Loading...
HomeMy WebLinkAbout05-Community Development CI. ( OF SAN BERNARD 10 - REQU ST FOR COUNCIL A( 'ION From: Kenneth J. Henderson, Director Subject: CDBG FUNDING ESTIMATED AT $10,400.00 FOR DESIGN COSTS RELATED TO NUNEZ PARK POOL FILTRATION SYSTEM Dept: Community Development Date: March 22, 1988 Synopsis of Previous Council action: ~o None Recommended motion: That the Mayor and Common Council move to approve the CDBG funding of design costs estimated at $10,400.00 related to Nunez Park Pool filtration system and authorize the Director of Public Works to issue a Request for Proposals (RFP) for design services. ~.V's~ Ken Henderson/Lisa Dickey Phone: 5065 Contact person: Staff Report Ward: 3 Supporting data attached: FUNDING REQUIREMENTS: Amount: $10,400 Source: (ACCT. NO.) 121-544-57735 (ACCT. DESCRIPTION) CDBG Appropriated Reserve Acct. Finance: IJ... -4~ Council Notes: Agenda I tem No. ~( C.~ , OF SAN BERNARD~ JO - REQU~ IT FOR COUNCILAC. ./ION STAFF REPORT On October 1, 1987, the Community Development Citizen Advisory Committee (CDCAC) considered a funding request ($150,000-$165,000) from the Parks, Recreation and Community services Department for replacement of the Nunez Park pool filtration system. The item was referred back to staff and the Parks, Recreation and Community Services Department to determine if there were other possible funding sources available. The CDCAC felt that the nature of the project suggested that it could and should have been planned for in the Parks, Recreation and Community services budget. On November 9, 1987, and February 3, 1988, staff was provided with additional information from the Parks, Recreation and Community Services Department pertaining to the cost estimates and request for reconsideration by the CDCAC for funding of the design services portion of the project. The approval of the design costs for this project would enable the Parks, Recreation and Community Services Department to submit a proposal for construction financing during the FY 1988/1989 CDBG funding cycle. The attached letter indicates that architectural and engineering (A&E) charges range between six percent (6%) and eight percent (8%) multiplied by the $130,000 (construction costs), with the resulting amount estimated at is $10,400. On March 17, 1988, the CDCAC reconsidered the request for funding and took action recommending to the Mayor and Common Council approval of this item. I recommend adoption of the form motion. Kenneth J. Henderson Director of Community evelopment KJH/LRD/lab/0856 March 22, 1988 75-0264 CAblfDRnl" PDUbS tr.JPM October 8, 1987 Mr. Josh Carter c/o Parks , Recreation Dept 547 N. Sierra Way San Bernardino, Ca. 92401 SUbject: Cost estimate for proposed modification to Ruben Campos Park Pool. Dear Mr. Carter, Per your direction we have inspected the above mentioned PQol and prepared an estimate for the work discussed. This estimate is cal- culated in 1986 dollars based on the general knowledge we were able to obtain at the sight. We feel they are sufficiently accurate for budget purposes. We have based our estimate on the equipment re- commended by Larry Knorr of Knorr Pool Systems. His submitted mat- erial is enclosed for your reference. We feel the project breaks down as follows: Removal of a minimum 2 filter tanks Construction of a new surgechamber to recapture gutter water & recirculate. Installation of new 8 tank filter system, piping, valves, and flowmeter. Change existing gas chl. system to a liquid chl. system and automatic disbursement of those chemicals. SUBTOTAL SUPERVISION & p/O 20% GRAND TOTAL $15,000.00 30,000.00 75,000.00 10,000.00 $130,000.00 26,000.00 $156,000.00 Additional, if you desire to remove the remaining two tanks you should add $15,000.00 to the above price. Engineering services for a project like this could run 6 to 8 percent should you decide to have a consultant prepare the plans and specifications. Please feel free to call if any further clarification is required. We apologize for the delay in preparing this estimate. J/krs 3-22-88 OFF~S AnIeloPe Valler . ArtadialSan Gabriel' Austin. TX . Bakersfield . Camarllo · Chino · Commercial [)ivision · C>>/InI' G1tnclora · olenCSalel8ulbank · High Detet' knperiaI Valler . La \Ierne . Las Yegu. NY . MisIlon Viejo . North Dallal. TX . ()rangelMaheim · Palm SpringS · PItImOunl. Pa5l~1\I · RidgeCrest · RMlr5idI ~n eemar6ino' San [);ego' San Jose' Santa Barbara' Santa Clarlta....lIer. Sara Cruz · Simi VIIIey' 'ftlouN/ldOlks' Upland.....IIey. walnut. Yuma. AZ Uce.... No 18S~