Loading...
HomeMy WebLinkAboutS08-Public Works . CI\-t OF SAN BERNAROQO File No. 6.1448-2 '. - REQUl.~)T FOR COUNCIL AC.....ON From: ROGER G. HARDGRAVE Subject: Approval of Change Order No. TWO -- Improvement of Patton Park South, Phase III, per Plan No. 7169 ---MATICH CORPORATION ~~- Dept: Publ ic Works/Engineering Date: 11-23-87 Synopsis of Previous Council action: June, 1986 --- Allocation of $120,000 from CDBG funds approved, to complete improvement of Patton Park South. 01-19-87 Plans approved and authorization granted to advertise for bids. 06-01-87 Plans approved and authorization granted to advertise for bids. 09-08-87 Transfer of $236,000.00, from Acct.#243-363-57528 to Acct.#243-362-57623 approved; Change Order No. One approved deleting work from project and changing bid prices; and Resolution No. 87-317 adopted awarding contract to Matich Corp. for the low bid price of $299,216.21 (as adjusted by Change Order No. One) Recommended motion: That Change Order No. Two to the contract with the Matich Corporation, for improvements of Patton Park South, Phase III, per Plan No. 7169, be approved; to authorize the contractor to install 2 concrete stairs with pipe handrails, for a net increase in contract price of $6,037.00, from $299,216.21 to $305,253.21. cc: Ray Schweitzer Warren Knudson Annie Ramos -(}AIiS~ Supporting data attached: Roqer G. Hardqrave Staff Report and Chanqe Order No. Two Phone: 5025 7 Contact person: Ward: FUNDING REQUIREMENTS: Amount: $6.037.00 Source: (Acct. No.) 243-363-57623 (Acct. DescriPtion) Patton Park South, Phase I I I Finance: ~/.-:t.-.C~ Council Notes: 75-0262 Agenda Item No, S-8 Clk OF SAN BERNARDICO - REQUO FOR COUNCIL AC.~N STAFF REPORT This project was originally bid with sixteen additives. This was done in order that the bid price would be within the available funding level. A certain few of these additive alter- nates were selected for inclusion in the contract award. The quantities for some of these alternates were decreased in order to reduce the contract price. Construction of two concrete steps will be required, in order to provide adequate access to the ballfields. These steps are not in the present contract. Change Order No. Two would authorize the Contractor to construct two concrete stairs, with tubular steel handrails, for the lump sum price of $6,037.00, increasing the contract price from $299,216.21 to $305,253.21. We have reviewed the price quote and feel that it is fair and reasonable for the work in- volved. After reduction of project scope, the project funding included $46,383.79 for contingencies. These funds could be used to cover the cost of this change order. Since these steps are needed at this time to provide proper access, and adequate funds are available, we recommend that Change Order No. Two be approved. URGENCY CL,Il,USE: This project is nearing completion. Approval of these extra items of work need to be secured at the meetina of 12-07-87, in order to avoid delaying completion of the project. 11-23-87 75.0264 Plan No. 7169 Date: NOV. 23, L .' File No. ~ject: PATTON PARK SOUTH, PH~III 6.1448 - 2 ENGINEERING DIVISION DEPARTMENT OF PUBLIC WORKS CITY OF SAN BERNARDINO, CALIFORNIA CONTRACT CHANGE ORDER NO. -L (Change necessitated because of field conditions) TO: MATICH CORP . 1371 S, LA CADENA DR COLTON, CA 92324 . Gentlemen: You are hereby authorized and directed to install concrete stairs with tubular steel handrails in two locations as shown on Plan No, 7169, for the Lump Sum Price of $6037.00. Total extra work cost added to contr~ct .............................$ 6.037'00 Previous Contract Price.............................................$ 299.216.21 Amended Cost Price..................................................$ 305.253.21 Additional time to complete contract due to change order ............ 8 Days CONTRACTOR: CITY OF SAN BERNARDINO: By: Title: By: ROGER G. HARDGRAVE Director of Public Works/City Engr. Accepted Date: Approved Date: