Loading...
HomeMy WebLinkAbout30-Public Works - -- - - - - CI~ OF SAN BERNARDICo - REQUUT FOR COUNCI~~~ON From: ROGER G. HARDGRAVE ftEC'O.. AOMIN. OFf. Publ ic Works/Enginee~NOV 21 pI 2: S \ Subject: Approval of Contract Change Order No. Twelve -- Construction of New Tippecanoe Avenue Bridge Over Santa Ana River. per Plan No. 6358 --KASLER CORPORATION Dept: Date: 11-21-85 Synopsis of Previous Council action: 08-06-84 Plans approved and authorization granted to advertise for bids. 01-21-85 10-07-85 -- Resolution 85-20 adopted. awarding a contract to Kasler Corporation for construction of the Tippecanoe Avenue Bridge over the Santa Ana River. for the low bid price of $4.283.034.00. Change Order No. One approved to authorize payment for removing and replacing material which prevented piles being driven at north abut- ment of the bridge at an increase in contract price of $9.701.00 from $4.283.034.00 to $4.292.735.00. 10-07-85 -- Change Order No. Two approved to authorize payment for construction and maintaining a detour through the construction area. at an in- (;1t:C1::;tt In cuntrdct price OT IJ.O.,700.00 Trom ~~hLYL,''':"I.UU "to $4.303.435.00. Recommelldcd Illot;O'.o That Change Order No. Twelve to the contract with Kasler Corporation. for construction of the new Tippecanoe Avenue Bridge. in accordance with Plan No. 6358. be approved; to authorize Contractor to break up a Portland Cement concrete surface found below the wearing surface on Tippecanoe Avenue on a time and material basis (Force Account) at an estimated cost of $4.100.00 and to delete part of the scarifying of A.C. at a credit of ($720.00) for a net increase in contract price of $3.380.00 from $4.314.265.00 to $4.317.645.00. cc: John Matzer. City Administrator Warren Knudson. Director of Finance r:A- rr~~- Signature '---- Contact person: Roger G. Hardqrave Phone: 5025 1 Suprorting data attached: Staff Report Ward: FUNDING REQUIREMENTS: Amount: $3,380.00 Account No. 242-362-57339 "Tippecanoe Bridge AF-AD60(l)" Source: Street Construction Fund-- Finance: ptt:- .iI( r-.;' Council Notes: 75-0262 Agenda Item No.~ .:r tJ. - - CI'IC OF SAN BERNARDICD - REQUL.JT FOR COUNCIL ACOoN STAFF REPORT During construction Portland Cement concrete was encountered immediately below the existing asphalt concrete. In order to keep water from ponding the Portland Cement concrete must be broken up in small enough pieces to be placed in the new roadway embankment. The costs for doing this work will be done on a "time and material" basis (Force Account) at an estimated cost of $4,100.00. the portion where the removal is done will be subtracted from the area to be scarified at a credit of ($720.00l. The net increase to the contract cost is $3,380.00. We recommend that Contract Change Order No. Twelve be approved. Synopsis of Previous Council Action: 10-07-85 -- Change Order No. Seven approved to authorize payment for changing the type of material to be used in the construction of an apron at a culvert from asphalt to Portland Cement concrete, at an increase in the contract price of $290.00, from $4,303.435.00 to $4,303,725.00. 11-04-85 -- Change Order No. Eight approved to authorize the installation of a 4- inch pipe PVC conduit with pull rope at a net increase in contract price of $1,200.00 from $4,303,725.00 to $4,304,925.00. 11-18-85 -- Change Order No. Nine approved to authorize funds to compensate the Con- tractor for "on-the-job" training of six trainees, at an increase in contract price not to exceed $4,800.00 from $4,304,925.00 to $4,309,725.00. 12-02-85 -- Change Order No. Ten on the agenda to authorize the Contractor to con- stuct a cross-gutter on the northside of San Bernardino Avenue at River- side Drive at an increase in contract price of $540.00 from $4,309,725.00 to $4,310,265.00. 12-02-85 -- Change Order No. Eleven on excavate unsuitable material the material and backfill increase in contract cost $4,314,265.00. the agenda to authorize the Contractor to to a maximum depth of four feet, dispose of with suItable material at an estimated of $4,000.00 from $4,310,265.00 to 75-0264 ,,_.,~. .-~,.~.~.)? 15~741 '1/ ,..... .. I /.itl'// J o "' .-..) FILC T0. _:jrq 4,;; t~ l: 1-(</ Fr:;~,I. _ Lit. i..lj/ ()t-'i..-?<'<.1.-1 c:c 1;0 I 2. i _'_ Rcy No _ Sup No 3, 3Y{). ['0 "Continacnc.y Ooln",:o (Ine 'I'hl CI" S Mngol ~ </'1 "7- $ _,;J I J (.,. . J ; Cl[" . s INCH. -OleGR~ THIS CHANGE ORDER pnOVIDES Fon, . c".,.,pa .4;Z;~~ .h;. .J~i-~/, -n, r" I.U Tv / t:"-<- dt.?Ct71H.-hctf:. ~1-7Ld.ck.?tl.e-- 19 G /U-utAd:?< 'f ~.UvirL~ '-:l1Y .n1id,;;y -Zir"'~~~ t1~ .,c,:".4"';..!' /:~J ",.L'cL. .P /fcu/C,c c' t"'-f..<-C'z-t'cf ~t( />If--u.>--' ..e-'J~-r-J/t"Y( y'. : Ji.. ~"" ,& '"z.d ~~4~'a:c<, ;xL ./ ':"'-(;.".'" ':/ xL.. ~"",u"<I'1r..6~, Con; ,L<.t:'~'tiY . It. '-Cdf"""'/.../ .~~~if;tj'{1 ;ct.../..4 C .....IrA<~" --7- u.~ t'due.-: .;.... ;tL/~., .,.. . [_,(/,/~f,h/ ~/ L f;; i::q "-',,..~ ~ t<<tt'd <I,~ 7>-0 '0 0 ".~{) Ac . ...f4.,.<~,.{ ~. . ;;e-L- &4, ,/L ~j;;ar.td ,a-l r /J..-.'d"j17 . ;el<. ..4 C. . kr/. ceo DISCUSSED WITH: ESTIMATE OF COST THIS CCO T~lTJl.L TO DATE 1- C~nstru::tion Engineer ;, Sol~ ,J Engineer :!'. rhWA Rep. YES NO Items t:orco Account Agreed PrlcQ' Adjushnent n~tClI ~ 'lj~ $ 7. J..1t,.c'~ ~. '3 ( [-'.0<" / ,. S <. ," $' /~ '. ,), , C" (J . S t ----L!.... :;~ c"" ). C"~") S _ S -~_.- $ ~, '3 Snoo S 34~{, 1I'c'C' Fcdoml Sllorcg.1tlon: . FcdornlNo. AF-Aj)-{,c>(;) 1.:;'2/ -- ~. S S Name NanX' Nnme ~.~. Pri,," Approval l\y: ... ~_ Issuo t. ^p~lIove Oy: 0."\10 DalD '\ $..:';,:. Fun.is Pnwhl('l! S "0HS; 1. O('~~clit,o \V1I.ll. \\1\V, 11.......7 ". 2. [),plain llWW.1 EXIl.!ll'-ioftl n 0 I .1 ~.r {11\(mOllls 3. Show " CIl,lf~:)l'.'lJtl! 10 (';ILh FC'lh'(;l1 f,ectlon 10 Non.P.llllc. f.cc.:lIoll~ P. to COO[1. ^Ur. ' / Cl-1i'.9, 'Cit:t.?!(t-/ ~;SI().[N r [Nt."Nt Lit ," UOI..'<)o,)fo.U_ll"lM ....to., c CITYC:; SAN DERNARD(:) CONTRACT CHANGE ORDER NO. 12 08-SBdo-O.-SBd :> F<- He-II "I....' 'OAO surrL. NO. sltm --L or _-L- slims 'EDERAI NO.(SI AF-AD-60(l) CONTRACT NO. 61S8 T. KASLER CORPORATION C.n"~'" You or. hereby directed to make Ihe herein delCribed chon9C\ from the pions and spe<iliCoI'io"s or do tI,e follow,"O dCi(ribed worlro nol Wacluded in rile prO"S Qnd '~(lli((J' ~ on thi, (oolrae'. HOTE: . Thi, chonge <<d., is not effecti.... until approved by ,he Engine.r. DeKripttcH1 01 war. to be donI!. c~limQle of quantities, alld prices to be poid. So:grr.Q(lfoe betwcr.n additional work 01 controd price. agreed price nod force account. Unlou otherwit.e slated. rates lor renlol 01 equipmenl cover only such time 0$ equ'pml':nt is actuolly used rmd no allowance will be mode for idle lime. Chongerequtlstedby En ineer The lent percenlage mown is the net accumulated increase or decrease from .he original quantity in the Engineer's Estimate 1. Extra work at force account. Prior to placing embankment on the existing Tippecanoe Avenue roadway surfaces, break-up the portland cement concrete base and the asphalt concrete wearing surface to preveht ponding of water, all as directed by the Engineer. Estimated cost ;p4,100.00 The Contractor will allow a credit of $720.00 to the City for his anticipated cost to scarify the asphalt concrete surface. Est;mated Cost DecreaseS .doc'eoooS 3,180.00 By reason of this order the timo of completion will be adjusted os follows: No adjustment ~itMdby, ~nglneer - //-7-S,5 Approwol R<<--.ded, .... Appt'owd, Engineer by .... We. the """'.'I'Ql'led (o/lIlOClol. ho... gi..." (a,elul (on,idt'.atiun IQ U.. th<Kl(lO propo\e\l Gnd "e,eby (10'". "fl,is p,<)"o~nl is approved, that.....o w,1l pro"jolo aU o'l""pmenl. '".",101, ull rnuteriol,. ..upf en rnoy olh.o,wiI0 be noted CItoo.... OI'Id polio,", D11111t"YJ(es ne<.O"ory lo.r the .....0... oboWlIp<<iilotd. 0IId......1I occepl oll"l~pO)'rnent the..lor tho p,ic., mown ......0..0. :"PI'dJ~ Contractor KASLER Tid. ';JJ4- "the Conlroclo. dc.el nol'~ act"plol'lC. 01 this <<del. h'III"-',on;1 direc;Nd to II,e roqui.e",""", 01 tho lpe(ili<ur'on us 10 pro<..dirlg......th the ordered WOf" oo..J l.Imu o.....,in.." prot..t.........in Iholi... the'....lpet.lwd.