Loading...
HomeMy WebLinkAbout2008-381 1 RESOLUTION NO. 2008-381 2 RESOLUTION OF THE CITY OF SAN BERNARDINO AUTHORIZING THE 3 CITY MANAGER TO EXECUTE AGREEMENTS FOR SERVICES WITH THE FIRMS 4 OF NINYO & MOORE, HILLTOP GEOTECHNICAL, INC. AND CONVERSE CONSULTANTS FOR GEOTECHNICAL INVESTIGATIONS AND CONSTRUCTION 5 MATERIAL TESTING. 6 BE IT RESOLVED BY THE MAYOR AND COMMON COUNCIL OF THE CITY 7 OF SAN BERNARDINO AS FOLLOWS: 8 SECTION 1. Ninyo & Moore, Hilltop Geotechnical, Inc. and Converse Consultants are 9 firms that are competent, experienced, and able to perform requested services and have provided 10 the most advantageous and responsible proposal for Geotechnical Investigations and 11 Construction Material Testing in amounts totaling up to $300,000 in aggregate. Pursuant to this 12 13 14 determination, the Purchasing Manager is hereby authorized and directed to issue Purchase Orders for said services to said firrns; all other proposals are hereby rejected. The City Manager 15 16 17 18 19 20 21 22 23 24 25 26 27 28 is hereby authorized and directed to execute, on behalf of the City, three Agreements for Geotechnical Investigations and Construction Material Testing; copies of which are attached hereto and incorporated herein as Exhibit A (Hilltop Geotechnical, Inc.), Exhibit B (Ninyo & Moore) and Exhibit C (Converse Consultants). SECTION 2. Said Agreements shall be in effect through June 30, 2009, unless earlier terminated as provided in the Agreements or as otherwise agreed to in writing by the parties. An administrative extension of one additional year may be authorized, subject to agreement of both parties. SECTION 3. The authorization to execute the above-referenced Agreements is rescinded, if they are not signed by the parties within sixty (60) days of the passage of this resolution. /II - ] - 2008-381 1 RESOLUTION... AUTHORIZING THE CITY MANAGER TO EXECUTE AGREEMENTS FOR SERVICES WITH THE FIRMS OF NINYO & MOORE, 2 HILLTOP GEOTECHNICAL, INC. AND CONVERSE CONSULTANTS FOR GEOTECHNICAL INVESTIGATIONS AND CONSTRUCTION MATERIAL TESTING. 3 4 I HEREBY CERTIFY that the foregoing resolution was duly adopted by the Mayor and 5 Common Council of the City of San Bernardino at a j oint regular meeting thereof, held 6 on the 6th 7 October , 2008, by the following vote, to wit: day of ABSTAIN ABSENT NAYS AYES Council Members: x x x x x x 15 16 17 18 19 20 21 22 23 24 25 26 27 28 MC CAMMACK x Q~h.~ CitY-Clerk The foregoing resolution is hereby approved this ~ day of October, 2008. ~ Patric J. Morris, f San Bernardino Approved as to form: JAMES F. PENMAN, City Attorney By: -2- 2008-381 EXHIBIT A AGREEMENT FOR SERVICES FOR ON-CALL GEOTECHNICAL INVESTIGATIONS AND CONSTRUCTION MATERIAL TESTING THIS AGREEMENT is made and entered into this 6th day of October 2008 ("Effective Date"), by and between the CITY OF SAN BERNARDINO, a charter city ("City"), and HILL TOP GEOTECHNICAL, INC. ("Consultant"). WITNESSETH: A. WHEREAS, City proposes to have Consultant perform the On-Call Geotechnical Investigation and Construction Material Testing described herein below; and B. WHEREAS, Consultant represents that it has that degree of specialized expertise contemplated within California Government Code, Section 37103, and holds all necessary licenses to practice and perform the services herein contemplated; and C. WHEREAS, City and Consultant desire to contract for specific services in connection with the project described below (the "Project") and desire to set forth their rights, duties and liabilities in connection with the services to be performed; and D. WHEREAS, no official or employee of City has a financial interest, within the provisions of California Government Code, Sections I 090-] 092, in the subject matter of this Agreement. NOW, THEREFORE, for and in consideration of the mutual covenants and conditions contained herein, the parties hereby agree as follows: 1.0. SERVICES PROVIDED BY CONSULTANT ]. ]. Scope of Services. Contractor shall furnish On-Call Geotechnical Investigation and Construction Material Testing to City in accordance with Attachment I "Scope of Services" and the Contractor's proposal dated July 3, 2008, attached and incorporated herein. ].2. Professional Practices. All professional services to be provided by Consultant pursuant to this Agreement shall be provided by personnel experienced in their respective fields and in a manner consistent with the standards of care, diligence and skill ordinarily exercised by professional consultants in similar fields and circwnstances in accordance with sound professional practices. Consultant also warrants that it is familiar with all laws that may affect its performance of this Agreement and shall advise City of any changes in any laws that may affect Consultant's performance of this Agreement. 1.3. Warrantv. Consultant warrants that it shall perform the services required by this Agreement in compliance with all applicable Federal and California employment laws including, but not limited to, those laws related to minimwn hours and wages; occupational health and safety; fair employment and employment practices; workers' compensation S:\_Public Works\RFCA's\2008 All\10-06~08\Agreement for Geotech Investigations & Construction Material Testing\Hilltop Geotechnical\Hilltop Agreement Geotech and Constr Material Testing lO-06-08.doc I 2008-381 EXHIBIT A insurance and safety in employment; and all other Federal, State and local laws and ordinances applicable to the services required under this Agreement. Consultant shall indemnify and hold harrnless City from and against all claims, demands, payments, suits, actions, proceedings, and judgments of every nature and description including attorneys' fees and costs, presented, brought, or recovered against City for, or on account of any liability under any of the above-mentioned laws, which may be incurred by reason of Consultant's performance under this Agreement. 1.4. Non-discrimination. In performing this Agreement, Consultant shall not engage in, nor permit its agents to engage in, discrimination in employment of persons because of their race, religion, color, national origin, ancestry, age, physical handicap, medical condition, marital status, sexual gender or sexual orientation, or any other category protected by law, except as permitted pursuant to Section ]2940 of the Government Code. Violation of this provision may result in the imposition of penalties referred to in Labor Code, Section 1735. 1.5 Non-Exclusive AlITeement. Consultant acknowledges that City may enter into agreements with other consultants for services similar to the services that are subject to this Agreement or may have its own employees perform services similar to those services contemplated by this Agreement. ] .6. Delegation and Assignment. This is a personal service contract, and the duties set forth herein shall not be delegated or assigned to any person or entity without the prior written consent of City. 1. 7. Business License: The Consultant shall obtain and maintain a valid City Business Registration Certificate during the term of this Agreement. 1.8. Duty of Lovaltv/Conflict of Interest: The Consultant understands and agrees that as the City's On-Call Geotechnical Investigation and Construction Material Testing, Consultant shall maintain fiduciary duty and a duty of loyalty to the City in performing Consultant's obligations under this Agreement. Consultant, in performing its obligations under this Agreement, is governed by California's conflict of interest laws, Government Code Section 87100 et seq., and Title 2, California Code of Regulations Section ]8700 et seq. 1.8.] Prior to performing any services to City under this Agreement, Consultant shall provide the Deve]opment Services Department a written list of the Assessor Parcel Numbers and general location or address of any and all real property located in the City of San Bernardino in which Consultant has any ownership interest, or which is the location of any pending project that is a source of income for Consultant. Consultant shall keep this list current on a monthly basis during the entire term of this Agreement. 1.8.2 Consultant shall not work on any task that is related to any real property that is located within 500 feet of any parcel in which Consultant has any ownership interest or which is the location of any pending project that is a source of income for Consultant. S:\_Public Works\RFCA's\2008 All\10-06-08\Agreemenl for Geotech Investigations & Construction Material Testing\Hilltop Geotechnical\Hilltop Agreement Geotech and Constr Material Testing lO-06-08.doc 2 2008-381 EXHIBIT A 2.0. COMPENSATION AND BILLING 2.1. Compensation. Over the term of this Agreement, Contractor shall be paid for such services in accordance with Attachment 2 "July 3, 2008", attached and incorporated herein, subject to an aggregate limit of $300,000 in payment for work performed by all consultants performing On-Call Geotechnical Investigation and Construction Material Testing. City shall distribute work among its consultants in a manner that best meets the needs of the City. City makes no guarantee to Consultant regarding the amount and/or the dollar value of the work assigned to Consultant. 2.2. Additional Services. Consultant shall not receive compensation for any services provided outside the scope of services specified in the Response unless the City or its Managing Engineer for this Project, prior to Consultant performing the additional services, approves such additional services in writing. It is specifically understood that oral requests and/or approvals of such additional services or additional compensation shall be barred and are unenforceable. 2.3. Method of Billing. Consultant may submit invoices to City's Managing Engineer for approval on a progress basis, but no more often than monthly. Said invoice shall be based on the total of all Consultant's services which have been completed to City's sole satisfaction. City shall pay Consultant's invoice within forty-five (45) days from the date City receives said invoice. Each invoice shall describe in detail, the services performed and the associated time for completion. Any additional services approved and performed pursuant to this Agreement shall be designated as "Additional Services" and shall identify the number of the authorized change order, where applicable, on all invoices. 2.4. Records and Audits. Records of Consultant's services relating to this Agreement shall be maintained in accordance with generally recognized accounting principles and shall be made available to City or its Managing Engineer for inspection and/or audit at mutually convenient times for a period ofthree (3) years from the Effective Date. 3.0. TIME OF PERFORMANCE 3.1. Commencement and Completion of Work. The, obligation to perform the professional services to be performed pursuant to this Agreement shall commence within five (5) days from the Effective Date of this Agreement. Said services shall be performed in strict compliance with the Project Schedule issued by the Managing Engineer. Failure to commence work in a timely manner and/or diligently pursue work to completion may be grounds for termination of this Agreement. 3.2. Excusable Delavs. Neither party shall be responsible for delays or lack of performance resulting from acts beyond the reasonable control of the party or parties. Such acts shall include, but not be limited to, acts of God, fire, strikes, material shortages, compliance with laws or regulations, riots, acts of war, or any other conditions beyond the reasonable control of a party. S:\_Public Works\RFCA's\2008 All\10-06-08\Agreement for Geotech Investigations & Construction Material Testing\Hilltop Geoteclurical\Hilltop Agreement Geotech and Constr Material Testing l(M)6-08.doc 3 2008-381 EXHIBIT A 4.0. TERM AND TERMINATION 4.1. Term. This Agreement shall commence on the date approved by the City Manager and continue through June 30, 2009, unless previously terminated as provided herein or as otherwise agreed to in writing by the parties. An administrative extension of one additional year may be authorized, subject to the prior written agreement of both parties. 4.2. Notice of Termination. The City reserves and has the right and privilege of canceling, suspending or abandoning the execution of all or any part of the work contemplated by this Agreement, with or without cause, at any time, by providing written notice to Consultant. The termination of this Agreement shall be deemed effective upon receipt of the notice of termination. In the event of such termination, Consultant shall immediately stop rendering services under this Agreement unless directed otherwise by the City. 4.3. Compensation. In the event of termination, City shall pay Consultant for reasonable costs incurred and professional services satisfactorily performed up to and including the date of City's written notice of termination. Compensation for work in progress shall be prorated as to the percentage of work completed as of the effective date of termination in accordance with the fees set forth herein. In ascertaining the professional services actually rendered hereunder up to the effective date of termination of this Agreement, consideration shall be given to both completed work and work in progress, to complete and incomplete drawings, and to other documents pertaining to the services contemplated herein whether delivered to the City or in the possession of the Consultant. 4.4 Documents. In the event of termination of this Agreement, all documents prepared by Consultant in its performance of this Agreement including, but not limited to, finished or unfinished design, development and construction documents, data studies, drawings, maps and reports, shall be delivered to the City within ten (10) days of delivery of termination notice to Consultant, at no cost to City. Any use of uncompleted documents without specific written authorization from Consultant shall be at City's sole risk and without liability or legal expense to Consultant. 5.0. INSURANCE 5.1. Minimum Scope and Limits of Insurance. Consultant shall obtain and maintain during the life of this Agreement all of the following insurance coverages: (a) Comprehensive general liability, including premises-operations, products/completed operations, broad form property damage, blanket contractual liability, independent contractors, personal injury with a policy limit of not less than One Million Dollars ($1,000,000.00), combined single limits, per occurrence and aggregate. (b) Automobile liability for owned vehicles, hired, and non-owned vehicles, with a policy limit of not less than One Million Dollars ($1,000,000.00), combined single limits, per occurrence and S:\_Public Works\RFCA's\200B All\ 10-06-08\ Agreement for Geotech Investigations & Construction Material Testing\Hilltop Geotechnical\Hilltop Agreement Geotech and Constr Material Testing 10-06-08.doc 4 2008-381 EXHIBIT A aggregate. (c) Workers' compensation insurance as required by the State of California. (d) Professional errors and omissions ("E&O") liability insurance with policy limits of not less than One Million Dollars ($1,000,000.00), combined single limits, per occurrence and aggregate. Consultant shall obtain and maintain, said E&O liability insurance during the life of this Agreement and for three years after completion of the work hereunder. 5.2. Endorsements. The comprehensive general liability insurance policy shall contain or be endorsed to contain the following provisions: (a) Additional insureds: "The City of San Bernardino and its elected and appointed boards, officers, agents, and employees are additional insureds with respect to this subject project and contract with City." (b) Notice: "Said policy shall not terminate, nor shall it be cancelled, nor the coverage reduced, until thirty (30) days after written notice is given to City." (c) Other insurance: "Any other insurance maintained by the City of San Bernardino shall be excess and not contributing with the insurance provided by this policy." 5.3. Certificates of Insurance. Consultant shall provide to City certificates of insurance showing the insurance coverages and required endorsements described above, in a form and content approved by City, prior to performing any services under this Agreement. 5.4. Non-limiting. Nothing in this Section shall be construed as limiting in any way, the indemnification provision contained in this Agreement, or the extent to which Consultant may be held responsible for payments of damages to persons or property. 6.0. GENERAL PROVISIONS 6.1. Entire Agreement. This Agreement constitutes the entire Agreement between the parties with respect to any matter referenced herein and supersedes any and all other prior writings and oral negotiations. This Agreement may be modified only in writing, and signed by the parties in interest at the time of such modification. The terms of this Agreement shall prevail over any inconsistent provision in any other contract document appurtenant hereto, including exhibits to this Agreement. 6.2. Representatives. The Director of Development Services or her designee shall be the representative of City for purposes of this Agreement and may issue all consents, approvals, directives and agreements on behalf of the City, called for by this Agreement, S:\_Public Works\RFCA's\2008 All\10-06-08\Agreement for Geotech Investigations & Construction Material Testing\Hilltop Geotechnical\Hilltop Agreement Geotech and Constr Material Testing 10-06-08.doc 5 2008-381 EXHIBIT A except as otherwise expressly provided in this Agreement. Consultant shall designate a representative for purposes of this Agreement who shall be authorized to issue all consents, approvals, directives and agreements on behalf of Consultant called for by this Agreement, except as otherwise expressly provided in this Agreement. 6.3. Proiect Managers. City shall designate a Managing Engineer to work directly with Consultant in the performance of this Agreement. Consultant shall designate a Contract Inspector(s) who shall represent it and be its agent in all consultations with City during the term of this Agreement. Consultant or its Contract Inspector(s) shall attend and assist in all coordination meetings called by City. 6.4. Notices. Any notices, documents, correspondence or other communications concerning this Agreement or the work hereunder may be provided by personal delivery, facsimile or mail and shall be addressed as set forth below. Such communication shall be deemed served or delivered: a) at the time of delivery if such communication is sent by personal delivery; b) at the time of transmission if such communication is sent by facsimile; and c) 48 hours after deposit in the U.S. Mail as reflected by the official U.S. postmark if such communication is sent through regular United States mail. IF TO CONSULTANT: Mr. Mark Hulett, President Hilltop Geotechnical, Inc. 786 S. Gifford Avenue San Bernardino, CA 92408 Fax: 909-890-9055 Tel: 909-890-9079 IF TO CITY: Valerie C. Ross Director of Development Services 300 North "D" Street San Bernardino, Ca 92418 Fax: 909-384-5080 Tel: 909-384-5357 6.5. Attornevs' Fees. In the event that litigation is brought by any party in connection with this Agreement, the prevailing party shall be entitled to recover from the opposing party all costs and expenses, including reasonable attorneys' fees, incurred by the prevailing party in the exercise of any of its rights or remedies hereunder or the enforcement of any of the terms, conditions, or provisions hereof. The costs, salary and expenses of the City Attorney and members of his office in enforcing this contract on behalf of the City shall be considered as "attorneys' fees" for the purposes of this paragraph. 6.6. Governing Law. This Agreement shall be governed by and construed under the laws of the State of California without giving effect to that body of laws pertaining to conflict of laws. In the event of any legal action to enforce or interpret this Agreement, the parties hereto agree that the sole and exclusive venue shall be a court of competent jurisdiction located in San Bernardino County, California. 6.7. Assignment. Consultant shall not voluntarily or by operation of law assign, transfer, sublet or encumber all or any part of Consultant's interest in this Agreement without City's. prior written consent. Any attempted assignment, transfer, subletting or encumbrance S:\_Public Works\RFCA's\2008 All\10-06-08\Agreement for Geotech Investigations & Construction Material Testing\Hilltop Geotechnical\Hilltop Agreement Geotech and Constr Material Testing lO-06-08.doc 6 2008-381 EXHIBIT A shall be void and shall constitute a breach of this Agreement and cause for termination of this Agreement. Regardless of City's consent, no subletting or assignment shall release Consultant of Consultant's obligation to perform all other obligations to be performed by Consultant hereunder for the term of this Agreement. 6.8 Indemnification and Hold Harmless. Consultant shall protect, defend, indemnify and hold harmless City and its elected and appointed officials, officers, and employees from any and all claims, liabilities, expenses, including attorney fees, damage to property or injuries to or death of any person or persons or damages of any nature including, but not by way of limitation, all civil claims or workers' compensation claims, arising out of or in any way connected with the intentional or negligent acts, errors or omissions of Consultant, its employees, agents or subcontractors in the performance of this Agreement. 6.9. Independent Contractor. Consultant is and shall be acting at all times as an independent contractor and not as an employee of City. Consultant shall secure, at his expense, and be responsible for any and all payment of Income Tax, Social Security, State Disability Insurance Compensation, Unemployment Compensation, and other payroll deductions for Consultant and its officers, agents, and employees, and all business licenses, if any are required, in connection with the services to be performed hereunder. 6.10 Ownership of Documents. All findings, reports, documents, information and data including, but not limited to, computer tapes or discs, files and tapes furnished or prepared by Consultant or any of its subcontractors in the course of performance of this Agreement, shall be and remain the sole property of City. Consultant agrees that any such documents or information shall not be made available to any individual or organization without the prior consent of City. Any use of such documents for other projects not contemplated by this Agreement, and any use of incomplete documents, shall be at the sole risk of City and without liability or legal exposure to Consultant. City shall indemnify and hold harmless Consultant from all claims, damages, losses, and expenses, including attorneys' fees, arising out of or resulting from City's use of such documents for other projects not contemplated by this Agreement or use of incomplete documents furnished by Consultant. Consultant shall deliver to City any findings, reports, documents, information, data, in any form, including but not limited to, computer tapes, discs, files audio tapes or any other Project related items as requested by City or its authorized r~presentative, at no additional cost to the City. 6.11 Public Records Act Disclosure. Consultant has been advised and is aware that all reports, documents, information and data including, but not limited to, computer tapes, discs or files furnished or prepared by Consultant, or any of its subcontractors, and provided to City may be subject to public disclosure as required by the California Public Records Act (California Government Code Section 6250 et. seq.). Exceptions to public disclosure may be those documents or information that qualify as trade secrets, as that term is defined in the California Government Code Section 6254.7, and of which Consultant informs City of such trade secret. The City will endeavor to maintain as confidential all information obtained by it that is designated as a trade secret. The City shall not, in any way, be liable or responsible for the disclosure of any trade secret including, without limitation, those records so marked if disclosure is deemed to be required by law or by order of the Court. S:\_Public Works\RFCA's\2008 All\10-06-08\Agreement for Geotech Investigations & Construction Material Testing\Hilltop Geotechnical\Hilltop Agreement Geotech and Canstr Material Testing lO..Q6..08.doc 7 2008-381 EXHIBIT A 6.12. Responsibility for Errors. Consultant shall be responsible for its work and results under this Agreement. Consultant, when requested, shall furnish clarification and/or explanation as may be required by the City's representative, regarding any services rendered under this Agreement at no additional cost to City. In the event that an error or omission attributable to Consultant occurs, then Consultant shall, at no cost to City, provide all necessary design drawings, estimates and other Consultant professional services necessary to rectify and correct the matter to the sole satisfaction of City and to participate in any meeting required with regard to the correction. 6.13. Prohibited Emplovment. Consultant will not employ any regular employee of City while this Agreement is in effect. 6.14. Order of Precedence. In the event of an inconsistency or conflict in this Agreement and any of the attached Exhibits or Attachments, the terms set forth in this Agreement shall prevail. 6.15. Costs. Each party shall bear its own costs and fees incurred in the preparation and negotiation of this Agreement and in the performance of its obligations hereunder except as expressly provided herein. 6.16. No Third Party Beneficiarv Rights. This Agreement is entered into for the sole benefit of City and Consultant and no other parties are intended to be direct or incidental beneficiaries of this Agreement and no third party shall have any right in, under or to this Agreement. 6.17. Headings. Paragraphs and subparagraph headings contained in this Agreement are included solely for convenience and are not intended to modify, explain or to be a full or accurate description of the content thereof and shall not in any way affect the meaning or interpretation of this Agreement. 6.18. Construction. The parties have participated jointly in the negotiation and drafting of this Agreement. In the event an ambiguity or question of intent or interpretation arises with respect to this Agreement, this Agreement shall be construed as if drafted jointly by the parties and in accordance with its fair meaning. There shall be no presumption or burden of proof favoring or disfavoring any party by virtue of the authorship of any of the provisions of this Agreement. 6.19 Amendments. Only a writing executed by the parties hereto or their respective successors and assigns may amend this Agreement. 6.20. Waiver. The delay or failure of either party at any time to require performance or compliance by the other of any of its obligations or agreements shall in no way be deemed a waiver of those rights to require such performance or compliance. No waiver of any provision of this Agreement shall be effective unless in writing and signed by a duly authorized representative of the party against whom enforcement of a waiver is sought. The waiver of any right or remedy in respect to any occurrence or event shall not be deemed S:\_Public Works\RFCA's\2008 All\ lO.06-08\Agreement for Geotech Investigations & Construction Material Testing\Hilltop Geotechnical\Hilltop Agreement Geotech and Constr Material Testing ID-06-0S.doc 8 2008-381 EXHIBIT A a waiver of any right or remedy in respect to any other occurrence or event, nor shall any waiver constitute a continuing waiver. 6.21. Severabilitv. If any provision of this Agreement is determined by a court of competent jurisdiction to be unenforceable in any circumstance, such determination shall not affect the validity or enforceability of the remaining terms and provisions hereof or of the offending provision in any other circumstance. Notwithstanding the foregoing, if the value of this Agreement, based upon the substantial benefit of the bargain for any party is materially impaired, which determination as made by the presiding court or arbitrator of competent jurisdiction shall be binding, then both parties agree to substitute such provision(s) through good faith negotiations. 6.22. Counterparts. This Agreement may be executed in one or more counterparts, each of which shall be deemed an original. All counterparts shall be construed together and shall constitute one agreement. 6.23. Corporate Authoritv. The persons executing this Agreement on behalf of the parties hereto warrant that they are duly authorized to execute this Agreement on behalf of said parties and that by doing so, the parties hereto are formally bound to the provisions of this Agreement. 6.24 Damages. The Parties agree to waive any rights to incidental or consequential and punitive damages arising out of performance under this Agreement whether the torts or contracts and in law or in equity. III III S:\_Public Works\RFCA's\2008 All\ 10-06-08\Agreernent for Geotech Investigations & Construction Material Testing\Hilltop Geotechnical\Hilltop Agreement Geotech and Constr Material Testing l0-Q6..08.doc 9 2008-381 EXHIBIT A AGREEMENT FOR SERVICES FOR ON-CALL GEOTECHNICAL INVESTIGATIONS AND CONSTRUCTION MATERIAL TESTING IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed by and through their respective authorized officers, as of the date first above written. 111.~ Lori Sassoon, Acting City Manager CONSULTANT HILLTOP GEOTECHNICAL, INC. ByN Signature CITY OF SAN BERNARDINO, A Municipal Corporation ~~ - fLfiJ7:P~ Name and Title Approved as to form: James F. Penman, City Attorney S:\_Public Works\RFCA's\2008 All\ lO..Q6-08\Agreement for Geotech Investigations & Construction Material Testing\Hilltop Geotechnical\Hilltop Agreement Geotech and Constr Material Testing 10-06-08.doc 10 I I I . I I I I I I I I I I I I I I I 2008-381 ATTACHMENT 1 TO EXHIBIT A PROPOSAL & QUALIFICATIONS FOR PUBLIC WORKS ON-CALL GEOTECHNICAL INVESTIGATION. CONSTRUCTION MATERIAL TESTING FOR CITY OF SAN BERNARDINO PROPOSAL NO.: P08087 JULY 3,2008 SUBMITTED TO: PUBLIC WORKS DIVISION OF THE DEVELOPMENT SERVICES DEPARTMENT CITY OF SAN BERNARDINO 300 North "D" Street. 3'd Floor San Bernardino, CA 92418 PREPARED BY: HILLTOP GEOTECHNICAL. INC. 786 SOUTH GIFFORD AVENUE SAN BERNARDINO, CA 92408 I I I I I I I I I I I I I I I I I I I 2008-381 786 S. GIFFORD AVENUE' SAN BERNARDINO' CALIFORNIA 92408 hilltopg@hgeotech.com . FAX 909-89G-9055 . 909-89().9079 HILLTOP GEOTECHNICAL INCORPORATED July 3, 2008 City of San Bernardino Public Works Division-Development Services Department 300 North 'D' Street, Third Floor San Bernardino, CA 92418 Proposal P08087 Attention: Mr. Michael Grubbs, P. E., Project Manager Subject: Proposal for Public Works On-Call Geotechnical Investigation and Construction Material Testing Services, City of San Bernardino, California. Reference: Request for Proposals to Provide Professional Services for Public Works On- Call Geotechnical Investigations and Construction Material Testing Services; Prepared by the Public Works Division of the Development Services Department, City of San Bernardino, Dated June 4, 2008. Hilltop Geotechnical, Inc. wishes to thank you for consideration of us to provide you with various geotechnical consulting services that you might require. In accordance with your request, we are pleased to submit this Proposal. Based upon the referenced 'Request for Proposal' it is our understanding that various types of soils, concrete and asphalt testing will be required for various projects within the city. In general, our services will include routine compaction, concrete, asphalt and soil gradation testing and soil borings to 15 feet. Hilltop Geotechnical, Inc. is completely qualified to perform all the services you require. Unit prices for the items you have requested are submitted under a separate cover. We have read and understand the definitions of what each test includes and have incorporated our costs into these unit prices. HILLTOP GEOTECHNICAL, INC. I I I I I I I I I I I I I I I I I I I 2008-381 rOSOS7 July 3, 2008 Page 2 Brief History and Experience... HGI. a California Corporation, is a qualified geotechnical I geologic consulting firm and materials testing laboratory. Originated initially in 1992, our Main Office and Full Service Laboratory is located in San Bemardino, California and has a variety of employees consisting of geologists, engineers, inspectors, soil and concrete field technicians, laboratory technicians, and office staff. HGI currently provides geotechnical I geologic and materials testing services to numerous governmental agencies and developers throughout the Southem California area. Currently, we are working with the Cities of Highland, Redlands, and Loma Linda along with our annual contracts for such services with the City of Riverside, the City of San Bernardino, and the San Bernardino County Special Services District. Additionally, we have provided similar services in the recent past, to many other of your neighboring cities and counties such as the County of Riverside, City of Rialto, City of Moreno Valley, City of Big Bear Lake, City of Lake Elsinore, and the City of Colton. HGI currently enjoys our on-going work with the City of San Bernardino-Public Works Department, as one of your consultants under a current On-Call Geotechnical Consultant Services contract. Weare hoping to continue our service to the City with this newest proposal opportunity. Recent projects with the City of San Bernardino have included performing compaction testing during various street improvement projects, performing asphalt and concrete coring for pavement evaluation, pavement compaction testing and asphalt laboratory testing as well as special preliminary soil investigations for geotechnical design, slope stability, retaining wall design, distress evaluations and environmental studies. HGI has enjoyed additional experience on many other diverse types of projects. Our staff has performed numerous studies involving streets and utilities for pipeline studies, pavement analysis, trench wall stability, and rippability studies. We have years of experience in many other types of construction projects such as Commercial, Industrial, Municipal, Residential, and Master Planned Communities; all requiring compaction control for soil, concrete and asphalt 'inspection services. HILLTOP GEOTECHNICAL, INC. I I I I I I I I I I I I I I I I I I I 2008-381 P08087 July 3, 2008 Page 3 HGI is a State of California "Qualitied Laboratory" by Caltrans. Currently participating in the Cement and Concrete Reference Laboratory (CCRL) Inspection Program, the CCRL Concrete Reference Sample Program, the AASHTO Material Reference Laboratory (AMRL) Laboratory Assessment Program, the AMRL Coarse and Fine Aggregate Reference Sample Program, and the Caltrans Aggregate and Soil Reference Sample Program. HGI is also State of California, Division of the State Architect (DSA) approved to provide geotechnical engineering and construction observation and testing services for public schools and essential buildings. HGI is affiliated with and/or have participated in a number of professional organizations such as the Inland Geological Society, the California Geotechnical Engineering Association, the Building Industry Association (BIA), the Portland Cement Association (PCA), American Concrete Institute (ACI), and the International Conference of Building Officials (ICBO). HGI technicians are well trained and are all currently certified in nuclear gage testing for soil and asphalt testing services as well as ACI certified for all types of concrete testing that would be required. We have perfomled compaction testing for many types of public works projects for local cities. Projects typically included utility installation, street widening, and paving operations, grading control, concrete inspection, cylinder fabrication, and other miscellaneous inspection services. Many of these projects have been within the Caltrans right-of-way and as such, we are adaptable to either Caltrans or Green Book procedures. HGI is Certified as a local "SBE" or "Small Business Enterprise" by the State of California- DGS; our reference number is #0016652. Managing Personnel... Principal Geologist- Mark Hulett is president of HGI and is responsible for the overall management and operations of the company. He is a Licensed Engineering Geologist, CEG 1623, with over 25 years of geotechnical experience. Mr. Hulett will provide for all of the managerial duties with each project contract, as well as geologic consulting and analysis. HILLTOP GEOTECHNICAL, INC. I I I I I I I I I I I I I I I I I I I 2008-381 POSOS7 July 3, 2008 Page 4 Project Manager- Donald L. Curran, P.E., will be designated the Licensed Geotechnical Engineer, GE 254, and your Project Manager. Mr. Curran currently possess over 37 years of geotechnical, construction testing, and project management experience and will be accessible to the Construction Supervisor I Inspector assigned to the project during the life of the contract. Mr. Curran has been involved with the geotechnical engineering aspect of many diverse projects. His experience covers a varied range including, highways, parking lots, bridge structures, airport runways, high rise buildings, commercial, industrial, and also single family residential structures. Light industrial experience includes storage tanks, silos, earth dams and embankments, stream channels, storm drains, sewer lines, and tunnels. Mr. Curran is also experienced in the testing and design of percolation, sewage disposal and subsurface dewatering systems. Other geotechnical projects incorporated various types of deep and shallow foundation systems, overexcavation and fiB placement, shoring systems, cut and fill slope stability, and pavement design. He is also experienced in testing and quality control of construction materials including soils, concrete, hot mix asphaltic (HMA) concrete, and structural steel. Donald L. Curran -Project Manager will assume the following functional responsibilities. . Will be the "Responsible Engineer" in charge of the work, and will be available 24- hours per day, 7 days a week. . Review, monitor, and provide general direction for the HGI field and laboratory personnel and the subcontractors. . Administer personal leave and substitution of personnel, subject of approval with the City of San Bernardino, City representative assigned to the project. . Be available for any scheduled meetings with the City and/or the project Construction Contractor. (Resumes of our principals are included in the appendix.) HILLTOP GEOTECHNICAL, INC. I I I I I I I I I I I I I I I I I I I 2008-381 POSOS7 July 3, 2008 Page 5 Key Personnel- Other key personnel that we anticipate to be assigned to your projects include: Michael Carrillo Tony Norcross Mike Boyd Kevin Beath Senior Supervisory Soils and Materials Field Technician SoilslMaterials Field Technician Soil/Materials Field Technician Laboratory Manager Caltrans certifications showing the qualifications of each technician/inspector anticipated to be involved with this contract are attached to this proposal. Our Caltrans Laboratory Certificate is also included. Caltrans approves technicians on a semi-annual basis but will only approve technicians when actively participating in Caltrans projects. Our technicians will be re-approved when an active project is specified. Specific resumes of our key personnel as well as other certifications (CCRL, DSA, etc.) can be provided upon request. Outside Services- We anticipate using 2R Drilling Company or GP Drilling Company for any services that require drilling such as the 15 foot borings itemized in your 'Routine Services". We have worked with these companies for many years and have a very good working relationship with each company. With this exception, we do not anticipate the need for any additional outside service. However, if required, professional services, equipment, or tests not provided by HILL TOP GEOTECHNICAL, INC. (HGI) and any unusual items of expense not customarily incurred in our normal operations will be charged at cost plus 15 percent. Any necessary "Outside Services" to be negotiated in advance of provisioning. References- HGI currently provides geotechnical I geologic and materials testing services to numerous local governmental agencies throughout the Southern California area and currently has yearly contracts for such services with the City of San Bernardino, the City of Riverside, and the San HILLTOP GEOTECHNICAL, INC. I I I I I I I I I I I I I I I I I I I 2008-381 P08087 July 3, 2008 Page 6 Bernardino COllnty Special Services District. Weare committed to performing our services on- time and within the project budget, please feel free to contact them and ask about LIS. CITY OF SAN BER1'lARDINO--PUBLIC WORKS Project Manager: Robert Sepulveda 300 N. "'D" Street, 3'. Floor Phone: 909-384-5167 San Bernardino, CA 92418-0001 ...,.......................... seDulveda rolaisbcitv.orl! COUNTY OF SAN BERNARDINO-- SPECIAL DISTRICTS DEPARTMENT 157 W. Fifth Street, Second Floor San Bernardino, CA 92415-0450 ........................... Division Manager: Mr. Jim Oravets Phone: 909-387-5940 i oravetslaisdd.sbcountv .l!OV CITY OF RIVERSIDE..PUBLIC WORKS Construction Contracts: Mr. Sean Gill 3900 Main Street Phone: 951-826-5889 Riverside, CA 92522 ........................................... wlllairiversideca.l!ov CITY OF RIVERSIDE-UTILITIES 3900 Main Street Senior Design Engineer: Mr. Ernest P. Marquez Phone: 951.826-5409 Riverside, CA 92522 ...................................... emaruuezlairiversideca.l!ov CITY OF LOMA LINDA City Engineer: Jarb Thaipejr 25541 Barton Road Phone: 909-799-4401 Lorna Linda, CA 92354................................... ithaiDeirlailomalinda-ca.gov CITY OF RED LANDS Senior Civil Engineer: Mr. Wen Huang 35 Cajon Street, Suite 222 Phone: 909-798-7655 Redlands, CA 92373 ..................................... whuanglaicitvofredlands.orl! CITY OF HIGHLAND City Manager: Mr. Joe Hughes 27215 Baseline Avenue Phone: 909-864-6861 Highland, CA 92346 ..................................... ihul!heslaicitvofhighland.orl! Specific Services- It is our understanding that HGI acting under the specific authorization of the City of San Bernardino or their authorized representative, will provide a qualified teclmician for inspection HILLTOP GEOTECHNICAL, INC. I I I I I I I I I I I I I I I I I I I 2008-381 rosos, July 3, 200S Page 7 and testing purposes and evaluation of earthwork materials, processed aggregate materials, concrete and asphalt materials encountered during the construction of the various city improvement projects. HGI shall also provide laboratory testing services for soil, processed aggregate materials and pavement materials in accordance with the plans and specifications for each project. HGI will also provide an office contact person who will coordinate the scheduling of the field technician for testing and sampling with the City. Forupcoming projects, we anticipate using our present laboratory facilities at 786 South Gifford Avenue, in the City of San Bernardino. Our field technicians will perform the required testing and observation, as requested by the City of San Bernardino, or their authorized representative. At the conclusion of our testing, we will provide the results of our observations and testing in a formal report to the satisfaction of the City. Detailed services for soil, asphalt and concrete are presented below. Soil Testin~ Primary services are anticipated to consist of compaction testing. This testing will be conducted by using either a nuclear gauge and/or sand cone method. Our laboratory will also perform maximum density/optimum moisture content determmations andlor check point determinations to assure compliance with existing curves. Other laboratory testing such as sieve analysis, R- value determinations and other testing may also be required. Grading observation may also be required on an as-needed basis. All field testing will be reported in a field daily and all tests will be summarized at the completion of each project. Written results of all laboratory tests will be provided. Asphalt Testing We propose to provide compaction testing for your paving projects. Asphalt inspection services can also be provided, if requested. In-house laboratory testing services such as asphalt extraction, Hveem and stability testing, specific gravity and/or core density testing can also be provided. Written results of both field and laboratory testing will be submitted upon completion of the project. Concrete Test!n!! .our field services will include fabricating concrete test cylinders (3 cylinders per test minimum), in accordance with your field inspectors request. We will provide pick-up services, store, cure HILLTOP GEOTECHNICAL, INC. I I I I I I I I I I I I I I I I I I I 2008-381 POSOS, July 3, 2008 Page 8 and test the samples at 3, 7 and 21 days from the date of fabrication, unless specified differently. Additional concrete tests andlor aggregate tests can be provided, upon request. All test results will be recorded in written fonnat. Soil Borinll Upon request, we can perform soil boring(s) at specified locations. Our services will include drilling and logging a 15 foot boring. Undisturbed ring sampling will be conducted at various intervals and blow count information will also be recorded. Written logs that will include soil classification, blow count information, groundwater information (if encountered) and sample locations will be provided. Deeper drilling and specific sampling can also be performed, upon request. These services will include general traffic control and asphalt patch, if necessary. Other Services Special geologic and engineering consulting services can also be provided, upon request. We are qualified to provide many types of studies including detailed geologic studies, fault investigations, foundation studies, pile investigations, distressed investigations, rippability studies, slope stability, shoring analysis, groundwater investigations, retaining wall recommendations, pavement analysis, corrosion studies, and environmental services, etc. HGI's staff have many years of local experience and would be happy to continue to provide consulting services to the city on all geologic and geotechnical subjects. Specialized inspection services such as ICC concrete, masonry, post-tension, and structural steel can also be provided. Hilltop Geotechnical Inc. also maintains a full service geotechnical laboratory that specializes in soil, aggregate, concrete and asphalt testing services. Detailed scope of services could be developed with the city, upon request. Proposed Costs- Costs for each task is itemized on your 'Price Form' and included in the Appendix. It is understood that the proposed field work will be "Prevailing Wage" work and as such, our rates reflect this. Additionally, it is understood that our field test and concrete test fees will be assessed on a 'per test' basis. All travel time, office time and support staff time will be included . in the cost of the test. Additionally, maximum densityloptimum moisture determinations will be included in the cost of compaction testing. All laboratory and concrete test results will be HILLTOP GEOTECHNICAL, INC. I I I I I I I I I I I I I I I I I I I 2008-381 P08087 July 3, 2008 Page 9 provided in writing. Soil borings will include obtaining blow count infonnation, soil samples and a written report. However, additional costs will be accrued if significant traffic control in which special signs and tlag men will be necessary. We have read and agree all items included in your definitions of each specific task listed in the RFP. Definition of Responsibility- The presence of our field representatives will be for the purpose of providing observation and field testing. Our work does not include supervision or direction of the actual work of the contractor, his employees or agents. The contractor for this project should be so advised. The contractor should also be informed that neither the presence of our field representative nor the observation and testing by our firm shal1 excuse him in any way for defects in his work. It is understood that our firm will not be responsible for job or site safety on this project. Job and site safety will be the sole responsibility of the contractor. Non Discrimination- Hil1top Geotechnical, Inc. does not discriminate against any employee or applicant for employment because of race, color, religion, sex, or national origin. Federal Laws and Regulations- All federal laws and regulations shall be adhered to notwithstflnding any state or local laws and regulations. In a case of contlict between federal, state or local laws or regulations the strictest shall be adhered to. Authorization- If this proposal meets with your approval, please authorize our work by signing below and return to this office. We have read the "Draft Agreement" for On-Call Geotechnical Investigation and Construction Material Testing. We find no exceptions, and we will execute the Agreement, if offered a contract by the City. In addition, Hilltop Geotechnical, Inc. presently carries both general liability and professional liability insurance for all our projects. Certificates HILLTOP GEOTECHNICAL, INC. I I I I I I I I I I I I I I I I I I I 2008-381 POS087 July 3, 2008 Page 10 of Insurance can be provided upon your request. Should the City of San Bernardino submit a contract for work preformed under this proposal, HGI requests that this document be incorporated into such a contract. Hilltop Geotechnical, Inc. looks fOlward to continuing to provide professional services the City of San Bernardino. Respectfully submitted, HILLTOP GEOTECHNICAL, INC. Mark Hulett President IN WITNESS WHEREOF, the undersigned have executed the Agreement as of this day of ,2008. BY: BY: Mark Hulett TITLE: TITLE: President HILLTOP GEOTECHNICAL, INC. I I I I I I I I I I I I I I I I I I I E g '! ns .- (I)'E I- ns c: E (I) (I) Em (I) e enns nsen e_ ns 0 :E>. t/)~ .u 0 .E (I) ~ J: '. - ... BJ: .- ... e .- J: ~ U Q. (I) .- "'J: o tn (I) ... C) ~ Q.t:: o ns :!::Q. - .- e :1:_ 2008-381 ,,;". "-",""1" ii>':~';',<i'"," '.~ ~:~i .... " s: ;: :t:" ... ~.l! " Gl "" .!!! =""'(/) C'lS o. (/) en '::'0<( t::=g~c Glu,._ 03c~.g o..J:o~<( o..c::t=Cl, ", III 1lI- c ::s '" ... c: ::: CJ) ~ :i ~ <B '~ Q) .5 >o:E (,) E'O>o L::: c: _ ~ ~ Ill::: o CIl~ '. - CIl .s, o =--C) Q)COw -Q)Q) ::S'CC)o :J:._ ' ~CIliOci' '- e 0.. a.. C'lS D.. .- ::E g .i: a.. i.: Q) ~ Q) C .5 l! w c)'-c) C o::S ~ W W '-co .2 0 co Q) CJ) .. C) ci' ~D..w CIl ~ _ .- Q) ci' = ~ ~ D.. <i: (5 0 ~w Q)Q)oO::: C)C)- ~ -"t:I m::S C) (,)'- :J: Q) C'lS ~_ .......r:: '- o (,) C'lS ~ii:::E , ~ }~ 1 l n 1"'\. i.:..r:: Q)- c)C'lS C'lS Q) cm C'lS c ::E .- > .Q Q) C'lS~ .J i.: g.2 .~ ~ Q) C'lS 0..0 ::s Q) CJ)~ 'C .- (j)::E u: , Ji. ~ ;,; ~. c c c c co co co co ._ .- .- '(3 C) .. .~ ~'-'c E C'c E .c: C'lS -5 .c: C) C) Q) w C) w w I-f-;"~f-;"I:;: '- Vl"O 2:' W o VlO >.~ E - o.c:.... g~cco~ 0. 0 co >. t:: CIlzwEw c>.-5E.o - c._ 0 0 0:::2i:1-Cl::: I- g z ~ ~ c), r ::l f .~~~-_.- I I I I I I I I I I I I I I I I I I I 2008-381 NO r TRANSfERABLE . MUS r HAVE A COLOR BACKGROUN ." . ACCOUNT NUMBER 907211 DATE PAID 04/25/2008 OW]\;ER. FIR.\1 OR CORPORA liON BUSINESS NAME ATTENTION MAILING ADDRESS CITY OF SAN BERNARDINO BUSINESS REGISTRATION CERTIFICATE This Business Registration Cnlilicate 00es no! irldiCalli' the le,al operation oC lhis businell at this \oc:alion. Other approvals by other CII)' deparllnems, such as Development services may be requim!. This Cenilic:ate is issllli'd without vnification that the certificate is subjli'C1 to or extn;ll &omlicensinJ by the State oCCaIiComia. B.EHfJYAL. The BlISiness Owner is responsible for timely renewal. NO! r<<eivin, a rentwal notice for any reason does not relieve responsibility Cor timely payment. ICnot paid within)O days oCthe expiration date shown, a ~ penalty will be imposed. CONSULTANT BUSrNESS CLASS: NOTES: BUSrNESS LOCATION: 786 S GIFFORD AVE EXPIRATION DATE 3/31/2009 MARK E HULETI & DAWN L HULETI HILLTOP GEOTECHNICAL, INC. MARK HULETI (CEO. PRESIDENT) 786 S GIFFORD AVE SAN BERNARDINO, CA, 92408-2449 R'lchel G. Clark un CLLR~ POST IN A CONSPICUOUS PLACE. PIIOTOCOPIESARE NOTVAI:JO" .. I I I I I I I I I I I I I I I I I I I 2008-381 STATE OF CAliFORNIA. BUSINESS. TRANSPORTATION AND HOUSING AGENCY ARNOLD SCH'NARZENEGGER, Govemor DEPARTMENT OF TRANSPORTATION District 08 - Materials E!'llineering 464 W. Fourth Street. 6'. Floor San Bernardino. CA 92401.1400 a CAL TRANS QUALIFIED LABORATORY INSPECTION REPORT Fom1 TL.OI13 (Southern lA. 01-06) Expiration date: April 14, 2009 Inspection by: David K. Farden IA No.: 081 Phone: (909) 383-4619 File: Materials Category 500 Laboratory: Hilltop Geotechnical, Inc Address: 786 South Gifford Avenue City: San Bernardino Lab Manager: Donald L. Curran State: CA Zip: 92408 e-mail: hilltopg@hgeotech.com Phone #: (909) 890-9079 Fax #: (909) 890-9055 A certified Independent Assurance (IA) Sampler and Tester visited this laboratory on April 14, 2008. Only equipment to be used on Caltrans construction projects and/or local construction projects on the National Highway System projects was checked for qualification. At the time of Caltrans Qualification, this laboratory had all necessary equipment to perform the tests methods indicated below. Testing personnel shall be Caltrans Qualified and possess a current Caltrans Certificate of Proficiency Form TL-01II prior to performing any sampling or testing. CT 105 CT 304 CT 125 CT 308 CT201 CT 375 CT 202 CT 382 CT217 CT 521 CT 226 CT216 CT231 CT 301 A visual check was performed and documents provided as necessary for the following items: [ZJ Facility Safety Manual [ZJ Laboratory Procedures Manual [ZJ Laboratory Quality Control Manual [ZJ Proper Test Equipment [ZJ Copies of current applicable test procedures [ZJ Calibration and Service Documentation o Calibration/Service stickers affixed to test equipment Laboratory Qualification is valid for one year On April 14.2008 this laboratory was qualified by: .'\ , i . 1 //: -;tc./ ,/ /Cllt~(1(:lY (:7{t ~d::t/~ David K. Farden District 8 I. Independent Assurance I I I I I I I I I I I I I I I I I I I 2008-381 TI.-Olll \Re> 07-00) CALIFOR.l\JIA DEPARTMENT OF TRANSPORT A nON Presents this CERTIFICATE OF PROFICIENCY to Kevin Beath Hilltop Geotechnical, Inc. who is qualified to pe,form the fol/owing tests: 105 Calculations Pertaining to Gradings & SpG 201 Soil & Aggregate Sample Preparation 202 Sieve Analysis of Fine & Coarse Aggregates 216 Relative Compaction, Soils & Aggregates 217 Sand Equivalent 226 Determination of Moisture Content by Oven Drying 304 Prcparation of Bituminous Mixtures for Testing 308 Bulk SpG & WI. Pcr Cubic Foot, Bituminous Mixture 366 Stabilometer Value 382 Asphalt Content of Bituminous Mixes, Ignition Method EXPIRES February 26, 2008 February 26, 2008 February 26, 2008 February 26, 2008 February 26, 2008 February 26, 2008 February 26, 2008 February 26, 2008 February 26, 2008 March 26, 2008 for: Bruce Kean. District !l.1ateria/s Engineer by: tlri?<K<:ftz"t#-U\ / David K- Farden Certified Independent Assurance TL-OJ II Issued: 21 May 2007 IA Phone No. : (760) 872-0663 IA Certificate No. : 081 note: This certificate is valid as long as the Acceptance Tester complies with applicable requirements in CaJtrans Independent Assurance Program Manual. I I I I I I I I I I I I I I I I I I I 2008-381 TL-Olll (R~\ 1)7-UO) I I I I I I I I I I I I I I I I I I I 2008-381 TL.Olll {R~'" 07.(0) I I I I I I I I I I I I I I I I I I I 2008-381 TL-0111 IRe> 07-001 I I I I I I I I I I I I I I I I I I I 2008-381 TL-01II tRev 07.00) 2008-381 '.' '. A TT ACHMENT 2 TO EXHIBIT A 786 S, GIFFORD AVENUE. SAN 8ERNARDINO . CALIFORNIA 92408 h;lItopg@hgeotech.com . FAX 909-890-9055 . 909-89()..9079 HIU-TOP GEOTECHNICAL INCORPORATED July 3, 2008 City of San Bernardino P08087- Fee Schedule Public Works Division- Development Services Department 300 North 'D' Street, Third Floor San Bernardino, CA 92418 Attention: Mr. Michael Grubbs, P. E., Project Manager Subject: "Schedule of Prices" and our "Schedule of Fees - 2008" to be accompanied with our Proposal for Public Works On-Call Geotechnical Investigation and Construction Material Testing Services, City of San Bernardino, California. Reference: Request for Proposals to Provide Professional Services for Public Works On-Call Geotechnical Investigations and Construction Material Testing Services; Prepared by the Public Works Division of the Development Services Department, City of San Bernardino, Dated June 4, 2008. March 13, 2008 Hilltop Geotechnical, Inc. is pleased to submit your completed "Schedule of Prices" and our 2008 "Schedule of Fees" for Professional Services for On-Call Geotechnical Investigations and Construction Material Testing Services; Materials and Soils Inspection and Testing Services for Public Works Division of the Development Services Department, City of San Bernardino. We anticipate that you will require various soil andlor materials technicianllicensed deputy inspection services and laboratory testing services. Hilltop Geotechnical, Inc. truly looks forward to continue to provide our professional services. If there are any questions after reviewing the enclosed information, please do not hesitate to call me at (909) 890-9079, at your convemence. Respectfully submitted, ILLTOP GEOTECHNICAL, INC. Mark Hulett President .. . 2008-381 SCHEDULE OF PRICES ON-CALL GEOTECHNICAL INVESTIGATIONS AND CONSTRUCTION MATERIAL TESTING SERVICES July 7,2008 .. (To be submitted in a sealed envelope separate from proposal documents) The undersigned Proposer, if offered, hereby certifies that it will execute the attached Agreement for Services and accept an annual purchase order effective on the date the Agreement is approved by the Mayor and Common Council and running through June 30, 2009 for Geotechnical Investigations and Construction Material Testing Services for Capital Improvement Projects on an as-needed basis with no guaranteed usage. The undersigned Proposer understands that, if exercised by the City, an optional one- year extension, as provided in the agreement, shall be effective on or about July 1, 2009 and running through June 30, 2010, and that actual option year pricing shall be negotiated with the Proposer prior to exercising of any given option year; however, the option year extension shall not become effective until issuance by the City of a duly authorized Purchase Order. Please provide detailed Firm Fixed Prices in the spaces provided on Sheet 2 of this Schedule of Prices. Indicate any other incidental or additional Prices required for complying with the Technical Specification requirements in the space provided below. Are there any other additional or incidental prices, which will be required by (fir firm in order to meet the requirements of the Technical Specifications? Yes e or No). If you answered "Ves., please provide details of said additional prices: Traf 1C control varies considerablv from olace to olace and this cost does not include flaoman or rental sionage. This offer shall remain firm for 90 days from RFP closing date. Terms and conditions as set forth in this RFP apply to this submittal. Page 1 of 3 ,", 2008-381 Schedule of Prices for On-Call Geotechnical Investigations and Construction Material Testing 07-07-08 'EStrmat8cJ Annual Unit Description Unit Price Total Price 1,000 ea Compaction Testing (1 - 4 per site visit) including curves. 153 153,000 1,000 ea Compaction Testing (5 - 20 per site 128 128,000 visit) including curves. 200 ea Compaction Testing (20+ per site visit) 90 18,000 including curves. 20 set Concrete Cylinders (includes 125 2,500 collection, tests and report) 20 ea Asphalt Extractions 160 3,200 40 ea Asphalt Compaction 150 6,000 40 ea Soil Gradation/Screen Analysis 100 4,000 500 hr Grading Observation 93 46,500 200 hr Engineering Geological Investigation & 150 30,000 Consulting . 40 ea Soil Boring to 15' 150 6,000 40 ea Pavement Bore (Asphalt) 150 6,000 40 ea Concrete Core 150 6,000 TOTAL ESTIMATED ANNUAL COST 409,200 Page 2 at 3 .. 2008-381 SCHEDULE OF PRICES (Continued) ON-CALL GEOTECHNICAL INVESTIGATIONS AND CONSTRUCTION MATERIAL TESTING SERVICES In signing this offer, Proposer warrants that all certifications and documents requested herein are attached and properly completed and signed. ~. Authorized Signature: Print Signer's Name and Title: Mark Hulett, President Date Signed: Company Name & Address: July 7, 2008 Hilltop Geotechnical, Inc. 786 South Gifford Avenue San Bernardino, CA 92408 Phone: 909-890-9079 Fax: 909-890-9055 Page 3 of 3 2008-381 POSOS7. Fee Schedule July 3. :2008 Page No. 1 SCHEDULE OF FEES CITY OF SAN BERNARDINO-2008 PERSONNEL CHARGES Prevailing Wage Prevailing Wage - Soils & Mat. Technician, per hour (2 hour min.> .... $89.00 Prevailing Wage - ICBO Deputy Inspector, per hour (4 hour min.> . . . . . $92.00 Prevailing Wage - UltraSonic Inspector, per hour (4 hour min.> . . . . . . $102.00 Prevailing Wage - Field Supervisor, per hour. . . . . . . . . . . . . . . . . . . . . $105.00 Non-Prevailing Wage Drafting, per hour. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $62.00 Labor, per hour .............................................. $73.00 Sample Pick-up, per hour . . . . . . . . . . . . . . . . . . . . .. ............... $62.00 Word Processing I Clerical, per hour ............................. $57.00 Senior Engineer-Certified (GE, CE), per hour. . . . . . . . . . . . . . . . . . . . . $150.00 Field Engineer Non-Certified, per hour. . . . . . . . . . . . . . . . . . . . . . . . . . $120.00 Engineering Geologist-Certified (CEG. RG), per hour .............. $150.00 Geologist Non-Certified, per hour .............................. $120.00 Inspector - ICBO, per hour. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $73.00 Project Manager, per hour .................................... $100.00 Supervisor. per hour . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $100.00 Technician - Geologic, per hour ................................. $73.00 Technician - Concrete, Per hour. . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . $73.00 Technician' Grading, per hour ................................. $73.00 Technician' Senior Grading. per hour. . . . . . . . . . . . . . . . . . . . . . . . . . . . $79.00 Technician - Manometer, per hour. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $73.00 Technician - Material, per hour ................................. $73.00 Technician - Post Grading, per hour ............................. $73.00 Technician' Office, per hour ................................... $7D.00 Technician' Sr. Office. per hour. . . . . . . . . . . . . . . . .. .............. $79.00 Outside Drilling, Seismic Survey. or Coring Service. . . . . . . . .. Cost Plus 15% HILLTOP GEOTECHNICAL, INC. 2008-381 P08D87. Fee Schedule July 3. 2008 Page No.2 SCHEDULE OF FEES CITY OF SAN BERNARDINO-2008 LABORATORY TESTING FEES Soil Testing Chloride Test (CT422), ea . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $80.00 Chunk Density & Moisture Content Test (ASTM D1188, D2216), ea ... $25.00 Consolidation Test (ASTM D5333), ea a) Consolidation - full ................................... $155.00 b) Consolidation' Remold ................................ $40.00 c) Consolidation - Single Point ............................. $80.00 Corrosion Analysis Test (pH, Redox, Min. Resistivity, Sulfide), ea .... $145.00 Direct Shear Test (ASTM D3080) a) Direct Shear - In'Situ, 3 Points ......................... $165.00 b) Direct Shear - Rernold, 3 points ......................... $205.00 Expansion Index Test (ASTM D4829), ea ........................ $115.00 ~Iaximum Dry Density I Optimum Moisture Content Test (ASTM D1557, CT216), ea ........................... $140.00 Check Point (ASTM D1557), ea ............................ $40.00 Moisture Content Test (ASTM D2216, CT 226), ea . . . . . . . . . . . . . . . . . . $15.00 Organic Content Test (ASTM D2974), ea ......................... $35.00 Permeability Test, Constant Head (ASTM D2434, CT220), ea ........ Quote Permeability Test, Falling Head (ASTM D5084, CT220), ea .......... Quote Atterberg Limits Test (ASTM D4318, CT204), ea . . . . . . . . . . . . . . . . . . $120.00 Resistance Value Test (R-Value) of Soil I Aggregate Base (ASTM D2844, CT301), ea .."... . . . . . . . . . . . . $260.00 Minimum Electrical Resistivity Test, ea ......................... $105.00 Ring Moisture & Density Test (ASTM D2937, D2216), ea .. . . . . . . . . . . $20.00 Sand Equivalent Test (ASTM D4219, CT217), ea . ... ..... .. .. ... . . $100.00 Sieve Analysis Test '3/4" to Clay (ASTM D422, CT202 I CT203). ea . . . $195.00 Sieve Analysis Test -3/4" to -#200 (ASTM D422,CT202), ea . . . . . . . . . . $100.00 Sieve Analysis Test. #200 (ASTM D1140), ea ..................... $75.00 Specific Gravity of Soils (ASTM D8;54. CT209), ea ................. $150.00 Sulfate Test (CT417), ea . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $60.00 Turbidity Test. ea ............................................ $25.00 Unconfined Compression Test of Cohesive Soil (ASTM D2166). ea . . . .. $75.00 Determination of Cement or Lime Content in Treated Aggregate Base By Titration :'vlethod (CT338). ea . . . . . . . . . . . . ., Quote HILLTOP GEOTECHNICAL, INC. 2008-381 P080R7. Fee Schedule July 3.2008 Pagl' ;\n. 3 SCHEDULE OF FEES CITY OF SAN BERNARDINO-200B Concrete I Masonry Testing Cylinder Compression Test, 6"xI2" Cylinder, Including Hold Specimens (ASTM C39, CT521), ea . . . . . . . . . . . . . . . . . . . . . $27.00 Core Compression Test, 3" to 6" dia. (ASTM C42, CT521), ea ......... $33.00 Cylinder I Core Trim Charge, ea ................................ $10.00 Grout Sample Compression Test, 3"x3"x6" Specimens, Including Hold Specimens, ea . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $33.00 Mortar Sample Compression Test, 2"x4" Cylinders, Including Hold Specimens, ea . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $33.00 Flexural Strength of Concrete Using Simple Bearn with Center-Point Loading Test (ASTM C293, CT 523), ea . . . . . . . , . . . $85.00 Modulus of Rupture, Flexural Strength of Concrete Using Simple Beam with Third-Point Loading (ASTM C78), ea .............. $85.00 Split Tensile Test, 6"xI2" Cylinder (ASTM C496), ea . . . . . . . . . . . . . . . . $70.00 Compression Strength of Concrete Masonry Unit (CMU) Test (Average of 3 Required by ASTM), ea . . . . . . . . . . . . . . . . . . . . . . . . $60.00 Absorption of Concrete Masonry Unit (eMU) Test (Average of 3 Required by ASTM), ea . . . . . . . . . . . . . . . . . . . . . . . . $30.00 Compressive Strength of Composite Masonry Prism Test up to 8"xI6", per unit ................................... $180.00 Asphalt Testing Asphalt Content - Ignition Oven, Premixed AC Sample (CT382), ea ......................... $125.00 Asphalt Content I Gradation - Ignition Oven, Premixed AC Sarnple (CT202, CT382), ea .. , . . . . . . . . . . . . . . . . $200.00 Hveem Specific Gravity I Stability Value, Premixed AC Sample (CT308, CT366), ea .. . . . . . . . . . . . . . . . . . $180.00 Hveem Stability Value' Premixed AC Sample (CT366). ea . . . . . . . . . . $120.00 Hveem Specific Gravity I Stability Value <Rubberized Asphalt). Premixed AC Sample (CT308, CT366). ea . . . . . . . . . . . . . . . . . . . $210.00 Hveem Stability Value (Rubberized Asphalt>- Premixed AC Sample (CT366), ea ......................... $150.00 Specific Gravity of Hveern or Core Sample -Uncoated (CT30S), ea ..... $45.00 Specific Gravity of Hveern or Core Sample -Coated (CT308), ea ....... $65.00 Asphalt Content in Premixed AC Sample by Vacuum Extraction (CT3G2), ea . . . . . . . . . . . . . . . . . . . . . . . . .. Quote .Recommended Optimum Bitumen Content. AC Mix Design (CT3G7), ea . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. Quote HILLTOP GEOTECHNICAL, INC. 2008-381 P08087. Fee Schedule July 3, 2008 Page No.4 SCHEDULE OF FEES CITY OF SAN BERNARDINO-2008 Aggregate Testing Specific Gravity and Absorption - Coarse Aggregate (ASTM C127, CT206), ea . . . . . . . . . . . . . . . . . . . . . . . . $110.00 Specific Gravity and Absorption' Fine Aggregate (ASTM C128, CT207), ea . . . . . . . . . . . . . . . . . . . . . . . . $150.00 Sodium or Magnesium Sulfate Soundness Fine or Coarse Aggregate (ASTM C88, C214), per sieve size tested. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $65.00 Los Angeles Abrasion - Small Size Coarse Aggregate (ASTM C131, CT211), ea . . . . . . . . . . . . . . . . . . . . . . . . $220.00 Los Angeles Abrasion' Large Size Coarse Aggregate (ASTM C535, CT211), ea . . . . . . . . . . . . . . . . . . . . . . . . $240.00 Durability Index Fine or Coarse Aggregate (CT229), ea . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $160.00 Potential Reactivity of Aggregate' Chemical Method (ASTM C289), ea ................................ $375.00 Petrographic Examination Fine to Coarse Method (ASTM C295), ea .............................. $1,400.00 Gradation of Aggregates (ASTM C136) (CT202) Fine Aggregate, Dry Sieve, ea . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $85.00 Fine Aggregate, Washed Sieve, ea ......................... $115.00 Coarse Aggregate, Dry sieve. ea . . . . . . . . . . . . . . . . . . . . . . . . . . . . $85.00 Coarse Aggregate, Washed Sieve, ea ....................... $115.00 Combined Aggregate, Dry Sieve, ea ...... . . . . . . . . . . . . . . . . . . $150.00 Combined Aggregate, Washed sieve, ea . . . . .. . . . . . . . . . . . . . ., $200.00 Material Finer than #200 Sieve(ASTM CI17), ea . . . . . . . . . . . . . . $75.00 Sand Equivalent Test (ASTM D2419) (CT217), ea ................. $105.00 Flat and Elongated Particles (ASTM D4791), ea .................. $200.00 Clay Lumps and Friable Particles (ASTl\I CI42), ea ............... $100.00 Lightweight Particles (ASTM C123) Coat I Lignite (sp gr = 2.00), ea . . . . . . . . . . . . . . . . . . . . . . . . . . . . $100.00 Chert (sp gr = -2.4), ea . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $100.00 Organic Impurities in Fine Aggregate (ASTM C40, CT213), ea . . . . . . . . $65.00 Cleanness Yalue (CT227), ea .................................. $160.00 Cnit Weight I Calculated Yoids (Fine I Coarse I Mixed Aggregates) C-\STM C29), ea ....................... $140.00 HILLTOP GEOTECHNICAL, INC. ". , . 2008-381 P08087. Fee Schedule July 3, 2008 Page No.5 SCHEDULE OF FEES CITY OF SAN BERNARDINO-2008 Aggregate Testing Continued Resistance Value Test (R-Value) of Soil I Aggregate Base Material (ASTM D2844, CT301), ea. . . . . . . . . . . $260.00 Operation of California Profilograph and Evaluation of Pavement Profiles (CT526), per hr. ................,..... $250.00 Potential Alkali Reactivity of Cement- Aggregate Combinations (Mortar- Bar Method) (ASTM C227) ............. Quote Potential Volume Charge of Cement-Aggregate Cornbination (ASTM C342) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. Quote Potential Reactivity Rock Cylinder Method (ASTM C586) ........................................... Quote Length Change Due to Alkali-Carbonate Reactivity (ASTM Cll05) ................................. Quote Potential Reactivity Mortar Bar (ASTM C1260) .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. Quote Potential Expansion of Aggregates from Hydration (ASTM D4792) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. Quote Aggregate Sarnpling, Staff Geologist I Engineer (Portal to Portal), per hour ............................... $105.00 Mileage, per mile. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $0.50 Sample preparation, packaging, and delivery for shipping for outside services, per hour. . . . . . . . . . . . . $60.00 Registered Geologist I Engineer for Test Result Evaluation, Report Preparation, Consultation, etc., per hour. . . . . . . . . . . .. .$145.00 Reinforcing Steel (ASTM AGI5) Tensile Test #11 or Smaller, per test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $55.00 Bend Test #11 or Smaller, per test. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $50.00 Tensile Test #12 to #18, per test ................................ Quote Bend Test #12 to #18, per test .................................. Quote Fireproofing Tests Oven Dry Density. per sample ......... . . . . . . . . . . . . . . . . . . . . . . . . . $55.00 HILLTOP GEOTECHNICAL, INC. 2008-381 '. P08087. Fee Schedule July 3. 2008 Page Xo. G SCHEDULE OF FEES CITY OF SAN BERNARDINO-2008 FIELD EQUIPMENT CHARGES Concrete Air meter, Pressure or Volumetric, per day. . . . . . . . . . . . . . .. $25.00 Concrete Unit Weight Kit, per day. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. $25.00 Concrete Core Drill, per day. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. $75.00 Pachometer, per day . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. $25.00 Schmidt Hammer, per day ..................................... $50.00 Windsor Probe, per test location 3-Shot Probe Location . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. $60.00 I-Shot Probe Location . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. $25.00 OUTSIDE SERVICES Concrete I Asphalt Cutting I Coring Services ................... Cost + 15% Geotechnical Drilling Services .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Cost + 15% Seismic Survey ........................................... Cost + 15% Materials Purchase . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Cost + 15% Dozer or Tow Truck. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Cost + 15% Outside Laboratory Testing Services. . . . . . . . . . . . . . . . . . . . . . . . . . Cost + 15% Rental of Equipment . . . . . . . . . . . . . . . .. ..................... Cost + 15% Shipping. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Cost + 15% MINIMUM CHARGES Engineering Technician ....................................... 2 haUl's Registered Inspector,7Al\I to 11M! .... . . . . . . . . . . . . . . . . . . . . . . . . . . 4 hours Work past 11A1\1 or Over 4 Hours ............................... 8 haUl's Show Up and No Testing or Inspection ........... . . . . . . . . . . . . . . . . 2 hours Cancellation of Work After 3:30 pm on previous day ................ 2 hours SHIFT DIFFERENTIAL Second Shift (2Pl\I-12PM) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 5.00/hour Third Shift (JOPM-8A...1I,I) .................................... 8.00/hour HILLTOP GEOTECHNICAL, INC. J ... ~.. '. 2008-381 " . ,I ; )1" - I I .C~ /' .w P08087. Fee Schedule July 3, 2008 a~:s r,'j !r~:t~(; - ,....., SCHEDULE OF FEES CITY OF SAN BERNARDINO-200B OVERTIME Overtime at the rate of 1.5 times the applicable hourly rate will be charged for any time in excess of 8 hours and less than 12 hours in anyone day, Monday through Friday, and tirne before 6:00 a.m. or after 6:00 p.m. and for Saturday work up to 8 hours. Work performed in excess of 12 hours on Monday through Friday, in excess of 8 hours on Saturday, and all work on Sundays or Company recognized Holidays will be charged at 2,0 times the applicable hourly rate. COMPANY RECOGNIZED HOLIDAYS New Year's Day Independence Day President's Day Memorial Day Christmas Labor Day Veteran's Day Thanksgiving Day Day After Thanksgiving RE-ISSUE OF REPORTS Copies of reports in excess of six will be charged at the rate of 25t per sheet copied. One copy of Inspection reports will be left at the project when the inspection is completed. OUTSIDE SERVICES Professional services, equipment, or tests not provided by Hilltop Geotechnical, Inc. and any unusual items of expense not customarily incurred in our normal operations will be charged at cost plus 15 percent. ACTUAL TIME & COSTS INCURRED In accordance with your request, we are pleased to provide you with our Schedule of Fees for your upcoming projects. The cost of our services will be invoiced in accordance with the attached fee schedule utilizing our rates shown in the c'\ppendix and will reflect only t he actual time and costs incurred. HILLTOP GEOTECHNICAL, INC. . . 2008-381 EXHIBIT B AGREEMENT FOR SERVICES FOR ON-CALL Gt6tkeh~ItR. INVESTIGATIONS AND CONSTRUCTION MATERIAL TESTING ., ',\ THIS AGREEMENT is made and entered into this 6th day of October 2008 ("Effective Date"), by and between the CITY OF SAN BERNARDINO, a charter city ("City"), and NINYO & MOORE, INC. ("Consultant"). WITNESSETH: A. WHEREAS, City proposes to have Consultant perform the On-Call Geotechnical Investigations and Construction Material Testing described herein below; and B. WHEREAS, Consultant represents that it has that degree of specialized expertise contemplated within California Goverrunent Code, Section 37103, and holds all necessary licenses to practice and perform the services herein contemplated; and C. WHEREAS, City and Consultant desire to contract for specific services in connection with the project described below (the "Project") and desire to set forth their rights, duties and liabilities in connection with the services to be performed; and D. WHEREAS, no official or employee of City has a financial interest, within the provisions of California Goverrunent Code, Sections 1090-1092, in the subject matter of this Agreement. NOW, THEREFORE, for and in consideration of the mutual covenants and conditions contained herein, the parties hereby agree as follows: 1.0. SERVICES PROVIDED BY CONSULTANT 1.1. Scope of Services. Contractor shall furnish On-Call Geotechnical Investigations and Construction Material Testing to City in accordance with Attachment 1 "Scope of Services" and the Contractor's proposal dated July 3, 2008, attached and incorporated herein. 1.2. Professional Practices. All professional services to be provided by Consultant pursuant to this Agreement shall be provided by personnel experienced in their respective fields and in a manner consistent with the standards of care, diligence and skill ordinarily exercised by professional consultants in similar fields and circumstances in accordance with sound professional practices. Consultant also warrants that it is familiar with all laws that may affect its performance of this Agreement and shall advise City of any changes in any laws that may affect Consultant's performance of this Agreement. 1.3. Warrantv. Consultant warrants that it shall perform the services required by this Agreement in compliance with all applicable Federal and California employment laws including, but not limited to, those laws related to minimum hours and wages; occupational health and safety; fair employment and employment practices; workers' compensation \ \Sierra\DS\_Public Works\RFCA's\2008 All\10-06-08\Agreement for Geotech Investigations & Construction Material Testing\Ninyo & Moore\Ninyo & Moore Agreement Geotech and Constr Material Testing lO-06-08.doc 1 \ , , 2008-381 EXHIBIT B insurance and safety in employment; and all other Federal, State and local laws and ordinances applicable to the services required under this Agreement. Consultant shall indemnify and hold harmless City from and against all claims, demands, payments, suits, actions, proceedings, and judgments of every nature and description including attorneys' fees and costs, presented, brought, or recovered against City for, or on account of any liability under any of the above-mentioned laws, which may be incurred by reason of Consultant's performance under this Agreement. 1.4. Non-discrimination. In performing this Agreement, Consultant shall not engage in, nor permit its agents to engage in, discrimination in employment of persons because of their race, religion, color, national origin, ancestry, age, physical handicap, medical condition, marital status, sexual gender or sexual orientation, or any other category protected by law, except as permitted pursuant to Section 12940 of the Government Code. Violation of this provision may result in the imposition of penalties referred to in Labor Code, Section 1735. 1.5 Non-Exclusive Agreement. Consultant acknowledges that City may enter into agreements with other consultants for services similar to the services that are subject to this Agreement or may have its own employees perform services similar to those services contemplated by this Agreement. 1.6. Delegation and Assignment. This is a personal service contract, and the duties set forth herein shall not be delegated or assigned to any person or entity without the prior written consent of City. 1.7. Business License: The Consultant shall obtain and maintain a valid City Business Registration Certificate during the term of this Agreement. 1.8. Duty of Lovaltv/Conflict of Interest: The Consultant understands and agrees that Consultant shall maintain a fiduciary duty and a duty of loyalty to the City in performing Consultant's obligations under this Agreement. Consultant, in performing its obligations under this Agreement, is governed by California's conflict of interest laws, Government Code Section 87100 et seq., and Title 2, California Code of Regulations Section 18700 et seq. 1.8.1 Prior to performing any services to City under this Agreement, Consultant shall provide the Development Services Department a written list of the Assessor Parcel Numbers and general location or address of any and all real property located in the City of San Bernardino in which Consultant has any ownership interest, or which is the location of any pending project that is a source of income for Consultant. Consultant shall keep this list current on a monthly basis during the entire term of this Agreement. 1.8.2 Consultant shall not work on any task that is related to any real property that is located within 500 feet of any parcel in which Consultant has any ownership interest or which is the location of any pending project that is a source of income for Consultant. \ \Sierra\DS\_Public Works\RFCNs\2008 All\10-06.08\Agreement for Geotech Investigations & Construction Material Testing\Ninyo & Moore\Ninyo & Moore Agreement Geotech and Constr Material Testing 10-06-08.doc 2 , . 2008-381 EXHIBIT B 2.0. COMPENSATION AND BILLING 2.1. Compensation. Over the term of this Agreement, Contractor shall be paid for such on-call services in accordance with Attachment 2 "Fee proposal dated July 3, 2008", attached and incorporated herein, subject to an aggregate limit of $300,000 in payment for work performed by all consultants performing On-Call Geotechnical Investigations and Construction Material Testing. City shall distribute work among its consultants in a manner that best meets the needs of the City. City makes no guarantee to Consultant regarding the amount and/or the dollar value of the work assigned to Consultant. 2.2. Additional Services. Consultant shall not receive compensation for any services provided outside the Scope of Services unless the City or its Managing Engineer for this Project, prior to Consultant performing the additional services, approves such additional services in writing. It is specifically understood that oral requests and/or approvals of such additional services or additional compensation shall be barred and are unenforceable. 2.3. Method of Billing. Consultant may submit invoices to City's Managing Engineer for approval on a progress basis, but no more often than monthly. Said invoice shall be based on the total of all Consultant's services which have been completed to City's sole satisfaction. City shall pay Consultant's invoice within forty-five (45) days from the date City receives said invoice. Each invoice shall describe in detail, the services performed and the associated time for completion. Any additional services approved and performed pursuant to this Agreement shall be designated as "Additional Services" and shall identify the number of the authorized change order, where applicable, on all invoices. 2.4. Records and Audits. Records of Consultant's services relating to this Agreement shall be maintained in accordance with generally recognized accounting principles and shall be made available to City or its Managing Engineer for inspection and/or audit at mutually convenient times for a period of three (3) years from the Effective Date. 3.0. TIME OF PERFORMANCE 3.1. Commencement and Completion of Work. The obligation to perform the professional services to be performed pursuant to this Agreement ~hall commence within five (5) days from the Effective Date of this Agreement. Said services shall be performed in strict compliance with the Project Schedule issued by the Managing Engineer. Failure to commence work in a timely manner and/or diligently pursue work to completion may be grounds for termination of this Agreement. 3.2. Excusable Delavs. Neither party shall be responsible for delays or lack of performance resulting from acts beyond the reasonable control of the party or parties. Such acts shall include, but not be limited to, acts of God, fire, strikes, material shortages, compliance with laws or regulations, riots, acts of war, or any other conditions beyond the reasonable control of a party. \ \Sierra\DS\_Public Works\RFCA's\2008 All\10-06-08\Agreement for Geotech Investigations & Construction Material Testing\Ninyo & Moore\Ninyo & Moore Agreement Geotech and Constr Material Testing 10-06-08.doc 3 , , 2008-381 EXHIBIT B 4.0. TERM AND TERMINATION 4.1. Term. This Agreement shall commence on the Effective Date and continue through June 30, 2009, unless previously terminated as provided herein or as otherwise agreed to in writing by the parties. An administrative extension of one additional year may be authorized, subject to the prior written agreement of both parties. 4.2. Notice of Termination. The City reserves and has the right and privilege of canceling, suspending or abandoning the execution of all or any part of the work contemplated by this Agreement, with or without cause, at any time, by providing written notice to Consultant. The termination of this Agreement shall be deemed effective upon receipt of the notice of termination. In the event of such termination, Consultant shall immediately stop rendering services under this Agreement unless directed otherwise by the City. 4.3. Compensation. In the event of termination, City shall pay Consultant for reasonable costs incurred and professional services satisfactorily performed up to and including the date of City's written notice of termination. Compensation for work in progress shall be prorated as to the percentage of work completed as of the effective date of termination in accordance with the fees set forth herein. In ascertaining the professional services actually rendered hereunder up to the effective date of termination of this Agreement, consideration shall be given to both completed work and work in progress, to complete and incomplete drawings, and to other documents pertaining to the services contemplated herein whether delivered to the City or in the possession of the Consultant. 4.4 Documents. In the event of termination of this Agreement, all documents prepared by Consultant in its performance of this Agreement including, but not limited to, finished or unfinished design, development and construction documents, data, studies, drawings, maps and reports, shall be delivered to the City within ten (10) days of delivery of termination notice to Consultant, at no cost to City. Any use of uncompleted documents without specific written authorization from Consultant shall be at City's sole risk and without liability or legal expense to Consultant. 5.0. INSURANCE 5.1. Minimum Scope and Limits of Insurance. Consultant shall obtain and maintain during the life of this Agreement all of the following insurance coverages: (a) Comprehensive general liability, including premises-operations, products/completed operations, broad form property damage, blanket contractual liability, independent contractors, personal injury with a policy limit of not less than One Million Dollars ($1,000,000.00), combined single limits, per occurrence and aggregate. (b) Automobile liability for owned vehicles, hired, and non-owned vehicles, with a policy limit of not less than One Million Dollars ($1,000,000.00), combined single limits, per occurrence and \ \Sierra\DS\_Public Works\RFCA's\2008 A11\lO-06-08\Agreement for Geotech Investigations & Construction Material Testing\Ninyo & Moore\Ninyo & Moore Agreement Geotech and Constr Material Testing lO-06-08.doc 4 , . 2008-381 EXHIBIT B aggregate. (c) Workers' compensation insurance as required by the State of California. (d) Professional errors and omissions ("E&O") liability insurance with policy limits of not less than One Million Dollars ($1,000,000.00), combined single limits, per occurrence and aggregate. Consultant shall obtain and maintain, said E&O liability insurance during the life of this Agreement and for three years after completion of the work hereunder. 5.2. Endorsements. The comprehensive general liability insurance policy shall contain or be endorsed to contain the following provisions: (a) Additional insureds: "The City of San Bernardino and its elected and appointed boards, officers, agents, and employees are additional insureds with respect to this contract with City." (b) Notice: "Said policy shall not terminate, nor shall it be cancelled, nor the coverage reduced, until thirty (30) days after written notice is given to City." (c) Other insurance: "Any other insurance maintained by the City of San Bernardino shall be excess and not contributing with the insurance provided by this policy." 5.3. Certificates of Insurance. Consultant shall provide to City certificates of insurance showing the insurance coverages and required endorsements described above, in a form and content approved by City, prior to performing any services under this Agreement. 5.4. Non-limiting. Nothing in this Section shall be construed as limiting in any way, the indemnification provision contained in this Agreement, or the extent to which Consultant may be held responsible for payments of damages to persons or property. 6.0. GENERAL PROVISIONS 6.1. Entire Agreement. This Agreement constitutes the entire Agreement between the parties with respect to any matter referenced herein and supersedes any and all other prior writings and oral negotiations. This Agreement may be modified only in writing, and signed by the parties in interest at the time of such modification. The terms of this Agreement shall prevail over any inconsistent provision in any other contract document appurtenant hereto, including exhibits to this Agreement. 6.2. Representatives. The Director of Development Services or her designee shall be the representative of City for purposes of this Agreement and may issue all consents, approvals, directives and agreements on behalf of the City, called for by this Agreement, \ \Sierra\DS\_Public Works\RFCA's\2008 A11\lO-06-08\Agreement for Geotech Investigations & Construction Material Testing\Ninyo & Moore\Ninyo & Moore Agreement Geotech and Canstr Material Testing lO-06-0B.doc 5 , 2008-381 EXHIBIT B except as otherwise expressly provided in this Agreement. Consultant shall designate a representative for purposes of this Agreement who shall be authorized to issue all consents, approvals, directives and agreements on behalf of Consultant called for by this Agreement, except as otherwise expressly provided in this Agreement. 6.3. Proiect Managers. City shall designate a Managing Engineer to work directly with Consultant in the performance of this Agreement. Consultant shall designate a Contract Inspector(s) who shall represent it and be its agent in all consultations with City during the term of this Agreement. Consultant or its Contract Inspector(s) shall attend and assist in all coordination meetings called by City. 6.4. Notices. Any notices, documents, correspondence or other communications concerning this Agreement or the work hereunder may be provided by personal delivery, facsimile or mail and shall be addressed as set forth below. Such communication shall be deemed served or delivered: a) at the time of delivery if such communication is sent by personal delivery; b) at the time of transmission if such communication is sent by facsimile; and c) 48 hours after deposit in the U.S. Mail as reflected by the official U.S. postmark if such communication is sent through regular United States mail. IF TO CONSULTANT: Mr. Jalal Vakili, Ph.D., P.E. Principal Engineer Ninyo & Moore, Inc. 11650 Mission Park Drive, Suite 101 Rancho Cucamonga, CA 91730 Fax: 909-758-5966 Tel: 909-758-5960 IF TO CITY: Valerie C. Ross Director of Development Services 300 North "D" Street San Bernardino, Ca 92418 Fax: 909-384-5080 Tel: 909-384-5357 6.5. Attorneys' Fees. In the event that litigation is brought by any party in connection with this Agreement, the prevailing party shall be entitled to recover from the opposing party all costs and expenses, including reasonable attomeys' fees, incurred by the prevailing party in the exercise of any of its rights or remedies hereunder or the enforcement of any of the terms, conditions, or provisions hereof. The costs, salary and expenses of the City Attorney and members of his office in connection with that litigation shall be considered as "attorneys' fees" for the purposes of this Agreement. 6.6. Governing Law. This Agreement shall be governed by and construed under the laws of the State of California without giving effect to that body of laws pertaining to conflict of laws. In the event of any legal action to enforce or interpret this Agreement, the parties hereto agree that the sole and exclusive venue shall be a court of competent jurisdiction located in San Bernardino County, California. 6.7. Assignment. Consultant shall not voluntarily or by operation of law assign, transfer, sublet or encumber all or any part of Consultant's interest in this Agreement without \ \Sierra\DS\_Public Works\RFCA's\2008 All\10-06-08\Agreement for Geotech Investigations & Construction Material Testing\Ninyo & Moore\Ninyo & Moore Agreement Geotech and Constr Material Testing 1O-06-08.doc 6 , 2008-381 EXHIBIT B City's prior written consent. Any attempted assignment, transfer, subletting or encumbrance shall be void and shall constitute a breach of this Agreement and cause for termination of this Agreement. Regardless of City's consent, no subletting or assignment shall release Consultant of Consultant's obligation to perform all other obligations to be performed by Consultant hereunder for the term of this Agreement. 6.8 Indemnification and Hold Harmless. Consultant shall protect, defend, indemnifY and hold harmless City and its elected and appointed officials, officers, and employees from any and all claims, causes of action, liabilities, expenses, including attorney fees, damage to property or injuries to or death of any person or persons or damages of any nature including, but not by way of limitation, all civil claims or workers' compensation claims, arising out of or in any way connected with the intentional or negligent acts, errors or omissions of Consultant, its employees, agents or subcontractors in the performance of this Agreement. 6.9. Independent Contractor. Consultant is and shall be acting at all times as an independent contractor and not as an employee of City. Consultant shall secure, at its expense, and be responsible for any and all payment of Income Tax, Social Security, State Disability Insurance Compensation, Unemployment Compensation, and other payroll deductions for Consultant and its officers, agents, and employees, and all business licenses, if any are required, in connection with the services to be performed hereunder. 6.10 Ownership of Documents. All findings, reports, documents, information and data including, but not limited to, computer tapes or discs, files and tapes furnished or prepared by Consultant or any of its subcontractors in the course of performance of this Agreement, shall be and remain the sole property of City. Consultant agrees that any such documents or information shall not be made available to any individual or organization without the prior consent of City. Any use by the City of such documents for other projects not contemplated by this Agreement, and any use of incomplete documents, shall be at the sole risk of City and without liability or legal exposure to Consultant. City shall indemnify and hold harmless Consultant from all claims, damages, losses, and expenses, including attorneys' fees, arising out of or resulting from City's use of such documents for other projects not contemplated by this Agreement or use of incomplete documents furnished by Consultant. Consultant shall deliver to City any findings, reports, documents, information, data, in any form, including but not limited to, computer tapes, discs, files, audio tapes or any other Project related items as requested by City or its authorized representative, at no additional cost to the City. 6.11 Public Records Act Disclosure. Consultant has been advised and is aware that all reports, documents, information and data including, but not limited to, computer tapes, discs or files furnished or prepared by Consultant, or any of its subcontractors, and provided to City may be subject to public disclosure as required by the California Public Records Act (California Government Code Section 6250 et. seq.). Exceptions to public disclosure may be those documents or information that qualifY as trade secrets, as that term is defined in the California Government Code Section 6254.7, and of which Consultant informs City of such trade secret. The City will endeavor to maintain as confidential all information obtained by it that is designated as a trade secret. The City shall not, in any way, be liable or responsible for \ \Sierra\DS\_Public Works\RFCA's\2008 Al1\10-06-08\Agreement for Geotech Investigations & Construction Material Testing\Ninyo & Moore\Ninyo & Moore Agreement Geotech and Canstr Material Testing lO-06-08.doc 7 , 2008-381 EXHIBIT B the disclosure of any trade secret including, without limitation, those records so marked if disclosure is deemed to be required by law or by order of the Court. 6.12. Responsibilitv for Errors. Consultant shall be responsible for its work and results under this Agreement. Consultant, when requested, shall furnish clarification and/or explanation as may be required by the City's representative, regarding any services rendered under this Agreement at no additional cost to City. In the event that an error or omission attributable to Consultant occurs, then Consultant shall, at no cost to City, provide all necessary design drawings, estimates and other Consultant professional services necessary to rectify and correct the matter to the sole satisfaction of City and to participate in any meeting required with regard to the correction. 6.13. Prohibited Emplovment. Consultant will not employ any regular employee of City while this Agreement is in effect. 6.14. Order of Precedence. In the event of an inconsistency or conflict in this Agreement and any of the attached Exhibits or Attachments, the terms set forth in this Agreement shall prevail. 6.15. Costs. Each party shall bear its own costs and fees incurred in the preparation and negotiation of this Agreement and in the performance of its obligations hereunder except as expressly provided herein. 6.16. No Third Partv Beneficiarv Ril!hts. This Agreement is entered into for the sole benefit of City and Consultant and no other parties are intended to be direct or incidental beneficiaries of this Agreement and no third party shall have any right in, under or to this Agreement. 6.17. Headings. Paragraphs and subparagraph headings contained in this Agreement are included solely for convenience and are not intended to modify, explain or to be a full or accurate description of the content thereof and shall not in any way affect the meaning or interpretation of this Agreement. 6.18. Construction. The parties have participated joiI\t1y in the negotiation and drafting of this Agreement. In the event an ambiguity or question of intent or interpretation arises with respect to this Agreement, this Agreement shall be construed as if drafted jointly by the parties and in accordance with its fair meaning. There shall be no presumption or burden of proof favoring or disfavoring any party by virtue of the authorship of any of the provisions of this Agreement. 6.19 Amendments. Only a writing executed by the parties hereto or their respective successors and assigns may amend this Agreement. 6.20. Waiver. The delay or failure of either party at any time to require performance or compliance by the other of any of its obligations or agreements shall in no way be deemed a waiver of those rights to require such performance or compliance. No waiver of any provision of this Agreement shall be effective unless in writing and signed by a \ \Sierra\DS\~Public Works\RFCA's\2008 A11\10-06-08\Agreement for Geotech Investigations & Construction Material Testing\Ninyo & Moore\Ninyo & Moore Agreement Geotech and Constr Material Testing lO-06-08.doc 8 , 2008-381 EXHIBIT B duly authorized representative of the party against whom enforcement of a waiver is sought. The waiver of any right or remedy with respect to any occurrence or event shall not be deemed a waiver of any right or remedy with respect to any other occurrence or event, nor shall any waiver constitute a continuing waiver. 6.21. Severability. If any provision of this Agreement is determined by a court of competent jurisdiction to be unenforceable in any circumstance, such determination shall not affect the validity or enforceability of the remaining terms and provisions hereof or of the offending provision in any other circumstance. 6.22. Counterparts. This Agreement may be executed in one or more counterparts, each of which shall be deemed an original. All counterparts shall be construed together and shall constitute one agreement. 6.23. Corporate Authoritv. The persons executing this Agreement on behalf of the parties hereto warrant that they are duly authorized to execute this Agreement on behalf of said parties and that by doing so, the parties hereto are formally bound to the provisions of this Agreement. 6.24 Damages. The Parties agree to waive any rights to incidental or consequential and punitive damages arising out of performance under this Agreement whether in torts or contracts and in law or in equity. III III \ \Sierra\DS\~Public Works\RFCA's\2008 All\10-06-08\Agreement for Geotech Investigations & Construction Material Testing\Ninyo & Moore\Ninyo & Moore Agreement Geotech and Canstr Material Testing lO-06-08.doc 9 , 2008-381 EXHIBIT B AGREEMENT FOR SERVICES FOR ON-CALL GEOTECHNICAL INVESTIGATIONS AND CONSTRUCTION MATERIAL TESTING IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed by and through their respective authorized officers, as of the date first above written. CITY OF SAN BERNARDINO, A Municipal Corporation CONSULTANT NINYO & MOORE, INC. -'i~ Lori Sats"oon, Acting City Manager By c-~~. Signature Jalal Vakili, RCE 45350 Principal Engineer Name and Title Approved as to form: James F. Penman, City Attorney By Q,.,Pwv> f/f~ U \ \Sierra\DS\_Public Works\RFCA's\2008 A11\lO-06-08\Agreement for Geotech Investigations & Construction Material Testing\Ninyo & Moore\Ninyo & Moore Agreement Geotech and Constr Material Testing lO-06-08.doc 10 I. ., 2008-381 ATTACHMENT 1 TO EXlllBIT B ~~r7lPJ"~.4""",9'llIfJn9D&~OOre\ --~~~:':\I>- , Geore,hn"al .md Enwonmmr." Suence, Comulr,,",, I I I I I I I I I I I I I I I I I July 3, 2008 Proposal No. P-13750 Mr. Michael Grubbs, Project Manager City of San Bernardino Development Services Department 300 North "D" Street, San Bernardino, California 92418-0001 Subject: Proposal for Public Works On-Call Geotechnical Investigation and Construction Material Testing Services City of San Bernardino, California Dear Mr. Grubbs: Ninyo & Moore is pleased to submit this proposal to provide professional geotechnical investigations and construction material testing services to the City of San Bernardino (City). This proposal is being submitted in response to the City's Request for Proposal (RFP) To Provide Professional Geotechnical Investigations and Construction Material Testing Services for the City of San Bernardino, dated June 4, 2008. We fully understand the City's needs and desires for a qualified consultant that can respond quickly and effectively. We are ready to meet the City's requirements by making available dedicated professionals who have the requisite experience and resources to meet your project needs. Some of the advantages Ninyo & Moore can provide to the Agency include: . A proven track record for successfully providing professional geotechnical investigations and construction material testing services to cities, counties, and other public agencies, including the cities of San Bernardino, Rancho Cucamonga, Fontana, Rialto, Riverside, Moreno Valley, Los Angeles, Irvine, the Department of Public Works at the counties of San Bernardino and Los Angeles; San Bernardino Associated Governments (SANBAG), the Riverside County Transportation Commission (RCTC), Orange County Transportation Authority (aCTA); Chino Basin Desalter Authority, Orange County Sanitation District (OCSD), John Wayne Airport, as well as Caltrans, California State Parks, and many other agencies and municipalities. Ninyo & Moore is experienced with the coordination and administration of on-call contracts and can effectively provide responsive and comprehensive services to the City of San Bernardino. . As one of the largest geotechnical consulting firms in southern California, Ninyo & Moore, a minority-owned business enterprise, currently employs over 350 professionals, including California-registered Civil Engineers, Geotechnical Engineers, Registered Geologists, and Certified Engineering Geologists, as well as certified inspectors and technicians. Ninyo & Moore provides geotechnical, environmental, geologic, and materials testing services in- house, reducing coordination and delivery time of our services to our clients. . Many of our staff are cross-disciplined, including many of our technicians and inspectors, which provides flexibility in the field of our personnel. Our field and laboratory technicians and inspectors hold current certifications from ICC, NICEl, ACI, AWS, and Caltrans. . In addition to our experienced diversified staff, we maintain three fully-equipped, in-house .soils and materials testing laboratories in southern California, located in Rancho 11650 MiSSion eark Drive. SUIte 101 . Rancho Cucamonga, California 91730 . Phone (909) 758-5960 . Fax (909)758-5966 San Diego . Irvine . Rancho Cucamonga . Los Angeles . OakJand . Las Vegas . Phoenix . Denver . E! Paso I. I I I I I I I I I I I I I I I I I I 2008-381 Public Works On-Call Geotechnical Investigations & Construction Materials Testing July 3, 2008 City of San Bernardino Proposal No. P-13750 Cucamonga, Irvine, and San Diego. Our laboratories are accredited by the American Association of State Highway and Transportation Officials (AASHTO), Cement and Concrete Reference Laboratory (CCRL), Caltrans, the Division of the State Architect (DSA), the City of Los Angeles, and many other public agencies. . Ninyo & Moore will service this contract from our local San Bernardino County office and laboratory located at 11650 Mission Park Drive, Suite 101, Rancho Cucamonga, California 90071. Dr. Jalal Vakili is the Principal Engineer for Ninyo & Moore's Rancho Cucamonga office and is authorized to negotiate with the City of San Bernardino on behalf of Ninyo & Moore. Dr. Vakili's e-mail address is ivakili@ninvoandmoore.com, telephone number is (909) 758-5960, and the fax number is (909) 758-5966. We are fully prepared to make every possible commitment needed for the successful and timely completion of any project assigned to us. Your favorable consideration of this proposal is appreciated, and we look forward to being of service to the City of San Bernardino. Sincerely, NINYO & MOORE , ~4L Jalal Vakili, Ph.D., P.E. Principal Engineer KSY/JV/rad Distribution: (6) Addressee 2 /111090& /(toon I' I I I I I I I I I I I I I I I I I I .. 2008-381 PROPOSER' CERTIFICATION AND ACKNOWLEDGMENT OF ADDENDA FOR GEOTECHNICAL INVESTIGATIONS AND CONSTRUCTION MATERIAL TESTING SERVICES The undersigned hereby certifies that I am an officer of the firm submitting the attached proposal and that I am authorized to submit said proposal on behalf of my firm. I hereby bind my firm to this proposal and state the following (if submitting a proposal): This offer shall remain valid for 90 days from the RFP close date; and All terms and conditions as set forth in this RFP shall apply to this offer; and In signing this offer, I warrant that all certifications and documents requested herein are attached and properly completed and signed; and I certify that I have received all addenda as indicated below and have incorporated the addenda in the attached proposal. Verification of Addenda Received Addendum No: f'bne Addendum No: Addendum No: Received on: Received on: Received on: AUTHORIZED SIGNATURE: PRINT SIGNER'S NAME AND TITLE: Jalal Vakili, Principal Engineer 'e;;;:;U ~d pf' . DATE SIGNED: July 3, 2008 COMPANY NAME & ADDRESS: Ninyo & M:Jore 11650 MIssion Park Drive, SUite 101 Rancho Cucarronga, California 91730 PHONE: 909/758-5960 F~: 909/758-5966 IF NOT SUBMITTING A PROPOSAL, PLEASE STATE REASON (5) BELOW: Page 2 of 12 I I I I I I I I I I I I I I I I I I I 2008-381 Public Works On-Call Geotechnical Investigations & Construction Materials Testing July 3, 2008 City of San Bernardino Proposal No. P-13750 TABLE OF CONTENTS PaQe PROJECT UNDERSTANDING ...................................................................................................1 COMPANY PROFILE ...................................................................................................................2 SCOPE OF SERVICES ................................................................................................................3 OFFICE LOCATION .....................................................................................................................6 KEY PROPOSED PROJECT PERSONNEL.............................................................................6 RELEVANT PROJECT EXPERIENCE....................................................................................l 0 REQUIRED STATEMENTS ......................................................................................................15 INSURANCE COVERAGE ........................................................................................................15 MINORITY-OWNED BUSINESS ENTERPRISE (MBE) CERTIFICATIONS....................16 FEE SCHEDULE.........................................................................................................................16 Attachments City Business Registration Cost - Separate Sealed Envelope Appendices Appendix A - Resumes of Key Personnel I(Jn9o&/(toon I I I I I I I I I I g I I I I I I I I . 2008-381 Public Works On-Call Geotechnical Investigations & Construction Materials Testing July 3, 2008 City of San Bernardino Proposal No, P-13750 PROJECT UNDERSTANDING Ninyo & Moore Geotechnical and Environmental Sciences Consultants is pleased to submit this proposal to provide professional geotechnical investigations and construction material testing services for the City of San Bernardino. We understand that our services will be provided on an on-call basis and will be subject to the Prevailing Wage requirements and will extend from approximately December 1, 2008 through June 20, 2009, with an optional one-year extension, from July 1, 2009 through June 30, 2010. We are committed to being responsive, thorough, and technically sound in order to provide high quality services to the City of San Bernardino efficiently and comprehensively. We have prepared this proposal based on the information contained in the City's Request for Proposal (RFP) To Provide Professional Geotechnical Investi9ations and Construction Material Testing Services for the City of San Bernardino, dated June 4, 2008. The coordination of our soils and materials testing services will be provided from our Rancho Cucamonga of fice, located at 11650 Mission Park Drive, Suite 101, Rancho Cucamonga, California 91730. The telephone number for our Ontario office is (909) 758-5960, and the fax number is (909) 758- 5966. Based on our understanding of the RFP, we understand that our services may include taking preliminary soil samples utilizing 15 foot-deep soil borings to determine the on-site soil characteristics, performing grading observations, taking soil compaction tests to evaluate relative compaction, collecting Portland cement concrete cylinders for laboratory compressive strength testing, and collection of asphalt concrete samples for laboratory conformance testing. We understand that the majority of the work that is anticipated to be requested will confined to routine soil compaction and concretelasphalt testing. Ninyo & Moore has been providing similar services to many other public agencies and has the in-house capabilities to provide the requested geotechnical and materials testing services. Our geotechnical sampling, including logging our borings and laboratory classification testing will be performed under the direct supervision of California licensed Geotechnical Engineers andlor Certified Engineering Geologists. Our field and laboratory materials testers are certified by Caltrans to perform the requested soils, Portland cement and asphalt concrete sampling and testing. P-13750 /(ln90& ~oo\"e 1 I I I I I I I I I I I I I I I I I I I . 2008-381 Public Works On-Call Geotechnical Investigations & Construction Materials Testing July 3, 2008 City of San Bernardino Proposal No. P-13750 COMPANY PROFILE The quality of Ninyo & Moore's personnel base of over 35 employees is widely recognized. Our staff of design and construction-related professionals includes experienced and certified registered geotechnical engineers, civil engineers, environmental engineers, engineering geologists and certified laboratory technicians. Since 1986, Ninyo & Moore has been providing geotechnical/geologic design services, hazardous materials evaluation and abatement, and construction support services in the form of soils and materials testing and inspection services for hundreds of projects throughout southern California. Our highly qualified staff is experienced in meeting the requirements of the California Building Code, as well as meeting the requirements of the various regulatory agencies involved with design and construction projects, including OSHA, OSHPD, DSA, South Coast Air Quality Management District, and other regulatory agencies. Our personnel are familiar with the standard plans and specifications prepared by various agencies, including the American Public Works Association, Caltrans, City of San Bernardino, and other agencies. In addition, Ninyo & Moore has three fully equipped, certified soils and materials testing laboratory facilities in southern California supervised by registered engineers. Our laboratories are certified by the American Association of State Highway and Transportation Officials (AASHTO), the Cement and Concrete Reference Laboratory (CCRL), California Department of Transportation (Caltrans), California Division of the State Architect (DSA), the City of Los Angeles, and many other agencies, and meet the requirements of ASTM E329, "Specifications for Agencies Engaged in the Testing andlor Inspection of Materials Used in Construction." Our laboratories are equipped with the necessary testing equipment required for the proposed contract. The quality assurance manual for our laboratories assures that laboratory testing is documented and efficiently performed in accordance with the applicable testing standards. Our testing equipment is calibrated by independent, third-party calibration companies and is re- certified by the various agencies within their required time limitations. In addition to our many certifications, our laboratories participate in soil, asphalt, and concrete proficiency sampling programs, including those administered by the AASHTO Materials Reference Laboratory (AMRL), the Cement and Concrete Reference Laboratory (CCRL), and the Caltrans Reference Sample Program (RSP). P-13750 /111090& /ft.oo~e 2 I I I I I I I I I I I I I I I I I I I 2008-381 Public Works On-Call Geotechnical Investigations & Construction Materials Testing July 3, 2008 City of San Bernardino Proposal No. P-13750 SCOPE OF SERVICES We understand that our scope of services will include the items listed in the City of San Bernardino's Price Form, which we have filled out and included in a separate sealed envelope. Ninyo & Moore has the in-house capabilities and resources to provide the complete scope of services requested in this RFP will not need to use sub-consultants for this contract. This will benefit the City of San Bernardino by having one company to perform the necessary services. In the event that the City would need additional geotechnical or materials testing services beyond the scope of services include in the Price Form, we have included sample scope of services for these areas. We would tailor our scope of services to meet the City of San Bernardino's needs on a project by project basis. Geotechnical Services Our scope of services for a geotechnical design project may include the following: . Project coordination, including meeting with the representatives of the City and their design team to discuss our scope of work. · Review of preliminary project plans, geologic and seismic hazard maps, and readily avail- able geotechnical reports to evaluate pOSSible geologic hazards that may impact the proposed construction. . Acquisition of permits necessary to proceed with our subsurface evaluation. · Geotechnical site reconnaissance to document the site conditions and to select and mark the proposed excavation locations for underground utility location. · Drilling, sampling, and logging of small-diameter andlor large-diameter exploratory borings andlor excavation of exploratory test pits. The depths of the excavations will depend on the details of the proposed project and site location. Traffic control will be performed, as ap- propriate, in general accordance with the W.A.T.C.H. manual. · Laboratory testing of representative soil samples to evaluate the soil characteristics. Labo- ratory testing may include in-situ moisture and dry density, gradation, maximum density and optimum moisture content, consolidation and expansion potential, expansion index, con- solidation, shear strength, corrosivity and sulfate content, and R-value testing. o Data compilation and geotechnical analysis of field and laboratory data. Our analyses will address the following: o Suitability of the site for the proposed construction from a geotechnical perspective. o Description of the site geology and on-site soils anticipated during construction, includ- ing an evaluation of geologic hazards that might be present at the site. P.13750 1(Jn90&iV\OOt"8 3 I I I I I I I I I I I I I I I I I I I 2008-381 Public Works On-Call Geotechnical Investigations & Construction Materials Testing July 3, 2008 City of San Bernardino Proposal No. P-13750 o Excavation and compaction requirements, including suitability of the on-site soils for use as fill andlor trench backfill. o Analysis of the temporary stability of the trench excavations and shoring pressures, in- cluding allowable lateral earth pressures and allowable passive pressures for proposed trenches, as appropriate. o Evaluation of the depth to the groundwater table and potential areas of dewatering, as appropriate. o Evaluation of potential settlement. o Evaluation of the potential for liquefaction. o Evaluation of the corrosion potential of the on-site soils. o Evaluation of pavement design for the proposed roadway sections, as applicable. . Preparation of a written report presenting the results of our field exploration, laboratory testing, and engineering analyses, as well as our conclusions and recommendations rela- tive to the geotechnical aspects of project design and construction. . Upon substantial completion of the project plans and specifications, Ninyo & Moore will per- form a geotechnical and geologic plan review to evaluate whether the conclusions and recommendations presented in our report were correctly interpreted and incorporated into the project plans and specifications. Soils and Materials Testing Services Our scope of services for soils and materials testing may include the following: . Project coordination and client liaison, including scheduling of personnel by our Project Manager to provide soils and materials testing services and meeting attendance. . Review of readily available background materials pertaining to the site, including geotechnical reports, and project plans and specifications. · On-site soils and materials testing during construction performed by our certified personnel, on an as-requested basis. Our soils and materials testing services will typically include the following: o Field observation, documentation and testing during the earthwork operations and foundation excavation operations, as applicable. Our services will include observation of the shoring and foundation excavations, and field density testing of compacted fill, utility trench backfill, subgrade, and aggregate base materials. Inspection, sampling and testing during batch plant operations, as required. Field observation and density testing during asphalt concrete pavement operations. o o P-13750 /f(ln90& /(toore 4 I I I I I I I I I I I I I I I I I I I . 2008-381 Public Works On-Call Geotechnical Investigations & Construction Materials Testing July 3, 2008 City of San Bernardino Proposal No. P-13750 o Pavement coring of new or existing pavements to observe and evaluate pavement thickness and materials, including sampling of subgrade materials, as requested. . Laboratory testing to evaluate the maximum dry density and optimum moisture content of the soils to be placed as fill or backfill; and conformance testing; R-value testing of subgrade soils and base materials; and material quality tests on the proposed soils, aggregate subbase, aggregate base, asphalt concrete, as may be required. . Pavement deflection testing and analyses as requested. . Preparation of daily reports and other memoranda to summarize the field operations and test results. . Preparation of letter-reports summarizing the results of our field and laboratory tests, and submittal of these reports to the City's Project Manager and others, as requested. Construction Inspection and Environmental Services We understand that construction inspection services, including reinforced concrete, pre- stressed concrete, structural steel, welding, masonry, and roofing are not a part of this RFP; however, Ninyo & Moore has in-house inspectors that our certified by the ICC, AWS, DSA, that can provide construction inspection if required. In addition, our in-house environmental services include hazardous materials evaluation and abatement/remediation and we have been able to quickly respond and remediate unanticipated soillgroundwater contamination as well as unanticipated lead paint/asbestos abatement on many past projects, with very little if any delay to the construction schedule. We mention these additional services due to the benefit they have provided to many of our materials testing and geotechnical engineering clients when unexpected emergency situations arose and we were able to quickly respond and resolve the issues for them. Scheduling Ninyo & Moore is committed to providing prompt, efficient, and high quality materials testing and geotechnical engineering services throughout the contract duration. As one of the largest geotechnical and environmental firms in southern California, Ninyo & Moore has the personnel and resources available to complete the requested services in accordance with the construction schedules. Our vast pool of experienced and certified technicians and inspectors has allowed us to accommodate continuous 24-hour construction schedules as well as weekend work when required. Our personnel are equipped with combination digital t:wo-way radiosltelephones with paging and voice mail so that our field and laboratory personnel are in constant communication with OlJr project manager, as well as the client, in order to effectively accommodate last minute P-13750 /If/RUO& I(t.oon 5 I I I I I I I I I I ; I I I I I I I I 2008-381 Public Works On-Call Geotechnical Investigations & Construction Materials Testing July 3, 2008 City of San Bernardino Proposal No. P-13750 scheduling changes. In addition, we have provided technicians and inspectors on-site within as little as 30 minute notification on past projects for other agencies. We understand that the City of San Bernardino requires response time of 30 minutes or less to accommodate last minute changes in the construction schedule. Our current workload allows us to provide the required personnel throughout the duration of the proposed contract for the City of San Bernardino. Quality Assurance/Quality Control Programs Ninyo & Moore has both geotechnical and materials testing quality assurancelquality control programs which facilitate compliance with project performance standards, schedules and budgets. These comprehensive quality assurance plans utilize management approach procedural manuals that delineate the interrelationship between management and design team components and describe specific quality control procedures to be used. The programs address data generation, management, and quality assessment guidelines for sampling and analysis procedures, as well as methods of corrective action. The quality assurance program manuals are available for review upon request. OFFICE LOCATION Ninyo & Moore will manage this contract from our San Bernardino County office and laboratory, located at 11650 Mission Park Drive, Suite 101, Rancho Cucamonga, California 91730. Our field personnel will be based out of this office and we will perform the required laboratory testing in our Rancho Cucamonga laboratory. In the unlikely event that additional personnel or laboratory capabilities are required for this contract, Ninyo & Moore will supplement our Rancho Cucamonga personnel and equipment with the resources from our Irvine office and laboratory, located approximately 45 minutes from our Rancho Cucamonga office. We also have our corporate headquarters office and laboratory in San Diego that can also support this contract, if necessary. KEY PROPOSED PROJECT PERSONNEL Our proposed project manager, who will be the single point of contact for the contract and responsible for the delivery of our services in accordance with the contract documents, is Mr. Kurt Yoshii. Mr. Yoshii graduated from the University of California at Berkeley with a degree in Civil Engineering and is a licensed Civil and Geotechnical Engineer in the State of California. He has over 18 years of experience in geotechnical engineering and materials testing services. P.13750 /(ln90& ~oore 6 I I I ! I I I I I I I I I I I I I I I 2008-381 Public Works On-Call Geotechnical Investigations & Construction Materials Testing July 3, 2008 City of San Bernardino Proposal No. P-13750 As Project Manager, he has provided project oversight for numerous geotechnical, soils and materials testing and inspection projects including the on-call contracts with the Cities of San Bernardino, Fontana, Rialto, Irvine, Mission Viejo; Department of Public Works for both the County of San Bernardino and County of Los Angeles; the Riverside County Transportation Commission (RCTC), Orange County Transportation Authority (OCTA); and John Wayne Airport, as well as, managed Ninyo & Moore's on-call materials testing contract with Caltrans District 8, and past contracts with the San Bernardino Associated Governments (SAN BAG). As key contact person, Mr. Yoshii will be available to the City 24 hours a day, 7 days a week. He can be reached at 949/244-7072. Mr. Yoshii will be supported by our large staff of available materials testers and licensed geotechnical engineers, certified engineering geologists, and registered geologists. Dr. Jalal Vakili, Ph.D., P.E., will serve as the Principal-in-Charge for the duration of the contract. He has a doctorate degree in geotechnical engineering and over 40 years experience in providing geotechnical services for public work and infrastructure projects for cities, counties, Caltrans, and other State and municipal agencies. Dr. Vakili earned his Ph.D. in geotechnical engineering from the University of Paris, France. His experience includes street improvements; bridges and retaining walls; highways and major transportation corridors; sewers, pipelines, dams and flood control structures; and residential and commercial developments. Dr. Vakili's background includes teaching and performing quality research in the field of geotechnical engineering. Dr. Vakili has served as Principal-in-Charge for Ninyo & Moore's continuous, past on-call geotechnical engineering contracts with several city/agencies. Dr. Vakili will be available to the City 24 hours a day, 7 days a week. He can be reached at 949/697-2942. The proposed project team personnel are highly qualified and experienced in their specific disciplines, and possess working knowledge of the required documents and standards. The following organization chart outlines the lines of communication that we will utilize for this contract. P-13750 I(Jn90& ~oore 7 I I I I I I I I I I I 2008-381 Public Works On-Call Geotechnical Investigations & Construction Materials Testing July 3, 2008 City of San Bernardino Proposal No. P-13750 City of San Bernardino I r- Tecbnical AdvIsors PrInd..Hn-Charge Project Mlnaver Daniel Chu, Ph.D., P.E., GoE.- Geotechnical lalaIYaklU,PII.D., P.E. KurtYoshil, P.E., Go!. lawrence IJWett., '.Eo, Q.E. -Materials I Plojed Englneer Field Operations SUpervisor GiuT'dh M. saiki, P. Eo, GoE. R. Woody' MiIIphls I GeoIogy/Eng_ng Slall Material Testen and Inspectors sam Guha, Ph.D., '.Eo, G.E. LawrenClll Jlnsen, P.G., C.EoG. GlennA-MHIer Dayld Dtsmang Andy Rodrlg_ Jeremy Allenbr Mkhaelpearce, P.E., G.E. Scott Johnson, P.G., C.E.G. Alfred '*fIno" Ra*lguez Phil Nekoranec Jolm ....bet..., James Cowles AruChlloiJyarty, P.E. Greg Corson, P.G., C.E.G. Vance Hunter CilrrteAbram. Hector Heredll Daniel EUenwoocl Rajlndra HandlpMgocll, m MIt"-" ROIl", P.G" C.!.G. 1Ir. Red. DMIeI Chacon Norllllln Lopez 010101...... Yk:lDril MKKImaI, EIT hanPrlce,Stlff EUglMFrazler David Mens Marlo Romo David ReId Jennlfor S_'" S.." WI,..1e V.h, SlaW M'rant hrkI, staff JoIIT_ 11molhyCII... MarIaVU"'" Joe Levario Ada.. CDckrHI AJexand. 'antillean Phil AI.. nm Tavenettl S.... 50IIs MiIIrloAdolfo Matt puraty Thomas Radoric:h emily Mlphls Robert Utile Ylnoent Cordova Matt .lIgB nm Cooper Robert Beattie Justin Van Fleet NldloIas Chavez The following table summarizes Ninyo & Moore's project team's qualifications and certified I inspectors and technicians. The resumes of our key project personnel are provided in Appendix A. Our proposed project team along with their titles and certifications are listed below: I I I I I I I [- ~ ~-----~-~------ .. Years Teallll.l~I1lLCIS FUl1clOI1 EeJuc<lIIOil ReglstrJtlol1s Celt./lcallons E;P -- -- --- ----- ----- --~ ala/Vakili Princlpal~n- Charge Ph.D. Geotechnical Engl.-ing M.S. Applied Mechanics B.S. Civil Engineering Construction Quality Manage- ment for Contractors, Corps of Engi- neers Training Course Registered Civil Engineer, CA, PE 45350 Professional Engineer, Nevada, PE 12269 Professional Engineer, Utah PE9734155932202 Professional Engineer, Arizona PE 33062 Professional Engineer, Idaho PE4470l 40 P-13750 /(/nHO& ~oo..e 8 I I I I I I I I I I I I I I I I I I I . 2008-381 Public Works On-Call Geotechnical Investigations & Construction Materials Testing July 3, 2008 City of San Bernardino Proposal No. P-13750 ~ --~~-- -- ~-~------ Tealll r.lelllbcrs Function Educ,lllon Regis lr<ltlons. Certifications Years E,p - - - -------- - ------ -- . . , Project PE 54759 Manager Registered Geotechnical Engineer, CA, GE 2508 Daniel Chu Technical M$" Geotechnical Engineering Registered Civil Engineer, CA, 25 Advisor - 8.S. , Civil Engineering PE 37991 Geotechnical Registered Geotechnical Engineer, CA, EnoineerinQ GE 2096 ,-awrence Lovett Technical M.8A. California Registered Quality Engineer,QE 3960 40 Advisor - OA 8.S, Civil Engineering California Registered Civil Engineer, CE 50994 Materials Engineering t3arreth Saiki Project M. S. Civil Engineering Registered Civil Engineer, CA, RCE 49665 18 Engineer 8.S. Civil Engineering Registered Geotechnical Engineer, CA, GE 2509 M.8.A ~oody Maphis Field DSA CeI1ified Inspector #3Z72 13 Operations ACI Concrete Field Technician Certification SUpelVisor ICC Reinfoo:ed Concrete Spectallnspector #1 074992-88 ICC Structural Masomy Special Inspector #1074992-84 iCC Slructural Steel and Welcing CeI1ification #1074992-85 iCC Prestressed Concrete Spectallnspector #1 074992-89 Troxler Electronics Nuclear Gauae Certification Ilred .Tino' Rodriquez Senior Field ACI Concrete Field Technician Certification 24 T echnicianl Caltrans TL'()111 Inspector Certified Inspector, Co. of Los Angeles Co. of Los Angeles, Special Inspector #01260 ICC Reinforced Concrete Inspector #1044572-88 City of Irvine Registered Special Inspector for As- phalUCoocretelPavement City of Irvine Registered Special Inspector for Structural Con- crete #1267 NICET Engineering Technician Certification Nucle... Gauge Operator Certification OSHA 4Q.Hour Hazardous Materials Certification lenn Miller Senior Field ACI Concrete Field Technician 21 T echnicianl Registered Asphalt Inspector/City of Irvine Inspector Registered Pile Driving InspectorlCity of Irvine Troxler Nuclear Density Gauge Operator Caltrans TL'()111 Certification City of Irvine Registered Special Inspector for AsphalUConcretelPavement City of Irvine Registered Special inspector for Structural Con- crete Co. of Los Angeles/Special Inspector #01262 iCCI Spectallnspector/Structural Steel and Welding #1033469- 85 ICC/Speciallnspectorl Reinforced Concrete #1033469-88 ICCI SpeclallnspectorlStructural Masonry Inspector #1 033469- 84 40-H0ur Hazardous Materials Certification urtYo ng g eg g P-13750 1(ln90& ,.,..oore 9 I I I I I I I I I I I I I I I I I I I 2008-381 Public Works On-Catt Geotechnical Investigations & Construction Materials Testing July 3, 2008 City of San Bernardino Proposal No. P-13750 MINORITY-OWNED BUSINESS ENTERPRISE (MBE) CERTIFICATIONS Ninyo & Moore is a Minority-Owned Business Enterprise (MBE). A list of agencies with which Ninyo & Moore is certified as a MBE is presented below: Agency I Certification Certification No. Expiration Date City of Los Angeles I Minority Business Enterprise CCA-964 April 3, 2013 County of Los Angeles 50198 July 11, 2009 CPUC WMBE Clearinghouse I Minority Business Enterprise 90CS0160 May 28, 2011 FEE SCHEDULE As requested in the RFP, we are providing the Price Form for Geotechnical Investigation and Construction Materials Testing Services in a separate sealed envelope. P-13750 If/nuo& ~OO\"8 16 I u r I UJI .LUU(J LU. '"+0 . 2008-381 NI"IYO & MOORE I I I lij::Jij'j/Ltb'j/q. :>;0 I 1 R,\:>;Sf[RABLE . MUSI Ii,WE A COlOllllACKGROUNO I ACCOliNT NUMBER 26358 I I DArt PAl)) 0212011008 O'\\IN'Bll,.FTRMOR. CO~PORArrON I BUSINE../i;S NM(o ATTENTION MAIUNO AODRE~S I I I I I I I I I I I . CITY OFSANiBElU\IARDINO R1!Sj1\'i$S 1tiJl}1~1'kArlOi'l ctRni<IcATE t1r\!;8,w:iM!is.-kqi'ltriiic.rt'-ceiiikilc'C!-~ riOt ~~-1J.it lcp:J ~ion I)flhb'bI,~, at this.1QtII1ion. 00.,. Dppmvnlll by arlltr (,Jty d~ri_lriMI,.NtIII!f Dc~ ~llt2ldltf't'lJil:reit 1liiJtMlnCllt( d:irNod ",itl>>ut V\:l'Ilic.'IllOlllh~ !hccrnilicu~ i.I" .';\Jbjl.'tllocr e:t~.tllril'~by'thl::ltdl~i)t'Citirotni:l. RS&e:ttM.., 11i1i BIlwIfldIII ()oi.Ifter iii ~~':ffirtimely n!neWlll Ntlt =ejYlllJ I ~ nQtke lbr any reIII(I" lioett ~ot r~lievt re-~h'ity~litnr!ly~. l(notpaicl:ri1litt~Oda)SofthC!o:pirdtirJJldatll'bown.ll.50%pona.lty"*illb:intpos:~d. BUSINESS CLASS: CONSULTANT (OUTSIDE) Noti;s'; BUSINESS tDCATION: 475 GOt>l;lARO STE 200 EXPIRATION DATE 113112009 AVRAM NINYO NTNYO & MOORB, INC 5710 RUFfiN RD SAN DIEGO CA 92123.1013 R~l,cfu:l G. CI~.tt'Jt CITY ClE~ 1( , PAGE 02 KEEP FOR YOUR RECO~OS ACCTNO. 26358 D^IC PAID :_"':',',':'~~~.\~02J20n008 575 ,-::,'S ,> :C:?~i\poo :',",.:., . ,\ ,,' f:;'~,t::::\~ ..'~ ...;. ,-,.;;/:.:;.!! ';:'., , :,..(--' BALANCE $0,00 CITY OF SAN BERNARDINI /fln90& /ftoo~e ., . 2008-381 ATTACI~u,l,{l 2 TO EXHIBIT B ~~(j;;.Idll~~1iLt:;~ZlJ1(ln9D&"'''''l'e'~~~~~=-'::b '. ',,' ;It', ,:"[~,,-.'.i I' ',.1 '-r~, 'k'I~J'YI'I,11 S:" 'ne' -s C;-'I"",;;r, "-,.', -. July 3, 2008 Proposal No. P-13750 Mr. Michael Grubbs, P.E. Principal Engineer City of San Bernardino 300 North "D" Street, 3rd Floor San Bernardino, California 92418 Subject: Fee Proposal for Professional Geotechnical Investigations and Construction Materials Testing Services City of San Bernardino Reference: Ninyo & Moore, 2008, Proposal for Professional Geotechnical Investigations and Construction Material Testing Services, City of San Bernardino, California, Proposal No. P-13750, dated July 3 Dear Mr. Grubbs: Ninyo & Moore is pleased to submit this cost proposal for provide professional geotechnical investigations and construction material testing services to the City of San Bernardino (City). In accordance with the City of Bernardino's Request for Proposal (RFP), we are submitting our cost proposal under separate cover. Our proposed scope of services, summary of qualifications and project organization are provided in the above-referenced proposal dated July 3, 2008. Our services for the scope of work described in our referenced proposal will be provided in accordance with the City of San Bernardino's Price Form, attached to this letter. Additional requested services that may be requested, but not included in the Price Form will be performed in accordance with our attached Schedule of Fees and Schedule of Fees for Laboratory Testing. Ninyo & Moore appreciates the opportunity to submit this proposal and we look forward to working with you. If you have any questions regarding our cost proposal or require additional information, please contact me at your convenience. Respectfully submitted, NINYO & MOORE ~J;;t>,;f4e:. Jalal Vakili, Ph.D., P.E. Principal Engineer KSY/JVlrad Attachments: Price Form, Geotechnical Investigations and Construction Materials Testing Services Schedule of Fees Schedule of Fees for Laboratory Testing Distribution: (1) Addressee I ! "tl~(! t'li,".',,;n Pille [;,'I',).' . :'_Jl.'(' Iii I . 1?,lll( tl') Cur>~'n'_A".J.l, (,J,I'l(lf,'"':ld 'J Ii 3IJ . r:'lir:l1l' ():N) i1),g[jr)6U ' F,-~,'( ,')(j')! 1';3 ~)')()6 S. in nit'! j!l . Ilvln,.: . Plnrhl) Ct}( ,j/'";'_II iil.i" J ()', /v)~It.:rL(. . OdJal:(j . LI', \,f,:,..}t, ~ Fr-rJUliX . r)t:..'nVf~r ' Ei r. I~Ci .. 2008-381 Public Works On-Call Geotechnical Investigations & Construction Materials Testing July 3, 2008 City of San Bernardino Proposal No, P-13750 SCHEDULE OF FEES HOURLY CHARGES FOR PERSONNEL Principal Engineer/Geologist/Environmental Scientist.......................,...,..................... ,......,..............,...,.'.....,...... $ 139 Senior Engineer/Geologist/Environmental Scientist.............................................,.,..,...,................,............,....,... $ 133 Senior Project Engineer/Geologist/Environmental Scientist.....................................,........."..,.........,..............',... $ 127 Project Engineer/Geologist/Environmental Scientist ..........................................................,..,.,............................ $ 123 Senior Staff Engineer/GeologistlEnvironmental Scientist..,....,....,..........................,..,...,..,........,.... ...................... $ 109 Staff Engineer/GeologisllEnvironmental Scientist..... ........... ............,.................., ............... ................................. $ 96 GIS Analyst. ........ ........ ......... ........ ..................................... ......................,..,............................................,.,............ $ 96 Field Operations Manager....................................................... ............................ ................................ .................. $ 87 Supervisory Technician.....................,..........,........................... .......................,............................................,...,.... $ 87 Nondestructive Examination Technician, UT, MT, lp.......................................................................................... $ 87 Pull Test Technician and Equipment' .....................................................................................,.........................,... $ 87 Senior FieldlLaboratory Technician'. ................... ..........,....... ........................... ....................... ....................,........ $ 73 FieldlLaboratory Technician' ..................... ........................ ......... ................. ...... ..... .................. ....................... ..... $ 73 ACI Concrete Technician...................................................................................................................................... $ 73 ConcretelAsphan Batch Plant Inspector .............................................................................................................., $ 73 Special Inspector, Reinforced Concrete.................................................................................'......................'...... $ 73 Special Inspector, Pre-stressed Concrete' .....................,..................................................................................... $ 73 Special Inspector, Reinforced Masonry................................................................................................................ $ 73 Special Inspector, Structural Steel........................................................................................................................ $ 73 Special Inspector, Welding, AWS......................................................................................................................... $ 73 Special Inspector. Fireproofing' ............................................................................................................................ $ 73 Technical Illustrator/CAD Operator ....................................................................................................................... $ 69 GeotechnicallEnvironmentallLaboratory Assistant.. ............ ..... ........ ........ ............ ........ ........ ......... ...... ..... ............ $ 53 Information Specialist ............... .......... ............................ ............................ ............... ........ ........ ............................ $ 52 Data Processing, Technical Edning, or Reproduction .......................................................................................... $ 44 OTHER CHARGES Expert Witness Testimony ....................................................................................,...................................... $ 400 /hr Concrete Coring Equipment (includes one technician) .............................................................................. $ 160 /hr Special Preparation of Standard Test Specimens....................................................................................... $ 64/hr Inclinometer Usage ...............................................................................................................................,..... $ 32/hr Vapor Emission K"1ls ..................................................................................................................................... $ 30/kit Rebar locator (Pachometer) ..................................................................................................................,.... $ 10/hr Nuclear Density Gauge Usage .................................................................................................................... $ 9/hr Field Vehicle Usage ..................................................................................................................................... $ 8/hr Direct Project Expenses .......................................................................................................................... Cost plus 15 % laborat testi , eo h sical e ui ment, and other s . al ui ment rovided u on re uest. NOTES (Field Services) For field and laboratory technicians and special inspectors. regular hourty rates are charged during normal weekday construction hours. Overtime rates at 1.5 times the regular rates will be charged for work performed outside normal con- struction hours and all day on Saturdays. Rates at twice the regular rates will be charged for all work in excess of 12 hours in one day or on Sundays and holidays. lead time for any requested service is 24 hours. Field Technician rates are based on a 2-hour minimum. Special inspection rates are based on a 4-hour minimum for the first 4 hours and an 8- hour minimum for hours exceeding 4 hours. Field personnel are charged portal to portal. 'Indicates rates that are based on Prevailing Wage Determination made by the State of California, Director of Industrial Relations on a semiannual basis. Our rates will be adjusted in conjunction with the increase in the Prevailing Wage De- termination during the life of the project. INVOICES Invoices will be submined monthly and are due upon receipt. A service charge of 1.0 percent per month may be charged on accounts not paid within 30 days. TERMS AND CONDITIONS The terms. and conditions of providing our consuning services include our limitation of liability and indemnities as pre- sented in Ninyo & Moore's Work Authorization and Agreement. c. iI1i!1!lfJ" //l\\;~Jr~ -. - , 2008-381 Public Works On-Call Geotechnical Investigations & Construction Materials Testing July 3, 2008 City of San Bernardino Proposal No, P-13750 SCHEDULE OF FEES FOR LABORATORY TESTING Laboratory Test, Test Designation, and Price Per Test Aaareaatea Mul!!!!l AllsoIptian, eoa...., C 127 """"",,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,.,,,,,,,,,.,,,,,,,,,,,$ Brick AbsorptIon, 24-hou' sullmerslon, C 67 "..,,,,,,"",,,"'''',,,,, $ 4S AbsorptIon, FIno, C 128....""""""""""'""",,,,,,,.,,.,,...,,,,,,,,,,,"',,,,..,,,,$ Brick AbsorptIon, 5-/1ou' boIIi1g. C 67""",,,,,,,,,,,,,,,,,,.,,,,,,,,.,,,,. $ 55 Clay Lumps and Friable Particles. C 142"."""""".""""",,,..,,,,,,,,,,,,,$ Brick AbsorptIon, 7-<1ay, C 67""""....,,,,,,,,,,.,,."',,,,,,,,,,,,,,,."',,,, $ 60 Cleanness Value, CT 227 """""""..",,,,,,,,.,,,,,,,,,,..,,,,,,,,,,,,,,,,,,,,,,,,,,,.$ Brick Compresslon Test, C 67 "'"""""".."'"".."',,,,,,,,,,,,,..,,,,,, $ 4S Crushed Partlcles, CT 205........""".."'..."....."""".."..."""..""".."..,,$ Brick EftIoI8Scence, C 67 ...."....,..".."..".."...""..,...."'""......".. $ 45 OuIaIlIiIy. Co....., CT 229....,,,........,,,,,,,,.....,....,,,,,,"'..,,,,,,,"',,,,,,,..,,.$ Brick ModtU 01 RI4>Iue. C 67 ........".""....""'""".."..",,"'..,,. $ 40 DurabIlIty, FIno, CT 229"""'...".""'"""......"......",,,,,"',..,,,,,,..,,.,,.,,,,,,$ Brick MoIsl1.n as received, C 67""......"""""'.."..".".."'".."",, $ 35 Los AngeIesAbrasloo, C 131 orC 535 "'.."...."'",,,,,,..,,..,,,,,..,,,,.,,....$ Brick SallnIlonCoe1liclent, C 67 ....."'".".".."..,,,,,,,...."',,,,,,... $ 50 Mortarmaldng propeI1ies oIfine aggregale, C 67 ''''...................,......$ Conaele Block Compression Test, 1lJ<6x16, C 140......".......... $ 60 OIganlc Impurities. C 40"'......"........"....".""".."""..".."""...."""..."'$ Conaete Block Conformance Package, C 9lL"..",,,,...,,,,,,,,,.. $ 440 Potential ReadMty 01 Aggregate (Chemical Method). C 269..."."",,$ Concrete Block linear Shrinkage. C 426"'.."".."..,,,,,,,........,,,, $ 120 Sand Equivalent. CT 217 ".."..."'...","'"""""..,,,.......,,,,,,"'..,,,,..........$ Concrete Block Unit Weight and AbsoIption. C 140..".....,....... $ 55 Sleva Analysis, Coarse Aggregale, C 136"...................,,,..,..,,,.......,..$ C""",, Compesslon or SI1ear Bond, CA Code."........""""..". $ 55 SIeve Analysis, Fine Aggregale Qncluding wash), C 136",,,.,,,,....,,"'$ Masorvy Grout. 3x3ldl prism compression, UBC 21-16"""..." $ 30 Sodium Sulfete Soundness (per size fraction). C 98""..."".."",..,..".$ Masonry Mollet, 2x4 cytInd"'COI11pnlSSIon, UBC 21-16"".."" $ 30 SpecillcGravity. eoa...., C 127....".."'""'".."""""'""."".""".,,,,..."'$ MaSOllfY Prism. haW size, compression, UBC 21-17".......""". $ 110 SpeciIIc Gravity. Fine. C 128.....,,,,,,,..,,,,,,,..,,,,,,....,,,,,,,..,,..,,,,....,,,,,,,.$ SpedeJ Pf1!P8rellon of standanllesl spedmens wi' be charged althe lechnlcien's hoo1y rela. N1nyo & Moore Is eccredRed 10 pertonn the MSHTO equlvalenl of many ASTM last procedures. Solis AUarberg Umils. D4316, CT 204",,,,,..,,...,,,,,,,,,,.,,......,,..,,,,.,,.. $ Callfomla Bearing Ratio (CBR), D 1863 .."""..""""."..,..".."" $ CNorida and Sulfale Contenl, CT 417 & CT 422,,,.....,,..,,,,,,,,. $ Consolidation. D 2435, CT 219 ".".......",..,,,,,,,,,,,,,,..,,..,,,,"...,,, $ ConsoIldatlon- Time Rala, D 2435. CT219.""..",,,,,......,,,,,,,, $ llIred SI1ear- Remolded, D 3060....."".""..""..."......",,,,,,,,.., $ Direct SI1ear- Undisturbed. D 3080..""""'",,,,,,,.,,....,,,,,,,,,,,,,, $ DIxabiIty Index, CT 229""....,"'..",,,,,....,,..,,,,,,,,,......,,..,,,,,,.,,,,. $ Expansion Index, D 4829. UBC 16-L..""..""..""""""......."" $ Expanslon PotenUaI (Method A), D 4546..""",,,,,..,,,,,,,.,,,,..,,,,. $ Expansive Pressure (Method C), D 4546 """....,,,..,,..,,.,,..,"',,, $ Geofebric Tensile and Elongation Tesl. D 4632.".."",..""",,,.. $ Hydreulc ConducIIvity, D 5064 "...""".."'".."""".......,,,...,,,,..,, $ Hydrometer AneIysIs, D422, CT 203 ."....".."...".."'"".."."",,. $ MoIsIure, Ash, & Organic Maller of PaatlOrganlc Sols"'....."" $ Moisture Only, D 2216, CT 226.."...."""".."".."..",..""....",,,,,, $ Moisture and Density, D 2937......"".."..........,....""....""....",.., $ PenneallIIIy, CH. D 2434, CT 220"."""",,,..,,,,,...,,.,,,,,,,,,,.,,,,,, $ pH end ResIsIMty, CT 643".."...."..""....".."..".""""'..".."",,.. $ Proctor DensIly D 1557, D 698. CT 216. &..""""..,,,,,,,..,,,,,..,,, $ AASHTO T-l60 (Rock cooeclIons add $60) R-veiue, D 2644. CT 301.."'......"".",.."''''""".."......""""..".... $ Sand Equlvalert, D 2419, CT 217 "."".."'''.."'''",....""."."..",, $ SIeve AnalysIs, D422, CT202 ..""......".."."""...."...".""'"",,. $ SIeve AnalysIs, 200 Wash, D 1140, CT 202""""......""."""',,. $ SpedtIc GravtIy, D 854.""",..,,,,,,,,,,,,,"',,,,,.....,,,,.."'..,,,,,,....,,,, $ Trieldel Sheer, C.P, D 4767. T 297 "."".."'"""""....".."""",.." $ Triaxial Sheer. C.U" wlpore press..... D 4767. T 2297 per pi. $ Triaxial Sheer, CU. wIo pore press...., D4767, T2297perpl.$ Triaxial Sheer. U.U., D 2650 ....""..,.."..".."""'""..,,,,,....,,,,,,,,,, $ Uncon1Ined Compression, D 2166. T 206 "."""'......"""....,..,,, $ Wax DensIly. D 1198,................."..""..".."..."......"".."""".."" $ .!!22!!!!lI Built-up Roofing. wt-oul samples. D 2829 ,,,,,,,,,..,,......,,,,.,,,,'" $ Roofing M_ Analysis. D 2629 ".""'..".."""".."..."""'",,,, $ Rooting TfIe Absorption, (set 015). UBC 15-5."'"..",,,,,,,"'.....,, $ RoollngTfle strength Test (set of 5), UBC 15-5.."....."'",,,,,.., $ co 145 440 135 275 70 290 250 150 165 145 145 165 300 190 110 30 39 230 140 160 250 90 110 90 90 390 330 190 140 100 90 Concrete Cemenl Analysis Chemical and Physical. C 109........,......,,,.,..,......,,.$ 1 .650 Compression Tests, 6x12 Cytind.... C 39 ....."....""".."""""".""""...$ 22 Conaete Mix Design RevIew, Job Spec"....",,,,,,,....,,,,..,,..,,,,,,,,,..,.. $ 140 Conaele Mix Design. per Trial Balch, 6 cyIlndar. ACL..""....,.."""..$ 750 Conaele Cores, Compression (excludes sampling). C 42 .."......,,"'.$ 55 DryIng Shrinkage. C 157 ."'......",..."""."..".....,,,..,,,,,"'..,,,,,,,,....,,$ 250 Flexural Test C 76 ""',,,,,,,.,,..,,,,,,..,,..,,,,,...."',,,,"'..,,,,,,,........,,,,,.,,..,,.$ 50 F1exurel Tesl, C 293 .."..""'"....".."".."...."'."......""""..""",,,,,....,,,,,,$ 55 Flexurel Test CT 523......""."""'...""',,,..,,.,,"',,,,,,,,,..,,....,,,,,,,,...,,,,.,,$ 60 GunilelShotcreta, Panels, 3 CIA cores per panel and lasl. ACI "'......$ 250 Jobslle TesUng LaboraIOlY """'.."."".......""........".."..""...."."""...." Quole lIghlweighl Conaele Fill. Compression, C 495............,................"...$ 40 PetnJgrep/1lcAnaIysls, C656.....,.................."..,..,,,.......,,...........,,......$l .100 SpIiIIilg TensIe SIrengIh. C 496......................".....................".....,....$ 80 Relnforclna and Structural Steel Fireproofing Density Tast, UBC 1-11"............,"',....................,.."'.......$ 55 Hardness Test, RockweI, A-370............................."......"........,........,$ 50 HIgh strength Bott. Nut & Washer Conformance, set. A-32....."..."...$ 120 Mechanicaly Spliced ReInfordng Tensile Test, ACI........".........."....$ 95 Pre-Stresa Slrand (Twinl), A 416 ..............................................."......$ 140 Chemical Analysis. A-:l6, M15..............................................".......... $ 120 ReInfordng Tensleorllend up to No. 11, A615 & A 706"........",...$ 50 SIrucllnI SIeeI Tensile Test Up to 200,000 Ibs. (1118CIlIn01g extra). A 370 ................."............".............,.........".......,,$ 70 Welded RelnforcIng Tensile Test: Up to No. 11 bars, ACI....."..""....$ 55 165 500 190 190 _am_It Concrete AspI1aII Mix DesIgn, Callrans "........................................,...................$ 2 .200 AsphaII MIx DesIgn Review, Job Spec...................,..........................$ 150 ExIracIIon, % Asphalt, including Gradation. 02172, CT 310.............$ 215 Film Stripping, CT 302..............................."......,....."..........................$ 100 Hveem Sleblllly and UnlI Weight CTM or ASTM, CT 366.................$ 195 Marshal S1ablllly, Flow and Unit Weight, T-245..........,......".."....."..,$ 215 Maxin.... TheoreIIcaI Unit WeIght, D 2041........................................$ 120 SweI, CT 305 ..........,..,.........................,.................,......"."..........".....$ 165 Unit Weigh! sample or core, D 2726, CT 306...,........,.................""..,$ 90 35 35 100 120 140 130 130 160 275 55 390 90 105 105 160 75 65 ?/!IJ!li}., }~I\;C\"'! .... -, '. i . 2008-381 SCHEDULE OF PRICES ON-CALL GEOTECHNICAL INVESTIGATIONS AND CONSTRUCTION MATERIAL TESTING SERVICES July 7,2008 .. (To be submitted in a sealed envelope separate from proposal documents) The undersigned Proposer, if offered, hereby certifies that it will execute the attached Agreement for Services and accept an annual purchase order effective on the date the Agreement is approved by the Mayor and Common Council and running through June 30, 2009 for Geotechnical Investigations and Construction Material Testing Services for Capital Improvement Projects on an as-needed basis with no guaranteed usage. The undersigned Proposer understands that, if exercised by lhe City, an optional one- year extension, as provided in the agreement, shall be effective on or about July 1, 2009 and running through June 30, 2010, and that actual option year pricing shall be negotiated with the Proposer prior to exercising of any given option year; however, the option year extension shall not become effective until issuance by the City of a duly authorized Purchase Order. Please provide detailed Firm Fixed Prices in the spaces provided on Sheet 2 of this Schedule of Prices. Indicate any other incidental or additional Prices required for complying with the Technical Specification requirements in the space provided below. Are there any other additional or incidental prices, which will be required by your firm in order to meet the requirements of the Technical Specifications? l'b (Yes or No). If you answered "Yes", please provide details of said additional prices: This offer shall remain firm for 90 days from RFP closing date. Terms and conditions as set forth in this RFP apply to this submittal. Page 1 of 3 ~. _. 2008-381 Schedule of Prices for On-Call Geotechnical Investigations and Construction Material Testing 07-07 -08 Estimated Annual Unit Description Unit Price Total Price Quantity 1,000 ea Compaction Testing (1 - 4 per site $ 260 $ 260,000 visit) including curves. 1,000 ea Compaction Testing (5 - 20 per site visit) $ 60 $ 60,000 including curves. 200 ea Compaction Testing (20+ per site visit) $ 30 $ 6,000 including curves. 20 set Concrete Cylinders (includes $ 200 $ 4,000 collection, tests and report) 20 ea Asphalt Extractions $ 105 $ 2,100 40 ea Asphalt Compaction $ 75 $ 3,000 40 ea Soil Gradation/Screen Analysis $ 110 $ 4,400 500 hr Grading Observation $ 81 $ 40,500 200 hr Engineering Geological Investigation & $ 133 $ 26,600 Consulting 40 ea Soil Boring to 15' $ 1,600 $ 64,000 40 ea Pavement Bore (Asphalt) $ 105 $ 4,200 40 ea Concrete Core $ 105 $ 4,200 TOTAL ESTIMATED ANNUAL COST $ 479,000 Page 2 of 3 -. , "r f , ,-~ 2008-381 . . SCHEDULE OF PRICES (Continued) ON-CALL GEOTECHNICAL INVESTIGATIONS AND CONSTRUCTION MATERIAL TESTING SERVICES In signing this offer, Proposer warrants that all certifications and documents requested herein are attached and properly completed and signed. Authorized Signature: Print Signer's Name and Title: ~~~~L: Jalal vakili Principal Engineer Date Signed: Company Name & Address: July 3, 2008 11650 Mission Park Drive Suite 101 Rancoo CUcanonga, CA 91730 Phone: 909/758-5960 Fax: 909/758-5966 Page 3 of 3 2008-381 EXHIBIT C AGREEMENT FOR SERVICES FOR ON-CALL GEOTECHNICAL INVESTIGATIONS AND CONSTRUCTION MATERIAL TESTING THIS AGREEMENT is made and entered into this ,;..,., day of I1rroh.,T 2008 ("Effective Date"), by and between the CITY OF SAN BERNARDINO, a charter city ("City"), and CONVERSE CONSULTANTS ("Consultant"). WITNESSETH: A. WHEREAS, City proposes to have Consultant perform the On-Call Geotechnical Investigations and Construction Material Testing described herein below; and B. WHEREAS, Consultant represents that it has that degree of specialized expertise contemplated within California Government Code, Section 37103, and holds all necessary licenses to practice and perform the services herein contemplated; and C. WHEREAS, City and Consultant desire to contract for specific services in connection with the project described below (the "Project") and desire to set forth their rights, duties and liabilities in connection with the services to be performed; and D. WHEREAS, no official or employee of City has a financial interest, within the provisions of California Government Code, Sections 1090-1092, in the subject matter ofthis Agreement. NOW, THEREFORE, for and in consideration of the mutual covenants and conditions contained herein, the parties hereby agree as follows: 1.0. SERVICES PROVIDED BY CONSULTANT 1.1. Scope of Services. Contractor shall furnish On-Call Geotechnical Investigations and Construction Material Testing to City in accordance with Attachment 1 "Scope of Services" and the Contractor's proposal dated July 7, 2008, attached and incorporated herein. 1.2. Professional Practices. All professional services to be provided by Consultant pursuant to this Agreement shall be provided by personnel experienced in their respective fields and in a manner consistent with the standards of care, diligence and skill ordinarily exercised by professional consultants in similar fields and circumstances in accordance with sound professional practices. Consultant also warrants that it is familiar with all laws that may affect its performance of this Agreement and shall advise City of any changes in any laws that may affect Consultant's performance of this Agreement. 1.3. Warrantv. Consultant warrants that it shall perform the services required by this Agreement in compliance with all applicable Federal and California employment laws including, but not limited to, those laws related to minimum hours and wages; occupational health and safety; fair employment and employment practices; workers' compensation \ \Sierra\DS\_Public Works\RFCA's\2008 All\10-06-08\Agreement for Geotech Investigations & Construction Material Testing\ Converse Consultants\ Converse Agreement Geotech and Canstr Material Testing 10-06-08.doc 1 2008-381 EXHIBIT C insurance and safety in employment; and all other Federal, State and local laws and ordinances applicable to the services required under this Agreement. Consultant shall indemnify and hold harmless City from and against all claims, demands, payments, suits, actions, proceedings, and judgments of every nature and description including attorneys' fees and costs, presented, brought, or recovered against City for, or on account of any liability under any of the above-mentioned laws, which may be incurred by reason of Consultant's performance under this Agreement. 1.4. Non-discrimination. In performing this Agreement, Consultant shall not engage in, nor permit its agents to engage in, discrimination in employment of persons because of their race, religion, color, national origin, ancestry, age, physical handicap, medical condition, marital status, sexual gender or sexual orientation, or any other category protected by law, except as permitted pursuant to Section 12940 of the Government Code. Violation of this provision may result in the imposition of penalties referred to in Labor Code, Section 1735. 1.5 Non-Exclusive Agreement. Consultant acknowledges that City may enter into agreements with other consultants for services similar to the services that are subject to this Agreement or may have its own employees perform services similar to those services contemplated by this Agreement. 1.6. Delegation and Assignment. This is a personal service contract, and the duties set forth herein shall not be delegated or assigned to any person or entity without the prior written consent of City. 1.7. Business License: The Consultant shall obtain and maintain a valid City Business Registration Certificate during the term of this Agreement. 1.8. Duty of Lovalty/Conflict of Interest: The Consultant understands and agrees that Consultant shall maintain a fiduciary duty and a duty of loyalty to the City in performing Consultant's obligations under this Agreement. Consultant, in performing its obligations under this Agreement, is governed by California's conflict of interest laws, Government Code Section 87100 et seq., and Title 2, California Code of Regulations Section 18700 et seq. 1.8.1 Prior to performing any services to City under this Agreement, Consultant shall provide the Development Services Department a written list of the Assessor Parcel Numbers and general location or address of any and all real property located in the City of San Bernardino in which Consultant has any ownership interest, or which is the location of any pending project that is a source of income for Consultant. Consultant shall keep this list current on a monthly basis during the entire term of this Agreement. 1.8.2 Consultant shall not work on any task that is related to any real property that is located within 500 feet of any parcel in which Consultant has any ownership interest or which is the location of any pending project that is a source of income for Consultant. 2.0. . COMPENSATION AND BILLING \ \Sierra\DS\_Public Works\RFCA's\2008 All\10-06~08\Agreement for Geotech Investigations & Construction Material Testing\ Converse Consultants\ Converse Agreement Geotech and COn5tr Material Testing 10-06-08.doc 2 2008-381 EXHIBIT C 2.1. Compensation. Over the term of this Agreement, Contractor shall be paid for such on-call services in accordance with Attachment 2 "Schedule of Prices dated July 7, 2008", attached and incorporated herein, subject to an aggregate limit of $300,000 in payment for work performed by all consultants performing On-Call Geotechnical Investigations and Construction Material Testing. City shall distribute work among its consultants in a manner that best meets the needs of the City. City makes no guarantee to Consultant regarding the amount and/or the dollar value of the work assigned to Consultant. 2.2. Additional Services. Consultant shall not receive compensation for any services provided outside the scope of services specified in the Response unless the City or its Managing Engineer for this Project, prior to Consultant performing the additional services, approves such additional services in writing. It is specifically understood that oral requests and/or approvals of such additional services or additional compensation shall be barred and are unenforceable. 2.3. Method of Billing. Consultant may submit invoices to City's Managing Engineer for approval on a progress basis, but no more often than monthly. Said invoice shall be based on the total of all Consultant's services which have been completed to City's sole satisfaction. City shall pay Consultant's invoice within forty-five (45) days from the date City receives said invoice. Each invoice shall describe in detail, the services performed and the associated time for completion. Any additional services approved and performed pursuant to this Agreement shall be designated as "Additional Services" and shall identify the number of the authorized change order, where applicable, on all invoices. 2.4. Records and Audits. Records of Consultant's services relating to this Agreement shall be maintained in accordance with generally recognized accounting principles and shall be made available to City or its Managing Engineer for inspection and/or audit at mutually convenient times for a period of three (3) years from the Effective Date. 3.0. TIME OF PERFORMANCE 3.1. Commencement and Completion of Work. The obligation to perform the professional services to be performed pursuant to this Agreement ~hall commence within five (5) days from the Effective Date of this Agreement. Said services shall be performed in strict compliance with the Project Schedule issued by the Managing Engineer. Failure to commence work in a timely manner and/or diligently pursue work to completion may be grounds for termination of this Agreement. 3.2. Excusable Delavs. Neither party shall be responsible for delays or lack of performance resulting from acts beyond the reasonable control of the party or parties. Such acts shall include, but not be limited to, acts of God, fire, strikes, material shortages, compliance with laws or regulations, riots, acts of war, or any other conditions beyond the reasonable control of a party. \ \Sierra\DS\_Public Works\RFCA's\2008 All\ ID-06-08\Agreement for Geotech Investigations & Construction Material Testing\ Converse Consultants\ Converse Agreement Geotech and Constr Material Testing 10-06-08.doc 3 i 2008-381 EXHIBIT C 4.0. TERM AND TERMINATION 4.1. Term. This Agreement shall commence on the Effective Date and continue through June 30, 2009, unless previously terminated as provided herein or as otherwise agreed to in writing by the parties. An administrative extension of one additional year may be authorized, subject to the prior written agreement of both parties. 4.2. Notice of Termination. The City reserves and has the right and privilege of canceling, suspending or abandoning the execution of all or any part of the work contemplated by this Agreement, with or without cause, at any time, by providing written notice to Consultant. The termination of this Agreement shall be deemed effective upon receipt of the notice of termination. In the event of such termination, Consultant shall immediately stop rendering services under this Agreement unless directed otherwise by the City. 4.3. Compensation. In the event of termination, City shall pay Consultant for reasonable costs incurred and professional services satisfactorily performed up to and including the date of City's written notice of termination. Compensation for work in progress shall be prorated as to the percentage of work completed as of the effective date of termination in accordance with the fees set forth herein. In ascertaining the professional services actually rendered hereunder up to the effective date of termination of this Agreement, consideration shall be given to both completed work and work in progress, to complete and incomplete drawings, and to other documents pertaining to the services contemplated herein whether delivered to the City or in the possession ofthe Consultant. 4.4 Documents. In the event of termination of this Agreement, all documents prepared by Consultant in its performance of this Agreement including, but not limited to, finished or unfinished design, development and construction documents, data, studies, drawings, maps and reports, shall be delivered to the City within ten (10) days of delivery of termination notice to Consultant, at no cost to City. Any use of uncompleted documents without specific written authorization from Consultant shall be at City's sole risk and without liability or legal expense to Consultant. 5.0. INSURANCE 5.1. Minimum Scope and Limits of Insurance. Consultant shall obtain and maintain during the life of this Agreement all of the following insurance coverages: (a) Comprehensive general liability, including premises-operations, productslcompleted operations, broad form property damage, blanket contractual liability, independent contractors, personal injury with a policy limit of not less than One Million Dollars ($1,000,000.00), combined single limits, per occurrence and aggregate. (b) Automobile liability for owned vehicles, hired, and non-owned vehicles, with a policy limit of not less than One Million Dollars ($1,000,000.00), combined single limits, per occurrence and \ \Sierra\DS\_Public Works\RFCNs\2008 All\10-06-08\Agreement for Geotech Investigations & Construction Material Testing\ Converse Consultants\ Converse Agreement Geotech and Canstr Material Testing 10-06-08.ctoc 4 2008-381 EXHIBIT C aggregate. (c) Workers' compensation insurance as required by the State of California. (d) Professional errors and omissions ("E&O") liability insurance with policy limits of not less than One Million Dollars ($1,000,000.00), combined single limits, per occurrence and aggregate. Consultant shall obtain and maintain, said E&O liability insurance during the life of this Agreement and for three years after completion of the work hereunder. 5.2. Endorsements. The comprehensive general liability insurance policy shall contain or be endorsed to contain the following provisions: (a) Additional insureds: "The City of San Bernardino and its elected and appointed boards, officers, agents, and employees are additional insureds with respect to this contract with City." (b) Notice: "Said policy shall not terminate, nor shall it be cancelled, nor the coverage reduced, until thirty (30) days after written notice is given to City." (c) Other insurance: "Any other insurance maintained by the City of San Bernardino shall be excess and not contributing with the insurance provided by this policy." 5.3. Certificates of Insurance. Consultant shall provide to City certificates of insurance showing the insurance coverages and required endorsements described above, in a form and content approved by City, prior to performing any services under this Agreement. 5.4. Non-limiting. Nothing in this Section shall be construed as limiting in any way, the indemnification provision contained in this Agreement, or the extent to which Consultant may be held responsible for payments of damages to persons or property. 6.0. GENERAL PROVISIONS 6.1. Entire Agreement. This Agreement constitutes the entire Agreement between the parties with respect to any matter referenced herein and supersedes any and all other prior writings and oral negotiations. This Agreement may be modified only in writing, and signed by the parties in interest at the time of such modification. The terms of this Agreement shall prevail over any inconsistent provision in any other contract document appurtenant hereto, including exhibits to this Agreement. 6.2. Representatives. The Director of Development Services or her designee shall be the representative of City for purposes of this Agreement and may issue all consents, approvals, directives and agreements on behalf of the City, called for by this Agreement, \ \Sierra\DS\_Public Works\RFCA's\2008 A1l\10-06-08\Agreement for Geotech Investigations & Construction Material Testing\ Converse Consultants\ Converse Agreement Geotech and Constr Material Testing 10-06-08.doc 5 2008-381 EXHIBIT C except as otherwise expressly provided in this Agreement. Consultant shall designate a representative for purposes of this Agreement who shall be authorized to issue all consents, approvals, directives and agreements on behalf of Consultant called for by this Agreement, except as otherwise expressly provided in this Agreement. 6.3. Proiect Managers. City shall designate a Managing Engineer to work directly with Consultant in the performance of this Agreement. Consultant shall designate a Contract Inspector(s) who shall represent it and be its agent in all consultations with City during the term of this Agreement. Consultant or its Contract Inspector(s) shall attend and assist in all coordination meetings called by City. 6.4. Notices. Any notices, documents, correspondence or other communications concerning this Agreement or the work hereunder may be provided by personal delivery, facsimile or mail and shall be addressed as set forth below. Such communication shall be deemed served or delivered: a) at the time of delivery if such communication is sent by personal delivery; b) at the time of transmission if such communication is sent by facsimile; and c) 48 hours after deposit in the U.S. Mail as reflected by the official U.S. postmark if such communication is sent through regular United States mail. IF TO CONSULTANT: Mr. Hashmi S. E. Quazi, Sr. Vice President, Managing Officer Converse Consultants 10391 Corporate Drive Redlands, CA 92374 Fax: 909-796-7675 Tel: 909-796-0544 IF TO CITY: Valerie C. Ross Director of Development Services 300 North "D" Street San Bernardino, Ca 92418 Fax: 909-384-5080 Tel: 909-384-5357 6.5. Attornevs' Fees. In the event that litigation is brought by any party in connection with this Agreement, the prevailing party shall be entitled to recover from the opposing party all costs and expenses, including reasonable attorneys' fees, incurred by the prevailing party in the exercise of any of its rights or remedies hereunder or the enforcement of any of the terms, conditions, or provisions hereof. The costs, salary and expenses of the City Attorney and members of his office in connection with that litigation shall be considered as "attorneys' fees" for the purposes of this Agreement. 6.6. Governing Law. This Agreement shall be governed by and construed under the laws of the State of California without giving effect to that body of laws pertaining to conflict of laws. In the event of any legal action to enforce or interpret this Agreement, the parties hereto agree that the sole and exclusive venue shall be a court of competent jurisdiction located in San Bernardino County, California. 6.7. Assignment. Consultant shall not voluntarily or by operation of law assign, transfer, sublet or encumber all or any part of Consultant's interest in this Agreement without \ \Sierra\DS\_PubIic Works\RFCA's\2008 All\10-06-08\Agreement for Geotech Investigations & Construction Material Testing\ Converse Consultants\ Converse Agreement Geotech and Constr Material Testing lO-06.08.doc 6 2008-381 EXHIBIT C City's prior written consent. Any attempted assignment, transfer, subletting or encumbrance shall be void and shall constitute a breach of this Agreement and cause for termination of this Agreement. Regardless of City's consent, no subletting or assignment shall release Consultant of Consultant's obligation to perform all other obligations to be performed by Consultant hereunder for the term of this Agreement. 6.8 Indemnification and Hold Harmless. Consultant shall protect, defend, indemnify and hold harmless City and its elected and appointed officials, officers, and employees from any and all claims, causes of action, liabilities, expenses, including attorney fees, damage to property or injuries to or death of any person or persons or damages of any nature including, but not by way of limitation, all civil claims or workers' compensation claims, arising out of or in any way connected with the intentional or negligent acts, errors or omissions of Consultant, its employees, agents or subcontractors in the performance of this Agreement. 6.9. Independent Contractor. Consultant is and shall be acting at all times as an independent contractor and not as an employee of City. Consultant shall secure, at its expense, and be responsible for any and all payment of Income Tax, Social Security, State Disability Insurance Compensation, Unemployment Compensation, and other payroll deductions for Consultant and its officers, agents, and employees, and all business licenses, if any are required, in connection with the services to be performed hereunder. 6.10 Ownership of Documents. All findings, reports, documents, information and data including, but not limited to, computer tapes or discs, files and tapes furnished or prepared by Consultant or any of its subcontractors in the course of performance of this Agreement, shall be and remain the sole property of City. Consultant agrees that any such documents or information shall not be made available to any individual or organization without the prior consent of City. Any use by the City of such documents for other projects not contemplated by this Agreement, and any use of incomplete documents, shall be at the sole risk of City and without liability or legal exposure to Consultant. City shall indemnify and hold harmless Consultant from all claims, damages, losses, and expenses, including attorneys' fees, arising out of or resulting from City's use of such documents for other projects not contemplated by this Agreement or use of incomplete documents furnished by Consultant. Consultant shall deliver to City any findings, reports, documents, information, data, in any form, including but not limited to, computer tapes, discs, files, audio tapes or any other Project related items as requested by City or its authorized representative, at no additional cost to the City. 6.11 Public Records Act Disclosure. Consultant has been advised and is aware that all reports, documents, information and data including, but not limited to, computer tapes, discs or files furnished or prepared by Consultant, or any of its subcontractors, and provided to City may be subject to public disclosure as required by the California Public Records Act (California Government Code Section 6250 et. seq.). Exceptions to public disclosure may be those documents or information that qualify as trade secrets, as that term is defined in the California Government Code Section 6254.7, and of which Consultant informs City of such trade secret. The City will endeavor to maintain as confidential all information obtained by it"that is. designated as a trade secret. The City shall not, in any way, be liable or responsible for \ \Sierra\DS\_Public Works\RFCA's\2008 AI1\lO-06-08\Agreement for Geotech Investigations & Construction Material Testing\ Converse Consultants\ Converse Agreement Geotech and Constr Material Testing 10-06-08.doc 7 2008-381 EXHIBIT C the disclosure of any trade secret including, without limitation, those records so marked if disclosure is deemed to be required by law or by order of the Court. 6.12. Responsibilitv for Errors. Consultant shall be responsible for its work and results under this Agreement. Consultant, when requested, shall furnish clarification and/or explanation as may be required by the City's representative, regarding any services rendered under this Agreement at no additional cost to City. In the event that an error or omission attributable to Consultant occurs, then Consultant shall, at no cost to City, provide all necessary design drawings, estimates and other Consultant professional services necessary to rectify and correct the matter to the sole satisfaction of City and to participate in any meeting required with regard to the correction. 6.13. Prohibited Emplovment. Consultant will not employ any regular employee of City while this Agreement is in effect. 6.14. Order of Precedence. In the event of an inconsistency or conflict in this Agreement and any of the attached Exhibits or Attachments, the terms set forth in this Agreement shall prevail. 6.15. Costs. Each party shall bear its own costs and fees incurred in the preparation and negotiation of this Agreement and in the performance of its obligations hereunder except as expressly provided herein. 6.16. No Third Partv Beneficiarv Rights. This Agreement is entered into for the sole benefit of City and Consultant and no other parties are intended to be direct or incidental beneficiaries of this Agreement and no third party shall have any right in, under or to this Agreement. 6.17. Headings. Paragraphs and subparagraph headings contained in this Agreement are included solely for convenience and are not intended to modify, explain or to be a full or accurate description of the content thereof and shall not in any way affect the meaning or interpretation of this Agreement. 6.18. Construction. The parties have participated jointly in the negotiation and drafting of this Agreement. In the event an ambiguity or question of intent or interpretation arises with respect to this Agreement, this Agreement shall be construed as if drafted jointly by the parties and in accordance with its fair meaning. There shall be no presumption or burden of proof favoring or disfavoring any party by virtue of the authorship of any of the provisions of this Agreement. 6.19 Amendments. Only a writing executed by the parties hereto or their respective successors and assigns may amend this Agreement. 6.20. Waiver. The delay or failure of either party at any time to require performance or compliance by the other of any of its obligations or agreements shall in no way be deemed a waiver of those rights to require such performance or compliance. No waiver of any provision of this Agreement shall be effective unless in writing and signed by a \ \Sierra\DS\_Public Works\RFCA's\2008 A11\10-06-08\Agreement for Geotech Investigations & Construction Material Testing\ Converse Consultants\ Converse Agreement Geotech and Canstr Material Testing 10..Q6-08.doc 8 2008-381 EXHIBIT C duly authorized representative of the party against whom enforcement of a waiver is sought. The waiver of any right or remedy with respect to any occurrence or event shall not be deemed a waiver of any right or remedy with respect to any other occurrence or event, nor shall any waiver constitute a continuing waiver. 6.21. Severabilitv. If any provision of this Agreement is determined by a court of competent jurisdiction to be unenforceable in any circumstance, such determination shall not affect the validity or enforceability of the remaining terms and provisions hereof or of the offending provision in any other circumstance. 6.22. Counterparts. This Agreement may be executed in one or more counterparts, each of which shall be deemed an original. All counterparts shall be construed together and shall constitute one agreement. 6.23. Corporate Authoritv. The persons executing this Agreement on behalf of the parties hereto warrant that they are duly authorized to execute this Agreement on behalf of said parties and that by doing so, the parties hereto are formally bound to the provisions of this Agreement. 6.24 Damages. The Parties agree to waive any rights to incidental or consequential and punitive damages arising out of performance under this Agreement whether in torts or contracts and in law or in equity. III III \ \Sierra\DS\_Public Works\RFCA's\2008 A11\lO-06-08\Agreement for Geotech Investigations & Construction Material Testing\ Converse Consultants\ Converse Agreement Geotech and Constr Material Testing 10-o6-08.doc 9 .. 2008-381 EXHIBIT C AGREEMENT FOR SERVICES FOR ON-CALL GEOTECHNICAL INVESTIGATIONS AND CONSTRUCTION MATERIAL TESTING IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed by and through their respective authorized officers, as of the date first above written. CITY OF SAN BERNARDINO, A Municipal Corporation CONSULTANT CONVERSE CONSULTANTS (t]A /' Lon Sassoon, Acting City Manager By _.... _::...- Signature tlashm', Qoaz.; rprit1ci~EYB;neer jCri!:> Name and Title ) ~ Approved as to form: James F. Penman, City Attorney /~ \ \Sierra\DS\_Public Works\RFCA's\2008 All\10-06-08\Agreement for Geotech Investigations & Construction Material Testing\ Converse Consultants\ Converse Agreement Geotech and Constr Material Testing lQ..06-08.doc 10 If I I I I I I I I I I I I I I I I I I 2008-381 ATTACHMENT 1 TO EXHIBIT C PROPOSAL TO PROVIDE PROFESSIONAL SERVICES FOR ON-CALL GEOTECHNICAL INVESTIGATION AND CONSTRUCTION MATERIAL TESTING TO THE PUBLIC WORKS DIVISION OF THE DEVELOPMENT SERVICES DEPARTMENT City of San Bernardino, California July 7, 2008 Converse Project No. 08-81-238-00 I I I I I I I I B I I I I I I I I I I 2008-381 (t) Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services July 7,2008 Michael W. Grubbs, P.E. City of San Bernardino 300 North "0" Street, 3"' floor San Bernardino, CA 92418 SUbject: PROPOSAL TO PROVIDE PROFESSIONAL SERVICES FOR ON-CALL GEOTECHNICAL INVESTIGATION AND CONSTRUCTION MATERIAL TESTING TO THE PUBLIC WORKS DIVISION OF THE DEVELOPMENT SERVICES DEPARTMENT City of San Bernardino, California Converse Project No. 08-81-238-00 Dear Mr. Grubbs: Enclosed is our proposal to provide Professional Services for On-Call Geotechnical Investigation and Construction Material Testing to the Public Works Division of the Development Services Department of the City of San Bernardino. This proposal is submitted in response to your "Request for Proposal," dated June 4, 2008. Converse has provided similar services to the city of San Bernardino under a prior contract. We are familiar with your needs and procedures. Also, we have existing contracts with other cities to render similar services. With knowledgeable staff and adequate resources, we are able to meet the needs of all our clients. Converse Consultants (Converse) has the resources and experience to provide the City of San Bernardino with quality services in a cost effective and timely manner. We have extensive experience providing geotechnical, geologic, as well as soils and materials testing and inspection services. We are very familiar with the geotechnical and geologic conditions and constraints that will face your projects. All field personnel are certified by Caltrans. Dr. Hashmi Quazi will manage all Converse services for the City. He is a registered civil and geotechnical engineer with over 21 years of experience in SoutHern California. Dr. Quazi has been the project manager on various Public Works projects. He will also be the single pOint of contact for our services to you and will be available 24/7. He will ensure that all deliverables are submitted on schedule and within budget. All projects for the City will be serviced out of our Redlands office. Though our office is not within the city boundary, we are at the edge of the city of San Bernardino and Lorna Linda boundaries. Our proximity to your projects enables us to respond with short notice. We will be able to respond within 30 minutes or less. Our unit rates will include travel time, test method and procedures, equipment, written report and copies, and clerical support. 0'''''-" .'IR.c.,c.". " p"..,,, 10391 Corporate Drive, Redlands, California 92374 Telephone: (909) 796-0544 . Facsimile: (909) 796-7675 . e-mail: redlands@converseconsultants.com > I I I I I I I I I I I I I I I I I I I 2008-381 Proposal to Provide Professional Services for On-Call Geotechnical Investigation and Construction Material Testing City of San Bernardino, California July 7, 2008 Page 2 Our observation and testing services will be available 24 hours a day. We understand field non- professional personnel will be paid no less than the state mandated prevailing wage. Our laboratory is certified by Caltrans. In compliance with the RFP, we have addressed the following items in our proposal: 1. We have provided proof of certification through Caltrans to perform soils, concrete and asphalt testing in Appendix A - Resumes and Certifications 2. We have provided samples of our past experience on public works projects in section 2.0. Project Experience 3. We have provided our proposed staff in section 5.0. Project Team 4. We have provided resumes and certifications for our proposed staff in Appendix A- Resumes and Certifications 5. We will utilize our lab in Redlands for all project needs; if additional resources are required, we will utilize our lab in Monrovia 6. The rates for the services requested in the RFP are included in the completed and signed Schedule of Prices provided by the City; this has been provided in a separate sealed envelope, as requested by the City Contact information: CONVERSE CONSULTANTS Hashmi S. Quazi, Ph.D, P.E, G.E. PrincipallProject Manager 10391 Corporate Drive Redlands, CA 92374 Phone: (909) 796-05441 Cell: (909) 264-3286 Fax: (909) 796-7675 E-mail: hauazi@converseconsultants.com The extensive experience of our team members will provide the City with projects-focused results. If you have any questions or would like to discuss our submittal in greater detail, please contact the undersigned at (909) 796-0544. We appreciate the opportunity to submit our proposal and look forward to continuing our relationship with the City of San Bernardino. CONVERSE CONSULT ~. Hashmi S.E. Quazi, Ph.D., G.E. Principal Engineer/Project Manager Dis!: 6/Addressee (1 Original and 5 copies) HSQ/apd ~ Converse Consultants \\Cc-redlandsloffice\JOBFILE\2008\81\238\08238 jJfO.doc If I I I I I I I I I I I I I I I I I I 2008-381 Proposal to Provide Professional Services for On-Call Geotechnical Investigation and Construction Material Testing City of San Bernardino, California July 7, 2008 Page 3 1.0 CONVERSE CONSULTANTS Converse Consultants was founded in 1946 by Professor Frederick J. Converse in Pasadena, Califomia, to provide the construction industry with geotechnical engineering and geological services. As a pioneer in modem soil mechanics, Professor Converse developed many innovative techniques and products to deal with varied and complex foundation engineering issues. Converse Consultants (Converse) has provided professional consulting services on projects which have included tunnels, roadways, wastewater treatment plants, water reservoir and dams, public facilities, educational institutions, and residential, commercial, and industrial developments. Our mission is to work together to provide responsive and quality services to our clients, with the objective of developing long-term client relationships. Freel Conver.. '89:2 - J987 We have annual agreements with various cities and other public agencies throughout southem California. We can provide all the services that will be required by the City of San Bernardino under this contract. Tvpes of Services Our services include various disciplines of geotechnical engineering, geology, earthquake studies, groundwater resources, materials testing and inspection, and environmental sciences and engineering. Our access to a large pool of qualified staff will allow us to provide services to the City in a timely fashion without compromising our high standard of service. In general, we provide services in the areas listed below: Geotechnical Foundation Engineering · Analysis of Soil and Rock Properties · Shallow and Deep Foundation for Various Types of Structures · Geotechnical Recommendations for Grading, Retaining Walls, Pavement and Slabs-on- grade · Evaluation of Settlement, Stability or Liquefaction Potential · Vibration Damping, Isolation and Monitoring · Underground Structure Investigations · Geotechnicallnstrumentation ~ Converse Consultants \\Cc-redlandslofficeIJOBFILEI2008\811238\08238 yro.doc ~. I I I I I I I . I I I I I J j I I J 2008-381 Proposal to Provide Professional Services for On-Call Geotechnical Investigation and Construction Material Testing City of San Bernardino, Calffornia July 7, 2008 Page 4 Earthquake Engineering · Development of Ground Motion Criteria · Ground Motion Time Histories and Response Spectra · Slope Stability Analysis due to Earthquake Loading · Evaluation of Secondary Effects of Earthquakes, such as Liquefaction, Sand Boils, Lateral Spreading, Seiches and Tsunamis · Settlement Associated with Earthquake Loading . Mitigation of Seismic Hazards Engineering Geology and Geophysics · Geologic Mapping · Rock Mass Stability Evaluation · Fault Risk Studies · Seismic Refraction Surveys · Slope Stability and Landslide Analysis Groundwater Resources . Adverse Impact Evaluation · Aquifer Testing and Characterization · Fracture Trace Analysis · Hydrogeologic Studies · Nitrate Dilution Modeling · Water Allocation Permit . Water Supply Development . Well Design · Wellhead Protection ~ I Special Expertise . Fault Study · Seismic Evaluations · Groundwater Study · Landslide Evaluation and Mitigation · Environmental Assessment . Slope Stability · Seepage analysis ~ Converse Consultants I\Cc-redlandslofficeIJOBFILEI2008\811238\08238 _pro.doc I I I I I I I I ~ I I I I I I I I I I 2008-381 Proposal to Provide Professional Services for On-Call Geotechnicai Investigation and Construction Material Testing City of San Bernardino, Cal~omia July 7, 2008 Page 5 Special Inspection . Observation of Welding in the Field & Shop · Observation During Erection of Structural Members · Bolts & Struts Field Installation & Pull Test · Non-Destructing Testing Using Dye Penetration, Ultrasonic & Magnetic Particle · Observation During Fireproofing Placement · Asphalt Batch Plant Inspection · Observation & Testing During Asphalt Concrete Placement · Reinforcing Steel · Observe Placement of Reinforcing Steel . Verify Mill Certification Laboratory Testing We have three full service laboratories equipped to perform all the testing that will be required under this contract. As part of our continuous quality control endeavor, we participate in the American Material Reference Laboratory (AMRL) program. As a result, we are certified as a testing agency by California Department of Transportation (Caltrans), Cement and Concrete Reference Laboratory (CCRL), and Division of State Architect (DSA). These agencies certify our equipment and our personnel. Soils and material testing, conducted by our laboratories, are presented below: Soils · In Situ Moisture and Density . Sieve Analyses · Hydrometer Analyses . Los Angeles Abrasion . Sand Equivalent · Atterberg Limits · California Bearing Ratio · Modified Proctor . Consolidation . Collapse · Expansion Index . Permeability E!) Converse Consultants IICc-redlandslofficelJOBFILE\2008\81 \238108238 -pro.doc I I I I I I I I I I I I I I I I I I I 2008-381 Proposal to Provide Professional Services for On-Call Geotechnical Investigation and Construction Material Testing City of San Bernardino, California July 7, 2008 Page 6 . R-Value · Direct Shear . Swell · Unconfined Compression Materials Concrete & Masonry · Beams . Blocks/Cubes · Cylinders . GrouUMortar · Prisms . Shrinkage . Shotcrete/Gunite Steel . Tensile & Bend test of reinforcing steel . Strength test of welds . Pull tests of nuts and washer Other Materials · Extraction and Gradation of Asphalt Concrete . Fireproofing . Kneading Compaction · Maximum Density of Asphalt Concrete USID · Marshall and Hveem, Method · Stability & Flow Analyses · Compressive Strength Test Ef) Converse Consultants IICc-redlandsloffice\JOBF ILE\2008181 \238108238 _pro.doc ~ I I I I I I I ~ I I I I I I I I I I " 2008-381 Proposal to Provide Prolessional Services lor On-Call Geotechnical Investigation and Construction Material Testing City 01 San Bernardino, Calilornia July 7, 2008 Page 26 3.0 PROJECT UNDERSTANDING AND SCOPE OF WORK Our understanding of the City's needs and approach to meeting these needs is discussed below. Proiect Understandina It is our understanding that the City of San Bernardino will retain a consulting firm to provide professional services for on-call geotechnical investigation and construction material testing on City projects throughout the City. The selected firm will be requested to provide routine compaction, concrete, asphalt soil gradation testing services and soils borings to 15' for the duration of the contract at the fixed unit cost. Additional services may also be requested for the above items or for additional andlor specialized services on non-routine projects or issues. Scope of Work The project, in general, will consist of taking preliminary soil samples and analyzing them to determine the properties of the material in order to determine the soil characteristics, performing grading observations when requested, taking soil compaction tests to determine if the compaction efforts are reaching the specified level, collecting concrete cylinders from concrete placements and performing testing on same to determine compressive strength, collection of asphalt concrete placement samples and routine testing for compliance with specifications, performing soils borings to 15 feet as requested with appropriate logs for inclusion in bid documents for underground types of work, providing a geological engineer as required to consult with the City and evaluate site conditions as required, and related work as required. The majority of the work will be confined to routine soil compaction and concrete/asphalt testing. These services will be required by the City to insure contractor compliance with specifications and insure techniques used by the contractor are achieving specified results. Soil testing will be performed as required on an on-call basis and there may be no set limits on the number of tests per call out or number of sites visited. Response time of 30 minutes or less from the designated offices is required. Services We understand that the City will require services on the following: (i) Converse Consultants IICc-redlandsloffie<iIJOBFILE\2008\81 \238108238 _pro ,doc I I I I I I I I ~ I I I I I I I I I I 2008-381 Proposal to Provide Professional Services for On-Call Geotechnical Investigation and Construction Material Testing City of San Bernardino, California July 7, 2008 Page 27 Soil testing: 1. Performing soils analysis to determine soil properties (moisturel densityl CUNe and point tests to assure compliance with established cUNe) 2. Perform compaction testing on site by either sand cone or nuclear gauge methods 3. Provide written results of test after giving verbal results to inspection staff 4. Provide written results of R-value test as required. No analysis for optimum pavement design will be required Asphalt testina: 1. Perform asphalt concrete compaction or extraction testing on project site or project materials as directed 2. Provide written results of tests Concrete testina: 1. Taking concrete cylinder samples at site (3 cylinders per test minimum) 2. Curing, storage and testing of samples including 3,7 or 21 day break (only one break is required if the sample meets the specified strength on the first test) 3. Written results of all testing Soil borina: 1. Perform soil boring with hollow stem auger to a depth of 15 feet (includes traffic control, pavement patch and all manpower and equipment). Test may be in pavement or dirt. 2. On-site obseNation of soils, collection of undisturbed soil samples, blow counts and log of boring 3. Written results of bore including log of boring Other services: Converse can provide other seNices as listed under Section 1.0 of this proposal. Also, we can: . Provide an engineering geologist . Conduct special inspection for steel and other construction material . Conduct slope stability, shoring and foundation analysis . Evaluate rippability of materials . Conduct all types of laboratory testing on soils to determine physical characteristics and engineering properties . Provide environmental seNice to determine presence of hydrocarbons or other hazardous materials ~ Converse Consultants IICc-redlandslofficelJOBFILE\2008181 \238108238 yro.doc I' I I I I I I I- a:: <( :r:: o ..oJ <( Z o ~rt <( C) a:: o o .,f I I I I I I I I I I I I 2008-381 " .~ ~~ fij ~~s:E ..c:oQ,J~ ~ >~c.9 c?J~ffi55 ~ 0. 0 "' ' ~ ! . " o! . " .EC~01:0 C~ ~~.f~j ~8HH .t.E.g::roi;U)llI:EeS ,,:t:;.giiZC::':::1i.c:J: ~",,~W'Ei;'~lilll~1:: $ C) .....,m 'C '5 5~ ~ 0 miia::co J! ~ . o e ;0: I .~ "!i to. ~i ~j iJ! ~o oC E= "it .- ~g 'C 0. II" ~U ~ ~~h~if. C ii a: S Ii ~;; !t E" &l c ~m::r..,::t'>.!I!::IE.c o -lC.!:! JI: '0 IDca_ II)liilzli~e.~a'S!lc .., "'ir,;o~:E't:~ Il . . HitL. ~~a.5!:: wwccsQCC n~.:i.:i'~~ilil __S!}:IfiWlileC 1'~~!itAIV'~ , o.e,..,1n a'e"'W W "'ilI w...,'- 0. ~!'" w -w C D. .!! a:ci~ci~;]ii1 en ~uiuiu.icia:a:rii' ci.:o...:if ~'i:~ ~c:i.l:.-8': dll 61: l! tj.r: ~I'll ~~ E~~ .o.1i; fi>o>r.:-1O :t aLl.. c'Oll! 2: ~ Efili.~~o~E S!>-~~Ei~ <l( i~~O&!C)U)" ci ci:Z;C) !li w~'" ,~~ ..;,,!o"!88 rll! rD.OO J C)o~.::t::t: a: rD.llIl'1lftl ." .:113;;;; ~a:': ...-di ;; .:." g ~ !:;i: a~ ~ 0:- c III~"" ~~ i ~ C) i lrof5 !i . ".0 '" Ow I' I I I I I I I ~ I I I I I I I I I I 2008-381 Proposal to Provide Professional Services for On-Call Geotechnical investigation and Construction Material Testing City of San Bernardino, California July 7, 2008 Page 29 5.0 PROJECT TEAM Converse has assembled a team of experienced professionals with specialized skills in the services required under this contract. We have sufficient staff to meet any proiect dernand. A brief description of the qualifications of key individuals is presented here. Resumes are provided in Appendix A - Resumes & Certifications. Principal In Charae/Proiect Manaaer Hashmi S. E. Quazi, Ph. D., G. E. is a registered civil and geotechnical engineer in the State of California and has over twenty years of experience providing services in the area of geotechnical engineering and construction inspection and materials testing. He has been the project manager on similar annual contracts with other public agencies. As the designated project manager, he will coordinate our scope of services required under this contract. He will provide technical oversight and will be responsible for budget and contract negotiation for this contract. He will ascertain that our services and obligations are met in a timely manner. Dr. Quazi will be available 24/7 to respond to any need that the City might have. Additional Professional Staff William H, Chu, P.E., G.E. - Principal Engineer - has over sixteen years of experience in the fields of geotechnical investigation, engineering analysis, instrumentation installation and monitoring data analysis. Mr. Chu has also performed quality control and assurance for materials inspection and testing during construction. Mr. Chu has managed numerous large projects for geotechnical investigations and materials testing during construction. Jeff Yang, Ph.D., C.E, G.E - Principal Engineer - has more than 27 years of experience in the field of engineering design and analysis of the foundation design, liquefaction analysis, seismic induced settlement, lateral spreading, surface manifestation, remedial measures, and troubleshooting. His experience also includes construction inspection of commercial, industrial and governmental development projects. Roy J. Rushing, C. E. G., P.G - Lead Geologist. a certified engineering geologist and Professional Geologist registered in the State of California with over thirty years of experience in applied engineering geology. He has conducted a wide range of investigations, including hazard surveys, fault risk, slope stabilityllandslide, and groundwater studies for diversified structures in Califomia, Nevada and Idaho. He has conducted and managed infrastructure and development projects encompassing all major ~ Converse Consultants IICc-redlandslofficelJOBFILE\2008\81 \238\08238 yro.doc I I I I I I I I I I I I I I I I I I I 2008-381 Proposal to Provide Professional Services for On-Call Geotechnical Investigation and Construction Material Testing City of San Bernardino, California July 7, 2008 Page 30 aspects of field exploration, laboratory testing and technical analyses. Mr. Rushing has strong project management and client interaction skills, and has conducted and managed more than 200 applied geologic and geotechnical projects for public and private sector clients. Joseph Gratzer, P.G. - Project Geologist - registered in the State of California with 13 years of experience in engineering geology hazard assessment, exploration and soil inspection. As a geologist Mr. Gratzer has performed field explorations, aerial photo reviews, soils inspection, site assessment and report preparation. Mr. Grater is experienced in variety of projects including tunnels, dams, and landfills. He is proficient in 2D AUTOCAD graphics and Excel for data reduction and presentation. Mr. Gratzer has excellent ability to interface with clients and state agencies and has sharp analytical and problem solving skills, thrive on challenges and new opportunities. Lead Technician Howard Franklin will be the lead field Technician/lnspector. He is certified by Caltrans for the types of testing that will be required under this contract. Howard has over eight years of experience. Howard Franklin has over 5 years experience as a soilslmaterials technician both in the laboratory and in the field. He has experience on public works projects, roadway re-construction, FAA airport paving, grading, mass grading, hillside grading, commercial and residential grading, trench backfill, field and plant sampling and nuclear gage and sand cone testing. Lead InsDectors Sonny Kyi has experience in providing field and laboratory testing of construction materials, special inspection (reinforced concrete), general inspection, coordinating quality control issues with construction engineers and inspectors, and participation in quality control partnering teams, as well as the preparation of construction materials, test summaries, and reports. In the laboratory he has experience handling soil classification and testing of construction Material including concrete, soil, asphalt, grout, prism, aggregates, fireproofing. Extensive experience with testing of ceiling wire, bolt & rebar pull test, torque wrench tests, in-placed concrete strength tests, Jeremy DeWitt is Caltrans, ICBO and ACI certified and has over 8 years of experience providing soils and materials testing and inspection services. As a field technician Mr. DeWitt has provided construction inspection of soil, concrete, steel, fireproofing and masonry on public works projects, educational campuses, and residential, commercial, and industrial developments. He is experienced in field density testing of soils with sand cone and nuclear gauge test methods, He can perform sampling of aggregates for compliance/specification, interpretation of plans and specifications on grading, street improvements, and utility construction. @ Converse Consultants IICc-redlandslofficelJOBFILE\2008181 \238108238 yro.doc I I I I I I I I ~ I I I I I I I I I I ,. 2008-381 Proposal to Provide Professional Services for On-Call Geotechnical Investigation and Construction Material Testing City of San Bernardino. California July 7. 2008 Page 31 Laboratorv Satish Jain has several years of proven experience working as an engineer, both in the office and in the field. He has worked on various public works and private projects in his 28 years of service. He has extensive knowledge on the various laboratory test procedures used to determine the physical characteristics of soils and other construction materials. Presently, as a laboratory manager, he conducts laboratory tests and also supervises tests performed by others. His testing procedures are compliant with the American Society for Testing and Materials (ASTM) standards, the Cement and Concrete Reference Laboratory (CCRL) and Caltrans requirements. He participates in the American Material Reference Laboratory program where his test results are evaluated and compared against 300 other laboratories throughout the United States. His performance has always been graded as outstanding. We have provided our staff qualifications in the tables below. All staff will be based out of our Redlands office. Hashmi Quazi Project Manager Ph.D., P.E., G.E. 20 William Chu Principal Engineer P.E., G.E. 17 Jeff Yang Principal Engineer Ph.D.. P.G., G.E., 27 R.EA Keyvan Footohi Senior Engineer P.G. 12 Cyrus Radvar Senior Engineer! Field Investigation P.E., G.E. 14 Ram Konanur Senior Engineer! Field Investigation Ph.D. 21 Gennady Tsarev Project Engineer P.E. 7 ..~-~--- Sam Chaymouni Project Engineer P.E. 20 -'-"-._' Danny Arteaga Staff Engineer! Field Investigation BS. 18 Amit Bharadwaj Staff Engineer! Field Investigation B.S. 2 Roy Rushing Lead Geologist P.G., C.E.G. 30 Mark Schluter Senior Engineering Geologist P.G., C.E.G., 22 C.H.G. Dunkan Walker Project Geologist P.G., C.E.G, 28 ~ Converse Consultants IICc-redlandslofficelJOBFILE\2008\81 \238108238 "'pro.doc m I I I I I I I I I I I I I I I I I I 2008-381 Proposal to Provide Professional Services for On-Call Geotechnical Investigation and Construction Material Testing City of San Bernardino, California July 7, 2008 Page 32 Joseph Gratzer Project Geologist P.G. 13 Chris Gryzsan Staff GeologisV Field Investigation B.S. 2 Ebenlyns Jones Staff Geologist B.S., P.C.C 2 Salish Jain B.S., ACI, Caltrans, ASTM, CCRL 8 Bradley Dellinger Caltrans, NICET Level II, ACI 8 Paul DeWitt CCRL, Soils 5 Jose Guzman ACI, Nuclear Gauge SOil S TECHNICIANS Name Duties eel tlfIC<ltIOllS YeJI::' of Expellenee Gerardo Portea Soil, Asphalt and Caltrans, ACI, Nuclear Gauge 12 Concrete Eric Harris Soil and Concrete Caltrans, Nuclear Gauge 9 - .-- Howard Franklin Soil and Asphalt Caltrans, Nuclear Gauge 8 -- .. -~_.- Daniel Dismang Soil and Concrete Caltrans, ACI, Nuclear Gauge 7 _.~-- . Jay Navarro Soil and Concrete Caltrans, ACI, Nuclei!' Gauge 7 I--~-..-- -- Brian Scott Soil Caltrans, ACI, Nuclear Gauge 7 Brian Kaufman Soil and Concrete Caltrans, ACI, Nuclear Gauge 7 .. .- ----_.- Michael Megana Soil and Asphalt Caltrans, Nuclear Gauge 4 ..- Rudy Arellano Soil Caltrans, Nuclear Gauge 4 ---- ......--- Brian Hooper Soil Caltrans, Nuclear Gauge 1 .-. ---..--0_- -- ~ Converse Consultants IICc-redlandslofficeIJOBFILE\2008\81 \238108238 "pro.doc ~ I I I I I I I ~ I I I I I I I I I I 2008-381 Proposal to Provide Professional Services for On-Call Geotechnical Investigation and Construction Material Testing City of San Bernardino, California July 7, 2008 Page 33 Sonny Kyi ICBO/ICC certified in structural steel and welding, and 26 reinforced concrete Nick Rorno AWS/CWI, ICBO structural steel and welding 25 inspector, DSA approved welding inspector Jan Bosoom AWS/CWI, ICC certified in structural steel and 20 welding, and reinforced concrete Hank Williams AWS/CWI and ICC certified inspector in structural 20 steel and welding, and reinforced concrete Piper Hankins DSA certified in concrete and masonry 20 Berge Jolakian P.E., certified in structural steel, welding, masonry. and concrete 12 David Karina DSA certified in masonry 10 Jeremy DeWitt ICBO/ICC certified in masonry, fireproofing, concrete, steel and welding 8 John Vicente ICBO certified in reinforced concrete, ACI certified 5 concrete field testing technician Mark Burnett ICC/UBC certified in structural masonry, reinforced 5 concrete, and fireproofing ICC certified in reinforced concrete, pre-stressed Carlos Samaniego concrete, structural steel and welding, and structural 4 masonr --- Kenneth Burr AWS/CWI and DSA certified project inspector 4 ---..,.------- ..._~--~---- .------ Ei) Converse Consultants IICc-redlandslofficeIJOBFILE\2008\81 \238\08238 _pro.doc ~ I I I I I I I ~ I I I I I I I I I I 2008-381 Proposal to Provide Professional Services for On-Call Geotechnical Investigation and Construction Material Testing City of San Bernardino, California July 7, 2008 Page 34 Outside Consultants/Sub Contractors Converse will utilize the services of subcontractors on an as-needed basis as required for this contract. Converse has a good working relationship with the sub-contractorsl sub-consultants listed below and feel they maintain the same high quality standards that we require for our clients. Drillers Layne GeoConstruction 11001 Etiwanda Ave Fontana, CA 92337 Tel.: (909) 390-2833 AI-Roy Drilling 19452 Shadow Hill . Yorba Linda CA, 92886 Tel.: (714) 779-1710 Martini Drilling 10983 Portal Drive Los Alamitos, CA, 90720 Tel.: (714) 715-2715 Corrosion Consultants Schiff Associates 431 W Baseline Road Claremont, CA 91711 Tel.: (909) 626-0967 ~ Converse Consultants IICc-redlandslofficeIJOBFILE\2008181 \238108238 _pro.doc fi,J 1/; I I I I I I I ~ I I I I I I I I I I 2008-381 Proposal to Provide Professional Services for On.Call Geotechnical Investigation and Construction Material Testing City of San Bernardino, California July 7, 2008 Page 35 6.0 PROJECT MANAGEMENT Our mission is to work together to provide responsive and quality services to our clients, with the objective of developing long-term client relationships. Our approach to managing your projects is discussed below. Proiect Manaaer The project manager (PM) from our office will be the single point of contact with your Construction Managers/lnspectors. He will be available 24/7 to respond to any requests from the City. The PM will discuss the contractor's progress with the Construction Manager weekly and forecast the man-hours required for staffing of all inspection and testing activities. Based on the contractors schedule and sequencing of activities our PM will project the staff requirement. This will enable us to respond to any demand. Schedulina and Service Coordination/Dispatcher Our Field Services Coordinator (FSC) will be the single point of contact to take requests for our services from your representatives. We request 24 hours advance notice, however, we will make every attempt to respond to shorter notice. Based on the specific project requirements the FSC will schedule technicians to be at the site on the day and time requested. With this single point of contact we will effectively reduce the chances of miscommunication and/or technicians failure to be at the site on time. Our FSC will be available between 7:30 a.m. and 5:00 p.m. Laboratorv Services Our laboratory is fully staffed between 7 a.m. and 5 p.m. During that time, we have personnel available to conduct the testing required to support construction related projects. The project engineer will ensure that the field personnel are supplied with the laboratory test results as soon as they are due or within 24 hours of the time the samples are delivered to the laboratorv. In case of large testing demand, we will increase the number of laboratory technicians, schedule testing on a night shift, or seek the assistance of the laboratories in our other branch offices. Communications All Southern California Converse field personnel and project managers are equipped with digital telephones. This enables instant contact between the FSC and the filed staff to avoid miscommunications and failure of technicians to be on-site when required. This communication system also provides the field personnel immediate access to the project manager, avoiding the potential for mistakes and costly delays and reworks. Billinas We will invoice the City for services rendered on a monthly basis. If services for more than one project in a month are being billed, a cost breakdown will be provided showing the Ei) Converse Consultants \\Cc-redlandslofficeIJOBFILE\2008\81 \238\08238 yro.doc '- , I I I I I I I I ~ I I I I I J ~ I I I 2008-381 Proposal to Provide Professional Services for On-Call Geotechnical Investigation and Construction Material Testing City of San Bernardino, California July 7, 2008 Page 36 cost attributable to each project. Projects will be clearly identified with our company name, project name, location and the name of the city employee requesting the seNice. Invoices will be supported by back-up documents, including copies of all involved employees' time sheets. The time sheets will be prepared by the individual employee in the normal course of hislher regular time and billing cycle. In the event of disputed charges, we will make available to the city of San Bernardino supporting documents as requested. @ Converse Consultants \\Cc-redlands\officeIJOBFILE\2008\81 \238\08238 "pro.doc :i..J I. I I I I I I I R I I I I I I I I I I 2008-381 Proposal to Provide Professional Services for On-Call Geotechnical Investigation and Construction Material Testing City of San Bernardino, California July 7, 2008 Page 37 7.0. QUALITY CONTROL Converse has an established presence in the state of California and we are familiar with the technical, regulatory and political climate involved in construction activities. Converse works with a single purpose for our clients: to thoroughly assess and properly document testing and inspection activities, and to comply with the Uniform Building Code, ASTM, AASHTO and applicable federal, state, and local regulations. Converse laboratories meet and strive to exceed industry standards. Participating in sample test reference programs administered by AASHTO for soils, fine aggregates, coarse aggregates and bituminous materials, Converse's laboratories carry the certifications required by local agencies and the industry. CCRL performs periodic inspections of Converse and AMRL distributes and evaluates the results of proficiency test samples. Their inspections verify compliance of the Quality Control Manual (QMC) to the ASTM and AASHTO standards, verify our compliance with: the policies and procedures contained in this QCM, equipment with the ASTM and AASHTO standard testing procedures, and our technicians in performance of tests in accordance with the standard testing procedures. As a result of these AMRL and CCRL services and the compliance of Converse with their standards, Converse is accredited by AASHTO, the Army Corps of Engineers, Caltrans, and the Division of the State Architect (DSA). Converse is accredited in Portland Cement Concrete, Portland Cement Concrete Aggregates, Soils, Bituminous Concrete, Bituminous Concrete Aggregates, Masonry Products and Fireproofing. The Technician Training and Competency Review policy and procedures, each technician, regardless of their Converse personnel classification or outside agency certifications, will have one of the following training status classifications for each test they perform: Trained with Current Competency Verification (V), Trained with Competency Verification Holding (H), Trainee (T), or not qualified. It is the responsibility of the individuals assigning a test to a technician and the technicians to whom work is assigned to assure that technician is properly trained' with current competency verification for the testing task to which they are assigned. Each piece of field and laboratory testing equipment is listed on the Equipment Inventory Log and assigned an equipment number. For each piece of equipment, an Equipment Calibration Record form is completed and the calibration record maintained, The Equipment Inventory Log and Equipment Calibration Record forms are maintained in a master file located in the laboratory manager's office, Converse will provide the City with evidence of insurance liability and abide by the City's Risk Management procedures. Our observation, findings and recommendations will be provided in accordance with generally accepted professional engineering principals and ~ Converse Consultants IICc-redlandslofficeIJOBFILE\2008\81 \238108238 "'pro.doc . I I I I I I I I ~ I I I I I I I I I I . 2008-381 Proposal to Provide Professional Services for On-Call Geotechnical Investigation and Construction Material Testing City of San Bernardino, California July 7, 2008 Page 38 practice in this area of Southern California, Unless we hear differently we will assume that these conditions are acceptable to you, We will maintain required professional licenses and registration during the life of the Agreement with the City, ~ Converse Consultants IICc-redlandslofficelJOBFILE\2008\81 \238\08238 -pro.doc ~ I I I I I I I R I I I I I I I I I I " . 2008-381 Proposal to Provide Professional Services for On-Call Geotechnical Investigation and Construction Material Testing City of San Bernardino, California July 7, 2008 Page 39 8.0. COMMENTS Based on the review of the RFP and Draft Agreement, we have the following comments: Draft Aareement Converse has read the Draft copy of the agreement for on-call geotechnical and construction material testing services, We will comply with all the terms and conditions. However, we request the City to consider the following modifications: Section 5.2.(b), Line 3: Please insert at the end of line 3 "10 days notice for non- payment of premium." Section 6.10, Line 4: Before "Consultant agrees that any such. .." insert "Except as may be required by law." Office location Converse office is located just outside the southern boundary of the city of San Bernardino. We have about 35 permanent staff working out of this office. Our travel time to the City Hall is about 15 minutes. San Bernardino Business Reaistration Converse possesses a business license to provide services within the city of San Bernardino. A copy of our business registration certificate is included. ~ Converse Consultants IICc-redlandslofficelJOBFI LE\2008181 \238108238 _pro.doc ,- " . I I I I I I I I ! I I I I I I I I I I 8~ .~ H 1! '" E' li ~ j: ~ Og !~ I Zo ~] ,J ~~ ~ ..~ - Jj n ~ ~f H . " ~ ~ H:l ~;i. iil O~ .".: .-i 0 0( H z.~ tii ~~ pi ..~ ~ is!: -;.~ I! e. <'" .ll"'" ...~ !2: zti !]~1 0( =:~ H ..~ "" rol!: h ;;!~ ~ ~~ li~..li'. Z ~~ l~HI 8 ~~ ~RH; ~ 1:5 t)JH~" .... t~ Ih~; ~ ~ u ~ . ~f .~ u _ = ~.~.e ~ ~ j!'i~f ~ g ~ ~ s~t co Z co 2008-381 s 00 ~~ -< 8 ~[;Iil ~ Q.. ~ 0= M [;IiI..... u;g~ ~Q u~ -< '" 0(;Z: CI 0 It: o ~ iii o Q. It: 8 ~ CD M o ~ ~ ~ :5 en 8 '" ::Q '" ~ o u ~z ~g s:;:! '0 ~~ OU ~ i5 :5 C/} Z o u '" C/} 0( '" > 8 ~ cl~ '" CjtJ -.:t; ~u ~ '" o '" :t 0(.... ol:l ~": ~i:5 o . ~~ -....l "'0 ~~ '" "' '" ~ z ~ zoo '" >= ., '" z " ~ ~ li~ '" < ;:0 a> ::;: ,- .. . 2008-381 A TT ACHMENT 2 TO EXHIBIT C . . @ Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services July 7, 2008 Michael W. Grubbs, P.E. City of San Bernardino 300 North "D" Street, 3rd floor San Bernardino, CA 92418 Subject: SCHEDULE OF PRICES FOR ON-CALL GEOTECHNICAL INVESTIGATION AND CONSTRUCTION MATERIAL TESTING City of San Bernardino, California Converse Project No. 08-81-238-00 Dear Mr. Grubbs: Enclosed is Schedule of Prices for On-Call Geotechnical Investigation and Construction Material Testing to the Public Works Division of the Development Services Department of the City of San Bernardino. This proposal is submitted in response to your "Request for Proposal," dated June 4, 2008. In compliance with the RFP, we are enclosing: · Completed and Signed Schedule of Prices · Schedule of hourly rates for work not covered by the Schedule of Prices Our fees are based on the following assumptions: · Our rates do not include overtime work. Work over 40 hours weekly will be charged at 1.5 times the regular hourly rate. In accordance with the prevailing wage laws, weekends will be charged at 1.5 times the regular hourly rate and hOlidays will be charged at 2.0 times the regular hourly rate. · For on-call services only test results will be provided. No verification report will be provided to indicate that the project was completed in substantial compliance with the plan and specification. · It is understood by both contracting parties that this is a prevailing wage project as defined in Labor Code Sections 1770-1780. ft ' . (,41. . 10391 Corporate Drive, Redlands, California 92374 Telephone: (909) 796-0544 . Facsimile: (909) 796-7675 . e-mail: redlands@converseconsultants.com " , 2008-381 Schedule of Prices for On-Call Geotechnical Investigation and Construction Material Testing City of San Bemardino, Callfomia July 7, 2008 Page 2 . Our field representative will not direct, supervise, or layout the work of the contractor. Our services will not include a review or evaluation of the contractor's safety measures on or near the project. . Any meetings and/or consultation(s) requested by the client will also be charged in accordance with the attached Schedules of Fees. Please do not hesitate to contact the undersigned at (909) 796-0544 if you have any questions or wish to discuss this proposal in greater detail. CONVERSE CON~S - Hashmi S.E. Quazi, Ph.D., G.E. Principal Engineer/Project Manager Encl: Completed and Signed Schedule of Prices Schedules of Fees (PW 2008, GL T 2008, MTS 2008) ~ Converse Consultants IICc-redlandslofliceIJOBFILE\2008181 \238108238 _cost.doc ',> '~i ;;;~ , 2008-381 - . "'&~"'1~~1?~~Z1 ~1.~~lIi'm."__.~~ .. , , '.....&Q.... ...' SCHEDULE OF PRICES ON-cALL GEOTECHNICAL INVESTIGATIONS AND CONSTRUCTION MATERIAL TESTING SERVICES July 7, 2008 (To be submitted.'lr.r sealed.mvelope separatb r""'m proposal documents) The under.:.igned Proposer, if offered, hereby certifies that it will execute the attached Agrefl';ftlnt for Services and accept an annual purchase ordet effective on the date the A~reement is approVed by the Mayor and Common Council antJ running through June .jO, 2009 for Geotechnical Investigations and Construction Materi:tl Testing Services for Capital Improvement Projects on an as-needed basis with no guaranteed usage. The undersigned Proposer understands that, if exercised by the City, an optional one- year extension, as provided in the agreement, shall be effective on O,r about July 1, 2009 and running through June 30, 2010, and that actUal option year pricli'lg shall be negotiated with the Proposer prior to exercising of any given option year; hov..-ever, the option year extension shall not become effective until issuance by the City of Co duly authorized Purchase Order. Please provide detailed Firm Fixed Prices in the spaces provided on Sheet 2 of this Schedule of Prices. Indicate any other incidental or additional Prices required for complying with the Technical Specification requirements in the space provided below. ..... the", a.y ..,., addm"a' '" '''''''ental _. Whi<h Will ba "'ti"'" by YOU"an " order to meet the requirements of the Technical Specifications? 0 (Yes or No). If you answered "Ves', please provide details of said additional prices: This offer shall remain firm for 90 days from RFP closing date. Terms and conditions as set forth in this RFP apply to this submittal. Page 1 of 3 , I I 'f \ . . 2008-381 , Schedule of Prices for On-Call Geotechnical Investigations and Construction Materials Testing 07 -07 .2008 Estimated Total Annual Unit Description Unit Price Price Quantity 1,000 ea Compaction Testing (1 - 4 per site visit) $95 $95,000 including curves 1,000 ea Compaction Testing (5 - 20 per site $85 $85,000 visit) including curves 200 ea Compaction Testing (20+ per site visit) $60 $12,000 including curves 20 ea Concrete Cylinders (includes $150 $3,000 collection, tests and report) 20 ea Asphalt Extractions $150 $3,000 40 ea Asphalt Compaction $150 $6,000 40 ea Soil Gradation/Screen Analysis $80 $3,200 500 ea Grading observation $80 $40,000 200 ea Engineering Geological Investigation & $110 $22,000 Consulting 40 ea Soil Boring to 15' $350 $14,000 40 ea Pavement Bore (Asphalt) $65 $2,600 40 ea Concrete Core $65 $2,600 TOTAL ESTIMATED ANNUAL COST $288,400 .w I ~ ,4 2008-381 , . SCHEDULE OF PRICES (Continued) ON-CALL GEOTECHNICAL INVESTIGATIONS AND CONSTRUCTION MATERIAL TESTING SERVICES In signing this offer, Proposer warrants that all certifications and documents requested herein are attached and properly completed and signed. Authorized Signature: Print Signer's Name and Title: - --- ~ Date Signed: Company Name & Address: .Hcd,rn', 6 .ql ~j ~c,~~~ .J u \ ~4 '. ~ Cc>~~ CO~~ J03~\ C~b~\"~ ~a::::>\....A-ND:s.... c...Pr 922f4 Phone: Fax: -3Q9 -7Cf&;;-7.b.'r-S Page 3 of 3 ... .....{ 2008-381 CONVERSE CONSULTANTS Prevailing Wage Schedule of Fees Personnel Introduction It is the objective of Converse Consultants to provide its clients with quality professional and technical services and a continuing source of profeSSional advice and opinions. Services will be performed in a manner consistent with that level of care and skill ordinarily exercIsed by members of the profession currently practicing in the same locality under similar conditions This fee schedule is valid through January 31, 2009 Hourly Charges for Personnel Slaff assignments 'Nil! depend on personnel availability, Job complexity, projecl site location and experience level required 10 satisfy the technical requirements of the project and to meet the prevailing standard of professional care. ..' Field Technical Services Construction Inspector - ACIIICBO and/or AWS/CWI certified (concrete, post.tension, masonry, structural steel, fireproofing, includes concrete batch plant and local steel fabrication inspectiolls) $75 DSA Masonry Inspector '78 Non.Destructive Testing Inspector (ultrasonic, magnetic particle, dye penetrant, skidmore, pull testing, torque testing, Schmidt hammer, and pachometer) 85 Soils Technician (soil, base, asphalt concrete, and moisture emission testing) 90 Supervisory Soils Technician 95 Sample Pick.up 50 Professional Services (Field and Office) Staff Professional $80 Senior Staff Professional 85 Project Professional 105 Project Manager 115 Senior Professional 135 Principal Professional 160 Laboratory Testing Laboratory Technician (Unit priCes for routine tests quoted upon request: Schedules of Fees) $65 see Geotechnical Laboratory Testing and Malerials Testing Services Office Support ClericallWord Processing Draning CAD Operator/Drafting Manager $60 65 70 Overtime and special shin rates for Field Technical Services personnel are determined in accordance with Prevailing Wage law. Travel time to and from the job site will be charged at the hourly rates for the appropriate personnel Expenses 1 Exploration expenses (drilling, trenching, ete) are charged at cost plus fifteen percent. 2 Travel and subsistence expenses (transportation, room and board, etc.) for Individuals on projects requiring travel and/or living away from a principal office are charged at cosl plus fifteen percent. 3 Automobile and truck expenses are charged at cost plus fifteen percent (rentals) or at a rate of fifty.tive cents per mile for company- owned vehicles traveling between principal office and project. 4. Other out-of-pocket direct projecl expenses (aerial photos, long-distance telephone calls, permits, bonds, outside printing services. tests, etc.) are charged at cost plus fifteen percent. Invoices invoices will be submitted to the Client on a monthly basis. and a final blli will be submitted upon completion of services 2 Payment is due upon presentation of invoice and IS past-due thirty days from invoice date. In the event Client fails to make any payment to Converse when due, Converse may Immediately cease work hereunder until said payment, together with a service charge atlhe rate of eighteen percent per annum (but not exceeding the maximum allo'Ned by law) from the due date. has been 'eceived. Further. Converse may at its sofe option and discretion refuse to perform any further work irrespec!tve of payment from CI;ent In the event Client falls fa pay Converse for services w".en said payments are due C:lent shall pay attorneys' fees or other costs If1curred In co!lectlng any delinquent amount General Conditions The terms and provisions of the Converse General Conditions are incorporated Into this fee schedule as though set forth in full. If a copy of the General Conditions does not accompany thiS fee schedule. Client should request a ,:opy from this office " <;r""H~", ')j ,c".lt;li~::; r'A-';:I~'')~ . '.- 2008-381 CONVERSE CONSULTANTS Schedule of Fees Geotechnical Laboratory Testing Compensation for laboratory testmg services will be made In accordance with this fee schedule Costs of tests not on this schedule will be by quote andlor In accordance with our current hourly fee schedule The rates are based on non-contaminated sod A surcharge will be charged for handling contaminated matenal, which will be determined based on the prOject IDENTIFICATION AND INDEX PROPERTIES TESTS Visual Classification, ASTM 02488.. . Engineering Classification, ASTM D2487 MOIsture Content . Moisture Content & Dry (Bulk) Density, ASTM D2216 & D2937... MOisture Content. ASTM D2216. Shrinkage limit. ASTM D427.. . Atterberg limits, ASTM D4318 . Several points. One pOint. Particle Size Analysis, ASTM D422 Fine Sieve (From +#200 to #4). Coarse Sieve (From +#200 to 3 in).. Hydrometer. Percent Passing #200 Sieve. ASTM D1140. Specific Gravity . Fine (passing #4 sieve), ASTM D854. Coarse (retained on #4 sieve), ASTM C127 Sand Equivalent Test.. Double Hydrometer Dispersion, ASTM D4221. 8.00 .1500 15.00 ...1000 ..85.00 ... ...8000 40.00 ....80.00 80.00 ..85.00 .. ....45.00 ...70.00 7000 .75.00 150.00 COMPACTION AND BEARING STRENGTH Standard Proctor Compaction, ASTM D698 or ASTM D1557- 91 Method A or B . . Method C (6-inch mold) . California Impact Method (Caltrans 216). R-value, ASTM D2844.. California Bearing Ratio (CBR), ASTM 01883 1 pOint 3 pOint Relative Density . 0 1 cubiC foot mold. . 0.5 cubic foot mold.. SHEAR STRENGTH Torvane/Pocket Penetrometer.. Dlfect Shear (per pOint) QUick Test. . Consolidated. Drained (granular soil) ASTM D3080.. Consolidated - Drained (fine grained SOli), ASTM D3080 Consolidated - Undrained (~ne grained) Reslduai Strength per Cycle Remo!ded SpeCimens, per specimen ..120.00 ........13000 .........200.00 . .240.00 ..12500 325.00 200 00 300.00 2000 6000 14000 . ..200.00 12000 45.00 4500 STATIC UNIAXIAL AND TRIAXIAL STRENGTH TESTS (PER POINT) Uncoof:red Ccmpresslon. ASTM 2166 Urir;onsoJiaated - Un,jralned, ASTM 02850 Conso!ldated- Undrained (per pOint) Conso[llJated - Drained tper pOint} \lJlt~ Pore Pressure Measurement, per 'o3d Rer;lcide.j SpeCimens per specimen '~>:r'J' r"~ (:<:rl',-,;L:n~:; .....L r~'r:":8 /500 110 'JO 70000 700 00 15000 4500 CONSOLIDATION AND SWELL COLLAPSE TESTS 8 Load Increments.. Additional load increment. Time-RatiO, per load increment Single POint (collapse test). Single Load Swell, ASTM D4546 . Ring Sample, Field Moisture Ring Sample, Air Dried Remolded Sample, per specimen.. ExpanSion Index Test, UBC 29-2/ASTM D4829 180.00 30.00 60.00 60.00 6500 6500 45.00 80.00 HYDRAULIC CONOUCTIVITY TESTS Constant Head, ASTM D2434 Falling Head Flexible Wall, ASTM D5084. Triaxial Permeability, EPA 9100 Remolded SpeCimen, per specimen.. 250.00 300 00 350 00 50.00 CHEMICAL TESTS Corrosivity (pH, reSistivity, sulfates, chlOrides) Organic Content. ASTM D2974 150.00 65.00 Conditions: Unit rates presented on this fee schedule are for roulinely performed geotechnical laboratory tests Numerous other earth matenal physical tests can be performed in our geotechnical laboratones, including rock core, soil .:ement and sod lime mixture tests Tests not listed can be quoted upon request. ThiS fee schedule IS valid through January 31,2009. Prices are based on the assumption that samples are uncontaminated and do not contain heavy metals, aCids, carcinogens and lor volatile organics whIch can be measured by an organic vapor analyzer or photolonlzatlon detector with a concentration greater than 50 parts-per-million (ppm). Quoted tesling fees are based on tne assumption lt1al no protective clothing Will be reqUired 10 handle samples, If Le...el 0 protective clotnlng Will be required dUring nandhng of samples (as defined in the Federal CFR Part 1910.120), then a 40% Increase In fees presented In this schedule Will be applied. Level C protective dottMg wlfI be a 60% ,ncrease In fees_ Converse Will not handle samples Ihat reqUire eilher Level B or Level A protection in our geotecnmcal labo~atories Contaminated samples Will be returned to the client Uncontaminated samples Will be disposed of 30 days after presentation of test results_ The client must disclose the source of samples Samples Imported from out of state Will be InCinerated after testing In ,1ccordance With 'equlremenls of the United States Department of Agnculture SOil samples obtained Within the State of California currertfy deSignated quarar,line areas Will also be ,ncmerated 11"1 accordance With the reqUirement 01 the Stale of California, Department of Food and Agnculture, 01""510n of Plant :ndustry Pest ExclUSion. A $500 ,nClneratlon fee Wlf! be ad,jed to each 5,lmple that IS requ,red to be InCinerated In accordance w.th State and Federal law Test results requinng plots ",,11 be presenfed 'n ,1 publosnable format generated from computer programs Ctherwise, raw :est numbers Will De cresented A minimum :abcralory fee of S50 :)1) w,!1 be charfled to present 3r.d mal test ~esults Beyond the standard U SMail 'Jelrvery. :;peClallzed transm,ttalml! De ,:harged elt ,lod'honal ICO!>t Ie g, F"lderal E~press, UPS ..tc) Geotechn!cal u,st!rg "lees ['01 mdl;de eflqlf1eenng on,jior leologlc rev,,,w dnd Jfl.llysls Typ,cal bin arour.d ~,}r geotechn:cal !ar.ori110r, tesLng s !'NO l,eeks lor ''JIJClht,. tenN,,(;"."9 r!JYs, To e'pf',:jrte lest turn-'H'il,nd to ','Je wor~,nq ,j;lyS"l 50'~<, ,,~.:reJ.'Oe In tt~e '~es ,n It-,s jC~,f'r:h"e NI:i to'! apf::'"ed, ~:ar\i~€I)t('ci1"I(a; '",~ts r.:l]u,re at :!-~.]st nr'e...eeil to ;)crtor:"'1 '11 "lCccrda~ce 'NI~" t~'e"Si~" or .J~;,er -t.l:1~ard :,~ec;f,"~Jh;r', ;:",e" pe5eMed In thiS sCr"ec:J:e for 'ei3TI',el', '.Jr'jslurte'~ (j"f"ct sliear '~n~O,C.1!,on N ")par'!scn ple5SUre t<,sts are hilseo ')r' l!'".e ,1S'i;.l1"!pt,on ~~,lt :::::,~.:r d",:lf"'e~er i::' 4 ;ij.,;'::'l ,I's'de ,j;']p'l'ler) br.1~s ring sJ.T!ples .~,il 1:1' P-,)~ ~E'(j tC' r'le l"Ol('chl',.:al 'abor.1tory 'or !e~Iln'1 Re"'cldcd "~f'C'rY1'~~S.\l"; ~,e '..c'~'ra(:ed !f"! .,tar,rj,]ld;: 5nch CU:'>lde ,j,a...,t'~e' I:1r;;~s Ulq~ fOI (~'rf'd shi:';H..,':r'so!,datlo'~ ill"'O p(ral'Slon iJre5sure tests ;'11 !ices pce,cr'Tf'd In tt:.s;,;~edu'e cl'.e ';;-io;ed ret' t"e ,hSUf1"~,t,on Irat the chert ',11,;1 :leb',tor .,w':;les te aL..r !;lto;atcrl ]1 ,~o .;cj,1it'0I"'al ,.cst ~o r;onverse 'r;vo"~es ',11,11 t'e IS<;I;ed 11101"'11':Iy .Hld :lIe r;,ly<lcle lOr 'ece,pl cl"if!<;S '--Int'!"'N,::;e l!J:ee,j ,,;Jen ;'lerest cf 15' p"1 "'cntt: ,but 1-01 e)("~'~I"'\J Ire n'c1>;Irh'~' Ji''-~''''e,l h'l IN-: ,v,11 b,~ L'-ly It''e _cr'! ,WI "IT',,,,", "(;1 (;,l,d -Mtb,n' ":'l _U/"_ L:;]yl"('r~t '~,u,odltel 'e Le ';ppr<<'1 rl'-~I :e _l'~' '-\It-'<-I ,,'I,..,'''.t ;,r',j '1'10" "J the pr '-ul,lr, .,r"pi:l.d Wln,ml I~e (I"~rt ,-,r:;11 o~;\i "lil; ,-,t'u,"'v_~ f.:-(,~ ,;r ,~t~.-:f ",n, .I"_-~IT'-.,I'(' 'Ti'E":l'lq.lI.,y<.)fo!,,",qu'nl,II'l')'_'fl!S .' ~. I ,,J 2008-381 CONVERSE CONSULTANTS Schedule of Fees Materials Testing Services ~.'<: I..,' Y~:2' ~~~,':~ -';~ a~ : 1I11~ IS r:J ::'U! Compensation for laboratory testing services will be based on rates In accordance with this schedule. Casts of tests net on this schedule will be by quote andlor in accordance with our current hourly fee schedule Our ser\llces will be performed in accordance with the General Conditions. This fee schedule IS valid through January 31, 2009. AGGREGATES MOisture Content (ASTM D2216) $10.00 Particle Size Analysis Coarse (ASTM C136), each 60.00 Coarse and fine (ASTM C136 & 137), each , .... ..... 140,00 Specific Gravity & Absorption Coarse Aggregate (ASTM C127),.. , , . . . .... .80.00 Fine Aggregate (ASTM C128). .,80.00 Unit weight per cubic foot (ASTM C29). ......5000 Soundness-Sodium or Magnesium (ASTM C88),each. ,200.00 Potentiai Alkali Reactivity (ASTM D289) . ..300.00 Freeze Thaw Soundness.. ... . ... ... 175.00 Los Angeles Abrasion, per class (ASTM C131, C535).. 210,00 Sand EqUivalent (ASTM D2419) 7000 Lightweight Particles (ASTM CI23), each 75.00 Clay Lumps and Fnable Particles (ASTM C1421. each .. 100.00 Stnpping test (ASTM DI664), each 65.00 Organic Impunties (ASTM C40) . .... .60.00 Durability. , By Quote CONCRETE TESTS Laboratory Trial Batch (ASTM C192). .... By Quote Laboratory Mix Design, historical data. ... .. By Quote Compression Test, 6"x 12" cylinder (ASTM C39), each ,. 2300 light Weight Concrete Compression .. Unit Weight. SpecImen preparation, trimming or coring, each. Bond Strength (ASTM C321) Prepared by Converse .. Prepared by Others .. Core Compression Test (ASTM C12), each... Flexure test, 6"x 6" beams (ASTM C78), each Modulus of Elasticity - Static (ASTM C469), each Length Change (3 bars, 5 readings each, up to 26 days) (ASTM C157). Splitting Tensile, 6" x 12" cylinders. each Field Concrete Control (sampling, slump, temperature, cast 4 cylinders, molds, cylinder pick-up. Within 10 ml of office, stand-by extra) ASTM/UBC, hourly rate schedule, or each Cylinder Field Concrete Control (same as above plus air content lest) ASTMlUBC, hourly rate schedule, or each CylInder. Hold Cylinder Cylinder Mold sent to Job site but not casted by returned to Converse .23.00 2300 ,4500 120.00 .60.00 45.00 60,00 110,00 250.00 5000 7000 8000 7.00 Converse or 500 MASONRY IASrMCI40. E447 USC STANDARD 24-22) MOisture Content. as received, each Absorption, each Compression, each Shrin~age (ASTM C426). each Net Area :1r:d Voiume, each rvlas0nry 810cl<"s, per set of 9 Masor"'ry C0re COMpress:on, each MJs..:;.nry Core Shear, each MJs.Jlwl' Cor~ Tr:mmng. eJch c.::n-'o~ess~':;n Test grouted prisms R x 8' x lb' edch l,~':I;lprI:'SS:O'1 TE.'sl grouted t:r~snlS ~;: '\ lt~' x 16' ('cleh 20,00 5000 40 GO 9000 2500 650 00 4500 5000 4500 11000 14000 , i.; I ~,' c,.: '",; f; Compression Test 2" x 4" Mortar Cylinder, each 3" x 6" Grout Prisms, each 2" Cubes (ASTM C 1 09), each Cast by others.. Mortar or Grout Mix Designs.. 23,00 . .... . . 23,00 2300 ....2300 By Quote FIREPROOFING TESTS Oven Dry Density (per sample)... 5000 MOISTURE EMISSION TEST Moisture Emission Test Kit .35.00 ASPHALTIC CONCRETE Stability, Flow, and Unit Weight, ASTM D6927 Marshali ASTM D1559, ASTM 02726. Measured MaXimum SpeCIfiC Gravity of Mix (ASTM 02041) (Rlcos Method), each., ................" ... ................ .. 75.00 Void Analysis of Cores or Marshall Specimens Calculations Only (ASTM 03203) set of 2 or 3 . ........ ,...35.00 Laboratory Mixing of Asphalt & Concrete, per sample... .50.00 Complete Asphalt Concrete Mix Design (Hveem or Marshali) . By Quote Extraction of Asphalt and Gradation (ASTM D2172, Method B) OrCahfornia 310, including ash correction, each 150.00 Extraction of Rubberized Asphalt and Gradation, each.. ..... . 170.00 Specific Gravity (ASTM D2726 or ASTM D1188) uncoated.. coated Immersion-Compression. Particle coating (ASTM 2489).. Stripping (ASTM D1664), Moisture or Volatile Distillates in paving mixtures, or materials containing petroleum products or byproducts Retamed Strength (ASTM D1074/D1075) 6 specimens Retamed Stability. Mil, Std, 520A, Method 104, 6 specimens.. CBR. ASTM 01883. Including MID curve, 1 point Asphalt Temperature 150.00 15000 .85.00 95.00 400.00 4500 . .50.00 120.00 By Quote By Quote 21000 1500 STRUCTURAL STEEL TenSile Test #11 Bar or Smaller, each Bend Test. #11 Bar or Smaller, each ,. Tensile Test. #14 8ar, each Tensile Test. #18 Bar, each Rebar coupler tensile test TenSile Test. Welded #11 Bar or Sr'1al:er, each Tensile Test, Welded #14 Bar each Tensile Test. Welded #18 Bar each Tensile Test. Mechanically Spliced Bar. #11 Bar or Srr.3:1er. each TenSile Test, Mechanically Spliced Bar, #14 Bar each 45.00 4000 11500 31000 6500 5000 11000 300 00 150.00 31000 HIGH STRENGTH BOLT. NUT AND WASHER TESTING Wedge TenSile Test for A490 Bolls U:ider 1 CO.OOO ibs, eJch Over 100,000 Ibs, each Wedge Ten$l:e Test for A325 Belts Under 1 '-=:0 JOG ibs e:lch 45 CO 5500 50.00 "',j,~'~ ",j.' '.~""~' L~l'."<";";"