Loading...
HomeMy WebLinkAbout10-Public Works c o o :) CITY OF SAN BERNARDINO File No. 1.359 - REQUEST FOR COUNC~ON From: ROGER G. HARDGRAVE Su~ect: Approval of Plans & Authorization to Advertise for Bids -- Replacement of Oak Street Bridge over Warm Creek, per Plan No. 6934 Oept: Public Works/Engineering Date: 6-02-87 Synopsis of Previous Council action: 03-07-85 -- Confirmation granted that requirements of Federal Bridge Replacement Program will be complied with, and allocation of $31,000, to cover 20% local agency share, approved. Recommended rnoti,on: That the plans for the replacement of the Oak Street Bridge over Warm Creek, in accordance with Plan No. 6934, be approved; and the Director of Public Works/City Engineer authorized to advertise for bids. cc: Ray Schweitzer Warren Knudson Contact penon: Roger G. Hardgrave Staff Report Phone: 5025 1 Supporting detl Ittlched: Ward: Amount: $213,686 -lit 242-362-57349, Oak Street,"D" St.to Warm Creek & Source: (ACCT. NO.) 242-362-57359. Oak Street Bridoe ~ Warm Creek (ACCT. DESCRIPTION) Street Construction Fund Finance: /J .. e ~ CouncllNotel:J ".0.. .+ ,...,,1..-....6& I ~.JuI, ...... L. ~~_I...'..I h .. L ...........J.. \C,') -" lJ~tl..,..r. L......J T"c..olJ.._.\.~ ~..Jw . . ~ .f ~('.""O ........ 6.u.'I../t... FUNDING REQUIREMENTS: n.Gtn Agenda Item No, /tJ. CI10 OF SAN BERNARDICD - REQUIQr FOR COUNCIL AC~N STAFF REPORT Plans for replacement of the Oak Street Bridge at Warm Creek have been prepared by the Engineering Division and the project is ready to be advertised for bids, The project consists, in general, of removing the existing bridge and constructing a reinforced concrete box culvert. Listed below is an estimate of the total project cost: Construction Contract Engineering & Inspection (W.O. #1438) Sub-Total Contingencies (5%)~ TOTAL ESTIMATED PROJECT COST $ 182,506 20,000 $ 202,506 11,180 $ 213,686 An amount of $157,680 has been made available from Federal Bridge Replacement Funds to finance 80% of the total project cost. The 20% local agency share will be financed from the $12,000 allocated under Account No. 242-362-57349, Oak Street - "D" Street to Warm Creek, and $31,000 allocated under Account No. 242-362-57359, "Oak Street Bridge at Warm Creek." The total amount of funds available is $200;680. The $12,000 was allocated to alleviate a drainage problem along Oak Street, between "0" Street and Warm Creek. These improvements were included in the bridge replacement project, in order to obtain the lowest possible bid prices. Caltrans has determined that $16,586 of the estimated construction contract cost is non-participating, which means that it is not eligible for fi nanci ng wi th Federal funds. The bul k of ,these i terns are the drainage facil i- ties on Oak Street, with the remainder being street work beyond the limits indicated at the field review. We recommend that the plans be approved and authorization granted to advertise for bids. Authorization to advertise will also have to be received from Caltrans before bids can be solicited. Supplemental funds, in the amount of $13,000, will be needed to fully finance the local agency share. It is proposed that these funds be provided in the 1987-88 Street Construction Fund Budget. 6-02-87 75.0264