CI. ( OF SAN BERNARD 10 - REQU ST FOR COUNCIL A( 'ION
From: Kenneth J. Henderson, Director
Subject:
CDBG FUNDING ESTIMATED
AT $10,400.00 FOR DESIGN
COSTS RELATED TO NUNEZ PARK
POOL FILTRATION SYSTEM
Dept: Community Development
Date: March 22, 1988
Synopsis of Previous Council action:
~o
None
Recommended motion:
That the Mayor and Common Council move to approve the CDBG funding of
design costs estimated at $10,400.00 related to Nunez Park Pool filtration
system and authorize the Director of Public Works to issue a Request for
Proposals (RFP) for design services.
~.V's~
Ken Henderson/Lisa Dickey
Phone:
5065
Contact person:
Staff Report
Ward:
3
Supporting data attached:
FUNDING REQUIREMENTS:
Amount:
$10,400
Source: (ACCT. NO.)
121-544-57735
(ACCT. DESCRIPTION) CDBG Appropriated Reserve Acct.
Finance: IJ... -4~
Council Notes:
Agenda I tem No.
~(
C.~ , OF SAN BERNARD~ JO - REQU~ IT FOR COUNCILAC. ./ION
STAFF REPORT
On October 1, 1987, the Community Development Citizen Advisory
Committee (CDCAC) considered a funding request ($150,000-$165,000)
from the Parks, Recreation and Community services Department for
replacement of the Nunez Park pool filtration system. The item was
referred back to staff and the Parks, Recreation and Community
Services Department to determine if there were other possible
funding sources available. The CDCAC felt that the nature of the
project suggested that it could and should have been planned for in
the Parks, Recreation and Community services budget.
On November 9, 1987, and February 3, 1988, staff was provided with
additional information from the Parks, Recreation and Community
Services Department pertaining to the cost estimates and request for
reconsideration by the CDCAC for funding of the design services
portion of the project. The approval of the design costs for this
project would enable the Parks, Recreation and Community Services
Department to submit a proposal for construction financing during
the FY 1988/1989 CDBG funding cycle.
The attached letter indicates that architectural and engineering
(A&E) charges range between six percent (6%) and eight percent (8%)
multiplied by the $130,000 (construction costs), with the resulting
amount estimated at is $10,400.
On March 17, 1988, the CDCAC reconsidered the request for funding
and took action recommending to the Mayor and Common Council
approval of this item.
I recommend adoption of the form motion.
Kenneth J. Henderson
Director of Community evelopment
KJH/LRD/lab/0856
March 22, 1988
75-0264
CAblfDRnl" PDUbS tr.JPM
October 8, 1987
Mr. Josh Carter
c/o Parks , Recreation Dept
547 N. Sierra Way
San Bernardino, Ca. 92401
SUbject: Cost estimate for proposed modification to Ruben Campos
Park Pool.
Dear Mr. Carter,
Per your direction we have inspected the above mentioned PQol and
prepared an estimate for the work discussed. This estimate is cal-
culated in 1986 dollars based on the general knowledge we were able
to obtain at the sight. We feel they are sufficiently accurate for
budget purposes. We have based our estimate on the equipment re-
commended by Larry Knorr of Knorr Pool Systems. His submitted mat-
erial is enclosed for your reference.
We feel the project breaks down as follows:
Removal of a minimum 2 filter tanks
Construction of a new surgechamber to recapture
gutter water & recirculate.
Installation of new 8 tank filter system, piping,
valves, and flowmeter.
Change existing gas chl. system to a liquid chl. system
and automatic disbursement of those chemicals.
SUBTOTAL
SUPERVISION & p/O 20%
GRAND TOTAL
$15,000.00
30,000.00
75,000.00
10,000.00
$130,000.00
26,000.00
$156,000.00
Additional, if you desire to remove the remaining two tanks you
should add $15,000.00 to the above price. Engineering services for
a project like this could run 6 to 8 percent should you decide to
have a consultant prepare the plans and specifications.
Please feel free to call if any further clarification is required.
We apologize for the delay in preparing this estimate.
J/krs
3-22-88 OFF~S
AnIeloPe Valler . ArtadialSan Gabriel' Austin. TX . Bakersfield . Camarllo · Chino · Commercial [)ivision · C>>/InI' G1tnclora · olenCSalel8ulbank · High Detet'
knperiaI Valler . La \Ierne . Las Yegu. NY . MisIlon Viejo . North Dallal. TX . ()rangelMaheim · Palm SpringS · PItImOunl. Pa5l~1\I · RidgeCrest · RMlr5idI
~n eemar6ino' San [);ego' San Jose' Santa Barbara' Santa Clarlta....lIer. Sara Cruz · Simi VIIIey' 'ftlouN/ldOlks' Upland.....IIey. walnut. Yuma. AZ
Uce.... No 18S~