Synopsis of Previous Council Action:
07110/00 Allocated $400,000 for street improvements of Pepper Linden from Kendall Drive to Northpark
Boulevard as part of the FY 2000/01 CIP budget.
11/06/00 Mayor and Common Council approved a Memorandum of Understanding between the City of San
Bernardino and California State University San Bernardino to conduct a traffic study at a total cost of $37,800,
50% to be paid for by the City.
11/20/00 Agreement for Professional Services awarded to Korve Engineering, Inc., to prepare preliminary plans,
specifications, and estimates for the design of street improvements on Pepper Linden.
06/25/01 Allocation of $93,000 in the 2001/02 Capital Improvement Program (CIP) for Pepper Linden and
Kendall Drive Traffic Signal (Account No. 250-370-5504-7262) and $219,400 for street improvements/safety
improvement - city wide (Account No. 129-367-5504-7156).
07/23/01 Council directed staff to proceed with the design of the Wagonwheel/Kendall traffic signaL
Recommended Motion:
Adopt Resolution
-~~
Contact person: Ronald C. Blymiller. Associate En~ineer
Phone:
5154
Supporting data attached: Staff Report, Reso, Exhibits U A" - "D"
Ward:
5
FUNDING REQUIREMENTS:
$45000.00
Amount:
Source: (Acct. No.) 126-369-5504-7007,250-370-5504-
7262 & 129-367-5504-7156
Acct. Description: Peoper Linden Street Imorovements
Finance:
~o .;1(}I:J:J\-dSl
Council Notes:
Agenda Item No. JJ
t/JJJjtJ/
CITY OF SAN BERNARDINO - REOUEST FOR COUNCIL ACTION
Staff Report
Subiect:
Resolution approving Amendment No.1 to Agreement with Korve Engineering, Inc., for
preparing final plans, specifications, and estimate for the design of street improvements on
Pepper Linden.
Backl!round:
On November 20, 2000, the Mayor and Common Council adopted Resolution No. 2000-330
approving a Professional Services Agreement with Korve Engineering, Inc., in an amount not
to exceed $52,240, for preparing final plans, specifications, and estimate for the design of
street improvements on Pepper Linden.
The Engineer began work about December 11, 2000, and monthly progress meetings between
the Engineer and City staff have been held since that date to discuss issues and resolve
problems. At a meeting on June 26, 2001, design revisions were requested by City staff to
increase design flexibility for future improvements (landscaped median), address aesthetic
considerations, and significantly reduce the cost of construction. On July 23, 2001, the Mayor
and City Council had recently directed staff to proceed promptly with the design of the traffic
signal at Wagonwheel Road and Kendall Drive, including interconnect coordination with the
Pepper Linden and Kendall Traffic Signal. Staff believes that by adding the design of the
traffic signals at Wagonwheel Road & Kendall Drive and Pepper Linden & Kendall Drive to
this change order No.1, it will significantly reduce the time to complete the design. These
revisions will require the following changes to the Engineer's scope of services (See Exhibits
"B"-"D"):
1. Significant changes to the proposed street section from two lanes undivided to a two lane
divided highway including a future landscaped median with the ability to easily (and cost
effectively) increase the number of paved lanes at a later date as funding becomes
available, and horizontal/vertical alignments changes (See Exhibit "B" amount
$15,000.00).
2. The addition of a traffic signal design at Pepper Linden and Kendall Drive with additional
street improvement design work to accommodate the new traffic signal (See Exhibit "c"
amount $18,000.00).
3. The addition of a traffic signal design at Wagonwheel Road & Kendall Drive including
interconnection with Pepper Linden & Kendall (See Exhibit "D" amount $12,000.00).
The compensation to the Engineer for these design changes is $45,000.00 fixed fee.
Paragraph 5. B. of the Agreement requires that:
"Any adjustment of the total cost of services will only be permitted when the Engineer
establishes and City has agreed in writing that there has been, or is to be, a significant
change in:
1. Scope, complexity, or character of the services to be performed;
2. Conditions under which the work is required to be performed; and
3. Duration of work if the change from the time period specified in the Agreement
for Completion of the work warrants such adjustment."
Staff has reviewed the Engineer's request and agrees that this work will result in a change in
the scope of services from that proposed in the Agreement and will result in increased cost to
the Engineer. The Engineer has proposed a total compensation of $45,000.00, and has
provided a breakdown (See Exhibits "B"-"D") of costs to justify the fee. Staff has reviewed
the breakdown and believes it is fair and reasonable for the additional work required by
Amendment No.1 to the Agreement.
Financial ImDact:
Funding for the Pepper/Linden Street Improvement project in the amount of $475,000 was
approved in the FY 2001102 budget in Account No. 126-369-5504-7007. Funding for the
Pepper/Kendall Traffic Signal in the amount of $93,000 was approved in the FY 2001102
budget in Account No. 250-370-5504-7262. Staff was directed by the Mayor and Common
Council to utilize an estimated $110,000 from the Street Improvement/Safety Improvements-
Citywide Account approved in the FY 2001102 budget in Account No. 129-367-5504-7156 to
design and construct a traffic signal at the intersection of Wagonwheel and Kendall. There are
adequate funds available in each of these accounts, and although the same firm will do the
designs to expedite the process, all charges will be tracked individually among the project
accounts.
Recommendation:
Adopt Resolution.
- 1
'-
2
3
4
5
6
7
8
-
'-
,-
'-
RESOLUTION NO.
RESOLUTION OF THE CITY OF SAN BERNARDINO APPROVING
AMENDMENT NO. I TO PROFESSIONAL SERVICES AGREEMENT WITH KORVE
ENGINEERING, INC. FOR PREPARING FINAL PLANS, SPECIFICATIONS, AND
ESTIMATE FOR THE DESIGN OF STREET IMPROVEMENTS ON PEPPER LINDEN
BE IT RESOLVED BY THE MAYOR AND COMMON COUNCIL OF THE CITY
OF SAN BERNARDINO AS FOLLOWS:
SECTION 1. The attached Proposals dated June 27, 2001, July 23, 2001, and July 24,
2001, and marked Exhibit "B", "C", and "0", respectively, submitted by KORVE
9
10 ENGINEERING, INC. to perform extra work for a fixed fee of $45,000.00, under terms of a
11 Professional Services Agreement with said Engineer authorized by Resolution No. 2000-330,
12 is hereby approved. Such approval shall be effective only upon Amendment No. 1 being fully
13
executed by both parties. The Mayor is hereby authorized and directed to execute said
14
15
16
17
18
19
Amendment No. I on behalf of the City. A copy of Amendment No. 1 is attached as Exhibit
"A" and incorporated herein by reference as fully as though set forth at length.
SECTION 2. This Amendment shall not take effect until the Amendment is fully
signed and executed by the parties, and no party shall be obligated hereunder until the time of
such full execution. No oral Contracts, amendments, modifications or waivers are intended or
20
21 authorized and shall not be implied from any act or course of conduct of any party.
22 SECTION 3. This resolution is rescinded if the parties to the Amendment fail to
23 execute it within sixty (60) days of the passage of the resolution.
24
25
26
27
28
V(o , I (
rlz-~;0/
-
'-
-
r
'-
,f"""
........
1 RESOLUTION . . . APPROVING AMENDMENT NO. 1 TO PROFESSIONAL
2 SERVICES AGREEMENT WITH KORVE ENGINEERING, INC. FOR PREPARING
FINAL PLANS, SPECIFICATIONS, AND ESTIMATE FOR THE DESIGN OF STREET
3 IMPROVEMENTS ON PEPPER LINDEN.
4
5
6
I HEREBY CERTIFY that the foregoing resolution was duly adopted by the Mayor and
meeting thereof,
Common Council of the City of San Bernardino at a
7 held on the
day of
,2001, by the following vote, to-wit:
8
Council Members: AYES
ABSTAIN
ABSENT
NAYS
9
10
11
12
13
SUAREZ
14
15
16
17
18
ESTRADA
LIEN
MC GINNIS
SCHNETZ
ANDERSON
MC CAMMACK
Rachel Clark, City Clerk
19
20
21
22
, 2001.
The foregoing resolution is hereby approved this _day of
Judith Valles, Mayor
City of San Bernardino
23 Approved as to form
24 and legal content:
25 James F. Penman
City Attorney
26
27
By: L t-.~
28 1/1 0
2
c
c
,-
'-
EXHIBIT "A"
AMENDMENT NO.1 TO AGREEMENT FOR PROFESSIONAL SERVICES
This AMENDMENT NO.1 is made and entered into this of
2001, by and between the CITY OF SAN BERNARDINO, California, a municipal
corporation, hereinafter referred to as the "CITY" Korve Engineering, Inc., hereinafter
referred to as "ENGINEER".
WITNESSETH
WHEREAS, San Bernardino City Council, on November 20, 2000, adopted
Resolution No. 2000-330 approving an Agreement for Professional Services with Engineer
for preparation of plans, specification, and estimate for the design of street improvements on
Pepper Linden; and
WHEREAS, subsequent to Agreement approval, revisions were requested by
CITY staff to change the roadway section and vertical/horizontal alignment of Pepper
Linden; and
WHEREAS, City has requested the Engineer to provide plans specification &
estimate for the traffic signals at Pepper Linden & Kendall Drive and for Wagonwheel &
Kendall Drive; and
WHEREAS, Engineer has requested an amendment to the Agreement to
cover the cost of additional services required to complete these revisions; and
WHEREAS, paragraph 5.B. of Agreement allows adjusunent to the total cost
of services when the Engineer and City agree in writing that there has been, or will be, a
significant change in the scope, complexity or character of the services to be performed; and
WHEREAS, City agrees that the requested revisions are not within the scope
of services covered in Agreement; and
WHEREAS, the proposed additional services to be performed by Engineer
are described in a letters from Engineer dated June 27,2001, July 23, 2001, and July 24,
2001, identified as Exhibits "B", "C", and "D", respectively, attached hereto and made a
part hereof.
NOW, THEREFORE, it is mutually agreed, as follows:
1. SCOPE OF SERVICES
Engineer shall perform those additional services identified in Exhibits "B",
"C", and "D".
2.
COMPENSATION
Upon satisfactory completion of the additional services contained herein City
shall be pay to Architect an additional fixed fee of $45,000.00.
P~ap. 1 nf?
EXIllBIT "A"
1-
\....
AMENDMENT NO.1 TO AGREEMENT FOR PROFESSIONAL SERVICES WITH
ENGINEER KORVE ENGINEERING, INC.
3. NO ADDITIONAL CHANGES
Except as otherwise stated in this Amendment No.1, all terms of the original
Agreement, as approved by City on November 20, 2000, shall remain in full
force and effect.
IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be
executed on the date written above by their duly authorized officers on their behalf.
ATTEST:
CITY OF SAN BERNARDINO
BY:
BY:
Rachel Clark, City Clerk
City of San Bernardino
Judith Valles, Mayor
City of San Bernardino
~
\,....
KORVE ENGINEERING, INC.
BY:
Signature
NAME:
TITLE:
Approved as to form
and legal content:
JAMES F. PENMAN
City Attorney
c: BY: ~.~ ~
III 0
n..........., ....."1
EXHIBIT "B"
I.E" Korve
I" Engineering
,.......
,-
June 27, 2001
Mr. Raymond A. Casey
City Engineer
CITY OF SAN BERNARDINO
300 North "0" Street, 3'" Floor
San Bernardino, CA 92418
RE: Request for Additional Work Number 2 for
Pepper-Linden Drive Street Improvement Project
City Of San Bernardino
500136XO
Dear Mr. Blymiller:
Weare pleased to submit this Proposal for Civil Engineering Services for additional work for Pepper-Linden
Drive. Per your request in our project meeting on June 26, 2001, we understand that the City wishes to
revise the design plans to include the new roadway section that provide provisions for future median island
along Pepper-Linden Drive and modify the vertical alignment to better serve the existing property along the
south east corner of Pepper-Linden Dr. and Kendall Dr. This vertical alignment will also eliminate the need
for any additional fill material within the project limits. The following task represents our scope of work for
,I"'" this additional work:
"-
Task -1 Project Management
We will meet with the City staff to coordinate the proposed changes and provide progress of the work
completed. We will prepare invoicing and progress reports.
Deliverables: Tow (2) Meetings, Invoices/Progress Reports
Task -2
Research and Data Collections
This task has been completed under the original contract.
Oeliverables: None.
Task -3
Preliminary Design
Under this task, we will revise the vertical alignment of the roadway, calculate the quantities for the cut and
fill material, produce cross section at 50 ft intervals and highlight the limits of the cut and/or the fill within the
project limits. Meet with the City staff to review and approve the proposed alignment and the typical cross
sections.
Oeliverables: Horizontal and Vertical alignment, Cross Sections and Revised Quantities.
r
'-
A California Corporation
With offices in:
290 North '0' Street, Suite 504
San Bernardino. CA 92401
909-884-4777
909-884-2277 Fax
Oakland
San Francisco
San Jose
Madera Ranchos
Los Angeles
La Quinta
Salt Lake City
Denver
Mr. Raymond A. Casey
June 27, 2001
_ Page 2
I.E" Korve
I.... Engineering
'-
Task -4
95% Complete Design Plans
Based on the City's approval of the HorizontalNertical alignment, we will produce 95% design plans, cost
estimate and specifications and submit to the City for review and comments.
Task -5
Oeliverables: Sheet 2 through 8 will be revised and resubmitted for review
Revised Cost Estimates and specifications
Final Plans, Specifications and Estimates (PS&E)
Based on the City's comment from the 95% submittal, we will revise the project plans, cost estimates and
specifications to produce a final deign (PS&E) package for construction.
Oeliverables: One set of Mylar sheet 1 through 8, Final Cost Estimate & Specifications and one
electronic set on CO using AutoCAO 14 or 2000.
Exclusions: The following items are not included in this proposal:
1. Advertising and Pre-Bid Project Activities
2. Pre-construction Meetings
3. Construction Supports
4. Construction SurveyinglStaking
5. Preparation of As-Built Plans
c
We estimate that this work will take approximately four weeks from notice to proceed. The following fee
schedule has been prepared in consideration of our understanding of the project changes, and the level of
effort we anticipate for the tasks defined above. We propose a firm fee (Lump Sum) amount of
$15,000.00, which includes direct labor, fringe benefits and indirect cost. Any changes or additions to this
scope of work may constitute additional charges beyond the amount shown herein.
Task-1
Task -2
Task -3
Task -4
Task -5
Project Management
Research and Data Collections (Comoletedl
Preliminary Design
95% Complete Design Plans
Final PS&E Package (included in oriainal Contract)
Sub-Total Labor Costs
Reproduction
TOTAL LUMP SUM FEE
$ 465.00
$ 0.00
$ 4,885.00
$ 9,490.00
$ 0.00
$14,840.00
$ 160.00
$15,000.00
KORVE will submit monthly Progress Reports and invoices based on the work percent (%) completed.
-
~
Mr. Raymond A. Casey
June 27, 2001
Page 3
I.E" Korve
I.... Engineering
,-
'-
We appreciate the opportunity for submitting this additional work. Please sign and retum one original for our
file along with Notice to Proceed (NTP), so we can commence work for this project. If you have any
questions regarding this proposal, please call me at (909) 884-477, or e-mail meatmkhodr@korve.com.
Sincerely Yours,
Approved:
KORVE ENGINEERING, INC.
/11:J..~d~~
Mahmoud A. Khodr, P.E.
Office Manager I Project Manager
Approved By:
Date:
Agency:
City of San Bernardino
-
,
'-
,.-
"-
EXHIBIT "c"
I.E" Korve
I.... Engineering
,_.
'- July 23,2001
Mr. Raymond A. Casey
City Engineer
CITY OF SAN BERNARDINO
300 North "D" Street, 3'" Floor
San Bemardino, CA 92418
RE: Request for Additional Work Number 1 for
Pepper.Linden Drive Street Improvement Project
City Of San Bernardino
500136XO
Dear Mr. Casey:
We are pleased to submit this Proposal for Traffic/Civil Engineering Services for the addition of traffic signal
at Pepper-Linden Drive/Kendall Drive, Drainage Inlets and Curb & Gutter along Pepper -Linden Drive. Per
your request in our project meeting on June 26, 2001, we understand that a new traffic signal will be needed
at the above-mentioned location, Curb & Gutter from Kendall Drive to approximately 300 ft. east of the
intersection and two (2) drainage inlets for the proposed undeveloped median of Pepper-Linden Drive. The
following is our scope of work for this additional work:
"......
~ Task-1
Traffic Signal at Pepper-Linden/Kendall Drive
. Research for existing utilities within the work limits.
. Coordination with utility companies.
. Design traffic signal based on Caltrans/City of San Bemardino Standards.
. Coordinate the design review and approval with the City of San Bemardino Staff.
. Prepare cost estimates and specifications.
Oeliverables:
One sheet oftrafflc signal plan, 1"=20' scale, to be added to PS&E package.
Task -2
Curb & Gutter, Sidewalk & Wheelchair Ramps
. Design Curb & Gutter per the City of San Bemardino standard plans from the existing Kendall Drive
to approximately 300 ft east of the intersection.
. Design Wheelchair Ramps for the NE & SE comers of the intersections
. If there is an existing sidewalk at the eastside of the Devil Creek crossing, KORVE will design a
sidewalk per the City of San Bernardino Standard to connect the proposed Wheelchair ramp with the
existing sidewalk.
Oeliverables:
Work will be incorporated into the original PS&E Package.
.~
'-
A California Corporation
With offices in:
290 North 'D' Street. SUite 504
San Bernardino, CA 92401
909-884-4777
909-884-2277 Fax
Oakland
San Francisco
San Jose
Madera Ranchos
Los Angeles
La Quinta
Salt Lake City
Denver
Mr. Raymond A. Casey
July 23, 2001
Page 2
1.6' Korve
I.... Engineering
f..........
'-
Task -3
Drainage Inlets for the proposed Pepper.Linden Drive Median
. We will provide design services to add two (2) drainage inlets for the unimproved proposed media of
Pepper-Linden Drive.
. Coordination with City Staff for locations and sizes.
Oeliverab/es:
Work will be incorporated into the original PS&E Package.
Exclusions: This proposal is an add-on work to the above-mentioned project and it is not stand-alone
project. The following items are not included in this proposal:
1. Design of an interconnect system.
2. Coordination with/approval from Caltrans.
3. Video System Design that may be required at this location.
4. Hydrology studies and drainage reports.
5. Surveying
We estimate that this work will take approximately six weeks from notice to proceed. The following fee
schedule has been prepared in consideration of our understanding of the project, and the level of effort we
anticipate for the tasks defined above. We propose a firm fee (Lump Sum) amount of$18,000.00, which
includes direct labor, fringe benefits and indirect cost. Any changes or additions to this scope of work may
constitute additional charges beyond the amount shown herein.
,-
'-' Task-1
Task -2
Task -3
Traffic Signal at Pepper-Linden/Kendall Drive
Curb & Gutter, Sidewalk & Wheelchair Ramps
Drainage Inlets for the proposed Pepper-Linden Drive Median
Sub-Total Labor Costs
Reproduction
TOTAL LUMP SUM FEE
$ 11,900.00
$ 2,720.00
$ 3.200.00
$ 17,820.00
$ 180.00
$ 18,000.00
KORVE will submit monthly Progress Reports and invoices based on the work percent (%) completed.
We appreciate the opportunity for submitting this additional work. Please sign and retum one original for our
file along with Notice to Proceed (NTP), so we can commence work for this project. If you have any
questions regarding this proposal, please call me at (909) 884-477, or e-mail meatmkhodr@korve.com.
Sincerely Yours,
Approved:
KORVE ENGINEERING, INC.
L/ .I- . .
/ I A'h.!:..-C.
Mahmoud A. Khodr, P.E.
Office Manager / Project Manager
Approved By:
Date:
-
'-'
Agency:
City of San Bernardino
EXHIBIT "D"
I.E"' Korve
1"- Engineering
-~
\....
July 23, 2001
Mr. Raymond A. Casey
City Engineer
CITY OF SAN BERNARDINO
300 North "D" Street, 3<d Floor
San Bernardino, CA 92418
RE: Request for Additional Work Number 3 for
Traffic Signal Design at Wagonwheel Rd/Kendall Dr for
Pepper-Linden Drive Street Improvement Project
City Of San Bernardino
500136XO
Dear Mr. Casey:
Weare pleased to submit this Proposal for Traffic/Civil Engineering Services for the addition of traffic signal
at Wagonwheel Rd/Kendall Drive. Per your request on July 19, 2001, we have prepared the following scope
of work based on our understanding ofthe project needs and our discussion. We understand that the City of
San Bernardino will supply the base map for this project. The following is our scope of work for this
additional work:
/-
'-' Task -1
Traffic Signal at Wagonwheel Rd/Kendall Drive
. Meet with the City staff to discuss the project and obtain base map and any relevant information
. Research for existing utilities within the work limits.
. Coordination with utility companies.
· Design traffic signal based on Caltrans/City of San Bemardino Standards.
. Coordinate the design review and approval with the City of San Bernardino Staff.
. Prepare cost estimates and specifications.
Oeliverables:
One sheet of traffic signa/ plan, 1 "=20' scale, to be added to PS&E package.
Exclusions: This proposal is an add-on work to the above-mentioned project and it is not stand-alone
project. The following items are not included in this proposal, but they can be added at additional cost:
1. Design of an interconnect system.
2. Coordination with/approval from Caltrans.
3. Video System Design that may be required at this location.
4. Widening Roadways, additional Curb & Gutter.
5. Surveying.
,-..
'-
A California Corporation
With offices in:
290 North 'D' Street, Suite 504
San Bernardino, CA 92401
909-884-4777
909-884.2277 fax
Oakland
San FranCISco
San Jose
Madera Ranchos
Los Angeles
La Quinta
Salt Lake City
Denver
Mr. Raymond A. Casey
July 23, 2001
Page 2
IE' Korve
1"- Engineering
-
\-
We estimate that this work will take approximately six weeks from notice to proceed. The following fee
schedule has been prepared in consideration of our understanding of the project, and the level of effort we
anticipate for the tasks defined above. We propose a firm fee (Lump Sum) amount of $12,000.00, which
includes direct labor, fringe benefits and indirect cost. Any changes or additions to this scope of work may
constitute additional charges beyond the amount shown herein.
Task -1
Traffic Signal at Pepper-Linden/Kendall Drive
$ 11,900.00
$ 100.00
$ 12,000.00
Reproduction
TOTAL LUMP SUM FEE
KORVE will submit monthly Progress Reports and invoices based on the work percent (%) completed.
We appreciate the opportunity for submitting this additional work. Please sign and return one original for our
file along with Notice to Proceed (NTP), so we can commence work for this project. If you have any
questions regarding this proposal, please call me at (909) 884-477, or e-mail meatmkhodr@korve.com.
Sincerely Yours,
Approved:
KORVE ENGINEERING, INC.
,.....
'-'
,'7;!:;:h~..-L__
Mahmoud A. Khodr, P.E.
Office Manager / Project Manager
Approved By:
Date:
Agency:
Citv of San Bernardino
-
'-
CITY OF SAN BERNARDINO
Interoffice Memorandum
CITY CLERK'S OFFICE
Records and Information Management (RIM) Program
DATE:
August 27, 2001
TO:
Leslie Crawford, Engineering Assistant 1
FROM:
Michelle Taylor, Senior Secretary
RE:
Transmitting Documents for Signature - Resolution 2001-251
At the Mayor and Common Council meeting of August 20, 2001, the City of San Bernardino
adopted Resolution 2001-251- Resolution approving Amendment No.1 to professional services
agreement with Korve Engineering, Inc., for preparing final plans, specifications, and estimate
for the design of street improvements on Pepper Linden.
Attached is one (1) original agreement and two certified copies of Resolution No. 2001-251.
Please obtain signatures in the appropriate locations and return the original agreement to the City
Clerk's Office as soon as possible, to my attention.
If you have any questions, please do not hesitate to contact me at ext. 3206. Thank you.
Michelle Taylor
Senior Secretary
Signed:
Please sign and return
Date:
CITY OF SAN BERNARDINO
Interoffice Memorandum
CITY CLERK'S OFFICE
Records and Information Management (RIM) Program
DATE:
August 30,2001
TO:
Finance
FROM:
Michelle Taylor, Senior Secretary
RE:
Resolution 2001-251 - Korve Engineering, Inc.
CC:
Attached is an executed copy of the agreement between the City of San Bernardino and Korve
Engineering, Inc., for preparing final plans, specifications, and estimate for the design of street
improvements on Pepper Linden. The original agreement is on file in the City Clerk's Office.
If you have any questions, please call me at ext. 3206.
** FOR OFFICE USE ONLY - NOT A PUBLIC DOCUMENT **
RESOLUTION AGENDA ITEM TRACKING FORM
Meeting Date (Date Adopted): 2 -?CY0,\ Item # I \
Vote: Ayes I \ Lj -Ij Nays e
Change to motion to amend original documents: '-
Resolution # 2m l - 2-5 I
Abstain B Absent :;J, ",
Reso. # On Attachments: ~ Contract term: -
Note on Resolution of Attachment stored separately: -=-
Direct City Clerk to (circle I): PUBLISH, POST, RECORD W/COUNTY
Date Sentto Mayor: ~-~~-() \
Date of Mayor's Signature: 'if- Z <,-(:) \
Date ofClerk/CDC Signature: '/(-Z3-0 \
NuIINOidAfter:f.oODA'-p 110-\q-O\
I
By: -
Reso. Log Updated: V
Seal Impressed: ~
60 Day Reminder Letter Sent on 30th day:
90 Day Reminder Letter Sent on 45th day:
See Attached: ,/'" Date Returned: 'i\'- d q -0 \
See Attached:
See Attached:
Date Memo/Letter Sent for Signature:
'if-d'/-O I
Request for Council Action & Staff Report Attached:
Updated Prior Resolutions (Other Than Below):
Updated CITY Personnel Folders (6413, 6429, 6433,10584,10585,12634):
Updated CDC Personnel Folders (5557):
Updated Traffic Folders (3985. 8234,655,92-389):
Copies Distributed to:
City Attorney"/ Code Compliance
Yes L No By
Yes No ~ By
Yes No /' By
Yes No V By
Yes No/ By
Parks & Rec.
Public Services
Water
Dev. Services"/ EDA
Others:
Police
Notes:
Finance ,/
MIS
BEFORE FILING. REVIEW FORM TO ENSURE ANY NOTATIONS MADE HERE ARE TRANSFERRED TO THE
YEARLY RESOLUTION CHRONOLOGICAL LOG FOR FUTURE REFERENCE (Contract Term. etc.)
Ready to File: (Y\\
Date: 55 ' .)~ -() I
Revised 01/12/0 I