Loading...
HomeMy WebLinkAbout10-Public Works o 0 CI,.y OF SAN BBRNARDINO - Ole No.7 .3720 0 REQUEST FOR COUNCIL ACTION From: ROGER G. HARDGRAVE Subject: Approval of Change Order No. TWO ---Improvement of Phase II-B of Rio Vista (Anne Shirrells) Park, per Plan No. 7038 --FERNANDO ORTEGA CONSTRUCTION ~ Dept: Public Works/Engineering Date: 8-03-88 Synopsis of Previous Council action: 06-16-86 Allocation of $96,410 from 1986/87 CDBG Program approved. 07-21-86 Authorization given for sale of Orangewood Park to Community Hospital. Allocation of $100,000 from 1984/85 CDBG Program confirmed. Finding of need for Health & Safety reasons made. Plans approved and authorization granted to advertise for bids. Bids rejected and authorization granted to re-advertise for bids. 11--17 -86 09-08-87 09-21-87 12-07-87 (Continued on second page) Recommended motion: 1. That the transfer of $1,452.64 from Account No. 241-361-57268, "Sixth Ward Park Extension Fund," to Account No. 243-363-57503, "Rio Vista Park Development, be approved. 2. That Change Order No. Two to the contract with Fernando Orte9a, for construction of Phase II-B of Rio Vista (Anne Shirrells) Park, in accordance with Plan No. 7038, be approved; to authorize the Contractor to perform various minor items of extra work, and delete va . us m or items of work, for a net increase in contract price of $1 5 .64, 0 $331,916.50 to $333,369.14. cc: Jim Robbins Jim Richardson Andy Green Ken Henderson Annie Ramos Ward: 5025 6 Supporting data attached: Roger G. Hardgrave Staff Report, CCO No. Two Phone: Contact person: FUNDING REQUIREMENTS: Amount: $1.452.64 $152,138 + $187,641 = ~33Q 7]Q Source: (Acct. No,) 121-544-57543, 243-363-57503 (Available) IAcct, Descriotionl (Anna Shirrells) Park, Phase II-B Improvement of Rio Vista ~ Financej)~r4t(P Council Notes: Agenda I tern No I(), 1 o o o o SYNOPSIS OF PREVIOUS COUNCIL ACTION Continued: 02-01-88 Resolution No. 88-33 adopted awarding a contract for the low bid price of $328,416.50. 02-01-88 Expenditure of $3,500 from Sixth Ward Park Extension Fund approved. 04-04-88 --- Contract Change Order No. One approved for the re- location of the scoreboard at an increase in the contract price of $3,500.00, from $328,416.50 to $331,916.50. 8-03-88 -L- . , CltOOF SAN BBRNARDIIO - RBQlGsT FOR COUNCIL AOION STAFF REPORT tion: The following items of extra work arose during construc- 1. Due to space restrictions, a wall hung lavatory was required in lieu of the counter sink called for on the plans. Net cost increase: $451.32 2. Metal "L" striping was installed on the edge of the new roof in order to increase weathering resistance. Net cost increase: $86.25 3. An existing residential driveway approach became too steep after improvements to Pennsylvania Avenue. In order to reduce the grade, 5 additional feet of the existing driveway were removed. Net cost increase: $624.91. 4. The private developer that installed the sewer main on Pennsylvania Avenue did not install a lateral to serve the park site, as shown on the plans. This omission required the Contractor to install a sewer lateral in order to provide sewer service, at a net cost increase of $489.14. 5. Subsequent to award of this contract, the Building and Safety Department increased their permit fe~s. This resulted in an increase in cost to the Contractor of $582.02. 6. The Contractor agreed to provide the City with a credit due to reduction in thickness of steel doors, change of handicap signs from metal to plastic, labor credit for overrun on brick dust, deletion of window screen installation. Net cost reduction: $781.00. Contract Change Order No. Two would authorize the Contractor to perform these various items of work, at a net increase in the contract price of $1,452.64. No contingency funds were included within the project budget. Therefore, the necessary supplemental funds will need to be transferred from Account No. 241-361-57268, "Sixth Ward Park Extension Fund". We feel these prices are fair and reasonable, and recommend that Change Order No, Two be approved. 8-03-88 75-0264 ~ject: R';'~"v~~t:II~~gi~n~~'ap~r~ vi o Date: ]-20-880 Ffle No. 7.3720 Plan No. 7038 ENGINEERING DIVISION DEPARTMENT OF PUBlIC WORKS CITY OF SAN BERNARDINO, CALIFORNIA CONTRACT CHANGE ORDER NO. -Ilfil (Change necessitated because of field conditions) TO: Fernando Ortega Construction, Inc. 27185 East Fifth Street Highland, CA. 92346 Gentlemen: You are hereby authorized and directed to perform the following described items of work: 1. Install wall hung lavatory in lieu of counter sink................... 2. Install "L" metal to edge of roofing................................. 3. Remove additional 5 feet of existing concrete driveway............... 4. Install additional 4" sewer lateral.................................. 5. Pay additional permit fee............................................ 6. Credit for steel door, handicap signs, brick dust, and wi ndow screens....................................................... $ 451. 32 $ 86.25 $ 624.91 $ 489.14 $ 582.02 $[781.00] Total extra work cost added to contract .............................$ 1,452.64 Previous Contract Price.............................................$ 331,916.50 Antended Cost Pri ce .................................................. $ 333,369.14 Additional time to complete contract due to change order ............ 10 working days CONTRACTOR: CITY OF SAN BERNAROINO: ~ ~- By:>:--.........~ - _~ ~ Title: 5?~ , By: ROGER G. HARDGRAVE Director of Public Works/City Engr. Accepted Date: ~ _?;.-~7 'Approved Date: