Loading...
HomeMy WebLinkAbout11-Development Services . " CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION From: James Funk, Director Dept: Development serviceO r,' ~~'.', ^, : :L Subject: Resolution approving Amendment No.3 to Agreement with Architect Milford Wayne Donaldson, FAIA, Inc, , for preparing final plans, specifications, and estimate for renovation and retrofit of the San Bernardino Santa Fe Depot. MCC Date: 10-15-01 Date: October 2,2001 File: 6,7178 Synopsis of Previous Council Action: 6j18jOl Approval of Amendment no. one to agreement with Architect Milford Wayne Donaldson, FAIA. Inc., for preparing final plans, specifications, and estimate for renovation and retrofit of the San Bernardino Santa Fe Depot. 4j16jOl Approval of change order no, one to the contract with Architect Milford Wayne Donaldson. FAIA. Inc" for preparing a final plan, specifications, and estimates for renovation and retrofit of the San Bernardino Santa Fe Depot. llj20jOO Award contract to Architect Milford Wayne Donaldson, FAIA, Inc. for preparing a final plan, specifications, and estimates for renovation and retrofit of the San Bernardino Santa Fe Depot. 10j20jOO Agreement for Professional Envirorunental Inspection Services approved with Earth Tech for providing inspection of hazardous waste removal at the San Bernardino Santa Fe Depot. 3j06/00 Approval of the Rehabilitation and Adaptive Reuse Plan for the San Bernardino Santa Fe Depot. 6j07j99 Agreement for Professional Services awarded to Architect Milford Wayne Donaldson, FAIA, Inc" to prepare preliminary plans, specifications, and estimates for the rehabilitation, seismic retrofit. and adaptive reuse of the Santa Fe Depot. 2j15j99 Authorized an amendment to the Cooperative Agreement with SANBAG and the Economic Development Agency to include City as owner for restoration of the Santa Fe Depot and the Commuter Rail Station. Recommended Motion: Adopt Resolution ~,~ Contact person:RlIYmond CaseY, Dt:Puty Director Phone: 5127 Supporting data attached: Staff Report Reso, Exhibit "B" Ward: 1 FUNDING REQUIREMENTS: Amount: $52.070.00 Source: (Acct. No,) 123-558-5504-7178 Acct. Description: Restoration of San Bernardino Santa Fe Depot /J,/fJ ;/ Finance: ~/;(/I?!rm kv Council Notes: ~tl-Z()() \-'31'1 Agenda Item No, -11 /Df/5fDJ , CITY OF SAN BERNARDINO - REOUEST FOR COUNCIL ACTION Staff Report Subiect: Resolution approving Amendment No. 3 to Agreement with Architect Milford Wayne Donaldson, FAIA, Inc" for preparing fInal plans, specifIcations, and estimate for renovation and retrofIt of the San Bernardino Santa Fe Depot, Backl!l"ound: On November 20, 2000, the Mayor and Common Council adopted Resolution No. 2000-327 approving a Professional Services Agreement with Milford Wayne Donaldson, FAIA, Inc., in an amount not to exceed $1,064,840, for preparation of final plans, specifIcations and estimate for renovation and retrofIt of the San Bernardino Santa Fe Depot, The Architect began work about December 11, 2000, and monthly progress meetings between the Architect, SANBAG, Metrolink, City staff, and more recently Transtech, have been held since that date to discuss issues and resolve problems. As a result of the value engineering process, design revisions were requested by Transtech and City staff to maximize contract flexibility and to ensure that the project would be built within the available budget. These revisions will require changes to the Architect's scope of services as described in Exhibit "B" and summarized as follows: 1. Amtrak, SANBAG, and Metrolink tenant improvement spaces and the temporary facilities developed for Amtrak and Metrolink and landscaping improvements except for planting and irrigation immediately adjacent to the building and improvements to the east parking lot will be identifIed as additive bid alternates. 2,Based on section 8-702,2 of the State Historical Building code (SHBC) , structural work will include the items needed to complete the renovation and selected seismic bracing of the most critical structural (elements). 3,All changes will be incorporated into the construction drawings and specifIcations and the Statement of Probable Costs. The compensation to the Architect for these design changes is $52,070,00 fIxed fee. This amendment is described as Amendment No, 3, reflecting the two amendmentsl change orders previously approved, The total cost of all amendments is within the contingency amount initially approved by the Mayor and Council. ., CITY OF SAN BERNARDINO - REOUEST FOR COUNCIL ACTION Staff Report - continued FinanciallmDact: Sufficient funds are available for these additional services from the project contingency fund of $106,484,00 originally authorized from Account No, 123-558-5504-7178 (Restoration of San Bernardino Santa Fe Depot) as part of the contract award, The majority of the cost of this project (88,53 percent) will be reimbursed through Federal/State Aid funding with the local match covered by the disbursement previously received from SANBAG, Summary of Contract Costs Original Contract Amount $1,064,840.00 Increase due to Contract Change Order No, 1 - Material Testing $8,500,00 Increase due to SANBAG/Metrolink revisions $39,100.00 Increase due to value engineering process $52,070,00 Total additional services $99,670.00 Revised Contract Amount $1,164,510.00 Recommendation: Adopt Resolution, . ,--- '- ~(Q)[?W , 1 2 3 4 5 6 7 8 9 RESOLUTION NO. RESOLUTION OF THE CITY OF SAN BERNARDINO APPROVING AMENDMENT NO. 3 TO PROFESSIONAL SERVICES AGREEMENT WITH ARCHITECT MILFORD WAYNE DONALDSON, FAIA, INC. FOR PREPARING FINAL PLANS, SPECIFICATIONS, AND ESTIMATE FOR RENOVATION AND RETROFIT OF THE SAN BERNARDINO SANTA FE DEPOT. BE IT RESOLVED BY THE MAYOR AND COMMON COUNCIL OF THE CITY OF SAN BERNARDINO AS FOLLOWS: SECTION 1. The attached Proposal dated September 19, 2001, and marked Exhibit "B", submitted by ARCHITECT MILFORD WAYNE DONALDSON, FAIA, INC. to 10 perform extra work for a fixed fee of $52.070,00, under terms of a Professional Services 11 12 13 Agreement with said Architect authorized by Resolution No. 2000-327, is hereby approved, Such approval shall be effective only upon Amendment No, 3 being fully executed by both C 14 parties, The Mayor is hereby authorized and directed to execute said Amendment No, 3 on 15 behalf of the City, A copy of Amendment No.3 is attached as Exhibit "A" and incorporated - "- 16 herein by reference as fully as though set forth at length, 17 18 SECTION 2. This Amendment shall not take effect until the Amendment is fully signed and executed by the parties, and no parry shall be obligated hereunder until the time of 19 20 such full execution. No oral Contracts, amendments, modifications or waivers are intended or 21 authorized and shall not be implied from any act or course of conduct of any party, 22 SECTION 3. This resolution is rescinded if the parties to the Amendment fail to 23 execute it within sixty (60) days of the passage of the resolution, 24 25 26 27 28 <-tCa II IcJ //5/6/ , C 1 2 3 4 5 6 7 8 RESOLUTION . . . APPROVING AMENDMENT NO. 3 TO PROFESSIONAL SERVICES AGREEMENT WITH ARCHITECT MILFORD WAYNE DONALDSON, FAIA, INC. FOR PREPARING FINAL PLANS, SPECIFICATIONS, AND ESTIMATE FOR RENOVATION AND RETROFIT OF THE SAN BERNARDINO SANTA FE DEPOT. I HEREBY CERTIFY that the foregoing resolution was duly adopted by the Mayor and Common Council of the City of San Bernardino at a meeting thereof, held on the day of ,2001, by the following vote, to-wit: 9 Council Members: AYES NAYS ABSTAIN ABSENT 10 ESTRADA 11 LIEN 12 MC GINNIS 13 SCHNETZ - 14 SUAREZ '-' 15 ANDERSON 16 17 18 19 20 21 22 23 24 25 26 - '- 27 28 MC CAMMACK Rachel Clark, City Clerk The foregoing resolution is hereby approved this _day of , 2001. Judith Valles, Mayor City of San Bernardino Approved as to form and legal content: James F, Penman City Attorney By: ~ 1,/k~~~ ///(/ 2 <: . c ,- \"...- EXHIBIT "A" AMENDMENT NO.3 TO AGREEMENT FOR PROFESSIONAL SERVICES This AMENDMENT NO, 3 is made and entered into this of 2001, by and between the CITY OF SAN BERNARDINO, California, a municipal corporation, hereinafter referred to as the "CITY" and Architect Milford Wayne Donaldson, FAIA, Inc., hereinafter referred to as "ARCHITECT", WITNESSETH WHEREAS, San Bernardino City Council, on November 20, 2000, adopted Resolution No. 2000-327 approving an Agreement for Professional Services with Architect for preparation of plans, specification, and estimate for renovation and retrofit of the San Bernardino Santa Fe Depot; and WHEREAS, subsequent to Agreement approval, revisions were requested by Transtec and City Staff pursuant to the Value Engineering process, WHEREAS, certain tests must be conducted to provide sufficient information for the Architect to create a proper design; and WHEREAS, Architect has requested an amendment to the Agreement to cover the cost of additional services required to complete these revisions; and , WHEREAS, paragraph 5,B. of Agreement allows adjustment to the total cost of services when the Architect and City agree in writing that there has been, or will be, a significant change in the scope, complexity or character of the services to be performed; and WHEREAS, City agrees that the requested revisions are not within the scope of services covered in Agreement; and WHEREAS, the proposed additional services to be performed by Architect are deScribed in a letters from Architect dated September 19, 2001, identified as Exhibit "B", r~spectively, attached hereto and made a part hereof. , NOW, THEREFORE, it is mutually agreed, as follows: 1, SCOPE OF SERVICES Architect shall perform those additional services identified in Exhibit "B". 2, COMPENSA nON Upon satisfactory completion of the additional services contained herein City shall be pay to Architect an additional fixed fee of $52,070,00, Page lof2 EXHmIT "A" ,_ AMENDMENT NO.3 TO AGREEMENT FOR PROFESSIONAL SERVICES WITH '_ ARCHITECT MILFORD WAYNE DONALDSON, FAIA, INC. 3, NO ADDITIONAL CHANGES Except as otherwise stated in this Amendment No, 3, all terms of the original Agreement, as approved by City on November 20, 2000, and as amended in Change Order Number One, approved by City on April 16, 2001, and as amended in Amendment Number One, approved by City on June 18, 2001, shall remain in full force and effect. IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed on the date written above by their duly authorized officers on their behalf, ATTEST: CITY OF SAN BERNARDINO BY: BY: ".- "- Rachel Clark, City Clerk City of San Bernardino Judith Valles, Mayor City of San Bernardino Milford Wayne Donaldson, FAIA, Inc. BY: Signature NAME: TITLE: Approved as to form and legal content: JAMES F, PENMAN City Attorney ,-. '- .f;. Page 2 of2 ,- '-' c c -.----.--. ." ! MILFORD WA'SE OO~ALD50~ ARCHITECT EXHIBIT "B" . September 19, 200 I HISTORIC GASL.~MP QU.~RTER CITY OF SAN BERNARDINO Development Services Department 300 North "0" Street San Bernardino, CA 92418 Attention: Mr, Raymond Casey Subject: San Bernardino Santa Fe Depot Value Engineering Services - (revised) Dear Ray: In regards to the City of San Bernardino's request for additional services, Architect Milford Wayne Donaldson is pleased to submit this revised proposal, for the above referenced project, in the amount ofFiBy Two Thousand Seventy Dollars (S52,070), Per Ali Cayir's request, MWD is submitting this proposal, to confirm our reduced fee and to be presented to the City Council Meeting on October \,2001 As detailed in our proposal dated October 10, 2000, value engineering is specifically excluded from our basic services. We have put together this proposal for Value Engineering Services required to reduce the construction budget to S8,800,000, This proposal reflects all additional services required to facilitate plan modifications based on our current understanding of the project which is summarized in the following scope: SCOPE OF WORK: 1. Amtrak, SANBAG, and Metrolink tenant improvement spaces, will be identified as three (3) separate additive alternate items, 2, The Temporary Facilities developed for Amtrak and Metrolink will be identified as one (I) separate additive alternate item. 3, Landscaping improvements, except for planting and irrigation immediately adjacent to the building, will be identified as one (I) additive alternate item. I I I i I I I ! j i I i , I I I I ..J 4. Improvements to the east parking lot will be identified as one (\) additive alternate item with the exception of the mechanical enclosure and required utilities. 5. Elements of the base bid to include the new parking lots between the Depot and Third Street consisting of paving, curb lines, sidewalk with curbs, and street lighting, Landscaping in the base bid is limited to planting and irrigation immediately adjacent to the building. The east parking lot will remain in its current condition with historic brick paving and new striping to accommodate parking: Paving along the west of the building and at the Metrolink kiosk will remain as is. Existing paving between the arcade and the tracks will remain as is. Brick paving under the arcade will be removed and reinstalled to be level. The mechanical enclosure at the far-east portion of the site will be built. Site lighting will consist of under arcade lights and lights along the entl)' plaza and near parking for persons with disabilities, , ;.c..::s(. A~. '-- c r- i..-. Mr. Raymond Casey CITY OF SAN BERNARDINO Development Services Value Engineering Proposal ~ (revised) Soptember 19,2001 Pago 2 MILFORD WAYl'.'E DONALDSON ARCHITECT . 6. The building exterior will appear much the same as it has been planned to date, The roof tile will be cleaned in-place instead of being removed and replacement tile will be installed at damaged locations, The exterior cement plaster cleaning is also important to the general appearance as well as to enable plaster repairs, All window and door openings currently blocked will be cleared and replicated windows or doors will be installed where needed, The improved exterior east stairway remains in the project as well as restoration of the arcade, canopies, and chimney reconstruction. 7. With the exception of cleaning tile, repairing ceiling finishes, repairing windows and doors, and repairing tile damage caused by settling, the Lobby and Amtrak areas will not be improved. The Amtrak counter will be improved, but limited to ADA requirements and glazing on the counter. Air conditioning will be provided to Amtrak. The Lobby, as part of the original design, will only have the air tempered with cooling and heating, not designed for maximum controlled comfort at all times, 8 The base bid will not include the improvements designed for Metrolink or the Banquet facility on the first floor. These areas will receive wall and ceiling finishes, floor repairs and cleaning, window, and door repairs, A storefront door system will be installed in the Banquet Area, The toilets and kitchen area will be partially constructed and left in shell condition, 9. With the exception of the removal of the west elevator, and not installing tenant improvements for SANBAG, the 2"" floor is generally unchanged from current plans, The east elevator and lifts remain to satisfy ADA requirements. The new stairs connecting the mid and upper level and ramping between the mid and lower level will remain, The two new toilets at the west end will be partially constructed and left in shell condition, The skylights remain per the plans, 10. Areas designated for future tenants will remain as currently planned, 11. Rehabilitation of the exterior and some primary structural elements of the Historic Donn remain in the project. Overall improvement of hollow clay tile (HCT) walls and unreinforced masonry (URM) and interior finishes are limited to shell type improvements, The interior of the donn building remains unchanged, 12. Based on section 8-702.2 of the State Historical Building Code (SHBC), structural work will include the items needed to complete the renovation and only selected seismic bracing of the most critical structural. Estimated Construction Costs not to exceed $500,000, 13. In general, mechanical equipment will be sized for maintaining a comfortable environment. Smaller equipment will take more time to acclimate to desired levels and the temperature swing will be wider, 14. Plumbing is largely unchanged, however, smaller hot water heaters are planned, and some will not be installed until future tenant improvements are undertaken, The radiators in the Main Lobby will not be functional. The number of gas & water meters will be reduced along with the amount of . ---..----------- .---.._.-.-- "."...~ / '-' c i rI '-' ! Mr. Raymond Casey CITY OF SAN BERNARDINO Development Services Value Engineering Proposal - (revised) September 19, 200 I Page 3 ~ULFORD WAYNE OONALDSON ARCHITECT . piping needed. The building must remain protected by an automatic sprinkler system to comply with SHBC and City of San Bernardino code requirements. 15. Individual metering, particularly for future tenant splits, may be eliminated at the forfeiture of measuring individual electrical useage, Lighting may change from pendant system to integral into suspended ceilings in portions of the SANBAG area, The fire alarm system, emergency lighting, and data systems remain unchanged, 16. Incorporate all changes into the construction drawings and specifications, 17. Incorporate all changes into the Statement of Probable Costs, Reimbursable Costs Reimbursable Expenses described below shall occur, as necessary, and be billed by the Architect on an itemized statement specifying the type of service and/or the material provided, copies of receipts, if applicable, the position of the person providing the service, the person's hourly rate, the time spent and the cost incurred to provide the service, Funding for the reimbursable expenses is provided to pay the Architect for the various duties described below that do not lend themselves to precise estimation on a lump sum basis, and for that reason is not included in the Basic Services, Reimbursable Expenses, however, are essential to aid the Architect in the performance of the Basic Services and Additional Services, when authorized. Reimbursable Expenses are estimated to be $250 and shall be limited to the following: , Printing and reproduction as required by the Consultant . Film and Film processing as required by the Consultant , Automobile Mileagerrravel related costs , Long distance telephone/fax , Report reproduction and expendable supplies (data duplication, historic photographs, and graphics supplies) Exclusions I, Preparation of permit processing documents, submittal of documents or attendance at agency plan check meetings, 2, Reproduction costs for blueprinting, CAD plots and photocopying, Reproduction for MWD use or project team coordination are not considered reimbursable costs. .- , "'- c ,'-' . "-' l'vULFORD WAYNE OONALDSON ARCHITECT Mr. Raymond Casey CITY OF SAN BERNARDINO Development Services Value Engineering Proposal - (revised) September 19.2001 Page 4 . PROPOSED FEE: The estimated total fixed fee for professional architectural services as described in this proposal is Fifty Two Thousand Seventy Dollars ($52,070). Break Down of Costs Architect Milford Wavne Donaldson. FAIA , Corporate Architect , Project Manager , CADD Technician Report Writer , Clerical Total Estimated Reimbursable Expenses Sub Total Leverton & Associates , Construction Cost Estimate Derenkolb Enrineers. , Structural Engineering Bechard Lone & Associates . Mechanical and Plumbing Van Buuren Kimper Enl:iners , Electrical Engineering GRAND TOTAL Hourly Ii2Jl.a Amount $120 15 1,800 $80 60 4,800 $70 160 11,200 $80 20 1,600 $50 20 l..QQQ 260 $20,400 ~ $20,650 $4,000 $14,000 $5,920 $7,500 Additional services beyond those described above are subject to the attached Schedule of Fees, m.m ,- Mr. Raymond Casey CITY OF SAN BERNARDINO Development Services Value Engineering Proposal- (revised) September 19. 200 I Page; IvULFORD WAYNE DONALDSON ARCHITECT '- . SCHEDULE OF FEES c Hourlv Rates Corporate Architect Project Architect Construction Administrator Project Historian Project Manager Specification Writer Senior Designer Senior Draftsperson Technical Manager Report Writer/Script Writer CADD Technician V ideo Editor V ideographer Video Duplicator Intermediate Designer Intermediate Draftsperson Research Assistant Beginning Draftsperson Clerical Financial Controller Architectural Trainee Basic Costs $120.00lHour $IOO.OOlHour $ 90.001H0ur $ 90.001H0ur $ SO.OOlHour $ SO.OOlHour $ SO.OOlHour $ SO.OOlHour $ SO.OOlHour $ SO.OOlHour $ 70.001H0ur $ 70.001H0ur $ 70.001H0ur $ 60.001H0ur $ 70.001H0ur $ 70.001H0ur $ 60.001H0ur $ 60.001H0ur $ 50.001H0ur $ 70.001H0ur $ 40.001H0ur Miscellaneous In this category are materials, service and equipment which are not covered in the hourly rate schedule. Miscellaneous items include: Computer Usage CADD Plots Automobile mileage (over 30 mile radius from office) Travel and subsistence, per day Printing and photographic work Long Distance telephone and faxes Equipment Rental Aircraft Rental $ 65.001H0ur $ 15.001Each $ 0.325/Mile. At cost + 15% At cost + 15% At cost + 15% At cost + 15% At cost + 15% Other Consultants Employed by Architect Milford Wayne Donaldson, F AlA, Inc. Services outside consultants employed by us on the client's behalf will be charged at cost plus 15%. ,<"""- Terms of Payment Payment for services is due upon presentation of the invoice. Invoices are normally rendered on a monthly basis as either a partial or final billing. . Per IRS Reculalions I\eviJed 6i99 -...,.. /---- '- -- '-' c Mr. Raymond Casey CITY OF SAN BERNARDINO Development Services Value Engineering Proposal. (revised) September 19. 2001 Page 6 IvULFORD WAYNE DONALDSON ARCHITECT . If this acceptable to you, please sign both originals and return a copy of this proposal as authorization to proceed with extra services. Should you need any further information or would like to discuss this, please give me a call. :fl~llL Milford Wayne D aldson, FAIA President C20193 MWD:rrw cun\mwd.projeas\O 16&.58D _ VE\daIl\propoAls\\'a1ue.ena-rcv .wpd . .. CITY CLERK'S OFFlCE RACHEL G. CLARK, CM.C. - Crrv CLERK '" P.O. Box 1318 . San Bernardino' CA 92402 300 North "D" Street. San Bernardino' CA92418-0001 909.384.5002' Fax: 909.384.5158 Business Registration Division: 909.384.5302 Passport Acceptance Facility: 909.384.5128 www.ci.san-bernardino.ca.us October 19,2001 Milford Wayne Donaldson, FAIA, Inc. 530 Sixth A venue San Diego, CA 92101-7010 Dear Mr. Donaldson, At the Mayor and Common Council meeting of October 15, 2001, the City of San Bernardino adopted Resolution 2001-319 - Resolution approving Amendment No.3 to professional services agreement with Architect Milford Wayne Donaldson, FAIA, Inc., for preparing final plans, specifications. and estimate for renovation and retrofit of the San Bernardino Santa Fe Depot. Enclosed is one (1) original agreement. Please sign in the appropriate location and return the original agreement to the City Clerk's Office, Altn: Michelle Taylor, P.O. Box 1318, San Bernardino, CA 92402, as soon as possible. Please retain a copy of the agreement for your files. Please be advised that the resolution and agreement will be null and void if not executed within 60 days, or by December 14, 2001. If you have any questions, please do not hesitate to contact me at (909)384-5002. Sincerely, , .,' r i . ,1 (;~;" !.' ,...../. t: Michelle Taylor Senior Secretary Enclosure cc: Raymond Casey, Deputy Director/City Engineer CITY OF SAN BERNARDINO ADOPTED SHARED VALVES: Integrity. Accountability' Respect for Human Dignity' Honesty December 10, 2001 Milford Wayne Donaldson, FAIA, Inc. 530 Sixth Avenue San Diego, CA 92101-7010 Dear Mr. Donaldson, Our office has not received Amendment No.3 to professional services agreement with Architect Milford Wayne Donaldson, FAIA, Inc., for preparing final plans, specifications, and estimate for renovation and retrofit of the San Bernardino Santa Fe Depot, which was approved at the Mayor and Common Council meeting held on October 15, 2001. Please forward the orirdnal executed agreement to the City Clerk's Office, to my attention, as soon as possible. Please be advised that the resolution and agreement will be null and void if not executed by December 14, 2001. If you have any questions, please do not hesitate to contact me at (909) 384-5002. Thank you, Michelle Taylor Senior Secretary 300 North "D" Street, San Bernardino, CA 92418 FAX: 909 384-5158 Fax To: Renard Wynn Date: December 12, 2001 Fax: (619) 234-6286 CITY OF SAN BERNARDINO CITY CLERK'S OFFICE From: Michelle Taylor Pages: 9 Phone: Re: Amendment NO.3 CC: D Urgent D For Review D Please Comment D Please Reply D Please Recycle -Comments: Mr. Wynn, Please obtain signatures on th Office, Attention Michelle Tayl soon as possible. u~ b '"" ~K '<;'" . ,=,,,<;; ~T "'-I F"., , D..,o/'tA-... Y~D F..' '....... de -S'fJ. tum to the City Clerk's ardino, CA 92402, as If you have any questions, please give me a ....." _ Michelle Taylor Sr. Secretary, City Clerk's Office (909)384-5002, ex!. 3206 TAYLOR MI(1j)CI.SAN-BERNARDINO.CA.U5 384-5002. ARCHITECT MILFORD WAYNE DONALDSON, F AlA, INC. 530 SIXTH AVENUE, SAN DIEGO, CALIFORNIA 92101 PHONE: (619) 239-7888. FAX: (619) 234-6286. E-MAIL: MWD@ARCHMWD..COM . LETTER OF TRANSMITTAL Date: December 12, 2001 To: Ms. Michelle Taylor, Sr. Secretary CITY OF SAN BERNARDINO CITY CLERK'S OFFICE 300 North "D" Street, 2nd Floor San Bernardino, CA 92418 Fax: (909) 384-5158 From: Renard Wynn Subject: San Bernardino Depot Amendment No.3 This FAX contains 9 Pages inc.Juding this cover sheet. Description and Comments: Please find attached the signed agreement to Amendment No.3 to Agreement for Professional Services. The original will be sent via FedEX. IDENTIFICATION o Tracing o Specifications D Plots D Submittal o Originals D Samples D Change Order D Addendum . Agreement D 1.44 mb Disk PURPOSE o Information o Quotation D Bidding . Per Request o For Y OUf Use D ACTION D Review & Comment D Correct & Resubmit D Approved D Disapproved D Return D For Approval D For Distribution VIA D u.s. Mail D Special Delivery D Pick~up . Facsimile . FEDEX \\Curt\mwdwprojects\OJ68-SBD _ VE\data\transmittals\tran_city clerksoffice.wpd CITY OF SAN BERNARDINO Interoffice Memorandum CITY CLERK'S OFFICE Records and Information Management (RIM) Program DATE: December 13,2001 TO: Raymond Casey, Deputy Director/City Engineer FROM: Michelle Taylor, Senior Secretary RE: Resolution 2001-319- Amendment No. 3 - Architect Milford Wayne Donaldson, FAIA, Inc. CC: Finance Attached is a fully executed copy of Amendment No. 3 to agreement with Architect Milford Wayne Donaldson, FAIA, Inc., for preparing final plans, specifications, and estimate for renovation and retrofit of the San Bernardino Santa Fe Depot. The original agreement is on file in the City Clerk's Office. If you have any questions, please call me at ext. 3206. ., ** FOR OFFICE USE ONLY - NOT A PUBLIC DOCUMENT ** RESOLUTION AGENDA ITEM TRACKING FORM Meeting Date (Date Adopted): _I (0-1 ")-0 I Item # Vote: Ayes l - 'I Nays..G- Change to motion to amend original documents: - I \ Resolution # Zen \ - 31 q Abstain J:d--- Absent-A- Reso. # On Attachments: ~ Contract term: - Note on Resolution of Attachment stored separately: -=- Direct City Clerk to (circle 1): PUBLISH, POST, RECORD W/COUNTY NullNoid After: 1.00 DAY':' } 12-14-(J\ I By: - Date Sent to Mayor: 10- II - () \ Date of Mayor's Signature: 10- \ ',(-0\ Date ofClerklCDC Signature: \0-\" -0 \ Reso. Log Updated: V Seal Impressed: V" Date Memo/Letter Sent for Signature: ':> - \ 9 - 0\ 60 Day Reminder Letter Sent on 30th day: \2-1C! -0 1 90 Day Reminder Letter Sent on 45th day: SeeAttached:~DateReturned: i2-12.-~, See Attached: t-/ See Attached: Request for Council Action & Staff Report Attached: Updated Prior Resolutions (Other Than Below): Updated CITY Personnel Folders (6413, 6429, 6433, 10584, 1058;, 12634): Updated CDC Personnel Folders (5557): Updated Traffic Folders (3985, 8234, 655, 92-389): Yes L No By Yes No / By - Yes No ~ By Yes No II' By Yes No/ By Copies Distributed to: City Attorney Parks & Rec. ./ Code Compliance Dev. Services ,/ EDA Finance / Police Public Services Water Others: MIS Notes: BEFORE FILING, REVIEW FORM TO ENSURE ANY NOTATIONS MADE HERE ARE TRANSFERRED TO THE YEARLY RESOLUTION CHRONOLOGICAL LOG FOR FUTURE REFERENCE (Contract Term, etc.) Ready to File: ()'\\ Date: 12 - \:5 -0\ Revised 01/12/01