HomeMy WebLinkAbout22-Facilities Management ,CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION Dept: Facilities Management O"""'''''L hi .....1.11;-1 Subject: Resolution Authorizing the Purchasing Manager to execute Change Order No. One with R. Moody Construction, Inc, for adding two 3.5-ton HV AC units and other minor contract changes in the total amount of$7,930 at City Yards. From: James Sharer, Director Date: October 9,2001 Synopsis of Previous Couocil Actioo 12/18/00 Adopted Resolution No. 2000-350 for the execution of a contract with R. Moody Construction, Inc. for remodeling ofthe City Yard Locker RoomlWarehouse at 234 North Mountaio View Street in Sao Bernardino, in the total amount of $247,625. Recommended Motion: James Sharer Adopt Resolution Contact person: Phone: 384-5244 Supporting data attached: Staff Report Ward(s): 1 FUNDING REQUIREMENTS: Amount: $7,930.00 Source: Facilities Management ~:06-0~~ ~ara Pachon - Council Notes: 17 i-C-.C:> ... 2t'0/ - ,'<,.~9 Agenda Item No.~ Ills/D} . CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION STAFF REPORT SUBJECT Authorize the Purchasing Manager to execute Change Order No. One with R. Moody Construction, Inc. for adding two 3.5-ton HV AC units and other minor contract changes in the total amount of$7,930 at City Yards. BACKGROUND On December 18, 2000, The City of San Bernardino Council adopted Resolution No. 2000-350 authorizing the execution of a contract with R. Moody Construction, Inc. for the remodeling of the City Yard Locker- Room/Restroom Facility at 234 North Mountain View, in San Bernardino. The remodel project included not only the restroom and locker room facilities, but also roof reconstruction and kitchen upgrades. During the reconstruction of the roof and prior to installation of the heating, ventilation, and air conditioning (HV AC) unit, it came to staffs attention that it would be more efficient and lower overall operating (electrical) costs to install two 3.5 ton HV AC units instead of adding one 3-ton unit to the existing 5-ton system that was 15- years old. The increased capital cost for this change is $3,800. Additionally, it was discovered that 400 square feet of concrete floor in the old shower and restrooms needed to be replaced due to significant defects including cracking and lifting. The cost of this additional work is $1,600. Previous to its current use as a locker room and warehouse, this facility was used as an automotive repair shop. Occasionally, the hydraulic lifts, which raised the vehicles for inspection of their undercarriages, were lifted too high for the sloped roof and damage to some of the structural columns and steel supports resulted. This damage was noticed when the demolition phase of the roof began and repair was required. The cost to perform this work amounts to $2,080. An additional gas line for the cook top and a bank of cabinet drawers, at a cost of $450, are required to complete the kitchen remodeling. The total amount of these changes is $7,930,00. FINANCIAL IMP ACT The cost of this change order request is $7,930, which will be funded by the Facilities Management's budget 001-321-5706-0000. RECOMMENDATION (S): Adopt Resolution. ,..-'" ( \...... C13 20 21 1/1 22 III 23 24 11/ 25 C 26 27 28 ~(Q)l?V '. RESOLUTION NO. 2 RESOLUTION OF THE MAYOR AND COMMON COUNCIL OF THE CITY 0 SAN BERNARDINO AUTHORIZING THE EXECUTION OF CHANGE ORDER NO ONE TO THE CONTRACT WITH R. MOODY CONSTRUCTION, INC. FOR T ADDITION OF TWO 3.5-TON HVAC UNITS AND OTHER MINOR CONTRA CHANGES AT THE CITY YARD IN THE AMOUNT OF 57,930.00. 3 4 5 6 BE IT RESOLVED BY THE MAYOR AND COMMON COUNCIL OF THE CITY 7 OF SAN BERNARDINO AS FOLLOWS: 8 9 SECTION 1. The Purchasing Manager is hereby authorized and directed to execute 10 Change Order No. One to the existing contract with R. Moody Construction, Inc. for the addition 11 of two 3.5-ton HV AC units, a gas line, a bank of cabinet drawers, removal and replacement of 12 400 square feet of concrete, and repair of roof colurnns and supports at the City Yard Locker- room Restroom Facility at 234 North Mountain View in San Bernardino per Specification No. 14 FOl-42 and per the quotations dated June 18,2001 for $3,800.00, June 4,2001 for $3,680.00, 15 16 and July 18,2001 for $450 in the total amount of $7,930.00. 17 SECTION 2. The authorization to execute the above-referenced Change Order No. One 18 to the contract with R. Moody Construction, Inc. for the aforementioned changes is rescinded if 19 not issued within sixty (60) days of the passage of this resolution. c c C2 RESOLUTION ... AUTHORIZING EXECUTION OF CHANGE ORDER NO ONE TO THE CONTRACT WITH R. MOODY CONSTRUCTION, INC. FO 2 ADDITION OF TWO 3.5-TON HVAC UNITS AND OTHER MINOR CONTRAC CHANGES AT THE CITY YARD IN THE AMOUNT OF $7,930.00. 3 4 I HEREBY CERTIFY that the foregoing resolution was duly adopted by the Mayor and Common Council of the City of San Bernardino at a meeting thereof, held on the day of ,2001, by the following vote, to wit: 5 6 7 Council Members: ABSTAIN ABSENT AYES NAYS 8 ESTRADA 9 LIEN 10 MCGINNIS SCHNETZ SUAREZ 12 ANDERSON 13 McCAMMACK 11 14 15 16 City Clerk 17 18 The foregoing resolution is hereby approved this day of ,2001. 19 20 2] 22 Judith Valles, Mayor City of San Bernardino Approved as to form and legal content: 23 ;J. 24 25 "- es F. Penman, City Attorney 27 28 c c c PROPOSAL R. MOODY CONSTRUCTION, INC. License #774281 June 18,2001 JOB: Locker RoomIWarehouse 234 S. Mountain View San Bernardino, CA City of San Bernardino 300 North D Street San Bernardino, CA 92418 OWNER: Attn: Jim Sharer Here are your three options for H.V.AC. at the locker rooms per Ken We propose to furnish and instal1 all materials necessary to do the following: I. Original plan per our quote of adding one (3) ton unit to go with existing unit and all new duct work. $12,100.00 .'" Removing existing unit that is very old and installing (1) new Carrier 7.5 ton unit with aU new ducts and registers. V. Removing existing unit and installing (2) new 3.5 ton Carrier gas/electric split systems. This will allow you to control the temperature in the locker roomlbathrooms separate from the lunch and meeting rooms. All of these options include gas piping and condensate drains as needed. Respectfully submitted: T ?--I~~~ Ronald L. Moody :Si/, $15,200.00 $15~::: i f ~?f{)O- 39821 Lincoln Street, Cherry Valley, CA 92223 (909) 769-3752 (909) 769-3712 fax PROPOSAL C R. MOODY CONSTRUCTION, INC. License #774281 June 4, 2001 JOB: Locker RoomIWarel1ouse 234 S. Mountain View San Bernardino. CA OWNER: City of San Bernardino 300 North D Street SanBernardino. CA 92418 Attn: Jim Sharer We propose to furnish and instaI1 aU materials necessary to do the following: c I. Remove and replace 400 s.t: of concrete floor at Old shower and rcstrooms: $ 1,600.00 $ 2,080.00 2. Replace bent steel pur1ios and structural columns: TOTAL S 3,680.00 Respectfully submitted: n-l~-7 Ronald L. Moo Y. ~ent c 39821 Lincoln Street, Cherry Valley, CA 92223 (909) 769-3752 (909) 769-3712 fax /""'" \-. c c FROM : l"OODY Ct>l5TRUCT I Cl'l PHJNE NO. : 'l097693712 Jul. 18 2001 08:53AM p~ [-..-------- R. MOODY CONSTRUCTION, INC. License #774281 PROPOSAL July 18,2001 JOB: Locker Room/Warchouse 234 S. Mountain Vicw San Bernardino, CA OWNER: City of San Bernardino 300 North D Street San Bernardino, CA 92418 Attn: Jim Sharer We propose to furnish and install all materials necessary to do the foUowing: Cost increase to insta11 additional gas !iDe for cook top and add blIIlk of drawers in cabiDct. TOTAL $ 450.00 Respectfully submitted: n--l~ Ronald L. M Y-, ident 39821 Lincoln Street, Cherry Valley, CA 92223 (909) 769-3752 (909) 769-3712 fax . ** FOR OFFICE USE ONLY - NOT A PUBLIC DOCUMENT ** RESOLUTION AGENDA ITEM TRACKING FORM Meeting Date (Date Adopted): \ \-'1--0\ Item # 2Z Resolution # 2 <J()\ -339 Vote: Ayes 1- (p Nays '\ Abstain .-e--- Absent B- Change to motion to amend original documents: - Reso. # On Attachments: / Contract term: - Note on Resolution of Attachment stored separately: ===---- Direct City Clerk to (circle I): PUBLISH, POST, RECORD W/COUNTY Date Sent to Mayor: It-\ - 0 , Date of Mayor's Signature: \ 1-, -() I Date of ClerklCDC Signature: \ \- ,-D \ Date mo/Letter Sent for Signature: 60 Day Reminder Letter Sen 0 90 Day Reminder Letter Sent on 45th day: See Attached: See Attached: ched: Request for Council Action & StatT Report Attached: Updated Prior Resolutions (Other Than Below): Updated CITY Personnel Folders (6413, 6429, 6433,10584,10585,12634): Updated CDC Personnel Folders (5557): Updated Traffic Folders (3985, 8234, 655, 92-389): Copies Distributed to: City Attorney / Parks & Rec. Code Compliance Dev. Services Police Public Services Water Notes: NullNoid After: <OCl Oi\/.s } 1-4---02... By: - Reso. Log Updated:/ _ Seal Impressed: / Date Returned: - Yes 1 No By Yes No --L By Yes NOL By Yes No ;: By Yes No_ By EDA Others: Finance / fio,cll{11 ~ MIS BEFORE FILING. REVIEW FORM TO ENSURE ANY NOTATIONS MADE HERE ARE TRANSFERRED TO THE YEARLY RESOLUTION CHRONOLOGICAL LOG FOR FUTURE REFERENCE (Contract Term, etc.) Ready to File: IY\\ Date: $ Revised 01/12/01