Loading...
HomeMy WebLinkAboutS02-Public Works - "CIO OF SAN BERNARDCO - REQUOiTNFOMl~OUNCIt1COION Rrc'D _ ROGER G. HARDGRAVE 0->' AD~j"FrAPproval of Char;ge Order No. t,,'!} JUt /2. -Three - Construct~on of Seccombe Public Works/Engineering ~4i1 8, 3/Lake Park, Phase I-B, per Plan No. 7444 -- MARINA CONTRACTORS, INC. From: Dept: Date: 7-07-89 Synopsis of Previous Council action: 01-04-87 -- Resolution No. 87-35 adopted authorizing execution of Development Agreement with State. June, 1987- Allocation of $2,330,408 approved in 1986/87 Budget for design and construction. 09-19-88 Plans approved and authorization granted to advertise for bids. ' 03-20-89 Resolution No. 89-85 adopted, awarding a contract for the low bid price of $2,018,625.32. 05-15-89 Addition of underground electrical services and a restroom building to the contract for Phase I-B approved. 06-19-89 Change Order No. One approved, increasing the contract price by $29,555.00 from $2,018,625.32 to $2,048,180.32. Recommended motion: 1. That the transfer of $27,058 from Acct. No. 243-363-57528, "Patton Park Development -(86 Bond) "to Acct. No. 243-363-57618, "Seccombe Dev. Phase I-a," be approved. 2. That Change Order No. Three to the contract with Marina Contractors, Inc., for the construction of Seccombe Lake Park, Phase I-B, in accordance with Plan N. 7444, be approved; to authorize the Contractor to install underground electrical services for events the picnic area, at a cost of $27,057.60, increasing the con ct price from $2,048,180.32 to $2,075,237.92. cc: Marshall Julian ~Jim Richardson ndy Green Annie Ramos Contact person: Roger G. Hardgrave Staff Report & Supporting data attached: CCO II 3 Phone: 5025 Ward: I FUNDING REQUIREMENTS: Amount: $27 r 00;7 _ 60 Source: (Acct. No,) 243-363-57618 Acct, Descri tion Seccombe La Finance: Council Notes: 75-0262 Agenda Item No ~.....l,...- , 'CI..o OF SAN BERNARDIa>> - REQUOT FOR COUNCIL ACOON STAFF REPORT The addition of underground electrical services and a restroom building to the contract for construction of Phase I-a of Seccombe Lake Park, was approved in principle at the Council meeting of 5-15-89. The electrical services were to provide power for different groups that want to use the park for some function. These services were not included in the original design since this type of facility is not provided as a part of normal park design. A restroom building was shown on the conceptual design, but was not included in the contract plans and specifications due to a shortage of funds. Plans for installation of electrical services have been prepared by the Engineering Division. The Contractor has provided a price quote of $27,057.60 to install two electrical service pedestals, underground conduit and conductors, trans- formers and weatherproof lockable plug enclosures. These services will be installed along the sidewalk in the picnic area. We have reviewed the price quote and determined that it is fair and reasonable for the amount of work involved. The approximate, balance of $400,000 for Patton Park North was identified 1n the Staff Report for approval, in principle, as a possible funding source. Form Motion No. I will approve the transfer of $27,058 from Patton Park North to Seccombe Lake. Plans have also been prepared for the restroom building, and a price quote has been requested from the Contractor. We recommend that the transfer of funds and Change Order No. Three be approved. URGENCY CLAUSE: The Contractor's schedule for this project indicates that elec- trical underground work will be completed before the next Council meeting of 8-7-89. Deferral of this Change Order would result in the quoted price becoming invalid, and the Contractor requiring that the price be increased to compensate for bringing the electrical sub-contractor back on the project to install these electrical services. 7-07-89 75-0264 F~ect: Plan No. Seccombe Lake Park, Phase I-B {C~)I ...' 7-07-89 7444 o Ffll No, ,.., 6.144~1!~ EN6INEERING DIVISION DEPARTMENT OF PUBLIC WORKS CITY OF SAlt BERNARDINO, CALIFORNIA CONTRACT CHANGE ORDER NO. Three , - To: Marina Contractors, Inc. 41 Corporate Park, Suite 200 P. O. Box 18410 Irvine, CA 92714 Gentlemen: You are hereby authorized and directed to provide, complete and in place electrical service for the picnic areas as shown on sheets E6.1, E2, E3 and E4, Addendum No. One. This work should be performed for the agreed lump sum price of $27,057.60. . Total extra work cost added to contract .............................$ 27.057.60 Previous Contract Price. ......... ........ .... ..... ..................$ 2,048,180.32 Amended Cost Pr1 c. .................................................. $ 2, 075 I 237. 9 L Addf tional time to C:OllIPlete contract due to change order ............ 10 Working Days CONTRACTOR: CITY OF SAN BERNARDINO: Approved By: Roger G. Hardgrave Date Direc:tor of Public: Works/City Engr. Accepted By: Ti tl e: Date