Loading...
HomeMy WebLinkAboutS01-City Administrator CITY OF SAN 8ER~RDINo'M REQUEST OR COUNCIL ACTION From: Marshall W. Julian, City Adainistrator .~ 1l/16/~.' ";If\ ;.'f Subject: COMMUNITY CLEAN-UP PROGRAMS -- COlllTIROING ABATEMElIIT O. VACANT PROPBRTIBS AND MAIR-TRAVELLED THOROUGHFARBS. Dept: DIIt8: Synopsis of Previous Council ection: IIONE. # . R~ motion: l That funds RoctpeECeed $100,000 be allocated for the continuing clean-up of properties and thoroughfares, as outlined in the Staff Report dated 11/16/89 ---.. ~.-.h,{~f-; nature Contact person: MARSHALL W. JULIAN Phone: 384-5122 Supporting dllt8 alr....hecl: YBS Ward:. RIA FUNDING REQUIREME~~ Amount: $1 00 .000 Source: IAcct, No,) Proceeds from Bond Refinancing (Acct, Description) Finance: Council Notlll: 75.0262 Agenda Item No S -I . "'CI~Y OF SAN BER&DINO - REQUEST F~R COUNCIL ACTION STAFF REPORT In order to maximize the results of the comprehensive community cleanup occurring on December 9th, there should be an ongoing program of trash and debris abatement. There are two elements of the fOllow-through program: 1. Abatement of properties requ~r~ng equipment and major removal activity (concrete, tree limbs, automobile parts, furniture, brush, etc.) 2. Dealing with the problem of litter, debris and weed build-up on heavily-traveled streets and minor accumulations on vacant commercial and residential property. PROGRAM 1...,.$87,400 The volunteer effort on December 9th will not be equipped to deal with properties having major accumulations of debris to remove. The Director of Public services has indicated that approximately 80% of the cost of such abatements will be recouped via liens placed against the properties. The abatement effort in this program would be supplementary to, and more intensive than, the private contract Weed Abatement program which Public Services currently conducts. Personnel and Equipment (Six month program) 6 Part-time Employees @ $6.00jhr"",......,$37,000 1 Part-time Supervisor @ $9jhr,............$ 9,000 1 Heavy Equipment Operator (provided by Public Services) 1 Skip Loader (leased at $2,000jmo.)........$12,000 2 Dump Trucks (leased at $1,200jmo. ea.)....$14,400 Dump Fees...................................$ 8,000 Fuel and Maintenance...,....................$ 5,000 Maintenance Materials (includes chains saws and weed eaters)................................$ 2,000 PROGRAM 2,....$172,648 (Six-month program) If the momentum provided by the December 9th cleanup is to be maintained, it will be necessary to conduct a regularized program of street, parkway and routine parkway tree "housekeeping." Community support and cooperation for the concept of a cleaner, more attractive city will be much stronger if there is an absence of litter and debris. While not a guaranteed solution to the daily depositing of litter on the sidewalks, parkways, and adjacent frontage property, the methodical picking up of 75-0264 5-1 .' . materi~nd correction of minor d~ciences is the only p~tical approach to the problem. It would be an overwhelming task to attempt to service every street in the city, every day. It is feasible, however, to set a repetitive schedule for traveling crews to service the major and secondary traffic arteries and to deal with problem residential streets on a less frequent basis. Traveling crews would also respond to "service requests" through the COPs on a scheduled basis. There are obviously two levels of activity in the overall "housekeeping" program (maintenance and servicing of one-time problem areas). Both of these objectives can be achieved by the same crews, However, the program will require close coordination and monitoring. It will also require coordination with the crews contemplated in Program 1. The number of crews will be limited by three factors: funds, span of control and the experience level of the personnel. The cost per traveling crew would be approximately $26,000 per year (assuming part-time personnel). Equipment costs would be additional, depending on the type of vehicle utilized. One-ton trucks can be purchased for approximately $18,000 each. In order to initiate the program, it is suggested that 5 crews be funded, After getting into the program, that number could be refined based on operating experience. The cost for 5 crews, for a one-year period, would be approximately $238,000 (plus supervision), If 7 crews were provided, for a six-month program, the cost would be approximately $172,648 (plus supervision.)