CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION
From: James Funk, Director
Date:
September 25,2001 C ,... ' ". 'L
III ""0' . ~ /1
4.7211
Subject: Resolution awarding contract to
Lambco Engineering, Inc. for installation
of 18" storm drain in Highland Avenue
from Mt. View Cemetery to Valencia
Avenue per Plan No. 10248.
Dept: Development Services
File:
MCC Date: October 1,2001
Synopsis of Previous Council Action:
None
Recommended Motion:
Adopt Resolution.
~U-
V James Funk
Contact person: Ron Blymiller, Associate Civil Engineer
Phone: ~ 1 ~4
Supporting data attached: Staff ReDort. MaD. Reso. & ReDort of bids Ward: 7 /I.z 7
FUNDING REQUIREMENTS: Amount: $75,500.00
Source: (Acct. No.) 248-368-5504-7211
Acct. Description: Installation of IS" storm drain in Hiehland Ave. from Mt.
V iew Cemetery to Valencia Ave,
Finance:
Council Notes:
t'ffi:.,M Za::, \ - 313
10/! JDJ
Agenda Item No. 1J.j
CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION
STAFF REPORT
Subject:
Resolution awarding contract to Lambco Engineering, Inc. for installation of 18" storm drain
in Highland Avenue from Mt. View Cemetery to Valencia Avenue per Plan No. 10248.
Background:
Highland Avenue (north side of the street) from the Mt. View Cemetery to Valencia Avenue
has a considerable amount of landscape drainage water flowing in the gutter year round.
During the summer months, this excess irrigation water from the cemetery causes algae and
slime to grow in the gutters, which in turn causes slippery conditions at the existing bus stop
and at the intersection of Valencia and Highland Avenues (NW corner). This flow of excess
irrigation water in combination with the stopping and starting of heavy busses is significant and
often enough to cause significant damage to the pavement, curb, gutter and driveways.
Department staff worked with the cemetery in an effort to reduce watering to mitigate the
problem. However, during the hot summer months, the reduced watering was not adequate to
maintain the cemetery's landscaping in a green, healthy condition. Therefore, it was necessary
for them to increase the watering, resulting in renewed problems with deterioration of the
street. Given that the cemetery had always drained to the street, they were unwilling to
participate in the construction costs. The Public Services Department, at significant cost to the
City, removed and replaced the pavement in the vicinity of the bus stop, but it is again starting
to fail due to the nearly constant flow of water.
Staff will also be working with the cemetery representatives to ensure the runoff is being
adequately "filtered" of pollutants by the lawn and/or additional measures as required.
In order to reduce street maintenance cost and to mitigate the problem of algae and slime in the
gutter, staff is recommending the installation of a small storm drain. This storm drain will
convey the excess irrigation water, as well as local low flow runoff, underground to a nearby
channel. It is not intended to carry major storm flows which will continue to be carried in the
street.
Plan and specifications for this project are complete and it is ready to be awarded. The
estimated project costs are as follows:
Construction Cost $62,500.00
Contingencies $ 6,500.00
Design, Inspection, and Contract Administration $ 6,500.00
Total $75,500.00
. .
STAFF REPORT - continued
This project was advertised locally in the San Bernardino County Sun Newspaper, Construction
Trend Newspaper, the City's web site, and with the San Bernardino Area Chamber of
Commerce; the following companies responded:
Name of Bidder City Amount of Bid
Entrineer's Estimate $ 64,075.00
Lambco Eneineerine, Inc. Santa Ana $ 62,500.00
Herman Weissker, Inc. Bloomington $ 64,952.13
P K Construction Altadena $ 81,307.50
PDQ Construction, Inc. Murrieta $ 88,800.00
Bonadiman-McCain, Inc. San Bernardino $ 91,363.50
I.A. Salazar Construction Co. La Mirada $ 93,950.00
Powell En!!ineering Construction Villa Park $ 93,984.50
Mladen Grbavac Construction Co. Arcadia $ 96,416.00
David T. Wasden, Inc. Riverside $ 99,490.00
H & H General Contractors, Inc. San Bernardino $102,326.00
Sean Malek En!!ineering & Construction, Inc. Perris $193,110.00
Financial Impact:
Sufficient funding for this contract is available in Account No. 248-368-5504-7211 (Installation
of 18" storm drain in Highland Avenue from Mt. View Cemetery to Valencia Avenue).
Recommendation:
Adopt Resolution.
City of San Bernardino, California
File No.4. 7211
W.O. No. 7211
DWG. No. 10248
VICINITY MAP
For
Drainage Improvements
In
HIGHLAND A VENUE
From
Mt. View Cemetery to Valencia Ave.
VICINITY MAP
N.T.S.
-
~.
~
1 8
tto~
z
~~
z
a:
'"
III
Z
C
Ul
II.
o
~
(j
!;(
c
Cl
z
Z
llJ
c..
o
C
!Xl
j
~
~
-=E
:2
CI
iii
...J '"
U >
z ~
:::l -
o I-
c.>a:'"
oD.
Z...::IE
oco
::!:a:U
::!: t; II. \
0-0
c.>!1- z
c::Ea: 0
ZClCl -
celli Ii:
:5r:~ 0:
>-UI- ~
c..lrl llJ
::!:::!:-. c
.. 0!Xl C
00::::l
I-L1.CIl !Xl
CI
III
II.
o
I-
Z
;:)
o
::IE
c
~;
(31
!
I
.....
00
.....
.....
'"
.....
...,
.....
....
.....
>-
!Xl
C
llJ
0:
~
llJ
0:
c.. :::l
, --I
2/1 C'ii
1.:1 1'1
~lil
~4 10\
~! lp,
gol
I- ..91
<....,
::!: I
ti~
llJ~
Cl .
Z 0
_ Z
0: I-
llJ Z
llJ :::l
~ 0
Cl'c.>
Z c.>
llJ <
lC)
.....
::!:
<
z
::E
0:
i:i:
III
C
llJ
C
0:
0 Cl
c.> Z
llJ it
Q:
en :I:
<J
C 0:
iii ::>
..
0
0
0:
Z
..
0
..l
0
Cl
I-
Z
..
~
I-
0:
C
..
..
0
'"
z
ii:
..
..l
ii:
0
iii
>
0:
C
Z
C
<J
~ Z
0
C ;::
C
llJ 0:
c.> I-
Z III
:::l Z
0 ~
z
z c
<
..
C I-
Z :i
< ;=
C
llJ Z
Z 0
llJ ;::
c.. ::>
0 III
en i
c I-
III
III ii
.",,-
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
-
"-~
""'
--
'-'
0)0, rr=iI ~1
~0lF U
,
RESOLUTION NO.
RESOLUTION OF THE MAYOR AND COMMON COUNCIL OF THE CITY OF SAN
BER.l~ARDINO AWARDING A CONTRACT TO LAMBCO ENGINEERING, INC.
FOR INSTALLATION OF 18" STORM DRAIN IN HIGHLAND AVENUE FROM MT.
VIEW CEMETERY TO VALENCIA AVENUE, PER PLAN NO. 10248.
BE IT RESOLVED BY THE MAYOR AND COMMON COUNCIL OF THE
CITY OF SAN BERNARDINO AS FOLLOWS:
SECTION 1. Lambco Engineering, Inc. is the lowest responsible bidder for
installation of IS" storm drain in Highland Avenue from Mt. View cemetery to Valencia
Avenue. A contract is awarded accordingly to said bidder in a total amount of $62,500.00,
with a contingency amount of $6,500.00, but such award shall be effective only upon being
fully executed by both parties. All other bids, therefore, are hereby rejected. The Mayor is
hereby authorized and directed to execute said contract on behalf of the City; a copy of the
contract is on file in the office of the City Clerk and incorporated herein by reference as fully
as though set forth at length.
SECTION 2. This contract and any amendment or modifications thereto shall not take
effect or become operative until fully signed and executed by the parties and no party shall be
obligated hereunder until the time of such full execution. No oral agreements, amendments,
modifications or waivers are intended or authorized and shall not be implied from any act or
course of conduct of any party.
SECTION 3. This resolution is rescinded if the parties to the contract fail to execute it
within sixty (60) days of passage of the resolution.
III
III
~/{
16/( ItJ/
-
,"""""
"'-
,~.
'-
RESOLUTION...AWARDING A CONTRACT TO LAMBCO ENGINEERING, INC.
FOR INSTALLATION OF 18" STORM DRAIN IN HIGHLAND AVENUE FROM MT.
VIEW CEMETERY TO VALENCIA AVENUE, PER PLAN NO. 10248.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16 MC CAMMACK
I HEREBY CERTIFY that the foregoing Resolution was duly adopted by the Mayor and
Common Council of the City of San Bernardino at a
meeting thereof, held on the _day
of _,2001, by the following vote, to wit:
AYES
NAYS
ABSTAIN ABSENT
Council Members:
ESTRADA
LIEN
MC GINNIS
SCHNETZ
SUAREZ
ANDERSON
17
18
19
20
21
22
City Clerk
The foregoing resolution is hereby approved this
day of
,2001.
Judith Valles, Mayor
City of San Bernardino
JAMES F. PENMAN,
27 City Attorney
28 By: ~ 7'~
()
CITY OF SAN BERNARDINO
Interoffice Memorandum
CITY CLERK'S OFFICE
Records and Information Management (RIM) Program
DATE:
October 4,2001
TO:
Leslie Crawford, Engineering Assistant I
FROM:
Michelle Taylor, Senior Secretary
RE:
Transmitting Documents for Signature - Resolution 2001-313
I am providing you with one certified copy of Resolution 2001-313 and four (4) original bound
contracts. Please obtain signatures where indicated and return one fully executed original
contract to the City Clerk's office as soon as possible.
Please be advised that the resolution and contract will be null and void if not executed
within 60 days, or by November 30, 2001.
If you have any questions, please do not hesitate to contact me at ex!. 3206. Thank you.
Please sign and return.
,
\ ..' ...
** FOR OFFICE USE ONLY - NOT A PUBLIC DOCUMENT **
RESOLUTION AGENDA ITEM TRACKING FORM
Meeting Date (Date Adopted): I o-I-C) \ Item #
Vote: Ayes 1-'/ Nays -E7
\4
Resolution # Z-t:O \ - 3 13
Abstain -G Absent ~
Change to motion to amend original documents:
-
Reso, # On Attachments: ~ Contract term: -
Note on Resolution of Attachment stored separately: ~
Direct City Clerk to (circle I): PUBLISH, POST, RECORD W /COUNTY
NullNoid After: (,,0 DAYS) 1/-:30-0 ,
I
By: -
Date Sent to Mayor: 10-3-0 \
Date of Mayor's Signature: ttr?'-(j
Date of Clerk/CDC Signature: I (J- 3> -()\
Reso. Log Updated:
Seal Impressed:
/
/'
60 Day Reminder Letter Sent on 30th day:
90 Day Reminder Letter Sent on 45th day:
See Attached: ,,/ Date Returned: IO-J9-o \
See Attached:
See Attached:
Date Memo/Letter Sent for Signature:
10-4--0 ,
Request for Council Action & Staff Report Attached: Yes /
Updated Prior Resolutions (Other Than Below): Yes
Updated CITY Personnel Folders (6413, 6429, 6433, 10584, 10585, 12634): Yes
Updated CDC Personnel Folders (5557): Yes
Updated Traffic Folders (3985, 8234, 655, 92-389): Yes
No By
No..L By
No ~ By
No ,/ By
No 7 By
Copies Distributed to:
City Attomey ,/
Parks & Rec.
Code Compliance
Dev. Services
VEDA
Police Public Services
Water
Others:
Finance v MIS
1m f..t C~wol
Notes:
BEFORE FILING, REVIEW FORM TO ENSURE ANY NOTATIONS MADE HERE ARE TRANSFERRED TO THE
YEARLY RESOLUTION CHRONOLOGICAL LOG FOR FUTURE REFERENCE (Contract Term, etc.)
Ready to File: -1'i'!L.-
Date: 10-30-01
Revised 01/12/01