REC'O _AlM4".c~ft-'pproval of Chang~ Orders NO.2
. & 3 -- Contract wlth VALLEY CREST
\987l\AY 2\ PM [~: ~f.\NDSCAPING, INC. for Construction
Of Phase I-A, Zone B, of Seccombe
Lake State Urban Recreation Area
per Plan No. 6878 ~
Dept: Publ ic Works/Engineering
Data: 5-11-87
Synopsis of Previous Council action:
02-17-86 -- Work on Phase I-A, Zone A, in accordance with Plan No. 6667,
approved and accepted and final payment authorized at expira-
tion of lien period.
Resolution No. 86-76 adopted authorizing execution of Agree-
ment for development of See combe Lake State Urban Recreation Area.
Plans approved and authorization granted to advertise for bids.
Resolution No. 86-328 adopted, awarding contract to Valley Crest
Landscaping, Inc. for the low bid price of $915,000.00.
Approval of Change Order No.1, deleting the Adobe Building
re-construction at a net decrease of $56,266.00 from
$915,000.00 to $858,734.00.
03-04-86
05-19-86
08-04-86
11-17-86
Recommended motion:
That Change Orders Nos. 2 and 3 to the contract with Valley Crest Landscape,
Inc. for construction of Phase lA, Zone B of Seccombe Lake State Urban
Recreation Area per Plan 6878, be approved; to authorize payments of
$3,542.58 and $6,741.87 for extra work to the existing column connections
and the existing adobe structure, for a total increase in contract price
of $10,284.45, from $858,734.00 to $869,018.45.
cc: Ray Schweitzer
Warren Knudson
Annie Ramos
AAl'~
Contact parson:
Jon Roberts
Phone:
5225
Supporting data attached:
Staff Report & C.C.O's
Ward:
1
FUNDING REQUIREMENTS:
Amount:
$10,284.45
Sourca: (ACCT. NO.) 243 - 363 - 5 7 5 2 7
(ACCT. DESCRIPTION) 1984 State 80nd Act.
Flnanca:
I j c:----k: /C/'--
Council Notal:
7S.0162
Agenda Item No.
11
-
COO J
CITY OF SAN _RNARDlNO - RI:QUEST FOR COUNCIL ACTION
STAFF REPORT
The construction of Phase IA of Seccombe Lake State Urban Recre-
ation area was awarded under two separate contracts. The Con-
tractor was required to make revisions to the existing tubular
steel columns at the pavilion structure. Connections between
the pavilion work performed under the first and second contracts
were not included in either contract. Change Order No.2 would
reimburse the Contractor $3,542.58 for this extra work.
Change Order No.3 is for extra work performed by the Contractor
for complete demolition of the existing adobe structure. The
contract called only for removal of a portion of the structure,
but the building was found to be unstable and was completely
demolished. The contractor hauled off the debris and stacked
the salvageable adobe bricks. The cost of Change Order No.3 is
$6,741.87.
Contract Change Order No. 1 deleted the reconstruction of the adobe structure
at a net decrease in the contract price of $56,266.00. The funds for Change
Orders Nos. 2 & 3 are, therefore, available in the original funding account,
No. 243-363-57527, 1984.State 80nd Act.
We consider these extra costs to be justified and reasonable,
and recommend that Change Orders No.2 and 3 be approved for a
total of $10,284.45, increasing the contract price from
$858,734.00 to $869,018.45.
5-11-87
c
--
o
o
J
project:
Plan No.
Seccombe Lake State Park
Date:
3/19/87
6878
Ffle No. 6.1444-3
ENGINEERING DIVISION
DEPARTMENT OF PUBLIC WORKS
CITY OF SAN BERNARDINO, CALIFORNIA
CONTRACT CHANGE ORDER NO. 2
(Change necessitated because of field conditions)
To: Valley Crest Landscape, Inc.
1920 South Yale Street
Santa Ana, CA. 92704
~
Gentlemen:
We hereby aporove extra work for the revisions to existfnq
tubular steel column connections for the lump sum price of
$3,542.58.
Total extra work cost added to contract..........$ 3.542.58
Previous Contract Pr1ce..........................S 858.734.00
Amended Cost Price...............................S fl62.276.58
Additional time to complete contract due to
Change Order..................................... 0
CONTRACTOR
CITY OF SAN BERNARDINO
By:
Tf tl e:
By:
ROGER G. HARDGRAVE
Director of Public Works/
City Engineer
Accepted Date:
Approved Date:
5-11-87
<
ProJKt: ~r.\"UII'IIll:. '-""'Co ,)11 r",,,,, ----. " u 01 -
,
f ., 0 .i~ FU. No. 6.1444-3~
" " ,)10. 6878
'.
EN6INEERING DIVISION
DEPARTMENT OF PUBLI C WORKS
CITY OF SAN BERNARDINO. CALIFORNIA
ciJNTAACT CHANGE ORDER NO. 3
-
(Change necessitated because of field conditiohs)
TO: Valley Crest Landscape Inc.
1920'South Yale Street
Santa Ana. CA 92704
.
Gentlemen:
You ar~ her~by authorized and direct~d demolish the ~ntire
existing adobe structure, inCluding the removal of the
roof structure, stacking of all salvageable adobe bricks
and disposal of all debris, in accordance with our letter
dated April 14, 1987.
The total extra wor~ cost for the conplete demolition of
thp. ~xisting adobe structure is $6,741.87.
Total extra work cost added to contract .............................$ 6,741.87
Previous Contract Price .............................................$ 862276 ;R
Amended Cost Price.. ...... ......... ...... ...........................$ 869.018'.45
Additional time to complete contract due to change order ............ thru Mav 1. 1987
CONTRACTOR:
CITY OF SAN BERNARDINO:
By:
Title:
By:
ROGER G. HARDGRAVE
Director of Public Works/City Engr.
Accepted Date:
5-11-87
Approved Date: