HomeMy WebLinkAbout11-Public Works C~ OF SAN BERNARD~O - REQUathNO,6Fi9boUNCIL N ROGER G. HARDGRAVE From: ~I' . Approval of Contract Change Order No. REC'D.-ADMlw.btWf. B and Approval & Acceptance of Work _--Construction of Del Rosa Drive, IS87 JUL -9 PM 3: 2 i from 9th Street to Basel ine Street. per P1an.No. 4993 -- POWELL CONSTRUCTION CO. Dept: Public Works/Engineering Date: 7 -07 -B7 Synopsis of Previous Council action: 07-01-85 Resolution No. 85-251 adopted authorizing execution of the Right-of-Way Certificate. Resolution No. 85-365 adopted authorizing execution Agreement with County relating to installation of traffic signals at Baseline Street. Resolution No. 85-425 adopted authorizing execution of Program Supple- ment No.1 to Local Agency - State Agreement No. 8-5033. Plans approved and authorization granted to advertise for bids. Award to contract for construction of Del Rosa - 9th to Baseline - -- Powell Construction - Resolution No. B6-283. Approval of CCO #1. 2. & 3. to increase contract price to $555,640.10. Approval of CCO #4. 5. 6 & 7 to increase contract price to $565,539.60. 09-13-85 1O-21-B5 05-05-B6 07-07-86 12-22-86 04-06-87 Recommended motion: 1. That Change Order No. B to the contract with Powell Construction Company. for construction of Del Rosa VRI(~ . from 9th Street to Baseline Street. in accordance with Plan No. 4993. be approved to authorize an increase in the quantity of roadway excavation of 4.843 C.Y. (from 760 cubic yards to 5,603 cubic yards) for an increase in the contract price of $4.BI2.00, from $565.539.16 to $570.351.16. 2. That the work performed by the Contractor. in accordance with Plan No. 4993. be approved and accepted; and that final payment be authorized at the expiration of the lien period. cc: Ray Schweitzer. City Administrator Warren Knudson. Director of Finance Gene R. Klatt Staff Report & CCO No.8 Phone: 5125 2 Contact penon: Supporting deta attached: Ward: FUNDING REQUIREMENTS: Amount: $543,537.36 Source: (ACCT. NO.) 242-362-57342 (ACCT. DESCRIPTION) Del Rosa Drive Finance: Ii. - 9th to Baseline t2 r: .A- . Council Notes: 15.0262 Agenda Item No. /1 - 'CI-N OF SAN BERNARDI~O - REQU.Qr FOR COUNCIL AC~N STAFF REPORT Addendum No.2 to contract documents included in the work to be per- formed. removal of a quantity of dirt stockpiled within the street right-of-way under the items of work to be done under the contract. A total of 5603 cubic yards were removed. which exceeds the bid item estimate of 760 C.Y. by more than 25%. Change Order No. 8 would pay the Contractor for 125% of the bid quantity of excavation (950 C.Y.) at the bid price of $5.00 per C.Y. The remainder of the excavated quantity (4653 C.Y.) would be paid at the Contrac- tor's actual unit cost plus mark-up of $0.83 per C.Y. The total increase in contract price to be authorized by Change Order No.8 is $4.812.00. The total estimated project cost. based upon the actual low bid price. included an amount of $62.008 for contingencies. which can be used to finance the additional cost authorized by this change order. All work under this contract was satisfactorily completed as of May 4. 1987. The contract was awarded for the low bid price of $553.304.00. Contract Change Orders No's 1. 2 & 3 were approved on 12-22-86. authorizing a total increase in the contract price of $2,336.10. from $553.304.00 to $555.640.10. Contract Change Orders No's 4. 5. 6 & 7 were approved on April 6. 1987. authorizing a total increase in the contract price of $9.899.50. from $555.640.10 to $565.539.60. The original contract completion date was December 15. 1986. Time extensions totaling 17 working days were granted for weather. change orders, and utility delays. The Contractor exceeded the amended completion date by 84 calendar days. The project specifications assign liquidated damages of $200.00 per calendar day. which amounts to $16.800.00. The actual damages suffered due to increased labor and administrative costs exceeded this amount. Therefore. the lesser amount of $16.800.00 was assessed as liquidated damages. The actual final contract price is $543.537.36. due to differences between actual construction quantities and estimated bid quantities. and the assessment of liquidated damages. A meeting was held with the Contractor and representatives from Ca1trans to discuss the Contractor's exception of several bid items listed on the Proposed Final Estimate. issued on 4-02-87. The resultant of this meeting was the issuance of Change Order No.8. increasing payment for road- way excavation. and the determination that actual liquidated damages exceed specified contract liquidated damages. A revised Final Estimate was forwarded to the Contractor on 6-22-87. The Contractor has not responded. There is the possibility that he may decide to arbitrate any items with which he is not in agreement. We recommend that the work be approved and accepted, and that final payment in accordance with the Revised Final Estimate be authorized. at the expiration of the lien period. 7-07-87 75-0264 12 ~ u, ;l '" ... (j .. i5 ~ .. ~ <> c "'11"N~OWt~ NO. ~ ,th Street .to Baseline SUPPl. NO.__ 1 S."~I "0 NO. 4..VI'llIHf\Cr loaD Del Rosa Drive .~ SlIfU 1 0.. PfDfRAl HO~SI FAP M-MG-R063(1) CONTlAcr NO 4993 t.__ . ~ c..... ,_ .... I....at,. ..I,.....~ .. _II. .h. h.,.... 4...,iblt" .~... Ir.... lite ~. -" ."..lIle..._ ., de th. '.11....,.... d.M,lb", ...,.. .... ....I"".... .... ,... 1"'0-1 . ....Uic..o-t _ thI.. .M"-'_ .. NOT!: th;. ch."... .,d., t. .... ."urlve '!~!.I!.!""." Sr" "'. '. Ci ~ In..:"..,.. D.",ip',.... .f _..II .. ... cr-.. ...._... 01 "".."tjtl.., _.. ",rc., .. ... ...... $.,;.,...... L.I__" fI,M;".,..oI ...." a. 1""'01'1 p,k... ...,...- r'''~ _.f ,_ O<I,ovn'. u..,... ..h.rwi.. .....4, ,ul., f. ,""... .f .q..iltftt.... ....., MI, ..,d, Ii.... .. ......i.,'"...' " ""_lIy \II_I on.I n. ull",......,,_ ....'" .... _. '_ .~. ti..... F i id CI.-.. ............. ' L. A. aust na. Res ent Engi neer rll. I"" .,.,.....av. ,he.. I. .h. .... ___,-,... ......... .. ...,.... ,,... 'h. _I.'nul ".....il' ,.. Ih. t"VI__. (",'''''',.. Reference is made to Addendum #2 of the Soecia1 Provisions for the contract. The "large quantity of dirt". referred to'in the Addendum. that was necessary to be moved. has been calculated as 5.603.0 C.Y. In accordance with Sections.4-1.03B(1) and 9-1.03 of the Standard Item #5. Roadway Excavation,'is adjusted as follows: Engineer's Estimate. 760 C.Y. x 125% = 950 C.Y. @ $5.00 = (5603.0 C.Y. - 950) = 4653 C.Y. @ the adjusted unit price of $0.83 C.Y. = TOTAL for Item Increase: Engineer's Estimate, 760 C.Y. @ $5.00 = Increase = $8.612.00 - $3.BOO.00 = r.-... c:... -., Iy ._"'" of .hit ...._ tho ........ ..o...ol.ti." ..ill .,. .dju".... .t 'ollow" . ""II",,,"'" ..,.. --~ ~ L. A. Faustina. Res. En9r~ . Approval Recommended: App,...d; Ci t y r...,:_.., lit., Specifications $ 4.750.00 3.862.00 $ 8.612.00 $ 3.800.00 $ 4.812.00 _ I........ S 4812.00 Date _Dolo W., Ih.. v....''''v''.d UIl""OC..... ..".. 01..... '_01...' ,_.1.1.,0"_ .. .... .h....O. ".......d ,..,., h.....hY' ...... ,. .hlt fI'........ I, CO".......... tho. ~. _'I ...,..,., oil ,"v..,.......,. fu,ni,.. nil ""o'.,;,,h, ........' o. ....,. .''''',w... It. *tIed ......., "'" ".ri.,... .u ,...,1(0' "_"...." ,.. ,h. wet'k .~.. ..,.dU..... .... ..J eu:-. at Ivll Io"'"..."nl ,h...,... tho ~i(., ~._.. OM." Auopt.". De.. C_.. r- OO , r- o , r- ".- n.,- If th. Cunl,.....ot ".0' ,"It .1"" ClCc.plfl"u of 11.1, lo'''.'. 1,1" nUontlt.. I, ~Ir..t." t. tho .oqulro.".",. 0' tho .p.ctllco'I_. o. t. ~oc""'L- with dID _d..... w.... und flll..g . w.lnoft ."..." wllk", 'h. 11_ ,h.,.I.. .fM,lII.... ~ITY OF SAN BER~ARDINO CL MEMORANDU~ Subject RAY SCHWEITZER To City Administrator REC'O,..ADMIH. OFF. Agenda Item for Acceptance of De1_.R~s~,} Drive - 9th Street to B168tllYtle!CSttWee1t I.-_ Clarification of First Paragraph From GENE R. KLATT Assistant City Engineer Date July 10. 1987 File No. 1.0492 Approved Date ~ COMMENT: The project was designed and plans prepared quite some time before the funding or authority was received to go to bid from Ca1trans. In the intervening time. an adjacent developer stockpiled dirt within the street right-of-way and was to remove it before our construction began. However. the developer went bankrupt and did not complete all of the work and. specifically. did not remove the pile of dirt in the roadway. The project bid documents were already out to bid so an addendum was sent that made the bidders aware of the dirt and gave it to them to use on the job. We knew that the Contractor would need additional fill material to complete the job so gave him the dirt. However. the addendum did not say anything about payment for moving the dirt or reduction in costs for giving it to him in the first place. After the contract was awarded to Powell. he came in and stated that he wanted to be paid at the contract price for excavation for the material we had given him. The City said "no" and several dis- cussions followed with Caltrans and the City. Basically. the Ca1trans' specifications state that we must pay for this additional excavation at the contract price for the first 25% of material over the contract and that after that, we can negotiate a fair price or pay the actual costs incurred. The Contractor was unwilling to negotiate a price so we kept daily extra work reports on what he did. Breaking down his true costs and adding overhead and profit per the standard Caltrans methods. we arrived at the $0.83 per cubic yard for material over the original amount plus the 25% allowed by the specifications. Simply put. we told the Contractor he must excavate approximately 750 yards but he actually excavated over 5500 yards. We. therefore. paid him at the contract price for the original amount (750) plus the contract amount for 25% over the original amount and then will pay him his actual costs for the remainder. This has all been approved by Ca1trans and we have the detailed backup for it. The first paragraph was an attempt to explain how a contract item changed from 750 cubic yards to over 5500 cubic yards and how it was paid. ~..."",k /" ~~"'., ,,'\; ~~,?;' c o RAY SCHWEITZER Agenda Item - Del Rosa Drive July 10. 1987 Page - 2 - ROGER G. HARDGRAVE Director of Public Works/City Engineer i..~,/.. / ,'h~y-- cx:":' ; ~, ,,;f.k' t. < ' GENE R. KLATT Assistant City Engineer GRK:rs o .~