HomeMy WebLinkAboutS05-Public Works , c..r-~ OF SAN BERNARDl"~O File No. 1.363 - REQUFc;T FOR COUNCIL A ~ON From: ROGER G. HARDGRAVE .1EC'D..~~!:.t: Approval of Change Orders No. , IN. OlFrand 2 & Approval & Acceptance 1387 NT; i., "'. of Work -- Improvement of Mi ss i on " .'Cr~ek Box Culvert at Tippecanoe Avenue, per Plan No. 7098 BONADIMAN-McCAIN. INC. Dept: Public Works/Engineering 11-10-87 Date: Synopsis of Previous Council action: 09/--/85 Final budget adoption allocating $28,276.00 as City's share of widening box culvert on Mission Creek at Tippecanoe Avenue. 10/07/85 Adoption of Resolution for the execution of Cooperative Agree- ment between the City and the County for the widening of the box culvert (50% cost sharing - City as lead agency). 03/03/86 Adopt Resolution 86-88 authorizing agreement for professional services for design of box culvert. 06/02/86 Adopt Resolution 86-217 authorizing agreement with County of San Bernardino for installation of automatic gates at Railroad Crossing 2U-4.2. 01/19/87 -- Plans approved and authorization granted to advertise for bids. 06/15/87 -- Resolution No. 87-204 adopted awarding contract for the low Recommended motion: bid p rice of $231,880.00 1. That Change Orders No.1 and No.2 to the contract with Bonadiman-McCain, for improvement of Mission Creek Box Culvert at Tippecanoe Avenue, in accordance with Plan No. 7098, be approved; authorizing the contractor to excavate unsuitable soil, install 2-5" conduits, pour concrete taper on uneven bridge decks, install reflective signs and lower bottom controls elevations, for a net increase in contract price of $4,763.81, from $231,880.00 to $236,643.81. 2. That the work be approved and accepted, and th t final payment be authorized at the expir . n of the lien iod cc: Ray Schweitzer Warren Knudson Amount: & Change & 2 $22.794.17 Werd: 5225 1 Contsct person: Jon Roberts Staff Report Qrd9r& Ne _ 1 Phone: Supporting dste eUechsd: FUNDING REQUIREMENTS: (Final Payment -10% of Final Contract price) Sourcs: (ACCT. NO.) 242 - 363 - 5 736 3 (ACCl. DESCRIPTION) Ti ppecanoe Avenue @ Grade Crossing. Flnancs: tJ. 4Y.A ~ Council Nots.: 15.0262 Agenda Item No. s-s Cll..,: OF SAN BERNARDO - REQU~T FOR COUNCIL AC::X>>N STAFF REPORT During construction, the Contractor encountered wet, un- suitable soil below the invert of the box culvert. Change Order No. 1 authorizes the Contractor to excavate the saturated material and replace with 3/4" rock, for an increase in contract price of $2,000.71, from $231,880.00 to $233,880.71. Contract Change Order No.2 authorizes the Contractor to place 2 - 5" conduits within the bridge for future growth; place reflective signs on the temporary barrier; pour a concrete taper between the existing bridge decks; and lower the bottom controls to match the existing stream flowline, for an increase in the contract price of $2,763.10, from $233,880.71 to $236,643.81. All work under this contract was satisfactorily completed as of 10-23-87. The actual final contract price is $227,941.71, due to construction quantities underrunning the estimated quantities in the bid documents for curb and gutter, sidewalk, driveways, and hand railing. We recommend that the work be approved and accepted and that final payment be authorized at the expiration of the lien period. URGENCY CLAUSE The expiration of the lien period occurs on 11-27-87. In order to release final payment by this date, the project must be approved and accepted at the Council meeting date of 11-16-87. 11-10-87 75-0264 Plan No. 7098 Date: 9-2-87 File No. "roject: tHSSION CREEK BOX CULVERT AT TIPPECANOE 1. 363 ENGINEERING DIVISION DEPARTMENT OF PUBLIC WORKS CITY OF SAN BERNARDINO, CALIFORNIA CONTRACT CHANGE ORDER NO. 2- (Change necessitated because of field conditions) TO: BOflADIMAN MCCAIII, HIC. P.O.BOX 6444 SAN BERNARDINO, CA 92412 . Gentlemen: You are hereby authorized and directed to over-excavate saturated subgrade material, and replace with approximately 100 tons of 1-1/2 inch rock for the Lump Sum price of $2,000.71. Total extra work cost added to contract .............................$ 2.000.71 Previous Contract Price .............................................$ 231.880.00 Amended Cast Pri ce .................................................. $ 233, 880 . 71 Additional time to complete contract due to change order ............ 5 days CONTRACTOR: CITY OF SAN BERNARDINO: By: -B..O~ By: ROGER G. HARDGRAVE Director of Public Works/City Engr. Title: ~<<:. v.~ Accepted Date: q.+e-r Approved Date: Mission Creek Box Culvert Pr~ct: at Tippecanoe ,- ,--"",' Plan No. 7098 File No. 11-09-87 1. 363 ~, Date: ~' ENGINEERING DIVISION DEPARTMENT OF PUBLIC WORKS CITY OF SAN BERNARDINO, CALIFORNIA CONTRACT CHANGE ORDER NO. ~ (Change necessitated because of field conditions) TO: Bonadiman - McCain, Inc. P. O. Box 6444 San Bernardino, CA 92412 Gentlemen: You are hereby authorized to perform the following items of extra work: Item 1. Install 2 5" ducts 2. Pour Concrete Taper between Decks 3. Install Reflective Signs on Temporary Railing 4. Lower Bottom Controls elevations 4.29 CY @ $400/CY per bid item 13 Cost $ 264.52 L.S. 291.58 L.S. 491.00 L.S. 1,716.00 Total extra work cost added to contract .............................$ 2,763.10 Previ ous Contract Pri ce ............................................. $ 233.880.71 Amended Cost Pri ce .................................................. $ 236 ,643 .81 Additional time to complete contract due. to change order ............ -0- CONTRACTOR: CITY OF SAN BERNARDINO: By: Title: By: ROGER G. HARDGRAVE Director of Public Works/City Engr. Accepted Date: Approved Date: