Loading...
HomeMy WebLinkAbout31-Public Works elk OF SAN BERNARDICO - REQUE~:f FOR.3couNcIL A r N Dept: Public Works/Engineering 11-10-87 ,1[C'D..tfl'mf Approval of Change Orders No. '" R. (J\C',-and 2 & Approval & Acceptance ;J8ll'.,')i;') .. of Work -- Improvement of Mission '" Cr~ek Box Culvert at Tippecanoe Avenue, per Plan No. 7098 BONADIMAN-McCAIN. INC, From: ROGER G. HARDGRAVE Date: Synopsis of Previous Council action: 09/--/85 Final budget adoption allocating $28,276.00 as City's share of widening box culvert on Mission Creek at Tippecanoe Avenue. Adoption of Resolution for the execution of Cooperative Agree- ment between the City and the County for the widening of the box culvert (50% cost sharing - City as lead agency). Adopt Resolution 86-88 authorizing agreement for professional services for design of box culvert. Adopt Resolution 86-217 authorizing agreement with County of San Bernardino for installation of automatic gates at Railroad Crossing 2U-4.2. Plans approved and authorization granted to advertise for bids. Resolution No. 87-204 adopted awarrling contract for the low Recommended motion: bid price of $231,880.00 10/07/85 03/03/86 06/02/86 01/19/87 -- 06/15/87 -- 1. That Change Orders No. 1 and No. 2 to the contract wi th Bonadiman-McCain, for improvement of Mission Creek Box Culvert at Tippecanoe Avenue, in accordance with Plan No. 7098, be approved; authorizing the contractor to excavate unsuitable soil, install 2-5" conduits, pour concrete taper on uneven bridge decks, install reflective signs and lower bottom controls elevations, for a net increase in contract price of $4,763.81, from $231,880.00 to $236,643.81. 2. That the work be approved and accepted, and th t final payment be authorized at the expir 'n of iod cc: Ray Schweitzer Warren Knudson Supporting datI aUlchad: Ward: 5225 1 Contact penon: Jon Roberts Staff Report & Change Orggrt ~Ig _ 1 & 2 Phonal FUNDING REQUIREMENTS: Amount: $22,794.17 (Final Payment -10% of Final Contract price) (ACCT. NO.) 242-363-571fi1 (ACCT. DESCRIPTION) Ti ppecanoe Avenue @ Grade Finance: IJ. 4 r A Source: Crossing. Council Noles: 15.0262 Agenda Ilem No, 3/ 'cIoN OF SAN BERNARD;;;o - REQUU FOR COUNCIL AC'..JON STAFF REPORT During construct10n, the Contractor encountered wet, un- suitable s01l below the 1nvert of the box culvert. Change Order No. 1 authorizes the Contractor to excavate the saturated material and replace with 3/4" rock, for an 1ncrease in contract pr1ce of $2,000.71, from $231,880.00 to $233,880.71. Contract Change Order No.2 author1zes the Contractor to place 2 - 5" condu1ts w1th1n the bridge for future growth; place reflective s1gns on the temporary barr1er; pour a concrete taper between the ex1st1ng bridge decks; and lower the bottom controls to match the ex1st1ng stream flowline, for an increase 1n the contract pr1ce of $2,763.10, from $233,880.71 to $236,643.81. All work under th1s contract was sat1sfactor1ly completed as of 10-23-87. The actual final contract pr1ce 1s $227,941.71, due to construct10n quant1t1es underrunn1ng the est1mated quant1t1es 1n the bid documents for curb and gutter, sidewalk, drlveways, and hand ra1l1ng. We recommend that the work be approved and accepted and that final payment be author1zed at the exp1ration of the lien period. URGENCY CLAUSE The expirat10n of the lien per10d occurs on 11-27-87. In order to release f1nal payment by th1s date, the project must be approved and accepted at the Counc1l meet1ng date of 11-16-87. 11-10-87 7S~0264 Project: ( Plan No. I MISSION CREEK BOX CULVERT AT TIPPECANOE 7098 Da te: 9 _ 2 - 8 7 File No. 1.363 ENGINEERING DIVISION DEPARTMENT OF PUBLIC WORKS CITY OF SAN BERNARDINO, CALIFORNIA CONTRACT CHANGE ORDER NO. ~ (Change necessitated because of field conditions) TO: BOIIADIMAN MCCAIll, INC. P.O.BOX 6444 SAN 8ERllARDIHO, CA 92412 . Gentlemen: You are hereby authorized and directed to over-excavate saturated subgrade material, and replace with approximately 100 tons of 1-1/2 inch rock for the Lump Sum price of $2,000.71. Total extra work cost added to contract .............................$ 2.000.71 Previous Contract Price .............................................$ 231.880.00 Amended Cost Price..................................................$ 233,880.71 Additional time to complete contract due to change order ............ 5 day s CONTRACTOR: CITY OF SAN BERNARDINO: By: ~..o ~ By: ROGER G. HARDGRAVE Director of Public Works/City Engr. Title: ~"'l( v.~ Accepted Date: Cl~~' Approved Date: I Mission Creek Box Culvert Pr?",""ct: at Tippecanoe .... Plan No. 7098 .--....,--" Date: 11-09-87 File No. 1.363 ENGINEERING DIVISION DEPARTMENT OF PUBLIC WORKS CITY OF SAN BERNARDINO, CALIFORNIA CONTRACT CHANGE ORDER NO. 2 (Change necessitated because of field conditions) TO: Bonad1man - McCain, Inc. P. O. Box 6444 San 8ernardino, CA 92412 Gentlemen: You are hereby author1zed to perform the follow1ng items of extra work: Item 1. Install 2 5" ducts 2. Pour Concrete Taper between Decks 3. Install Reflective S1gns on Temporary Rai11ng 4. Lower Bottom Controls elevations 4.29 CY @ $400/CY per bid item 13 Cost $ ,264.52 L.S. 291.58 L.S. 491.00 L.S. 1,716.00 Total extra work cost added to contract .............................$ 2,763.10 Previous Contract Price .............................................$ 233.880.71 Amended Cost Pri ce .................................................. $ 235 ,643 .81 Additional time to complete contract due to change order ............ -0- CONTRACTOR: CITY OF SAN 8ERNARDINO: By: By: ROGER G. HARDGRAVE Director of Public Works/City Engr. Title: Accepted Date: Approved Date: l M1ss10n Creek 80x Cl>4~ert oject: at T1ppecanoe Plan No. 7098 Date: File No. ENGINEERING DIVISION DEPARTMENT OF PUBLIC WORKS CITY OF SAN BERNARDINO, CALIFORNIA CONTRACT CHANGE ORDER NO. ~ (Change necessitated because of field conditions) TO: 80nad1man - McCain, Inc. P.O. Box 6444 San Bernardino, CA 92412 11-09-87 1. 363 -;::> ~ t1' ""'. c;:;> ::. CJ ~ :.. '3l" - C!il <.P " - - ~ ~ 0 I';'? ~ ~" \ ~ r. Gentlemen: You are hereby author1zed to perform the follow1ng items of extra work: Item 1. Install 2 5" ducts 2. Pour Concrete Taper between Decks 3. Install Reflect1ve S1gns on Temporary Rai11ng 4. Lower 80ttom Controls elevations 4.29 CY @ $400/CY per bid item 13 *Copy of Change Order with reflective signs. Santa Fe was to have started widening adjacent crossing in October, now set forkJanuarv. Tdraffic Engineer recommended reflective warning mar ers du~ to . e ay. , Total extra work cost added to contract .............................$ 2,763.10 Cost $ 264.52 L.S. 291.58 L.S. 491.00 L.S. 1,716.00 Previous Contract Price.............................................$ 233.880.71 Amended Cos t Pri ce .................................................. $ 236 , 643 . 8 1 Additional time to complete contract due to change order ............ CONTRACTOR: CITY OF SAN BERNARDINO: By: Title: By: ROGER G. HARDGRAVE Director of Public Works/City Engr. @ Accepted Date: Approved Date: -0-