HomeMy WebLinkAbout17-Development Services CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION From: James Funk, Director Date: November 19, 2001 O............'.L 'j"I,...".d Subject: Resolution awarding contract to Lambco Engineering, Inc. for installation of storm drain in "H" St. from Esperanza St. to Adell St. per Plan No. 10244 and authorization for the Director of Finance to amend the FY2001/02 budget. Dept: Development Services File: 4.7258 MCC Date: December 3,2001 Synopsis of Previous Council Action: 7/9/01 Allocation of $40,000 in the 2001/02 Capital Improvement Program (CIP) for installation of storm drain in "H" Street from Esperanza Street to Adell Street. Recommended Motion: 1) Adopt Resolution. 2) That the Mayor and Common Council authorize the Director of Finance to amend the FY 2001/02 budget to increase the budget amount in Account No. 248-368-5504-7258 by $25,000 and reflect the associated reduction in account No. 248-000-3405-0000 (Unappropriated Storm Drain Construction fund). ~ ~ James Funk Contact person: Mehran Sepehri, Senior Civil Engineer Phone: 'i 1 ?7 Supporting data attached: Staff Report. Map. & Reso. Ward: 3 FUNDING REQUIREMENTS: Amount: $65,000.00 Source: (Acct. No.) 248-368-5504-7258 Acct. Description: "H" St. Storm Drain from Adell Street to Jefferson St. (Esperanza St.) Finance: ~.,(Au/c.IIh",(/k Council Notes: .,\d Q.@ 2601-- 7)(,1 Agenda Item No. J 7 III BioI .. CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION STAFF REPORT Subject: Resolution awarding contract to Lambco Engineering, Inc. for installation of storm drain in "H" St. from Esperanza St. to Adell St. per plan no. 10244 and authorization for the Director of Finance to amend the FY2001l02 budget. Background: This budgeted project consists of the installation of a storm drain system in "H" Street. "H" Street between Esperanza Street and Adell Street has landscape drainage water flowing from private properties overspraying into the gutter year round. During the summer months, this excess irrigation water causes algae and slime to grow in the gutters, which in turn causes slippery conditions, as well as year round ponding at certain locations. In addition, rainfall runoff collects in these same local depressions. This ponding of excess irrigation water and rainfall runoff could cause significant damage to the pavement, curb, gutter and driveways over time, which is why staff is proposing to move forward with this project as soon as possible. In order to reduce street maintenance cost and to mitigate the problem of ponding, algae and slime in the gutter, staff recommended the installation of a storm drain during the Capital Improvement Program budget process. However, during the preliminary engineering and surveying it was determined that more catch basins and associated drains would be necessary than was originally anticipated to reduce the number of ponding areas. This resulted in a higher engineer's estimate than was anticipated in the process of developing the CIP budget for this project. Plan and specifications for this project are complete. The project is ready to be awarded. The estimated project costs are as follows: Construction Cost $52,680.00 Contin2encies $ 5,300.00 Design, Inspection, and Contract Administration $ 7,020.00 Total $65,000.00 , , CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION STAFF REPORT - continued This project was advertised locally in the San Bernardino County Sun Newspaper, Construction Trend Newspaper, the City's web site, and with the San Bernardino Area Chamber of Commerce seven bids were received. The following companies responded: Name of Bidder City Amount of Bid Lambco EUldneerinl!, Inc. Santa Ana $ 52,680.00 Fischer Plumb in!! San Bernardino $ 62,860.00 O'Duffy Const. Romoland $ 63,320.00 David T. Wasden, Inc. Riverside $ 69,850.00 Beador Const. Co., Inc Corona Del Mar $ 73,700.00 R.W.Jacobson Gen. En!!., Inc. Riverside $ 75,981.20 Sean Malek Engineering & Construction, Inc. Perris $138,600.00 Enf?ineer's Estimate $ 55,420.00 Based on review of the sealed competitive bids received, staff has determined that Lambco Engineering, the apparent low bidder, has met the minimum requirements of the specifications and bid guidelines, and therefore recommends that the Mayor and Common Council award the referenced contract accordingly. Financial Impact: For the reasons identified, $40,000 was included in the FY2oo1/02 budget under Account No. 248-368-5504-7258. An additional $25,000 is now needed for this project. Staffrecommends that the additional $25,000 be transferred from Account No. 248-000-3405-0000 (Unappropriated Storm Drain Construction Fund) to cover project cost. Recommendation: That the Mayor and Common Council authorize the Director of Finance to amend the FY 2001/02 budget to increase the budget in Account No. 248-368-5504-7258 by $25,000 and reflect the associated reduction in Account No. 248-000-3405-0000 (Unappropriated Storm Drain Construction Fund); and adopt resolution. Drainage Improvements At "H' STREET And Esperanza st. to Adell St. VICINITY MAP N. T. S. " ~ -- 14 ....... 1 2 3 4 5 6 7 8 RESOLUTION NO. RESOLUTION OF THE MAYOR AND COMMON COUNCIL OF THE CITY OF SAN BER:\"ARDI:\"O AWARDING A CONTRACT TO LAMBCO ENGINEERING, INC., FOR I:\"STALLATION OF STORM DRAIN IN "H" STREET FROM ESPERANZA STREET TO ADELL STREET PER PLAN NO. 10244. BE IT RESOLVED BY THE MAYOR AND COMMON COUNCIL OF THE CITY OF SAN BERNARDINO AS FOLLOWS: SECTION 1. Lambco Engineering, Inc. Lambco Engineering, Inc. is the lowest responsible bidder for installation of storm drain in "H" Street from Esperanza Street to Adell 9 10 Street per Plan No. 10244. A contract is awarded accordingly to said bidder in a total amount 11 of $52,680, with a contingency amount of $5,300, but such award shall be effective only upon 12 being fully executed by both parties. All other bids, therefore, are hereby rejected. The 13 Mayor is hereby authorized and directed to execute said contract on behalf of the City; a copy of the contract is on file in the office of the City Clerk and incorporated herein by reference as 15 16 fully as though set forth at length. 17 SECTION 2. This contract and any amendment or modifications thereto shall not take 18 effect or become operative until fully signed and executed by the parties and no party shall be 19 obligated hereunder until the time of such full execution. No oral agreements, amendments, 20 moditications or waivers are intended or authorized and shall not be implied from any act or 21 22 course of conduct of any party. 23 SECTION 3. This resolution is rescinded if the parties to the contract fail to execute it 24 within sixty (60) days of passage of the resolution. 25 III 26 ,.n'""'''''. I I I 27 ~. -:t\l 28 ld-/3( 0 l ", - 1 RESOLUTION OF THE MAYOR AND COMMON COUNCIL OF THE CITY OF SAN '"- 2 BERNARDINO AWARDING A CONTRACT TO LAMBCO ENGINEERING, INC., FOR INSTALLATION OF STORM DRAIN IN "H" STREET FROM ESPERANZA 3 STREET TO ADELL STREET PER PLAN NO. 10244. 4 5 I HEREBY CERTIFY that the foregoing ResDlution was duly adopted by the Mayor and 6 Common Council of the City of San Bernardino at a meeting thereof, held on the _day 7 of _,2001, by the following vote, to wit: 8 9 ESTRADA 10 11 Council Members: AYES NAYS ABSTAIN ABSENT LIEN 12 MC GlNNIS 13 SCHNETZ r-- 14 '- SUAREZ 15 16 ANDERSON 17 MC CAMMACK 18 19 20 21 22 23 City Clerk day of , 2001. The foregoing resolution is hereby approved this Judith Valles, Mayor City of San Bernardino 24 25 Approved as to form and legal content: 26 -- JAMES F. PENMAN, 27 ,-. 28 By: . CITY OF SAN BERNARDINO Interoffice Memorandum CITY CLERK'S OFFICE Records and Information Management (RIM) Program DATE: December 6, 2001 TO: Mehran Sepehri, Senior Civil Engineer FROM: Michelle Taylor, Senior Secretary RE: Transmitting Documents for Signature - Resolution 2001-361 At the Mayor and Common Council meeting of December 3, 2001, the City of San Bernardino adopted Resolution 2001-361 - Resolution awarding a contract to Lambco Engineering, Inc., for installation of storm drain in "H" Street from Esperanza Street to Adell Street, per Plan No. 10244. I am providing you with one certified copy of Resolution 2001-361 and four (4) original bound contracts. Please obtain signatures where indicated and return one fully executed original contract to the City Clerk's office as soon as possible. Please be advised that the resolution and contract will be null and void if not executed within 60 days, or by February 1,2002. If you have any questions, please do not hesitate to contact me at ext. 3206. Thank you. 1 hereby acknowledge receipt of the above mentioned documents. Signed: u:/ ~ ~U1/ L / I Please sign and return. Date: /J.. " CJ I , . ** FOR OFFICE USE ONLY - NOT A PUBLIC DOCUMENT ** RESOLUTION AGENDA ITEM TRACKING FORM Meeting Date (Date Adopted): IZ-3-()\ ltem# Nays ...G- 1'1 Vote: Ayes 1- ., Change to motion to amend original documents: Abstain Resolution" ___:200 \ - ~ ,___._. ..G- Absent _ -B- ______.___ Reso. # On Attachments: ~ Contract term: - Note on Resolution of Attachment stored separately: ~ Direct City Clerk to (circle I): PUBLISH. POST. RECORD \\"/COUNTY Date Sent to Mayor: 1<.-4 -0 \ Date of Mayor's Signature: \ 2.-:5 -01 Date ofClerklCDC Signature: 12.-;)-0 I Date Memo/Letter Sent for Signature: 12. -~-D \ 60 Day Reminder Letter Sent on 30th day: 90 Day Reminder Letter Sent on 45th day: NullNoid After:_(" O_QA:.7~~Z-I-6L___ By: _"::::-_____ ResQ, Log Updated: Seal Impressed: ,/ ,/---- See Attached: v'" Date Returned:: \2-1'1. -0 I See Attached: See Attached: Request for Council Action & Staff Report Attached: Updated Prior Resolutions (Other Than Below): Updated CITY Personnel Folders (6413, 6429, 6433,10584,10585,12634): Updated CDC Personnel Folders (5557): Updated Traffic Folders (3985, 8234, 655, 92-389): Copies Distributed to: City Attorney .,/ Parks & Rec. Code Compliance Dev. Services ,,/ Police Public Services Water Notes: &xJn 0 tJ:mlUit--;r Ves ,/' No By - Ves No v By Ves No ,/ By Yes No ,/ By Ves NO/ By EDA Others: Finance'/ MIS m rnefu..! :? 8P 8+12-1 BEFORE FILING. REVIEW FORM TO ENSURE ANY NOTATIONS MADE HERE ARE TRANSFERRED TO THE YEARLY RESOLUTION CHRONOLOGICAL LOG FOR FUTURE REFERENCE (Contract Term. etc,) Ready to File: m'l Date: 12-l9-0i Revised 01112/01