HomeMy WebLinkAbout23-Public Works
. O. . 0 File No. Q40-28.-0
CITY OF SAN BERNARDINO - RlI!.faUI!ST FOR COUNCIL ACTION
From:
ROGER G. HARDGRAVE
PUBLIC WORKS/ENGINEERING
AUGUST 8, 1985
Change Order No. One --
ftEC'~~'HO Orange Show Lane, 1911
. F~l:t Project
/985 AlN; -8 PH /: 40
Dept:
Date:
Synopsis of Previous Council action:
5- 20-85
Resolution awarding contract
Recommended motion:
That the Director of Public Works of the City of San Bernardino is
authorized to issue Change Order No. One to Riverside Construction
Company as follows:
1.
The deletion from said work of 37 lin. ft. of 27" reinforced
concrete pipe as delineated on Sheet 5 of 5 Sheets, of Plan No.
6502; the addition of 74 lin. ft. of 15" truss pipe, plus
potholing and incidental work located on the East side of "E"
Street, North of Orange Show Lane.
(Continued on page 2)
John Matzer Jr.. City Admil'li.t-rat-nr ~~tur~~~ '"
cc:
Contact person:
Verne Nadeau
Phone:
5026
FUNDING REQUIREMENTS:
Amount: $2.538.00
Ward: 3
,)..~TI- (,32 - 5$7,;1..::.-
::$:;:;:~~~.~:;
Supporting da~ attached:
Yes
Council Notes:
1
Agenda Item N~( 3,
75-0262
,
l
!
~
'I
I
1
I
t
I
o
o
o
o
Recommended Motion (continued from page one)
2. The deletion of recompacting subgrade to a depth of 2 feet; add
the excavation of unsuitable material and replace with base, plus
incidental work between Engineer's Station 2+89 and Station 6+00
as shown on Sheets 2 and 3 of 5 Sheets, of said Plan on Orange
Show Lane.
3. The removal of an abandoned vault and excavate exploratory hole
for irrigation line near Engineer's Station -0+40 on Sheet 2 of 5
Sheets of said Plan.
4. The removal and replacement of encased sewer lateral between
Engineer's Station 5+50 and 7+00 on Sheet 3 of 5 Sheets of said
Plan.
2
CIR OF SAN BERNARDlio - REQU8T FOR COUNCIL AC~ON
STAFF REPORT
This office has been made aware of circumstances in the field
which requires certain changes in the construction as follows:
1. The deletion from said work of 37 lin. ft. of 27"
reinforced concrete pipe as delineated on Sheet 5 of 5
Sheets. of Plan No. 6502; the addition of 74 1 in. ft. of
15" truss pipe. plus potholing and incidental work
located on the East side of "E" Street. North of Orange
Show Lane.
2. The deletion of recompacting subgrade to a depth of 2
feet; add the excavation of unsuitable material and
replace with base. plus incidental work between
Engineer's Station 2+89 and Station 6+00 as shown on
Sheets 2 and 3 of 5 Sheets, of safd Plan on Orange Show
Lane.
3. The removal of an abandoned vault and excavate
exploratory hole for irrigation line near Engineer's
Station -0+40 on Sheet 2 of 5 Sheets of said Plan.
4. The removal and replacement of encased sewer lateral
between Engineer's Station 5+50 and 7+00 on Sheet 3 of 5
Sheets of said Plan,
We recommend that the changes be approved. but in order to
implement the changes in accordance with Section 20447 and 20455
of the Public Contract Code. the Director of Publ ic Works must be
authorized to issue the Change Order. The increased cost
estimate is $2.538,00.
3