HomeMy WebLinkAbout13-Development Services CITY OF SAN BERNARDINO - REOUEST FOR COUNCIL ACTION From: Valerie C. Ross, Director Subject: Authorize the Director of Development Services to execute Dept: Development Services Contract Change Order No. One with A.K. Engineering for Traffic Signal Date: November 7, 2009 Modification at Waterman A venue and Parkdale Drive (TC05-07), Per File Nos. 1.7492 Project Plan no. 11628. MCC Date: December 7, 2009 Synopsis of Previous Council Action: 09-02-08 The Mayor and Common Council approved FY 2008-09 CIP budget. 12-01-08 The Mayor and Common Council adopted a Resolution awarding a contract to A.K. Engineering for Traffic Signal Modification at Waterman Avenue and Parkdale Drive (TC05-07), Per Project Plan no. 11628. Recommended Motion: Authorize the Director of Development Services to execute Contract Change Order No. One with A.K. Engineering for Traffic Signal Modification at Waterman Avenue and Parkdale Drive (TC05-07), Per Project Plan no. 11628. ~ V. /(141-- Valerie C. Ross Contact Person: Robert Eisenbeisz, City Engineer Phone: Ext. 5203 Supporting data attached: Staff Report & CCO No. One Ward: 4, 7 FUNDING REQUIREMENTS: Amount: $ 9,372.75 Source: (Acct. Nos.) 258-359-5504-7492 Acct. Description: Prop 1 B Fund Finance: Council Notes: Agenda Item NO'(i]-iC? CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION STAFF REPORT Subject: Authorize the Director of Development Services to execute Contract Change Order No. One with A.K. Engineering for Traffic Signal Modification at Waterman Avenue and Parkdale Drive (TC05-07). Per Project Plan no. 11628. Background: The traffic signals located at the intersection of Waterman Avenue and Parkdale Drive have been modified to allow for protected north and south left-turn movements. This Capital Improvement Program (CIP) project will improve traffic safety at the intersection and also aid in reducing traffic congestion. New signal poles, mast arms and signal heads are being installed as part of the proj ecl. Change Order: During construction of the project the contractor encountered the following conditions: 1. One of the existing signal conduits was unusable due to an accumulation of dirt and debris. In order to route new wiring to the signal, the conduit had to be replaced, which required saw cutting though an existing concrete handicap ramp. The additional work was completed at a cost of $6,725.00. 2. Caltrans recently installed curb ramps at the intersection that conflicted with City plans. Since the new signal poles would then be located too far from the intersection, it was necessary to install pedestrian push-button posts in order to comply with accessibility requirements. The additional work was completed at a cost of$I,100.58. 3. The new traffic controller equipment required programming changes to be compatible with the newly modified signal system. Until Caltrans modified the signal timing plan, no work could be done by the contractor, causing a construction delay. The standby time added an additional cost of $829.04. 4. During construction it was found that two of the State's existing loop indicators were not working. To insure a proper functioning traffic signal, the contactor was directed to replace the existing loops. The additional work was completed at a cost of$718.13. 2 .-'; CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION STAFF REPORT (Continued) Financial Impact: The revised estimated project costs are as follows: TOTAL Original Contract Amount $77,010.00 Contract Change Order No. One $9,372.75 Total Project Cost $86,382.75 This change order represents a net increase of 12.2% of the original contract amount. There are sufficient funds in the project account to cover this change order. This project had a total budget of 591,000, including the additional costs for inspection and contingencies. Inspection costs were estimated at 8.2% and contingencies were estimated at 10% of the total contract amount. The change order exceeds the 10% contingency, but the actual inspection costs were less than anticipated, so no additional funds are needed for this project. Recommendation: Authorize the Director of Development Services to execute Contract Change Order No. One with A.K. Engineering for Traffic Signal Modification at Waterman Avenue and Parkdale Drive (TC05-07), Per Project Plan no. 11628. Attachments: Change Order No. One 3 DEVELOPMENT SERVICES DEPARTMENT '" 300 North "D" Street. San Bernardino' CA 92418-0001 Planmng & Building 909.384.5057 . Fax: 909.384.5080 Public WorkslEngineering 909.384.5111 . Fax: 909.384.5155 www.sbcity.org CONTRACT CHANGE ORDER NO. ONE FILE NO, 1.7492 W.O, NO, 7492 DATE: DECEMBER 7, 2009 PROJECT: TRAFFIC SIGNAL MODIFICATION AT WATERMAN AVENUE AND PARKDALE DRIVE (TC05-07), PER PROJECT PLAN NO, 11628, TO: A,K, ENGINEERING 1254 S, WATERMAN AVE., STE. #17 SAN BERNARDINO, CA 92408 GENTLEMEN: You are hereby compensated for performing the additional work as follows: ITEM NO: DESCRIPTION OF CHANGE COST 1-1 Install New Lateral Crossing & Wire & Construct new Handicap $ 6,725,00 Ramo 1-2 Install Pedestrian Pushbutton & Lower Existing Pushbuttons $ 1,100,58 1-3 Turn on Delay $ 829.04 1-4 Install Two (2) Loops $ 718.13 TOTAL COST CCO #1 $ 9,372,75 JUSTIFICATION: Item No, 1-1 Install New Lateral Crossing & Wire The existing conduit crossing was congested with debris and was unusable. The contractor was directed to replace the existing conduit and wire. The handicap ramp was cut into in order to fix the conduit. It was then necessa to re lace the handica ram . Install Pedestrian Pushbutton When placing the traffic signal poles, it was determined that the pedestrian push button pole would be too far from the crosswalk to meet ADA standards. The contractor was directed to install a new edestrian ost and ush button. Standby Time The existing controller was not programmed to accept the new improvements; therefore, the contractor was ordered to stand by until the programming was com leted. 1-2 1-3 CHANGE ORDER NO. ONE - AX ENGINEERING TRAFFIC SIGNAL MODIFICA nON AT WATERMAN AVE & PARKDALE DR (TCOS-Q7). PER PROJECf PLAN NO., 11628, Install Two (2) Loons 1-4 Two existing traffic loops were not functional. It was necessary to repair these loops to ensure the new im rovements would function ro erl . SUMMARY OF CONTRACT COSTS The estimated revised contract cost is as follows: Original Bid Amount. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ..... ...................$ 77,0 I 0.00 Contract Change Order No. One. . . . . . . . . . . . . . . . . . . . . . . . . . . . . ....................$ 9,372.75 Revised Construction Contract cost. . . . . . . . . . . . . . . . . . . . . . . . .. ....................$ 86,382.75 Additional time to complete Contract due to this Change Orderm"mm""m.""," 0 Working Days This change order represents 12.2 % of the original contract.amount. A,K, ENGINEERING CONTRACTOR Accepted By: CITY OF SAN BERNARDINO DEVELOPMENT SERVICES Approved By: VALERIE C. ROSS Director of Development Services Title: Date: Date: Approved By: CHARLESE.McNEELY City Manager Date: Item No. December 7, 2009 2