HomeMy WebLinkAboutR21-Public Works - \ File No. 6.251-10 - REQUF'~T FOR COUNCIL AC"10N . CI.,."" OF SAN BERNARDJNO , From: Roger G. Hardgrave (.,.~: Publ ic WorkslEngineering Date: 12-09-85 Subject: Approval and Acceptance of Work -- Electrical for NEW CENTRAL LIBRARY, per Plan No. 6464 -- MARK COX ELECTRIC Synopsis of Previous Council action: 07-11-84 -- Resolution No. 84-248 adopted, awarding a contract to Mark Cox Electric, Inc., and approving Change Order No. One, to reduce the contract price by $126,524.00. 02-04-85 Change Order No. Two approved to authorize the Contractor to provide TV outlets, additional phone jack, deleted fixtures in the skylight, revised ceiling and security wiring at an increase of $5,444.91 in the contract. price, from $495,798.00 to $501,242.91. 03-18-85 -- Change Order No. Three approved to authorize the Contractor to delete TV outlets, added in C.C.O. No. Two, revised existing lights, revised first floor lighting and power; and added two low voltage relays, at a total decrease of $175.62 in contract price from $501,242.91 to $501,067.29 (Continued on 2nd page) Recommended motion: c That the work performed by the Contractor, in accordance with Specification No. 6464 be approved and accepted; and that final payment be authorized at the expiration of the lien period. cc: John Matzer, Jr., City Administrator Wayne Overstreet, Public Blds. Supt. Orur -& ~ Signature Contact person: Roger G, Hardgrave Supporting data attached: Sta ff Report Phone: 5025 1 Ward: FUNDING REQUIREMENTS: Amount: Source: Bonds sold bv RDA and Grant through State Librarian Finance: Council Notes: C 75.0262 Agenda Item No.tR ell / _.J _ CloW OF SAN BERNARD-'b - REQU~T FOR COUNCIL AC~ON r-- '- STAFF REPORT 12-06-85. All work under the contract was satisfactorily completed as of The contract was awarded to Mark Cox Electric, Inc. (including deductive Change Order No. One) for the low bid price of $495,798.00. Change Orders Two through Eight authorized a net increase in the contract price of $7,543.32, from $495,798.00 to $503,341.32, which is the actual final contract price. A copy of the letter from the Architect, dated 11-06-85, certifying that all work is 100% complete, is attached for reference. We concur with the Architect's recommendation that the work be approved and accepted, and that final payment be authorized at the end of the lien period. URGENCY CLAUSE Since all work has been completed, it is necessary for the project to be approved and accepted as soon as possible, in order for the final payment to be made in a timely manner. <:: SYNOPSIS OF PREVIOUS COUNCIL ACTION Cont: 05-13-85 -- Change Order No. Five approved to authorize the Contractor to add a 2" conduit for irrigation sprinkler control wires, at an increase in the contract price of $367.81 from $501,067.29 to $501,435.10. 11-04-85 -- Change Order No. Six on Agenda approved to authorize the Contractor to relocate temporary power; provide additional wiring for elevator control; and relocate three thermostats, at an increase in contract price of $661.75, from $501,435.10 to $501,096.85. 11-04-85 -- Change Order No. Seven approved to authorize the Contractor to install Halo Model #1176 track lights in place of Halo Model #733-P track lights, at an increase in the contract price of $1,003.93, from $502,096.85 to $503,100.78. 12-02-85 -- Change Order No. Eight approved to authorize the Contractor to re- wire the chiller control panels to be in conformance with the manu- facturers recommendations, and the Engineer's directives, at a net increase in the contract price of $240.54, from $503,100.78 to $503,341. 32. c 75.0264 ;- ~ c c c o November 6, 1985 - .~ I , :) City of San Bernardino Public Works/Engineering 300 North "0" Street, 4th Floor San Bernardino, California 92418 .~--, Attention: William J~,Senior Re: Central Library Dear Mr. Post: Field Engineer This letter is to certify that Bid pack i 5,6,7,8,10,11' and 13 are 100% complete. car A. Arnoni AI roject Architect cc: Bill Doran J.D.Diffenbaugh GREGORY VILLANUEVA ARCHITECTURE "DD '''YINE AYE., JUtT. .., ASSOCIATES A.I.A. & ASSOCIATES PLANNING NEW..DIIIT ..ACH. CA. ....D ~7M1 _,.,...