CI'Cf OF SAN BERNARD~ - REQUO'T FOR COUNCIL ACQON
'From: Roger G. Hardgrave
0: Publ ic Works/Engineering
Date: lO-l8-85
Subjact: Approval of Change Order No. SIX --
Contract with Mark Cox Electric -
Facilities for New Central Library.
per Plan No. 6464
Synopsis of Previous Council action:
07-l1-84 --- Resolution No. 84-248 adopted, awarding a contract to Mark Cox Electric,
Inc., and approving Change Order No. One, to reduce the contract price
by $126,524.00.
02-04-85 --- Change Order No. Two approved to authorize the Contractor to provide
TV outlets, additional phone jack, deleted fixtures in the skylight,
revised ceiling and security wiring at an increase of $5,444.91 in
the contract price, from $495,798.00 to $501,242.91.
3-18-85 --- Change Order No. Three approved to authorize the Contractor to delete
TV outlets, added in C.C.O. No. Two, revised existing lights, revised
first floor lighting and power; and added two low voltage relays, at
a total decrease of $175.62 in contract price from $SOl,242.'91 to
$501,067.29. (cont. on 2nd page)
Racommended motion:
()
That Change Order No. Six to the contract with Mark Cox
Electric, Inc., for construction of electrical facilities
for the New Central Library in accordance with Plan No. 6464,
be approved; to authorize the Contractor to relocate
temporary power; provide additional wiring for elevator
control, and relocate three thermostats, at an increase in-
contract price of $661.75, from $50l,435.10 to $502,096.85.
cc: John Matzer, Jr.. City. Admin.
-rJA,o~
Signature
~
Contact person:
Roger G. Hardgrave
Phone:
5025
1
Supporting data attached:
Staff Report & C.C.O. No.6
Ward:
FUNDING REQUIREMENTS:
Amount: $661.75
Source: Bonds sold by RDA and
Grant through State Librarian
Finance:
t)nCil Notes:
. 75-0262
Agenda Item NO./i!3.
~.
III
.
u..
III
CI'O OF SAN BERNARDrcP - REQUIIOT FOR COUNCIL ACQON
o
o
o
75.0264
STAFF REPORT
Change Order No. Six directs the contractor to relocate temporary
power from the main court yard to the switch gear room in order to accommodate
construction and, thus, prevent a delay in the progress of the work. This
change order also directs the contractor to provide power to the elevator
cabs and a conduit for telephone (as they were inadvertently omitted from the
plans); and to relocate three thermostats incorrectly shown on the plans.
A copy of the memorandum from Bill Doran, Construction Manger, dated
September 17, 1985, is attached. In this memorandum, Mr. Doran describes each
item of work, and recommends that Change Order No. Six be approved.
We concur with the recommendation by Mr. Doran that this Change
Order be approved.
The Budget vs. Bid Analysis dated 12-6-84 showed an amount of $6,138
for change orders in process and $5,000 for estimated future change order
costs. The net additional cost for Change Orders No.2, 3, 5 and 6 is
$6,298.85 since Change Order No.4 was for no cost. Therefore, approval of
Change Order No. Six will nto invalidate the financial report dated l2-6-84.
SYNOPSIS OF PREVIOUS COUNCIL ACTION (Cont.)
5-13-85 --- Change Order No. Five approved to authorize the Contractor to
add a 2" conduit for irrigation sprinkler control wire, at an
increase in the contract price of $367.8l, from $501,067.29 to
$501,435.10.
o
o
()
o
~
o
o
J.D. DIFFEN8AUGH. (Ne. CONSTRUCTION MANAGERS
237j Chicago Avenue, Riverside, California 92507
(714) 684-2820
MEMORANDUM
DATE: September l7, 1985
TO: Roger Hardgrave
City of San Bernardino
..oi';:---f","r---__
,c.:: l', : '"
).. .\-"..~ -..i<!< 2:.~;.
... ".
, '
FROM:
Bi 11 Doran
'"
SUBJECT,
San Bernardino Central Library
BP lO. - Electrical
Change Order #6
.
"
/":"~''''' ~ i.. r
,",j
_.-,. "J
'.;j ,...... l
'\.< ,:-/
-" ';;r
iE~"
follows:
SUbject change order is attached.
The reasons for and explanations of these changes are as
File #
Descri,'pti,'on
This compensates the contractor for the cost of
relocattng the temporary power installation from
the matn courtyard to the switch gear room.
RFQ 18
RFQ 19
Thi,s cQm~ensates the contractor for providing i\110
volt line to elevator #1 for providing cab power
and a c~ndui~ for telephone. These lines were
apparantly omitted from the contract drawings.
RFQ 2li
This compensates contractor for cost of relocating
3 thermostats that were shown incorrectly on the
contract drawings.
,.
We have reviewed
accepta b 1 e,
the itemi zed costs in each case and have found them to be
We reconl'lend that YOL apP"OVE tnis change order.
cc:
B i li PQS t
Steve Whitney
Ole Hamblin
Oscar Arnoni
Dan Flanigan
Don Rogers
L"::)'~"O
....u~_
File
eM 108
, '
o
o
o
o
.
J
o
o
J.n. DIFFEN8AUGH, INC. CONSTRUCTION MANAGERS
2375 Chicago Avenue, Riverside, California 92507
(714) 684-2820
MEMORANDUM
DATE: September 17, 1985
TO: Roger Hardgrave
City of San Bernardino
FROM:
Bi 11 Doran
1......:',
...'....'
(ti ,-
.-\
\~-',
\/'
Subject change order is attached. ~/ " ,--('\$.'
:,,,riT-'.y'
The reasons for and explanations of these changes are as folto'Ws;- -
~UBJECT:
San Bernardino eentral
BP 10 ~ Electrical
Change Order #6
Library
f51e #
RrQ l8
Descri,'ptton
This compensates the contractor for the cost of
reloc~ting the temporary power installation from
the m~in cQurtyardto the switch gear room.
RFQ 19
Thts cQmpensates the contractor for provtding AII0
volt ltne to alev~tor #1 for providing cab power
and ~ condutt for telephone. These lines were
apparantly omitted from the contract drawings.
~FQ ?O
Thts compensates contractor for cost of relocating
3 thermostats that were shown incorrectly on the
contract drawings..
We have reviewed the itemized costs in ~ch case and have found them to be
,'Iceptabl e.
W< recommend that you approve this change order.
cc: Bill Post
Steve Whitney
Ole Hamblin
Oscar Arnoni
Dan Flanigan
Don Rogers
Ledge
File
eM 108
.
o
o
o
on
i !
::t;! ~
~~~J
Sl!l"'ll
u!il:t
JIll:
Sg!o"
~tlH
a~ ~
.... r
! a
.
i
]
~
o
o
lLll
.. ;r.
:;;J~s
~ :a
~
.
'8
.;
. '5! .
.1:..
Je.!
:; to
~ ...
.
..
~..!
-.0"
~ .:!
:I..
!HI
~.....
~r:! a ...
ili
3l~~
.~
~~ ell
....II:
1
o
..
- - -------
~~~;;I"'jSi!~...~~G\:
1.........51...lI5...:I..15;:!;...
~QN"I';'; .,.jo~o";c
1'"41'11;:::10 N.... ....:::=Nl'"4::;....
- -------
...
lil:l;:!;i'::l~2"S~'''::;
N.....,..G\O.........::=I"'tCC;C
...."'';", I NeoN"''';' $''';
..... 0\.........00 G\
"'ION ... P'l1I'I'" ..N
...
...
... ... .
~ ~~
2:~ I I ~ I I !R=~!i1:;;
~"':.",:oc~co~'t~~~~
-n=~1 'l'"4II"~""~i
... ...
~ ~~
...
.... .........
22"'i'i~2=!:I22=8
C!5;S~..o.............iil;:::::::;';..,c
';,oN"'''; I ,,;iO';N";~"''';
lD::= .l"'4....~=0\....:!~
...
...
;;:!;l=l:!l'222on"':l2~:l:
...on.......151515lil::l:a:15.....
O~.,;,,;IC..;O.;~,,;,:,,;.;
..0,., .e...."'NO 10.
....'" ... ..,...... '!.N
...
~,,~.... I I 5pi2:;:;25i!;:cn
N.,...,..:oN.15a:;.2SiSN:J
c.,;,.:,,; 1";'.0.0':00";.
ClIDCION ..,..........,........
.......... .... N"'" "tN
...
...
g
..
..
II
g
..
..
Of'OtNf"'I....
...N"'..............IIOG\.-I.-4.....-4....
o
~~1 ~
..... on
~ ~
... ...
..
...
...
...
..,
...
..
...
~
..,
:B
...
oj
~
...
:
...;
~
..
...
:;l
...
~
~
~~~ E
,,;.... ~
it::: ...
.
.., ..
... ...
to
!i i
0..
.... .
:8 ..
i I
..
..
~ .
., '"
...
. . s
. .
!
! ~!j~
on ...
III
...
I
i
.
o
,
o
~
i
~ Ii
.. ...:t
~ 0.. C"")
..on ...
I:: --iU ~
; ..U~ I
O:s E$j ~
t; "'''~
i5 ~..
~ ~'&
i 8,2
.. ..
~
i:i
:l
o
~
...
; ; ~ ;
...
~
...
"!
ill
''&1 e:l
1:1 :~
~ s] U
lie &: . ~
II. ...: = ~
o .0\ a ...
.... M Co)
i s
.. ..
~~
o
o
o
. .
! ~ ~~~+ 1
~2",g::ll:ll~
.....cs:J.".O\
:ii~~i'"
.....N:5t...
.
~
~ ~
...
~~~I~ 1
.....,,52.....
<'j"';;r;:ll
j
..
~
'&
~
.II
..
-
-
..
..
;l
..
'"
..
! I
~ ..
.. ~
: i /1
H is- t
I ~ i ]j a ..~! I
I il I _...!l( .!lI 1
j ill llll- H I j~ H -'!
I.... ~J =&8-/1 ...~ ·
...... 8 0 A Z ~. ~
~ !~!"a. eii~5 ~$ 5
.. ..~.. ~ a~ !es-J .I!
; IJ!Ji]j :~ 5l1~ ~
I tn ! ~
::l ! ~ s
S(:ii;J;1
on N N ... .I..l
.....,.;'..TT
~::::ll;l
i
-
i
...
'&