Loading...
HomeMy WebLinkAbout04-Public Works - Cl'k OF SAN BERNARDICD n Ie IW. b.l'1'1'1-j _ REQ~T FOR COUNCIL Ac:lON From: ROGER G. HARDGRAVE REC'O _AlM4".c~ft-'pproval of Chang~ Orders NO.2 . & 3 -- Contract wlth VALLEY CREST \987l\AY 2\ PM [~: ~f.\NDSCAPING, INC. for Construction Of Phase I-A, Zone B, of Seccombe Lake State Urban Recreation Area per Plan No. 6878 ~ Dept: Publ ic Works/Engineering Data: 5-11-87 Synopsis of Previous Council action: 02-17-86 -- Work on Phase I-A, Zone A, in accordance with Plan No. 6667, approved and accepted and final payment authorized at expira- tion of lien period. Resolution No. 86-76 adopted authorizing execution of Agree- ment for development of See combe Lake State Urban Recreation Area. Plans approved and authorization granted to advertise for bids. Resolution No. 86-328 adopted, awarding contract to Valley Crest Landscaping, Inc. for the low bid price of $915,000.00. Approval of Change Order No.1, deleting the Adobe Building re-construction at a net decrease of $56,266.00 from $915,000.00 to $858,734.00. 03-04-86 05-19-86 08-04-86 11-17-86 Recommended motion: That Change Orders Nos. 2 and 3 to the contract with Valley Crest Landscape, Inc. for construction of Phase lA, Zone B of Seccombe Lake State Urban Recreation Area per Plan 6878, be approved; to authorize payments of $3,542.58 and $6,741.87 for extra work to the existing column connections and the existing adobe structure, for a total increase in contract price of $10,284.45, from $858,734.00 to $869,018.45. cc: Ray Schweitzer Warren Knudson Annie Ramos AAl'~ Contact parson: Jon Roberts Phone: 5225 Supporting data attached: Staff Report & C.C.O's Ward: 1 FUNDING REQUIREMENTS: Amount: $10,284.45 Sourca: (ACCT. NO.) 243 - 363 - 5 7 5 2 7 (ACCT. DESCRIPTION) 1984 State 80nd Act. Flnanca: I j c:----k: /C/'-- Council Notal: 7S.0162 Agenda Item No. 11 - COO J CITY OF SAN _RNARDlNO - RI:QUEST FOR COUNCIL ACTION STAFF REPORT The construction of Phase IA of Seccombe Lake State Urban Recre- ation area was awarded under two separate contracts. The Con- tractor was required to make revisions to the existing tubular steel columns at the pavilion structure. Connections between the pavilion work performed under the first and second contracts were not included in either contract. Change Order No.2 would reimburse the Contractor $3,542.58 for this extra work. Change Order No.3 is for extra work performed by the Contractor for complete demolition of the existing adobe structure. The contract called only for removal of a portion of the structure, but the building was found to be unstable and was completely demolished. The contractor hauled off the debris and stacked the salvageable adobe bricks. The cost of Change Order No.3 is $6,741.87. Contract Change Order No. 1 deleted the reconstruction of the adobe structure at a net decrease in the contract price of $56,266.00. The funds for Change Orders Nos. 2 & 3 are, therefore, available in the original funding account, No. 243-363-57527, 1984.State 80nd Act. We consider these extra costs to be justified and reasonable, and recommend that Change Orders No.2 and 3 be approved for a total of $10,284.45, increasing the contract price from $858,734.00 to $869,018.45. 5-11-87 c -- o o J project: Plan No. Seccombe Lake State Park Date: 3/19/87 6878 Ffle No. 6.1444-3 ENGINEERING DIVISION DEPARTMENT OF PUBLIC WORKS CITY OF SAN BERNARDINO, CALIFORNIA CONTRACT CHANGE ORDER NO. 2 (Change necessitated because of field conditions) To: Valley Crest Landscape, Inc. 1920 South Yale Street Santa Ana, CA. 92704 ~ Gentlemen: We hereby aporove extra work for the revisions to existfnq tubular steel column connections for the lump sum price of $3,542.58. Total extra work cost added to contract..........$ 3.542.58 Previous Contract Pr1ce..........................S 858.734.00 Amended Cost Price...............................S fl62.276.58 Additional time to complete contract due to Change Order..................................... 0 CONTRACTOR CITY OF SAN BERNARDINO By: Tf tl e: By: ROGER G. HARDGRAVE Director of Public Works/ City Engineer Accepted Date: Approved Date: 5-11-87 < ProJKt: ~r.\"UII'IIll:. '-""'Co ,)11 r",,,,, ----. " u 01 - , f ., 0 .i~ FU. No. 6.1444-3~ " " ,)10. 6878 '. EN6INEERING DIVISION DEPARTMENT OF PUBLI C WORKS CITY OF SAN BERNARDINO. CALIFORNIA ciJNTAACT CHANGE ORDER NO. 3 - (Change necessitated because of field conditiohs) TO: Valley Crest Landscape Inc. 1920'South Yale Street Santa Ana. CA 92704 . Gentlemen: You ar~ her~by authorized and direct~d demolish the ~ntire existing adobe structure, inCluding the removal of the roof structure, stacking of all salvageable adobe bricks and disposal of all debris, in accordance with our letter dated April 14, 1987. The total extra wor~ cost for the conplete demolition of thp. ~xisting adobe structure is $6,741.87. Total extra work cost added to contract .............................$ 6,741.87 Previous Contract Price .............................................$ 862276 ;R Amended Cost Price.. ...... ......... ...... ...........................$ 869.018'.45 Additional time to complete contract due to change order ............ thru Mav 1. 1987 CONTRACTOR: CITY OF SAN BERNARDINO: By: Title: By: ROGER G. HARDGRAVE Director of Public Works/City Engr. Accepted Date: 5-11-87 Approved Date: