Loading...
HomeMy WebLinkAbout16-Development Services --. OR''"''''''L II \,(0 II vM CITY OF SAN BERNAR)lINO - REQUEST FOR COUNCIL ACTION From: James Funk, Director Subject: Authorization to execute Contract Change Order No. One to the contract with Janus Corporation for abatement of lead- based paint, asbestos, PCB, and clean-up at the San Bernardino Santa Fe Depot. MCC Date: 2/20101 Dept: Development Services Date: February 7, 2001 File: 6.7178 Synopsis of Previous Council Action: 12/04/00 Adopted Resolution No. 2000-340 awarding contract to Janus Corporation for abatement of lead-based paint, asbestos, PCB abatement, and clean-up at the San Bernardino Santa Fe Depot. 11/20/00 Adopted Resolution No. 2000-327 awarding contract to Architect Milford Wayne Donaldson, Inc. for preparing final plan, specifications and estimates for renovation of the San Bernardino Santa Fe Depot. 10/02/00 Agreement for Professional Environmental Inspection Services approved with Earth Tech for providing inspection of hazardous waste removal at the San Bernardino Santa Fe Depot. 3/06/00 Approval of the Rehabilitation and Adaptive Reuse Plan for the San Bernardino Santa Fe Depot. Recommended Motion: Approve Contract Change Order No. One to the contract with Janus Corporation for abatement of lead-based paint, asbestos, PCB, and clean-up at the San Bernardino Santa Fe Depot. ~f~ Contact person: Jarb Thaipejr, Senior Civil Engineer Phone: 5127 Supporting data attached: Staff Report. Proposal Ward: FUNDING REQUIREMENTS: Amount: $14,560.00 Source: (Acct. No.) 123-558-5504-7178 Acct. Description: Restoration of San Bernardino Santa Fe Depot Finance:~~~~.~~~ &y~.J- /A1j;.MdLi1 tU1 UY"dd C il N t ~../ IIVMb.r tJ,.,ct ounc 0 es: Agenda Item No.1ftJ :1./;),0/0 J City of San Bernardino - Request for Council Action Staff Report Subiect: Authorization to execute Contract Change Order No. One to the contract with Janus Corporation for abatement of lead-based paint, asbestos, PCB, and clean-up at the San Bernardino Santa Fe Depot. Backeround: On December 4, 2000, the Mayor and Common Council awarded a contract to Janus Corporation for abatement of hazardous materials at the San Bernardino Santa Fe Depot. The original bid was for the removal of 5,000 square feet of loose ceiling tile at $2.00 per square foot. During the initial final design site visit by the architect, Milford Wayne Donaldson, it was suggested that all of the ceiling tiles be removed and not just the loose ones originally contracted for, as it was determined that they contained asbestos and are of no historic value. During the removal process, interior work areas are contained within plastic sheeting so that the asbestos will not contaminate the air. For this reason, it would be more economical to remove all of the tile at this time rather than with the subsequent rehabilitation phase of the project. There is an additional 13,000 square feet of tile needing to be removed at $1.12 per square foot. Financial ImDact: All costs incurred for this project are charged to Account No. 123-558-5504-7178 (Restoration of the San Bernardino Santa Fe Depot). In addition, all costs associated with the Depot rehabilitation are reimbursable through $1,371,746.00 in federal transportation funds awarded excepting the local match requirements. The City received $168,926.00 from SANBAG on July 6, 1999 as local match funds for this project. The net cost of this change order is $14,560.00 and is within the $58,800.00 set aside for contingencies. Recommendation: That the Mayor and Common Council approve Contract Change Order No. One to the contract with Janus Corporation for abatement of lead-based paint, asbestos, PCB, and clean-up at the San Bernardino Santa Fe Depot. '. .02/05/2001 10: 28 909-390-9925 JANUS CffiP PAGE 02 PROPOSAL FOR SERVICES 360 S. MILLlKI:N AVENUE, SUITE B ONTARIO, CA 91761-7641 [909J 390-9928 FAX [909) 390-9926 Februaty S, 2001 Mr. Raymond A Casey City Engineer City of San Bemardino-Develo Services Deputment Public Works Division 300 North -0" StIeet 3'" FlOOl, City Hall San Bernardino, CaIifbmia 92418 PROJECT: CeiliDg Tile I Mastic - Sm BernardiDo Suit. Fe Depot (RJ:VlSED) Dear Mr. Casey: The lb110wing is our revised proposed. scope of work lbr EI1\IiromDental Ahotem- services for the above listed project a$leferem:ed in the Earth Tech letter dated JlI11IllUY 29, 2001: SCOPE OF WORK: · Removal and dispcIa1 of lIJlPfOJL 13,000 s.f. Of asbeIltos-con"'imng 12 X 12 ceiling tile/mastic . Approximately 7 workings days to complete OUR GENERAL CONTROLS: . Utilize wet l'elllova1 methods . Double bag and dispose of all waste lIS friable asbestos waste . Rc&pUatory and eye prorection lbr the wocnrs will be utilized . Asbestos WlIlDing signs will be posted lIS required by regulations . JlUlUS will amdIIct personnel air .."",Ii~g lIS required by OSHA . Negative air p.rc:ssure di1ferentia1 mA;ntAinPrl within the iDterior worlc aml(s) OWNER TO PROVIDE: . Sufiicient electrical & water . EPA Generator N1IlIlber . Waste Manift:st siglll\tuRs . Lock; out ofHV AC and electric in work area(sl EXCLllSIONS FROM OUR BID: . Final air c1eamnces showing the worlc lIRaS can be 0CICUpied by non1'fOlecled penllllnel . Digging or shoring . <Mlrtin1e worlc which may include holidays and/or wee1<end worlc . ReplAN>moeut materials . Wall, ceiling and/or tIoor da.mage as a n:snit of xemoval activitlea and containmeDt preparation. ~ . .02/05/2001 10:28 909-390-9926 JANus CCRP Page lof2 Depot PRICE: . Janus will perform !be specified _rldile $14,560.00 (FOUTEEN TIlOUSAND FIVE HUNDRED SocrY AND NOIOO DOLLARS) Unit Price $1.12 X 13,000 s.f. PRICE: S14~.OO ACCEPT REJECT TERMS AND CONDmONS: Cost estimate is based on infonnation providt;d by the client. In !be event !be silc couditi0n5 and/or quantity ofwodc dlffers from the above deacribed scope ofwolle provided by !be client, additional fees lIllIY be n:quiIed fur !be comp\elion of!be additioual work. PLEASE HAVE I\LL OF YOUR CONCEBNS AND QUESTIONS ADDRJ:SSED BEFORE 11D: PROJECT BEGINS. J'ROPOSj f8PJ:CTFULLY SUBMl'lTED BY: n'~ =~ MANAGER ACCEPTED BY: NAME TI1'LE DATE .JANUS CORPORATION SAN f'RA/'\lCISCO . LOS ANGELES PAGE 03