Loading...
HomeMy WebLinkAbout16-Public Works CITy' OF SAN BERNARDINO Fil No. 6.141-K - REQUEST FOR COUNCIL ACTION From: ROGER G. HARDGRAVE Subject: REC'O.-AOMfff. OFF. Public Works/Engineeri~q801 1::1 a rfOV -9 PH 4: 10 11-08-88 Approval of Change Orders ONE & TWO Installation of Ballfield Lighting at Fisca1ini Field per Plan No. 7332 -- GEORGE JUGOVIC CONSTRUCTION Dept: Dlte: Synopsis of Previous Council action: June, 1987 Allocation of $117,090 from 1987/88 CDBG Program for installation of new lights approved. Finding made the installation of new lights is needed for health' and safety reasons. Directed to conduct full environmental impact report. Staff directed to prepare environmental assessment and $5,000 authorized for preparation of technical studies. Report entitled "Noise Assessment Study of Sprint Baseball Games" accepted. Negative Declaration adopted and authorization given to advertise for bids. Resolution No. 88-394 adopted awarding a contract for the low bid price of $94,157.00, for the Basic Bid. Reappropriation of $25,000, from Account No. 121-544 -57597, "Handicapped Ramps," & approximately $11,238 from CDBG Contingency Account, approved. 09-21-87 09-21-87 10-05-87 03-21-88 06-06-88 10-08-88 11-07-88 Recommended motion: cc: J. Robbins J. Richardson A. Green K. Henderson A. Ramos That Change Order No's one & Two to the contract with George Jugovic Construction, for the installation of ballfield lighting at Fiscalini Field, per Plan No. 7332, be approved; authorizing the contractor to install 4 outfield lights at a net increase in the contract price of $42,32. , from $94 7. 0 to $136,485.00. M Contact person: Roger Hardgrave Phone: 5025 Supporting data attached: Staff Report, ceo One & Two Ward: 2 FUNDING REQUIREMENTS: Amount: $42,328.00 Source: (Acct. No.) 121-544-57596 (Acct. DescriPtion) Fiscalini Field Lighting Finance: O~ ;:.jr-./ System Council Notes: 75-0262 Agenda Item No. /6 CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION STAFF REPORT The contract for installation of was awarded for the Basic Bid only, due finance the replacement of all lights. were included in the Basic Bid, with designated as Additive Alternate "A". lights at Fiscalini Field to insufficient funds to The four infield towers the four outfield towers A price of $62,328.00 was included in the low bid for Additive Alternate "A". The Colony Village development, at Barton Road and Hunts Lane, improved a baseball field. This field has a much higher lighting level than required. Therefore, the Parks and Recreation Department has proposed that four of the eight poles at Colony Village be removed and furnished to the Contractor for Fiscalini Field. Removal of these poles and transporting them to Fiscalini Field would be done by City Forces. The Contractor has quoted a credit of $20,000, for the City furnishing the four poles. Lighting fixtures would still be furnished by the Contractor. We have checked the purchase price for poles, and determined that the credit of $20,000 is fair and reasonable. Inclusion of the four outfield poles, furnished by the City, would increase the contract price by $42,328.00. At the Council meeting of 11-07-88, the amount of $25,000 was reappropriated from Account No. 121-544-57597, "Handicapped Ramps at Various Locations," and the approximate amount of $11,238 was appropriated from the CDBG Contingency Account, to finance the cost for adding the four outfield poles to the contract. Change Order No One will add Additive Alternate "A" to the contract, at an increase in the cost of $62,328, and Change Order No. Two will authorize a credit of $20,000 for the City furnishing the four poles. We recommend that Change Orders No. 1 & 2 be approved. 11-08-88 75-0264 ~ ~\1lwC:. .L.':" - i .. ~'~ . project: BALLFIELD LIGHTIrlG IMPROVErlENTS TO FISCALINI BASEBALL FIELD File NO.6 .141-K Plan No. 7332 ENGINEERING DIVISION DEPARTMENT OF PUBLIC WORKS CITY OF SAN BERNARDINO, CALIfORNIA CONTRACT CHANGE ORDER NO. Q!lL.. (Change. necessitated because of field conditions) TO: GEORGE JUGOVIC CONSTRUCTION CO. 23014 ERWIN STREET WOODLAND HILLS, CA. 91367 Gentlemen: You are hereby authorized and directed to remove and install (4)four otufield poles and light fixtures in accordance with Additive Alternate "A" of the Bid Schedule for Plan No. 7332 for the Lump Sum price of $62,328.00. Total extra work cost added to contract .............................$ 62.32R nn Previous Contract Price .............................................$ 94,157.00 Amended Cost Price ..................................................$ 156,485.00 Additional time to complete contract due to change order ............ -0- CONTRACTOR: CITY OF SAN BERNARDINO: 8y: Title: 8y: ROGER G. HARDGRAVE Director of Public Works/City Engr. Accepted Date: Approved Date: ~ project: BALLFIELD UGH" 'G H1PROVE~1ENTS TO FICALINI BA~~JALL FIELD P11ft No. 7332 Da te: 9-16-88 File No. 6.141-K ENGINEERING DIVISION DEPARTMENT OF PUBLIC WORKS CITY OF SAN BERNARDINO, CALIFORNIA CONTRACT CHANGE ORDER NO. TWO .- (Change necessitated because of field conditions) TO: GEORGE JUGOVIC CONSTRUCTION CO. 23014 ER~JlN STREET WOODLAND HILLS, CA. 91367 Gentlemen: You are hereby authorized and directed to install four (4) Owner furnished steel poles and light fixtures, along with all appurtenant facilities as called for on the Plans and Special Provisions No. 7332, at a net decrease in the contract price of $20,000.00. Total extra work cost added to contract .............................$ (20,000.00) Previous Contract Price .............................................$ 156,485.00 Amended Cos t Pri ce .................................................. $ 136. 485 . 00 Additional time to complete contract due to change order ............ -0- CONTRACTOR: CITY OF SAN BERNARDINO: By: Title: By: ROGER G. HARDGRAVE Director of Public Works/City Engr. Accepted Date: Approved Date: