C'.TV OF .~N BER.QRDINO &EQUEST NO>>'RoCOUNCIL ACTION
From:
ROGER G. HARDGRAVE .,.-"", _ t.F\\J.:iSu6jiiCt. Proposed Freeway Agreement
it:." >'. 'w"" . Route 30/330, from Del Rosa
Public Works/EngineeringgaS 110'1 -7. /.H 7: 26 ~r~~~:n~\;~~u:ile North of
10-31-89
Dept:
Date:
!)ynopsis of Previous Council action:
05-18-87 -- Recommendation from the Legislative Review Committee on
provision of access to properties abutting Route 330
approved.
09-18-89 Draft Freeway Agreement referred to Transportation Com-
mittee for review and recommendation.
10-11-89 Transportation Committee referred Freeway Agreement to
staff to attempt to work out solution amenable to all
parties.
10-30-89 -- Transportation Committee recommended approval of Free-
way Agreement with certain amendments.
Recommended motion:
That the draft Freeway Agreement on Route 30, from 0.1 mile west
of Del Rosa Avenue to Route 330, and on Route 330, between Route
30 and 1.0 mile north of Highland Avenue, be approved in principle,
subject to the condition that the equestrian crossing under Route
330 be enlarged to provide 10 feet horizontal clearance and 12
feet vertical clearance, and that Caltrans be requested to prepare
Freeway Agreement in final form for approval.
cc:
Marshall Julian
Jim Richardson
Jim Penman
Richard Moon
~
Contect person:
Roaer G. Hardgrave
Phone:
'in?'i
Supporting data attached:
Staff Report & Map
Ward:
4 & 7
FUNDING REQUIREMENTS:
Amount:
N/A
Source: (Acct. No.)
(Acct. DescriDtionl
Finence:
Council Notes:
75-0262
Agenda Item No
60
ciTY OF SAN BER~DINO - REQUEST .oR COUNCIL ACTION
STAFF REPORT
Page 1 of 2
Preliminary plans for the improvement of Route 330 were
submitted to the City for review. The Stubblefield Construction
Company asked to review these plans, since they own property on
both sides of Route 330 Freeway. A mobile home park has been
developed on the west side. The property on the east side is
vacant.
The plans showed construction of a frontage road along the
east side of the freeway. A secondary emergency access road was
to be provided northerly of the frontage road, terminating at an
access to Route 330 by a locked gate.
The Stubblefield Construction Company requested assurance
from Staff that this arrangement would meet the City's requirement
for secondary emergency access. We responded that Staff could not
provide such assurance. The matter was then presented to the Leg-
islative Review Committee. After several hearings, the Legisla-
tive Review Committee recommended that the amended proposal be
approved. A presentation was made at the Council Meeting of 5-18-
89, at which time the proposal was approved. The proposal
included the condition that all of the agreed upon project
features would I:>e incorporated into and become a part of the
Freeway Agreement.
The proposed draft of the Freeway Agreement does not
include any of the project features. According to the Caltans
personnel currently assigned to the project, their policies will
not allow these features to be included in the Freeway Agreement.
There are other changes, such as the secondary emergency access
road being dirt instead of paved.
Due to the reV1S10ns from the previously agreed upon
features, it was recommended that the draft Freeway Agreement be
referred to the Legislative Review Committee.
At the meeting of the Transportation Committee of 10-30-
89, it was agreed that the metal arch culvert to be installed
under Route 330, for an equestrian crossing, would be enlarged to
allow access by a fire engine. The culvert will be enlarged to
provide 10 feet horizontal clearance and 12 feet of vertical
clearance. Enlarging this facility will enable the culvert to be
used for emergency access, and thereby replace the access
currently afforded by the approximate 14' X 14' box culvert,
commonly referred to as the "Barnes Crossing."
10-31-89
75.0264
.
d.TY OF SAN BER-'lRDINO - REQUEST ~R COUNCIL ACTION
STAFF REPORT
Page 2 of 2
Caltrans will adjust the location of the cul-de-sac, for
the east frontage road, from about 750 feet north of the
equestrian crossing to just north of this facility. A graded dirt
road will be extended from the new location of the cul-de-sac to
the locked gate.
All parties of the Transportation Connnittee meeting were
in agreement with this arrangement. Therefore, we reconnnend that
the Freeway Agreement be approved in principle, and Cal trans re-
quested to prepare the Agreement in final form.
10-31-89
75.0264
r
.;.
'-.)
~ H~C
..
..
! "
i
S!
I i I ..
:~ r -:..
'" oJ .
~
;~
.....
w! .
.....
el
r!
I
J
.
~
~
I
~-
l~
CI)
~
I
..j
\ n I
' "I" I
1 _ ."....
.~. ;".
, 'II 1/:/.:
~--- I,
i :--. t> ~!I'
" ~ I, 1
I, ,
","" ','1 I
-' I
,....,: ~I\
'~rni',
III
I
I
..
.
\,;:;
\, I~
I~
.
,.
,
~
~
~.
i
AI'TiY
,.~
~ r---
,0 l< ~
.,::
c(~
~~
o
I
I~ I
&
C5
10-31-89
~
,
.