RESOLUTION NO. 2008-351
BE IT RESOLVED BY THE MAYOR AND COMMON COUNCIL OF THE CITY
OF SAN BERNARDINO AS FOLLOWS:
5
SECTION 1. The City Manager is hereby authorized and directed to execute on behalf of
6
the City the Funding Agreement between the San Bernardino County Transportation Authority
7
8 and the City of San Bernardino for Rail-Highway Grade Separation Project at Palm Ave BNSF,
9 attached and incorporated herein as Attachment "1."
10
11
12 III
13 11/
14
SECTION 2. The authorization to execute the above-referenced Agreement is rescinded
if it is not executed within sixty (60) days of the passage ofthis resolution.
15
16
17
18
19
20
21
22
23
24
25
26
27
28
- I -
2008-351
RESOLUTION ... APPROVING FUNDING AGREEMENT FOR PALM
1 AVENUEIBNSF GRADE SEPARATION WITH THE SAN BERNARDINO COUNTY
2 TRANSPORTATION AUTHORITY.
I HEREBY CERTIFY that the foregoing resolution was duly adopted by the Mayor and
3
4 Common Council of the City of San Bernardino at a joint regular
5
6
7
8
9
10
11
12
13
meeting thereof, held
on the ?nn
day of
, 2008, by the following vote, to wit:
~pptpmhp.r
Council Members: AYES NAYS ABSTAIN ABSENT
ESTRADA -----'L-
BAXTER x
BRINKER x
DERRY x
KELLEY x
-
JOHNSON x
MC CAMMACK x
14
15
16
17
18
19
20
21 Approved as to form:
22
23
24
25
26
27
28
~;b.~
Rac el Clark, CIty Clerk
The foregoing resolution is hereby approved this <In day of September , 2008.
JAMES F. PENMAN,
City Attorney
-2-
J\.UHcnmenl "1"
2008-351
FUNDING AGREEMENT NO.
BETWEEN
SAN BERNARDINO COUNTY TRANSPORTATION AUTHORITY
AND
CITY OF SAN BERNARDINO
FOR
Rail-Highway Grade Separation Project at Palm Ave BNSF
THIS AGREEMENT is made and entered into this 2nd day of September by
and between the San Bernardino County Transportation Authority (hereinafter referred to
as "SANBAG") and City of San Bernardino (hereinafter referred to as "CITY'').
WITNESSETH
WHEREAS, on April 10, 2008 the California Transportation Commission (CTC)
approved $9,390,000 in Trade Corridor Improvement Fund (TCIF) for this project; and
WHEREAS, the estimated total cost of the Palm Ave. Railroad Grade Separation Project
(hereinafter referred to as the "PROJECT')is $35,176,000, which includes construction
of a grade separation (highway over rail) and widening of Palm Ave and Cajon Blvd
from 2 to 4 lanes; and
WHEREAS, SANBAG and the CITY are the co-sponsors of the project; and
WHEREAS, in order to secure the $9,390,000 in TCIF funding, the sponsoring agencies
will need to identifY all project funding as being committed and available; and
WHEREAS, if the CITY and SANBAG cannot provide the identified share of the project
cost at the time of project construction, the TCIF funds will be lost;
NOW, THEREFORE, SANBAG and the CITY agree to the following:
I. Local share is defined as the development contribution portion of the PROJECT cost
established in the SANBAG Development Mitigation Nexus Study. This portion is
established as 14.6% Percent for all phases of the PROJECT and is estimated in the
PROJECT Programming Request form (Attachment A) which maybe be updated from
time to time to reflect current conditions
2. TCIF funds are considered as part of the public share funding and the local share is not
reduced by the TCIF contribution.
Page I
2008-351
3. The CITY agrees to commit a minimum of 14.6% Percent of the total PROJECT cost
as its share of the funding of the PROJECT. The CITY agrees that this funding will come
from development contributions but that the CITY may borrow from other accounts to
provide this funding, if provision is made to reimburse such accounts with development
contribution as they become available.
4. If at the time the funds are required the CITY is not able to provide the required 14.6%
Percent local share of the PROJECT cost as estimated on the most current Project
Programming Request form (Attachment A), SANBAG may provide a loan of Measure I
dollars to cover the CITY local share at the discretion of the SANBAG Board.
Repayment of such a loan by development contributions would occur in accordance with
the provision of a loan agreement between SANBAG and the CITY. Loan agreement will
be established through the strategic plan process, which will result in specific policies and
procedures governing these loans.
5. No commitment to loan Measure I funds for the PROJECT can be made until the
SANBAG Board has approved a loan agreement containing the specific terms and
conditions for the PROJECT.
By:
San Bernardino County
Transportation Authoritv
Date:
Date:
APPROVED AS TO FORM AND
PROCEDURE:
APPROVED AS TO FORM:
By:
Jean-Rene Basle
SANBAG County Counsel
Date: ~_,t- 21 ~o" r
Date:
Page 2
..
JarI__
2008 Project Programming Request
(Project Information)
J-uun':IlIlU:lll J\.
2008-351
G.""ml Instructions
o New Project 0 Amelldment (ExIsting Project)
Caltran. DI8trIct EA
08
County RoutelCorrldor
SBD
ProIlICt TItkI
Palm Ave Railroad Grade Separation
PM Bk PMAhd PI'OIIiCt. r!ContB.ct PhOne e......11 Add.....
Gilbert Betancourt 909-886-3971 gbetancourt@sanbag.ca.gov
Location. ProltICt L1mltL n ofWOi'k. LIIi....tIv. DeecmillOn
In the City of San Bemardino and the County of San Bemardlno, from 1000' east of at-grade on Palm Ave and
1000' north and south of grade on Cajon Blvd, construct grade separation (likely highway over rail) and widen
Palm and Cajon from 2 to 4 lanes
PPNO
MPOID
200850
MPO
SCAG
I Date: I 07/10/08
TCRPNo.
N/A
EI8m.nt
MT
PrO tICt Sooll8OrlLead AGencv
SANBAG
.
COIllIlOll.rit Imll"m.ntIna AGencv AIr 3lIIIO Letter of NoPreludlee
PA&ED SAN BAG
PS&E SANBAG
Rlaht of Wav SAN BAG
~:=~WNBAG ~
AssemblY: 63 I S.nate:132
Cona.....IO'-= 43
PU--..nd~ d . . ...
Palm Ave is a major east-west arterial that carries approximately 5,300 vehicles per day. The estimated 94
freight and two passenger trains that cross Palm Ave every day create substantial traffic delays and disrupt
access to a developing industriallwarehouse area nearby. Separating the railroad crossing from Palm Ave will
mitigate community impacts of goods movement and provide more reliable access to warehouse and truck
facilities.
ProltICt nem.
Railroad grade separations increase travel reliability on major roadways for both the community and truck
traffic, improve air quality, and eliminate potential conflicts between vehicular and train traffic, which all act to
mitigate the impact of freight movement on communities. This grade separation will eliminate gate down time
of 6.6 hours per day in 2030 and is estimated to reduce 105 daily vehicle hours of delay in 2030.
PrOllIct Mlle8tQn. ..
Proiect StudY Reoort AnDroVed
Beain Environmental (PA&ED) Phase
Circulate Draft Environmental Document IDoeurnentT- IN/A
Draft Proiect Reoort
End Environmental Phase (PA&ED Milestone)
seain DesKin (PS&El Phase
End Desian Phase (Readv to List for Advertisement Milestone)
Beain Riaht of Way Phase
End RllIht of Wav Phase (Riaht of Way Certification Milestone)
Beain Construction Phase (Contract Award Milestonel
End Construction Phase (Construction Contract Acceptance Milestonel
Beain Closeout Phase
End Closeout Phase (Closeout ReDOrt)
D..
N1A
07/01/08
CECA SE
06130/09
12130/09
01/01/10
06/30/12
07101110
06130/12
07/01/12
12/30/13
01/01/14
06130/14
Form Version Date: 10/1107
.
M_w
2008 Project Programming Request
(Funding Information)
2008-351
County I CTllIolrtc:t T PPNO T TCRP ......... No. I EA
SBO I 08 I 0 I NlA I 0
Project TItle: TPalm Ave Rail.- Grade Separation
(dollars in thousands and escalated 10 the programmed year)
Date: 07/10/08
Exlollng T_ Project Coot
Component Prior 08109 09110 10111 11/12 12/13 13/14+ Total Im....mentl~ .......c.
E&P (PMED) 0 0 0 0 0 0 0 0
PS&E 0 0 0 0 0 0 0 0
RIW SUP (CT) 0 0 0 0 0 0 0 0
CON SUP (CT) 0 0 0 0 0 0 0 0
RIW 0 0 0 0 0 0 0 0
CON 0 0 0 0 0 0 0 0
TOTAL 0 0 0 0 0 0 0 0
Propooed T....I Project Coot
E&P (PMED) 750 0 0 0 0 0 0 750
PS&E 0 0 2.000 0 0 0 0 2,000
RIW SUP (CT) 0 0 0 0 0 0 0 0
CON SUP (CT) 0 0 0 0 0 0 0 0
RIW 0 0 1.126 0 0 0 0 1,126
CON 0 0 0 0 31,300 0 0 31.300
TOTAL 750 0 3,126 0 31.300 0 0 36,178
Fund No.1: T Program Code
ExIoIIng Funding
Component Prior 08109 09110 10111 11/12 12/13 13114+ Total Funding Agency
E&P (PA&ED) 0 0 0 0 0 0 0 0
PS&E 0 0 0 0 0 0 0 0
RIW SUP (CT) 0 0 0 0 0 0 0 0
CON SUP (CT) 0 0 0 0 0 0 0 0
RIW 0 0 0 0 0 0 0 0
CON 0 0 0 0 0 0 0 0
TOTAL 0 0 0 0 0 0 0 0
Propooed Funding Notes
ESP (PMED) o Proposed TCIF
PS&E 0
RIW SUP (CT) 0
CON SUP (CT) 0
RIW 0
CON 9,390 9,390
TOTAL 0 0 0 0 9,_ 0 0 9.3110
Fund No.2: I Prognlm Code
"-ng Funding
Component Prior 08109 09110 10111 11/12 12/13 13114+ Total Funding Agency
E&P (PA&ED) 0 . 0 0 0 0 0 0
PS&E 0 0 0 0 0 0 0 0
RIW SUP (CT) 0 0 0 0 0 0 0 0
CON SUP (CT) 0 0 0 0 0 0 0 0
RIW 0 0 0 0 0 0 0 0
CON 0 0 0 0 0 0 0 0
TOTAL 0 0 0 0 0 0 0 0
Propooed Funding Notes
E&P (PA&ED) o Developer Impact Fees
PS&E 0
RIW SUP (CT) 0
CON SUP (CT) 0
RIW 0
CON 5,138 5.138
TOTAL 0 0 0 0 5.138 0 0 5,138
Form Vorsion Oato: 1011107
1of2
.
lbIIIrttI#
:.!UUtl t'roJect t'rogrammlng Request
(Funding Infor~ation)
2008-351
County I cr_ I PPNO I TCRP ........ No. I EA
saD I 08 I 0 I NlA I 0
Project TIlIo: IPalm Ave Railroad Grade Separation
(dollars In thousands and escalated to the programmed year)
Data: 07/10108
Fund No.3: I Prognlm Code
ExIolIng Fundll1ll .
Component Prior 08109 09110 10111 11/12 12113 13114+ TOlaI Fundll1ll Agoncy
E&P (PA&ED) 0 0 0 0 0 0 0 C
PS&E 0 0 0 0 0 0 0 0
RIW SUP (CT) 0 0 0 0 0 0 0 0
CON SUP (CT) 0 0 0 0 0 0 0 0
RIW 0 0 0 0 0 0 0 0
CON 0 0 0 0 0 0 0 0
TOTAL 0 0 0 0 0 0 0 0
Propoood Fundll1ll -
E&P (PA&ED) 750 750 San Bernardino County
PS&E 2,000 2,000 Measure I
RIW SUP (CT) 0
CON SUP (CT) 0
RIW 1,126 1.128
CON 16,n4 16.n4
TOTAL 750 0 3.128 0 18.n4 0 0 20.860
Fund No.4: I Program Code
EllIolIng Funding
Component Prior 08109 09110 10/11 11/12 12113 13/14+ TOlaI Funding Agoncy
E&P (PA&ED) 0 0 g 0 0 0 0 0
PS&E 0 0 0 0 0 a 0 0
RIW SUP (CT) 0 0 0 0 0 0 0 0
CON SUP (CT) 0 a 0 0 a 0 0 0
RIW 0 0 0 0 0 0 0 0
CON 0 a 0 0 0 0 0 0
TOTAL 0 0 0 0 0 0 0 0
P_od Fundll1ll Notes
E&P (PA&ED) 0
PS&E 0
RIW SUP (CT) 0
CON SUP (CT) 0
RIW 0
CON 0
TOTAL 0 0 0 0 0 0 0 0
Fund No.5: I Program C_
ExIolIng Funding
Component Prior 08109 09110 10111 11/12 12/13 13/14+ TOlaI Fundll1ll Agency
E&P (PA&ED) 0 0 0 0 0 0 0 0
PS&E 0 0 0 0 0 0 0 0
RIW SUP (CT) 0 0 0 0 0 0 0 0
CON SUP (CT) 0 0 0 0 0 0 0 0
RIW 0 0 0 0 0 a 0 a
CON a 0 a 0 a a a 0
TOTAL 0 0 0 0 0 0 0 0
Propoood Fundll1ll Noles
E&P (PA&ED) 0
PS&E 0
RIW SUP (CT) 0
CON SUP (CT) 0
RIW 0
CON 0
TOTAL 0 0 0 0 0 0 0 0
Fonn Vorsion 00/0: 1011107
2of2