HomeMy WebLinkAboutR03-Public Works - - - II Fil e No. 6.251-l0 CI'Cf OF SAN BERNARD~ - REQUO'T FOR COUNCIL ACQON 'From: Roger G. Hardgrave 0: Publ ic Works/Engineering Date: lO-l8-85 Subjact: Approval of Change Order No. SIX -- Contract with Mark Cox Electric - Facilities for New Central Library. per Plan No. 6464 Synopsis of Previous Council action: 07-l1-84 --- Resolution No. 84-248 adopted, awarding a contract to Mark Cox Electric, Inc., and approving Change Order No. One, to reduce the contract price by $126,524.00. 02-04-85 --- Change Order No. Two approved to authorize the Contractor to provide TV outlets, additional phone jack, deleted fixtures in the skylight, revised ceiling and security wiring at an increase of $5,444.91 in the contract price, from $495,798.00 to $501,242.91. 3-18-85 --- Change Order No. Three approved to authorize the Contractor to delete TV outlets, added in C.C.O. No. Two, revised existing lights, revised first floor lighting and power; and added two low voltage relays, at a total decrease of $175.62 in contract price from $SOl,242.'91 to $501,067.29. (cont. on 2nd page) Racommended motion: () That Change Order No. Six to the contract with Mark Cox Electric, Inc., for construction of electrical facilities for the New Central Library in accordance with Plan No. 6464, be approved; to authorize the Contractor to relocate temporary power; provide additional wiring for elevator control, and relocate three thermostats, at an increase in- contract price of $661.75, from $50l,435.10 to $502,096.85. cc: John Matzer, Jr.. City. Admin. -rJA,o~ Signature ~ Contact person: Roger G. Hardgrave Phone: 5025 1 Supporting data attached: Staff Report & C.C.O. No.6 Ward: FUNDING REQUIREMENTS: Amount: $661.75 Source: Bonds sold by RDA and Grant through State Librarian Finance: t)nCil Notes: . 75-0262 Agenda Item NO./i!3. ~. III . u.. III CI'O OF SAN BERNARDrcP - REQUIIOT FOR COUNCIL ACQON o o o 75.0264 STAFF REPORT Change Order No. Six directs the contractor to relocate temporary power from the main court yard to the switch gear room in order to accommodate construction and, thus, prevent a delay in the progress of the work. This change order also directs the contractor to provide power to the elevator cabs and a conduit for telephone (as they were inadvertently omitted from the plans); and to relocate three thermostats incorrectly shown on the plans. A copy of the memorandum from Bill Doran, Construction Manger, dated September 17, 1985, is attached. In this memorandum, Mr. Doran describes each item of work, and recommends that Change Order No. Six be approved. We concur with the recommendation by Mr. Doran that this Change Order be approved. The Budget vs. Bid Analysis dated 12-6-84 showed an amount of $6,138 for change orders in process and $5,000 for estimated future change order costs. The net additional cost for Change Orders No.2, 3, 5 and 6 is $6,298.85 since Change Order No.4 was for no cost. Therefore, approval of Change Order No. Six will nto invalidate the financial report dated l2-6-84. SYNOPSIS OF PREVIOUS COUNCIL ACTION (Cont.) 5-13-85 --- Change Order No. Five approved to authorize the Contractor to add a 2" conduit for irrigation sprinkler control wire, at an increase in the contract price of $367.8l, from $501,067.29 to $501,435.10. o o () o ~ o o J.D. DIFFEN8AUGH. (Ne. CONSTRUCTION MANAGERS 237j Chicago Avenue, Riverside, California 92507 (714) 684-2820 MEMORANDUM DATE: September l7, 1985 TO: Roger Hardgrave City of San Bernardino ..oi';:---f","r---__ ,c.:: l', : '" ).. .\-"..~ -..i<!< 2:.~;. ... ". , ' FROM: Bi 11 Doran '" SUBJECT, San Bernardino Central Library BP lO. - Electrical Change Order #6 . " /":"~''''' ~ i.. r ,",j _.-,. "J '.;j ,...... l '\.< ,:-/ -" ';;r iE~" follows: SUbject change order is attached. The reasons for and explanations of these changes are as File # Descri,'pti,'on This compensates the contractor for the cost of relocattng the temporary power installation from the matn courtyard to the switch gear room. RFQ 18 RFQ 19 Thi,s cQm~ensates the contractor for providing i\110 volt line to elevator #1 for providing cab power and a c~ndui~ for telephone. These lines were apparantly omitted from the contract drawings. RFQ 2li This compensates contractor for cost of relocating 3 thermostats that were shown incorrectly on the contract drawings. ,. We have reviewed accepta b 1 e, the itemi zed costs in each case and have found them to be We reconl'lend that YOL apP"OVE tnis change order. cc: B i li PQS t Steve Whitney Ole Hamblin Oscar Arnoni Dan Flanigan Don Rogers L"::)'~"O ....u~_ File eM 108 , ' o o o o . J o o J.n. DIFFEN8AUGH, INC. CONSTRUCTION MANAGERS 2375 Chicago Avenue, Riverside, California 92507 (714) 684-2820 MEMORANDUM DATE: September 17, 1985 TO: Roger Hardgrave City of San Bernardino FROM: Bi 11 Doran 1......:', ...'....' (ti ,- .-\ \~-', \/' Subject change order is attached. ~/ " ,--('\$.' :,,,riT-'.y' The reasons for and explanations of these changes are as folto'Ws;- - ~UBJECT: San Bernardino eentral BP 10 ~ Electrical Change Order #6 Library f51e # RrQ l8 Descri,'ptton This compensates the contractor for the cost of reloc~ting the temporary power installation from the m~in cQurtyardto the switch gear room. RFQ 19 Thts cQmpensates the contractor for provtding AII0 volt ltne to alev~tor #1 for providing cab power and ~ condutt for telephone. These lines were apparantly omitted from the contract drawings. ~FQ ?O Thts compensates contractor for cost of relocating 3 thermostats that were shown incorrectly on the contract drawings.. We have reviewed the itemized costs in ~ch case and have found them to be ,'Iceptabl e. W< recommend that you approve this change order. cc: Bill Post Steve Whitney Ole Hamblin Oscar Arnoni Dan Flanigan Don Rogers Ledge File eM 108 . o o o on i ! ::t;! ~ ~~~J Sl!l"'ll u!il:t JIll: Sg!o" ~tlH a~ ~ .... r ! a . i ] ~ o o lLll .. ;r. :;;J~s ~ :a ~ . '8 .; . '5! . .1:.. Je.! :; to ~ ... . .. ~..! -.0" ~ .:! :I.. !HI ~..... ~r:! a ... ili 3l~~ .~ ~~ ell ....II: 1 o .. - - ------- ~~~;;I"'jSi!~...~~G\: 1.........51...lI5...:I..15;:!;... ~QN"I';'; .,.jo~o";c 1'"41'11;:::10 N.... ....:::=Nl'"4::;.... - ------- ... lil:l;:!;i'::l~2"S~'''::; N.....,..G\O.........::=I"'tCC;C ...."'';", I NeoN"''';' $'''; ..... 0\.........00 G\ "'ION ... P'l1I'I'" ..N ... ... ... ... . ~ ~~ 2:~ I I ~ I I !R=~!i1:;; ~"':.",:oc~co~'t~~~~ -n=~1 'l'"4II"~""~i ... ... ~ ~~ ... .... ......... 22"'i'i~2=!:I22=8 C!5;S~..o.............iil;:::::::;';..,c ';,oN"'''; I ,,;iO';N";~"'''; lD::= .l"'4....~=0\....:!~ ... ... ;;:!;l=l:!l'222on"':l2~:l: ...on.......151515lil::l:a:15..... O~.,;,,;IC..;O.;~,,;,:,,;.; ..0,., .e...."'NO 10. ....'" ... ..,...... '!.N ... ~,,~.... I I 5pi2:;:;25i!;:cn N.,...,..:oN.15a:;.2SiSN:J c.,;,.:,,; 1";'.0.0':00";. ClIDCION ..,..........,........ .......... .... N"'" "tN ... ... g .. .. II g .. .. Of'OtNf"'I.... ...N"'..............IIOG\.-I.-4.....-4.... o ~~1 ~ ..... on ~ ~ ... ... .. ... ... ... .., ... .. ... ~ .., :B ... oj ~ ... : ...; ~ .. ... :;l ... ~ ~ ~~~ E ,,;.... ~ it::: ... . .., .. ... ... to !i i 0.. .... . :8 .. i I .. .. ~ . ., '" ... . . s . . ! ! ~!j~ on ... III ... I i . o , o ~ i ~ Ii .. ...:t ~ 0.. C"") ..on ... I:: --iU ~ ; ..U~ I O:s E$j ~ t; "'''~ i5 ~.. ~ ~'& i 8,2 .. .. ~ i:i :l o ~ ... ; ; ~ ; ... ~ ... "! ill ''&1 e:l 1:1 :~ ~ s] U lie &: . ~ II. ...: = ~ o .0\ a ... .... M Co) i s .. .. ~~ o o o . . ! ~ ~~~+ 1 ~2",g::ll:ll~ .....cs:J.".O\ :ii~~i'" .....N:5t... . ~ ~ ~ ... ~~~I~ 1 .....,,52..... <'j"';;r;:ll j .. ~ '& ~ .II .. - - .. .. ;l .. '" .. ! I ~ .. .. ~ : i /1 H is- t I ~ i ]j a ..~! I I il I _...!l( .!lI 1 j ill llll- H I j~ H -'! I.... ~J =&8-/1 ...~ · ...... 8 0 A Z ~. ~ ~ !~!"a. eii~5 ~$ 5 .. ..~.. ~ a~ !es-J .I! ; IJ!Ji]j :~ 5l1~ ~ I tn ! ~ ::l ! ~ s S(:ii;J;1 on N N ... .I..l .....,.;'..TT ~::::ll;l i - i ... '&