elk OF SAN BERNARDI.Q - REQU~VoFbFi8boUNCIL AC.;bN
REC'D
SubjaCt?A~",.vfJPf.f Change Order No. TWO --
1987 flAY 2ConstrucUon of Restroom/Concess i on
I ~uiR~i~l~t Del Vallejo Jr. High -
Plan No. 6865 --DUNCAN CONSTRUCTION, INC.
ROGER G. HARDGRAVE
Dapt:
Public Works/Engineering
Data:
5-19-87
Synopsis of Previous Council action:
~~
June, 1985
June, 1986
10-06-86
01-19-87
12-17-84 -- The transfer of $55,000 to Del Vallejo Jr. High School Park Site approved.
- An additional allocation of $30,000 approved in 1985-86 Budget.
- An additional allocation of $80,000 approved in 1986-87 Budget.
- Plans approved and authorization granted to advertise for bids.
- Resolution No. 87-21 adopted awarding contract to Duncan Construction
for the low bid price of $126,173.00.
03-23-87 - Change Order No. One approved, authorizing Contractor to raise the
building finish floor elevation, increase the sewer size and re-route
irrigation lines for an increase of $2,162.00 in the contract price,
from $126,173.00 to $128,335.00.
Recommen"ed motion:
That Change Order No. Two to the contract with Duncan Construction,
Inc. for the construction of a restroom/concession building at
Del Vallejo Jr. High School, in accordance with Plan No. 6865, be
approved; to authorize the Contractor to adjust the sidewalk and
driveway grades to match the building pad elevation, and remove
water from the flooded building pad, at a net increase in contract
price of $1,212.95, from $128,335.00 to $129,547.95.
cc: Ray Schweitzer, City Admin.
Warren Knudson, Dir. of Finance
Annie Ramos, Dir. of Parks, Rec.
& Comm. Svcs.
Contact person: ___
Jon Roberts
Phone: _____ 5225
Supporting data attached:_
Ward:
7
FUNDING REOUIREMENTS:
Staff R~jlort
Amount: $1,212.95
Del Vallejo Park Concession Stand
Source: Acct. 243-363-57521 -
Finance: ?- J <-<-_ _ e L/z--
Council Notes:
75-0262
Agenda Item No.
--~
CIT~F SAN BERNARDI to - REQUOT FOR COUNCIL AOON
STAFF REPORT
Contract Change Order No. One raised the elevation of the building
pad by approximately 1 foot. In order to match the new pad elevation, the
perimeter sidewalks and the driveway must be regraded to match the new ele-
vation. The Contractor has agreed to import fill material and perform the
grading for a cost of $545.00.
During construction, an irrigation valve, under the control of the
San Bernardino City Unified School District, was opened during non-construction
hours, and flooded the job site. The Contractor sustained costs of $667.95
for pump rental and labor in order to restore the site to a workable condition.
Contract Change Order No. Two will authorize a net increase in the
contract price of $1,212.95, from $128,335.00 to $129,547.95. We consider
these costs to be reasonable and justified, and recommend that Change Order
No. Two be approved.
This Change Order will be funded with monies allocated as contin-
gencies under Account No. 243-363-57521, "Del Vallejo Park Concession Stand."
5-19-87
75-0264
Project.
Plan No.
Construction of Restro~Concession ~ilding
at Del Vallejo School f\..ik ,...)
6865
Date:
File No.
5/15/87
6.1483
:>
"
ENGINEERING DIVISION
DEPARTMENT OF PUBLIC WORKS
CITY OF SAN BERNARDINO. CALIFORNIA
CONTRACT CHANGE ORDER NO. ~
(Change necessitated because of field conditions)
TO: Duncan Construction ComDany
1966 South Date Street
Bloomington, CA. 92316
Gentlemen:
The following extra work is to be Derformed on the construction of
the Restroom/Concession Building at Del Vallejo School Park:
1. Adjust sidewalk and driveway grades to match
building pad elevation of 1275.1 feet
2. Remove water from flooded building Dad
$ 545.00
$ 667.95
Total extra work cost added to contract .............................$ 1,212.95
Previ ous Contract Pri ce ................;............................ $ 128, 335 . 00
Amended Cos t Pri ce .................................................................................................... $ 129, 547 .. 95
.'
Additional time to complete c~ntract due to change order ............
9 days
CONTRACTOR:
CITY OF SAN BERNARDINO:
r~ . (2 /I.., '. D
By:r! (1 J ."P. rr.<. I \-.(W\--(~('
Title:'\"~()r,~L.t/l ,f.
(0 u"c",,,,,) eel J f;. (/u( Ir Jy..)
----! '> ( ...
Accepted Date: _) / (0.. oJ ')
f i
By:
ROGER G. HARDGRAVE
Director of Publi.c Works/City Engr.
Approved Date: