Loading...
HomeMy WebLinkAbout18-Development Services . . . CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION From: James Funk, Director Subject: Resolution awarding contract to C ".,' I"' C Lambco Engineering, Inc. for storm drain ; i . .... I . ~ rl L outlet structure repair on 40th Street, Phase I, per Plan No. 10320 Dept: Development Services Date: November 20. 2001 File: 4.7256 MCC Date: December 17, 2001 Synopsis of Previous Council Action: 7/9/01 Allocation of $50,000 in the 2001/02 Capital Improvement Program (CIP) for 40'h Street storm drain (Account Nos. 248-368-5504-7256). Recommended Motion: Adopt Resolution. -h~ Contact person: Mehran Sepehri, Senior Civil Engineer Phone: ~1?7 Supporting data attached: Staff Report, Map, & Resolution Ward: ~ FUNDING REQUIREMENTS: Amount: $50,000.00 Source: (Acct. No.) 248-368-5504-7256 Acct. Description: Storm drain outlet structure re air on 40th Street. Finance: Council Notes: 'l'~~~\-'S'\s Agenda Item No. I g Jell n JOJ .' CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION STAFF REPORT Subject: Resolution awarding contract to Lambco Engineering, Inc. for storm drain outlet structure repair on 40th Street, Phase I, per Plan No. 10320. Background: This project consists of the repair and installation of rip-rap at the 401h Street storm drain outlet structure east of "H" Street. Rip-Rap is the loose rock placed in front of the outlet structures to prevent erosion. This structure which has been damaged and eroded due to the effect of previous storms and is currently in need of immediate repair prior to the next heavy storm. Staff is proposing to move forward with the Phase I repair as soon as possible to prevent further damage to the outlet structure. Due to time constraints, the complete reconstruction and repair can not be done during the rainy season; Phase II of this project will be completed after the rainy season. Plan and specifications for this project are complete and the project is ready to be awarded. The estimated project costs are as follows: Construction Cost $28,900.00 Contingencies $5,000.00 Design (Phase I & II), Inspection, and Contract $16,100.00 Administration Total $50,000.00 This project was advertised locally in the San Bernardino County Sun Newspaper, Construction Trend Newspaper, the City's web site, and with the San Bernardino Area Chamber of Commerce. The following three companies responded: Name of Bidder City Amount of Bid Lambco Engineerinl!:, Inc Santa Ana $28,900.00 4 Con Engineerin2: Fontana $39,000.00 Sim Engineering, Inc. Fall Brook $43,000.00 Engineering Estimate $30,000.00 Based on a review of the sealed competitive bids received, staff has determined that Lambco Engineering, Inc., the apparent lowest bidder, has met the minimum requirements of the specifications and bid guidelines, and therefore recommends that the Mayor and Common Council award the referenced contract accordingly. CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION STAFF REPORT Financial Impact: Funding for this project in the amount of $50,000 has been included in the FY 01-02 budget from the Storm Drain Construction Fund. All costs incurred will be charged to Account No. 248-368-5504-7256 (Storm Drain Outlet Structure Repair on 40th Street). Recommendation: Adopt Resolution. City of San Bernardino, California Department of Public Works, Division of Engineering November 27, 2001 File No. 1.7256 W.O. No. 7256 DWG. No. 10320 Storm Drain Outlet Structure Repair On 40th Street -- Phase I T" , " ~ '././0 '. to '.J- 0 "--.. en ~ ,,! J~ 0.:::;' ~ ';:'/lIfs :~'~~ '</f' ErA~" . ~/~ 'ff" ......f.., '....1/;> / f'''' "> ", oS' ~ .. ,', ~ _--~-,.,.. f !. "" ~ /<."'~/ /1'"'- "'(' '.J' '..... '-, -...-' J....(V S'lir~ 0;:( ~ ',-'/'/,~~'" _..,-'"l'\.~fl'1l \ ... ...__ ~r,.......--,,, :r: _,y",,\ -..."\..... "l<lDI!~ ". '%.i/l(IC'eJluec;." /..'" '~~" "I;:Vlo:!V "I( ft: ~----r~~~" ~~ + ----~-~fI~~,____~ ~"V"J N:S. ~ ~ .'~" /' /1oJ 4lr...... j ....~ e'-,. /.... ~ ' ~':;<{"'., -.Irq /..:- 0 .p/'!Y'N/~"'" \.\)GE LlNE ~/' Tf 'o~/.:'"ff;~ "~I~" ~ },.------- RilACf~! <1" ",I~ / Dri , -i" ~i~_ .~" /.~ I ..-....--~- /' 1"// /' 1 " 1E1 co ell!:z ;Z ;Z ;Z I'~ ~I :zl ~ ~,,! i rr1 · '''.--r~-'''+-+-~ Jr 1'1"1 I I I. I"''' tz:: trio :2:1 ,.'ll~\~ 2 c::a ~ :,..J ~ Ic:5p...... ..., I LW I <[ I_.JI' ':it...! '--;;;, "'J "1''' i:= ~I! ::ili ~ ,'_:pI 81_,~!I ;----~1~-=.\ - -_~C=-~_~j-FS )400 I: I., 1 I " '300 1400, \. :3l ~i ~i:-. I ., '.m'.\ d:! 2:;,<( ....I. t:ITItE.}J/)U~i/tto/ ~ - ~ ' ~ / r ~-r'r 1""~(7 ;Z LL~,..,.~l1lST"'-- >-_ J'--^^~...,LLjf~b- .;..dI~tL '! . ~~~=::~~-=~':::'=:~'~~_~.~ff:tf'_-_~)j'- ~! ~c::.<::H::1 rYJ,~~I;1!O..,. >, , SKrlA\l....>', ."'-...-:..._:..:...-_:;.:,..;....-~ .----. ~ -OR ST ...,1 I I~ l~ VICINITY MAP N. T.S. - \..... .,-, "- , ce(Q)~V I. 1 2 RESOLUTION NO. RESOLUTION OF THE MAYOR AND COMMON COUNCIL OF THE CITY OF SAN 3 BERNARDINO AWARDING A CONTRACT TO LAMBCO ENGINEERING, INC. 4 FOR STORM DRAIN OUTLET STRUCTURE REPAIR ON 40TH STREET PHASE I, PER PLAN NO. 10320. 5 BE IT RESOLVED BY THE MAYOR AND COMMON COUNCIL OF THE 6 CITY OF SAN BERNARDINO AS FOLLOWS: 7 SECTION 1. Lambco Engineering, Inc, is the lowest responsible bidder for. storm 11 but such award shall be effective only upon being fully executed by both parties. All other 12 bids, therefore, are hereby rejected. The Mayor is hereby authorized and directed to execute 13 said contract on behalf of the City; a copy of the contract is on file in the office of the City 14 Clerk and incorporated herein by reference as fully as though set forth at length. 15 16 17 18 19 SECTION 2. This contract and any amendment or modifications thereto shall not take effect or become operative until fully signed and executed by the parties and no party shall be obligated hereunder until the time of such full execution. No oral agreements, amendments, modifications or waivers are intended or authorized and shall not be implied from any act or 20 21 course of conduct of any party. 22 SECTION 3. This resolution is rescinded if the parties to the contract fail to execute it 23 within sixty (60) days of passage of the resolution. /-- , '-- f"'""'" '- r '- . 1 RESOLUTION OF THE MAYOR AND COMMON COUNCIL OF THE CITY OF SAN 2 BERNARDINO AWARDING A CONTRACT TO LAMBCO ENGINEERING, INC. FOR STORM DRAIN OUTLET STRUCTURE REPAIR ON 40TH STREET PHASE I, 3 PER PLAN NO. 10320. 4 5 6 7 8 9 10 I HEREBY CERTIFY that the foregoing Resolution was duly adopted by the Mayor and Common Council of the City of San Bernardino at a meeting thereof, held on the _day of _,2001, by the following vote, to wit: Council Members: AYES NAYS ABSTAIN ABSENT ESTRADA LIEN 11 12 MC GINNIS 13 SCHNETZ 14 15 16 17 18 19 SUAREZ ANDERSON MC CAMMACK City Clerk 20 21 22 23 , 2001. The foregoing resolution is hereby approved this day of Judith Valles, Mayor City of San Bernardino 24 Approved as to 25 form and legal content: 26 JAMES F. PENMAN, 27 28 City Attorney By: Qh><A r. f~ o CITY OF SAN BERNARDINO Interoffice Memorandum CITY CLERK'S OFFICE Records and Information Management (RIM) Program DATE: December 19,2001 TO: Mehran Sepehri, Senior Civil Engineer FROM: Michelle Taylor, Senior Secretary RE: Transmitting Documents for Signature - Resolution 2001-373 At the Mayor and Common Council meeting of December 17, 2001, the City of San Bernardino adopted Resolution 2001-373 - Resolution awarding a contract to Lambeo Engineering, Inc., for storm drain outlet structure repair on 40th Street Phase L per Plan No. 10320. I am providing you with one certified copy of Resolution 200 l~ and four (4) original bound contracts. Please obtain signatures where indicated and return one fully executed original contract to the City Clerk's office as soon as possible. Please be advised that the resolution and contract will be null and void if not executed within 60 days, or by February 15,2002. If you have any questions, please do not hesitate to contact me at ext. 3206. Thank you. I hereby acknowledg.e receipt of the above mentioned documents. Signed: -( /}'rV' ~ . ! z.- J u I tp 1 Please sign and return. Date: ~ ** FOR OFFICE USE ONLY - NOT A PUBLIC DOCUMENT ** RESOLUTION AGENDA ITEM TRACKING FORM Meeting Date (Date Adopted): 1"2- \l-<:) \ Item # Vote: Ayes 1-(.0 Nays G- Change to motion to amend original documents: \'6 Abstain Resolution ~ __?OC> 1- 3 '13______ ..-e-- Absent_~___ Reso. # On Attachments: I Contract term: ~ Note on Resolution of Attachment stored separately: X"'_ Direct City Clerk to (circle I): PUBLISH. POST. RECORD WCOUNTY Date Sent to Mayor: 1"2--1 'b~ () \ Date of Mayor's Signature: 12-1"1--01 Date ofClerk/CDC Signature: 1'2--/4-0, NullNoid After: By: _=:._~_ Reso Log Updated ~/ Seal Impressed: ____ __-:::::__________~__.__ Date Memo/Letter Sent for Signature: 12 - 2.0 -<::, \ 60 Day Reminder Letter Sent on 30th day: 90 Day Reminder Letter Sent on 45th day: See Attached: / Date Returned: . I-~,,\ -0:>- See Attached: See Attached: Request for Council Action & Staff Report Attached: Updated Prior Resolutions (Other Than Below): Updated CITY Personnel Folders (64t3, 6429, 6433,10584,10585, t2634): Updated CDC Personnel Folders (5557): Updated Traffic Folders (3985, 8234,655,92-389): Copies Distributed to: City Attorney ,,/ Parks & Rec. Code Compliance Dev. Services ,./' Police Public Services Water Notes: f'wI\D COl1'rf.Pc...1 Yes ./ No By Yes No ~ By Yes No --.L By Yes No V- By Yes No/ EDA Finance / -~ J118tfI.p,J MIS Others: BEFORE FILING, REVIEW FORM TO ENSURE ANY NOTATIONS MADE HERE ARE TRANSFERRED TO THE YEARLY RESOLUTION CHRONOLOGICAL LOG FOR FUTURE REFERENCE (Contract Term. etc.) Ready to File: ~ Date: ).- \ -0:) Revised 01/12/01