENT will be governed and construed in accordance with 467 laws of the State of California. If any provision or provisions of this AGREEMENT shall 46R be held to be invalid, illegal or unenforceable, the validity, legality, and enforceability of 4 the remaining provisions shall not in any way be affected or impaired hereby. Any legal 4'1 action which arises out of or is in any way related to this AGREEMENT shall be brought 471 in the Superior Court of the County of San Bernardino. June 8 2M MS4 Implmentation Draft Final-clean.doc 1 i o . 472 473 XVIII. Consent to Breach not Waiver. No term or provision hereof shall be deemed waived 474 and no breach excused, unless such waiver or consent shall be in writing and signed by 475 any Permittee to have waived or consented. Any consent by any Permittee to, or waiver 476 of a breach by the other whether expressed or implied, shall not constitute a consent to, 477 waiver of,or excuse for any other different or subsequent breach. 478 479 XIX. American Recovery and Reinvestment Act of 2009 "ARRA"). DISTRICT, while acting 480 as the Stormwater Program Administrator, shall include in any contract funded in 481 whole,or in part,by ARRA provisions that substantially conform to the following: 482 483 A. Use of ARRA Funds and Requirements. This Contract may be funded in 484 whole or in part with funds provided by the American Recovery and 485 Reinvestment Act of 2009 ("ARRA"), signed into law on February 17, 486 2009. Section 1605 of ARRA prohibits the use of recovery funds for a 487 project for the construction, alteration, maintenance or repair of a public 488 building or public work (both as defined in 2 CFR 176.140) unless all of 489 the iron, steel and manufactured goods (as defined in 2 CFR 176.140) 490 used in the project are produced in the United States. A waiver is 491 available under three limited circumstances: (i) Iron, steel or relevant 40" manufactured goods are not produced in the United States in sufficient and reasonable quantities and of a satisfactory quality; (ii) Inclusion of 4�- iron, steel or manufactured goods produced in the United States will 495 increase the cost of the overall project by more than 25 percent; or (iii) 496 Applying the domestic preference would be inconsistent with the public 497 interest. This is referred to as the "Buy American' requirement. Request 498 for a waiver must be made to the DISTRICT for an appropriate 499 determination. 500 Section 1606 of ARRA requires that laborers and mechanics employed by 501 contractors and subcontractors on projects funded directly by or assisted 502 in whole or in part by and through the Federal Government pursuant to 503 ARRA shall be paid wages at rates not less than those prevailing on 504 projects of a character similar in the locality as determined by the 505 Secretary of Labor in accordance with the Davis-Bacon Act(40 U.S.C. 31). 506 This is referred to as the"wage rate" requirement. 507 508 The above described provisions constitute notice under ARRA of the Buy 509 American and wage rate requirements. Contractor must contact the 510 DISTRICT contact if it has any questions regarding the applicability or 511 implementation of the ARRA Buy American and wage rate requirements. 512 Contractor will also be required to provide detailed information 513 regarding compliance with the Buy American requirements, expenditure 514 of funds and wages paid to employees so that the DISTRICT may fulfill 51'q any reporting requirements it has under ARRA. The information may be required as frequently as monthly or quarterly. Contractor agrees to fully 5 cooperate in providing information or documents as requested by the 518 DISTRICT pursuant to this provision. Failure to do so will be deemed a June 6 2010 MS4 Implmentatlon Draft Final-dearn.doc 12 519 default and may result in the withholding of payments and termination 520 of this Contract. 521 Contractor may also be required to register in the Central Contractor 522 Registration (CCR) database at htW://www.ccr.gov and may be required 523 to have its subcontractors also register in the same database. Contractor 524 must contact the DISTRICT with any questions regarding registration 525 requirements. 526 527 B. Schedule of Expenditure of Federal Awards. In addition to the 528 requirements described in "Use of ARRA Funds and Requirements," 529 proper accounting and reporting of ARRA expenditures in single audits 530 is required. Contractor agrees to separately identify the expenditures for 531 each grant award funded under ARRA on the Schedule of Expenditures 532 of Federal Awards (SEFA) and the Data Collection Form (SF-SAC) 533 required by the Office of Management and Budget Circular A-133, 534 "Audits of States, Local Governments, and Nonprofit Organizations." 535 This identification on the SEFA and SF-SAC shall include the Federal 536 award number, the Catalog of Federal Domestic Assistance (CFDA) 537 number, and amount such that separate accountability and disclosure is 538 provided for ARRA funds by Federal award number consistent with the 539 recipient reports required by ARRA Section 1512(c). In addition,Contractor agrees to separately identify to each subcontractor and document at the time of sub-contract and at the time of disbursement 542 of funds, the Federal award number, any special CFDA number assigned 543 for ARRA purposes,and amount of ARRA funds. 544 Contractor may be required to provide detailed information regarding 545 expenditures so that the DISTRICT may fulfill any reporting 546 requirements under ARRA described in this section. The information 547 may be required as frequently as monthly or quarterly. Contractor agrees 548 to fully cooperate in providing information or documents as requested by 549 the DISTRICT pursuant to this provision. Failure to do so will be deemed 550 a default and may result in the withholding of payments and termination 551 of this Contract. 552 553 554 XX. Applicability of Prior Agrieements. This document constitutes the entire AGREEMENT 555 between the Permittees with respect to the subject matter; all prior agreements, 556 representation,statements,negotiations,and undertakings are superseded hereby. 557 558 XXl. Execution of the AGREEMENT. This AGREEMENT may be executed in counterpart 559 and the signed counterparts shall constitute a single instrument. 560 561 XXII. No Separate Entity. This AGREEMENT established a framework for PERMITTEE 562 cooperation on storm water issues. Nothing in this AGREEMENT shall be construed to 5( create an entity separate from the local agencies that join in this cooperative effort. 5c. June 6 2010 MS4 Implmer"ion Draft Final—cleen.doc 13 565 IN WITNESS WHEREOF, the AGREEMENT has been executed as of the day and year first 566 above written. 567 568 PLEASE INSERT YOUR AGENCY'S STANDARD SIGNATURE PAGE. 569 AF A Jum 8 2MG MS4 WOomtmbm w.n F+W—d"mocc. 14 �1 NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM STORMWATER PERMIT IMPLEMENTATION AGREEMENT SANTA ANA REGION. IN WITNESS WHEREOF, the Agreement has been executed as of the day and year first above written. ATTEST: CITY OF SAN BERNARDINO, a Municipal Corporation Rachel Clark, City Clerk Charles E. McNeely, City Manager Approved as to form: James F. Penman City Attorney By: I 570 APPENDIX A 571 572 A. The DISTRICT shall pay five percent(5%) of the total annual cost, and the COUNTY and 573 the remaining Co-permittees,collectively, shall pay the remaining ninety-five percent 574 (95°x) of the total annual cost pursuant to the formula set forth in Paragraph C,below. 575 576 B. The Permittees total annual cost share is the sum of the individual cost-shares calculated 577 for each Program Cost Area. 578 579 C. The Permittees annual cost share for each Program Cost Area(PCAi) shall be calculated 580 using three cost factors: 581 582 1. Base,which represents the percentage of the program costs equally applied to all 583 Permi.ttees.The base (B)fraction is calculated as follows: 584 585 B =1/N,where N=number of Permittees 586 587 2. Relative Population,which represents the percentage of the program costs based 588 on the relative population of each Permittee.Relative population (RP) of each 589 Permittee shall be calculated annually from annual population estimates issued 5QO by the California Department of Finance (E-1 Table). RPi=(Pi/Pt,,w),where 593 594 RPi= relative population of Permittee (i) 595 P;= population of Permittee (i) 596 Pt=, = total population for area covered by the area-wide permit 597 598 3. Relative Land Area,which represents the percentage of the program costs based 599 on the relative land area of each Permittee. Relative Land Area (RLA)shall be 600 calculated as follows: 601 602 a. The calculation of relative land area within each Pernuttee's jurisdiction 603 shall exclude land under tribal,state or federal jurisdiction,or any land 604 excluded by the State Wafter Resources Control Board. Any Permittee 605 seeking to exclude lands under this Section shall specifically request that 606 exclusion from the Principal Permittee by providing the request in 607 writing along with necessary documentation no later than October 1 to be 608 considered for inclusion in the next year's annual budget. The requesting 609 Permittee has the burden of proving entitlement to any exemption so 610 requested. 611 612 b. The method for calculating relative land area shall be determined from 611 the Assessor's Parcel data provided by the COUNTY Information Services Department. 6_ 616 RLAi where June 8 2010 MS4 Implmantabon Draft Final-dean.doc 15 617 618 RLAi=relative land area of Co-permittee (i) 619 L= land area of Co-permittee (i), less excluded lands 620 total land area under permit jurisdiction 621 622 D. The Permittee's cost share for each individual Program Cost Area is based on the 623 relative importance of the cost factors to the Program Cost Area as identified in budget 624 year-specific Tables 1,2 and 3.The cost share calculation for each Program Cost Area, 625 which will be phased in over a three year period as shown in Tables 1, 2 and 3,is as 626 follows: 628 + P * + RLAi*Zi* ABi)] 628 PCAi _ [(B X; ABi) (R Y, AB;) ( 629 630 Where, 631 632 FICA,= Permittee's cost share for PCAi 633 ABi= Annual budget for PCAi 634 635 B= Base fraction for each Permittee 636 Xi= Percentage apportioned to the base for PCAi r- RPi= Relative population of Permittee(i) 6.19 Yi= Percentage apportioned to relative population for PCAi 640 641 RLAi= Relative land area of the Per -dttee(i) 642 Zi= Percentage apportioned to relative land are for PCAi 643 644 E. The Pennittee's total annual cost share shall be calculated by summing the cost shares 645 calculated for each individual Program Cost Area: 646 647 Permittee's annual cost share =PCAi +PCA2+PCAi +PCA4 648 Table 1. Budget Year[DATE) Percent of the Program Cost Area Apportioned to each Cost Factor Program Cost Areas (PCAi) Relative Relative Base population Land Area (Xi) (Y+) (Zi) Monitoring(PCAi) 10% 30% 60% Public Education(PCA2) 10% 80% 10% Program Management& 30% 30% 20% Regulatory Activities PCAg Training(PCA4) 30% 60% 10% June 8 2010 MS4 Impimentalion Draft Final-dean.doc 16 r 649 June 6 1010 WA"ffwntMion W FWW-dnnAoc 17