HomeMy WebLinkAbout15-Development Services 0,.. '.."'>'" 'L hl\'dl~ti CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION Dept: Development Services Subject: Authorization to execute Change Order No. Two to contract with Pyramid Building & Construction for the Installation of a Wall along Mountain A venue between 39th Street and 40th Street. MCC Date: 02/20/2001 From: James Funk, Director Date: February 5, 2001 File No. 1.7157 Synopsis of Previous Council Action: 06/06/99 Allocated $100,000 in the 1999/00 CIP for Mountain Ave. South of 40th St.-Remove sandbag wall and replace with barrier. 06/19/00 Adopted Resolution No. 00-134 awarding contract to Pyramid Building & Construction for Construction of Street Improvements on Mountain Ave between 39th Street and 40th Street in the amount of $93,262.45 and authorized the Director of Finance to amend the FY 99/00 budget and transfer $20,000 from 129-367-5504-7158 "Palm/Baseline-20th rehab pavement (co-op w/Highland)" to 129-367-5504-7157 "Mountain Ave. south of 40th St.-remove sandbag wall and replace with barrier" Recommended Motion: 1. That the Mayor and Common Council authorize the Director of Finance to amend the 2000/2001 budget and transfer $29,000 from Account No. 129-367-5504-7156 "Street ImprovementslSafety Improvements - Citywide" to Account No. 129-367-5504-7157 (Mountain Ave. South of 40th St. - Remove Sandbag wall and replace with barrier); and 2. Approve Contract Change Order No. Two to contract with Pyramid Building & Construction for the Installation of a Wall along Mountain Avenue between 39th Street and 40th Street resulting in a net increase in the contract amount of $40,952.94. ~~ James Funk Contact person: Michael Grubbs. Field Engineer Phone: 5179 Supporting data attached: Staff Report, Change Order Ward: 4 $40,952.94 FUNDING REQUIREMENTS: Amount: Source: (Acet. No.) 129-367-5504-7157 Acct. Description: Mountain Ave. South of 40th St. - Remove Sandbag wall and replace with barrier. Finance: Council Notes :lj:1lJjOJ Agenda Item No. JS CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION Staff Report Subiect: Authorization to execute Change Order No. Two to contract with Pyramid Building & Construction for the Installation of a Wall along Mountain Avenue between 39th Street and 40th Street and authorization for the Director of Finance to amend the 2000/2001 budget and transfer $29,000 from Account No. 129-367-5504-7156 "Street ImprovementslSafety Improvements--Citywide" to Account No. 129-367-5,504-7157 (Mountain Ave. South of 40th St. - Remove Sandbag wall and replace with barrier). Backl!:round: On June 19, 2000, the Mayor and Common Council awarded a contract to Pyramid Building & Construction for the Installation of a Wall along Mountain Avenue between 39th Street and 40th Street. The purpose of this project was to replace an existing sandbag wall that was installed along the West Side of Mountain Avenue between 39tthStreet and 40th Street during the late 1970's as an emergency measure to protect adjacent residential properties from being flooded during major storms. The sandbag wall was later gunited and was left in place as a flood protection device. The wall had begun to crack due to age and had generally exceeded its life expectancy. Many citizens complained that the sandbag wall detracted from the beauty of the neighborhood. During construction it became apparent that certain changes to the contract were necessary to provide a product acceptable to the local residents. The previously approved Contract Change Order (CCO) #1 and the proposed CCO #2 are described below. CCO #1 was approved by the Interim Director of Development Services. That change order, in the amount of $1,750.00, compensated the contractor for removal of seven (7) additional trees which was necessary to construct the wall. As described in the attached change order, CCO #2 resulted in significant changes to the original project design. These changes were the result of a neighborhood meeting held in October of 2000, involving the residents, the Mayor's Office, Staff, and the Council Office which was held to address neighborhood concerns that had arisen after the construction began. As a result of the meeting, the plan was modified to delete the curb & gutter, sidewalk, and the Type "A" curb (modified) with handrail, and replace it with a 6" thick, solid grouted, 6 foot high masonry wall. At this point, the old sandbag wall had already been removed and, with winter approaching, the residential properties along the west side of Mountain A venue could potentially have been exposed to flooding if a major storm occurred. CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION Staff Report - continued In order to protect the property owners from flooding and potential liability on the part of the City, Staff directed the contractor to proceed with the proposed construction of a 6-foot high block wall that was acceptable to all involved. Due to cost considerations and objections by some of the neighbors, the sidewalk was deleted from the project. As a further complication to the project, Southern California Edison Company (SCE), at the request of the Public Services Department, removed 10 large Palm trees along the west side of Mountain A venue at no cost to the City. These trees were damaging overhead power lines and creating a potentially dangerous situation. In addition, Staff consulted with neighborhood representatives who ultimately agreed with the decision to remove the Palm trees. Unfortunately, SCE's contractor left holes approximately 10 feet in diameter and 14 feet deep at each of the 10 locations where Palm trees were removed. Given that SCE was under no obligation to remove the Palm trees, and in fact would have preferred to keep trimming them indefinitely, the trees were removed at the City's request and SCE felt no obligation to re- compact the holes in preparation for the wall construction. Therefore, it was necessary to authorize Pyramid Builders to proceed on a time and materials (T &M) basis to fill the holes prior to start of construction of the 6-foot concrete block wall. Please see the attached Change Order for further details of this Change Order No. Two MODIFICATIONS TO THE ORIGINAL BID Due to modifications to the character of the project, certain items in the original bid were reduced in quantity or deleted entirely. These modifications have resulted in a reduction in contract cost of approximately $69,575.29. The estimated revised contract cost is as follows: Original Bid Amount..............................................................$ 93,262.45 Savings due to ModifiedlDeleted Items....... ............... ....... ...... ..... ($ 69,575.29) Increase due to CCO #1 - Remove 7 Additional Olive trees ..... ...... ... $ 1,750.00 Increase due to CCO #2 - Install 6' Block Wall, Pill Holes and Install Asphalt Concrete Pavement........................ $110,528.23 Revised Contract Amount (approximate)................................... $135,965.39 Approved Delay due to shutdown for re-design 09/12/00 throul!h 10/29/00 Additional working days due to Change Order 72 Workinl! Davs from re-start CITY OF SAN BERNARDINO - REOUEST FOR COUNCIL ACTION Staff Report - continued Financial ImDact: All costs incurred for this project are chargeable to Account No. 129-367-5504-7157 (Mountain Ave. South of 40111 St. - Remove Sandbag wall and replace with barrier). The net cost of this change order in the amount of $40,952.94 plus the amount of CCO #1 of $1,750.00 equals a net increase in the contract amount of $42,702.94. This net amount exceeds the contingency amount of $13,989.37 which was approved by the Mayor and Common Council as part of the contract award. Therefore, we are recommending the transfer of $29,000 from Account No. 129-367-5504-7156 "Street ImprovementslSafety Improvements _ Citywide" to Account No. 129-367-5504-7157 (Mountain Ave. South of 40111 St. - Remove Sandbag wall and replace with barrier) which will cover that amount exceeding contingencies and additional inspection costs incurred due to the changes. Recommendation: 1. That the Mayor and Common Council authorize the Director of Finance to amend the 200012001 budget and transfer $29,000 from Account No. 129-367-5504-7156 "Street ImprovementslSafety Improvements - Citywide" to Account No. 129-367-5504-7157 (Mountain Ave. South of 40111 St. - Remove Sandbag wall and replace with barrier); and 2. Approve Contract Change Order No. Two to contract with Pyramid Building & Construction for the Installation of a Wall along Mountain Avenue between 39111 Street and 40111 Street resulting in a net increase in the contract amount of $40,952.94. DEVELOPMENT SERVICES DEPARTMENT '" 300 North "D" Street. San Bernardino. CA 92418-0001 Planning & Building 909.384.5057 . Fax: 909.384.5080 Public WorkslEngineering 909.384.5111. Fax: 909.384.5155 www.ci.san-bernardino.ca.us CONTRACT CHANGE ORDER NO. TWO FILE NO. 1.7157 DATE: FEBRUARY 5, 2001 PROJECT: CONSTRUCTION OF STREET IMPROVEMENTS ON MOUNTAIN AVENUE FROM 39TH STREET TO 40TH STREET TO: PYRAMID BUILDING & CONSTRUCTION P.O. BOX 3306 VICTORVILLE, CA 92393 GENTLEMEN: You are hereby compensated for performing the additional work as follows: DescriDtion of Chanf!e Additional Cost ~ Item 1: Add the Following Item per attached proposal by Contractor. $ 82,387.50 Insta1l6-inch thick concrete block wall including three 5' high x 5' wide tubular steel gates per plans find specifications dated 10/19/2000. Item 2: Add the following Item per attached T&M report. Excavate $14,208.73 and re-compact 10 holes approximately 10 feet wide x 14 feet in depth on a Time and Materials basis. The cost s!1own is based on the measured time and materials used to accomplish the work. Item 3: Delete Bid Item #5 "Asphalt concrete Pavement (4" thick)" 20 tons at $191.00 per ton and replace with Item #5R "Asphalt $ 13,932.00 Concrete Pavement (4" thick)" 154.8 tons at $90.00 per ton. Total Added Cost Due to this Change Order $110,528.23 CCO #2 Pyramid Builders Page 2 of 4 Modifications to the original bid Items: Estimated Increase (Savings) A. Item 5 - Asphalt Concrete Pavement (4" Thick) ($ 3,820.00) B. Item 6 . PCC Curb and Gutter Type "B" - Reduce quantity ($ 16,140.48) from 830 LF to approximately 48 LF (exact amount will be determined bv measurement): C. Item 7 - PCC Curb Type "A" - Delete Item 7 in its entirety. ($ 20,124.00) C. Item 8 - PCC Sidewalk, Case "A", Width 4'.0" -Reduce ($ 9,015.81) quantity from 3,825 SF to approximately 84 SF (exact amount will be determined bv measurement). D. Item 10 - Metal Hand Rail, Type "A" - Delete Item 9 in its ($ 20,475.00) entiretv. This item is included in the cost of the 6' Wall. Estimated total savings due to this change order. ($ 69,575.29) NET ADDED COST DUE TO THIS CHANGE ORDER $ 40,952.94 JUSTIFICA nON: Item 1: The original design of this project called for an 8 inch curb & gutter, a 5 foot wide sidewalk, and ai' -6" high Type "A" curb with a handrail on top to replace a gunited sandbag wall which was constructed in the 1970's as a flood protection measure. After construction began, residents adjacent to the project raised objection to the removal of a number of trees along the west side of Mountain between 39th Street and 40th Street. A handful of Olive trees and several Palm trees had already been removed at the time the neighborhood complaints began. A neighborhood meeting, involving the residents, the Mayor's Office, Staff, and the Council Office, was held to address the concerns. As a result of the meeting, the plan was modified to delete the curb & gutter, sidewalk, and the Type "A" curb (modified) with handrail, and replace it with a 6" thick, solid grouted, 6 foot high masonry wall. See attached contractor proposal to perform this work. Item 2: Although there were initial objections to removal of any of the trees along the west side of Mountain Avenue, it was found during the neighborhood meeting, that the majority of residents were not concerned about the removal of the Palm trees. The Palms were regarded as a nuisance due to falling fronds and rat nests. Additionally, the trees had been severely "topped" by Southern California Edison Company due to interference with overhead power lines. Further, the City's Public Services Department voiced concern that the Palms would be difficult to maintain after the 6 foot high wall was built. Because of that concern Public Services Department authorized Southern California Edison to completez remove a total of ten additional Palm trees along the west side of Mountain Avenue between 39 Street and 40th Street. CCO #2 Pyramid Builders Page 3 of 4 Because ofthe tree removal, 10 holes approximately 10 feet wide by 14 feet deep were left along the west edge of Mountain A venue in the same alignment as the proposed 6 foot high masonry wall. Southern California Edison's landscape contractor who removed the trees was unable to properly backfill and compact the holes and, instead, just pushed the excavated material back into the holes. Therefore, it was necessary for the City to authorize Pyramid Builders to re- excavate the holes and properly backfill and compact the material in accordance with Public Works Standard Specifications. Due to the uncertainty of the amount of work involved, the contractor agreed to perform the work on a time and materials basis in accordance with Section 3-3 "Extra Work" of the Standard Specifications. See attached time and materials (T&M) report for the period October 31, 2000 through December 8, 2000. Item 3: The original bid included an item for 20 tons of Asphalt Concrete Pavement at $191.00 per ton. This item was intended to compensate the contractor for patching the pavement around the proposed new curb and gutter. Due to the change in design to a 6 foot high block wall with no curb and gutter and the requirement to replace additional pavement due to the removal of the Palm trees (see Item 2), the quantity of Asphalt Concrete Pavement increased from 20 tons to 154.8 tons. Under the provisions of Section 3-2.2.1 of the Standard Specifications, increases or decreases in excess of 25% of the original bid quantity require a change order and is subject to an adjustment in the unit price. Due to the substantially increased quantity of Asphalt Concrete Pavement and the change in character of the work required to install the pavement, the contractor agreed to decrease the unit price from $191.00 per ton to $90.00 per ton. Staff feels this is a fair and reasonable price for the extra work necessary to supply and install the Asphalt Concrete Pavement for the revised design. MODIFICATIONS TO THE ORIGINAL BID Due to modifications to the character of the project, certain items in the original bid were reduced in quantity or deleted entirely. These modifications have resulted in a reduction in contract cost of approximately $69,575.29. The estimated revised contract cost is as follows: Original Bid Amount. . . . . . . . .. . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . ... . . . . .. Savings due to ModifiedlDeleted Items................................. .... Increase due to CCO #1 - Remove 7 Addit. Olive trees ............ .... Increase due to CCO #2 - Install 6' Block Wall, Fill Holes and Install Asphalt Concrete Pavement..................... $ 93,262.45 ($ 69,575.29) $ 1,750.00 Revised Contract Amount (approximate)............................... $110,528.23 $135,965.39 Approved Delay due to shutdown for re-design 09/12/00 through 10/29/00 Additional working days due to Change Order 72 Working Days from re-start date of 10/30/2000 Estimated New Completion Date February 16. 2001 'Feb 06 01 11: 53a P~~amid Con~t~uotion 760-949-8480 ID,9ill9394S1$$ PAGE p.2 5/l4 FEB-0'!S-01 09:33 FROM:C5B PUaLIC WORJ(S DIVISION ceo 112 Pyramid 8uild4':ts Page 4 of 4 Title: " CITY OF SAN BERNARDINO DEVELOPMENT SERVICES Approved By: James Flink Director. Development Services Department Date: PYRAMID BUILDING &: CONSTRUCTtON CONTRACTOR Accepted By; Dale:: z j, 10 J - . Approvtd By City Council MCC Agllnda llem No. Dale: Approved . -. .. .. ~ 760-949-8480 p.l Oct 17. OO~02~35p P~~amid Const~uetion SAN BERN. CITY OF PUBLIC WORKS 300 N. D. ST. 3RD FLOOR SAN BERNARDINO, CALIF. 909-384-5111 909-384--S15.~ Pyramid Building & Construction :t i ton. It 11I1, till... BIPLOC N R IIOCI!i03-P DATE: 10117/00 MOUNTAIN/39TH ST IMP ATTN MIKE GRUBBS CHANGE ORDER MOUNTAIN/39TH ST SAN BERNARDINO PAGE10FI lI!1M DESCRIPTION OUANTITY UNIT UNIT COST FXTENSION 1 PLACE '" BLOCK WALL AS PER PLAN AND S LESSCURBANDWALL"8" TALL ~ 97S LF 5 84.so 5 82,387.so Z ABB PeR III.NBICAP JlMIP 1 U S I,500AIU S 1,1Cl1111O ;-;-e/..-&'; h_h" hhlnO~ ,B,ct: NOTE: 10 HOLES 10' X 14' IN DEPTH WILL BE DONE ON TIME AND MATERIAL BAStS + 15% FOR OVERHEAD AND PROFIT. RATES WILL BE rAXED WITH CHANGE ORDER f4 . ALSO, ALL EXTRA WORK WILL BE DONE AS PER UNIT PRICE GIVEN IN ORIGINAL PROPOSAl ~ (..V)'tU.. 70 t3~ INsrl"fl..l.EO P=J2 rrr.?rC~ ~1'ItL. .~ 8~337..S'll $ lB 8'7'.58 TOTAL AMOUNT OF CHANGE ORDER TIlE FOlLOWING PROPOSAL INCLUDES LABOR, EQUIPMENT, MATERIALS, FRElGHr AND TAXES. PRICES ARE B1DAT tletlUNIBN,tlet1 PIlEVJ\Ul~t~~IS<lOODFOR30DAYS FROM ABOVE DATE. C#t.Irt&tc:1' "j!E1l/VI PffS PH~IIIt--IIK:; Wf/G?€? . . WEAPPRECIATE TIlE OPPORTUNITY TO BID ON YOUR WORK. PYRAMID BUUDING.l CONSTRUCTION SANBERN.crrYOFPUBLICWO~ ACCFYrF.DB~ VI 0 OO~ .....1A423 MAIN ST., HESPERIA, CA., 92345 * TEL. 760-949-8560 * FAX 760-949-8480 0 I~ 2 JOHN GARRISON Oct 1? 00 02:36p P~ramid Construction 760-949-8480 p.2 Pyramid Building & Construction RATE SHEET DESCRIPTION WHEEL LOADER WI OPERATOR SKIP LOADER WI OPERATOR WATER TRUCK BLADE WI OPERATOR D - 6 DOZER 613 SCRAPER 623 SCRAPER TRUCKING SEMI-END DUMP BACK HQE WI OPERATOR FOREMAN WI TRUCK & EQUIPMENT OPERATORS ONLY LABORS ONLY GRADE CHECKER WATER BABY 500 GALLON AMOUNT PER HR $ 125.00 PER HR--'-----' ._n ----------- $ 85.00 PER HR $ 60.00 PER HR $ 105.00 PER HR $ 145.00 PER HR $ 125.00 PER HR $ 145.00 PER HR $ 70.00 PER HR $ 105.00 PER HR $ 55.00 PER HR $ 45.00 PER HR $ 30.00 PER HR $ 45.00 PER HR $ 20.00 PER HR 14423 MAIN ST_, HESPERIA, CA, 92345 * TEL. 760-949-8560 * FAX 760-949-8480 :}ITY OF SAN BERNARDINt, MOUNTAIN AVENUE WALL CONTRACT NO. 10076 REVISED WALL DESIGN CCO #2 - 10/19/2000 "S@3~" faer/CAL (j C.L. . -. . , - - , '. . \ UPC~CI'fP ~If 8MlCtJ~ 6" THICK CONCRETE BLOCK SOLID GROUTED '( . :Z~ :5:!l '. - ... ..... 0000 I I # 'I C4NT. in (g , .... ... - , ; . . . .- , · It 1 t - .... ... . . . - , , , , I ,_.,~ ~ (11/1'. ... , " , , , H5"~.3;1" L /Z." 2'-6" ~ 1. No additional trees shall be removed. 2. Paint wall "Tan" on both sides. 3. Install 5 fI high by 5 fI wide tubular steel gales at three locations shown on plans. The gates and hardware shall be coated with a rust protective coating and painted black. 4. Material Specifications: A) fm = 1,500 psi B) Fy = 60,000 psi C) F'c (footing) = 2,000 psi D) F'c (curb) = 2,500 psi. 5. Replace pavement 1" thicker than existing (minimum thickness = 4', 6. 'Transitions at the north and south end will be laid out in the field by the Field Engineer. 21'-6" ;~ .. TO \ SURVEY " AI€cU /f,c. ,P,lMimGNr, /"1,,-/..Jf 7'1'I'k_ . _ _ _C6R~-m'6- fkcf1€tlT o VJI..K (..~,P8> fiLL S7f!!t? f7, D ...,."..t,- fett- /17rffcfff?D !)!?rlllt- i' 1 I --r I f 1 I ---1-' 1:1 L! OP1l0NAL CORNER SHAPE I. TOl' elf" FOOliNG ElLVA TICN 1.2 1ft (4'-0' Uti. BOND BfAU ANO~ EXIEN9~ lor EDGE TYPE 2 00 J FOOliNG _ ELEVA TION AUCEUS - ..- p AND SOND BEAMS SHALL BE GROUTED sauo. 61D mm (2'-) ~ MIN. LAP (TYP.) ~ SINGLE REINFORCING BARS SHALL BE CENTERED IN CEUS. oaJBLE ROWS OF REINFORCING BARS SHALL HA lot: lHE RElNFORCENEN T PLACEO IN EACH FACE. CORNER DETAILS flo~m (24") 115M (14) ~ 010 mm '""" (24") SONO BEAM UNITS 115M (14) EACH FAa AS BOND BEAIot LIMITS (12") 1 CllUlSE I4IN. . COURSES UAll. SPREAO FOOTING 'NPE 2 AND J BOND BEAM DETAIL PUCE FlU HEIGHT RONF"ORCDlENT EAOf SlDE CE EXPANSlOH .JOlNr CHANCE IN HeCHT. Cfl END CE WollL AI'PROX. f1NSI(O (;R0IJNl ., JOO mm (IZ") TRENCH FOOTING .I:lfi....1 FOOTING STEP DETAILS AMERICAN PUBLIC WORKS ASSOCIATION - SOUTHERN CALIFORNIA CHAPTER REINFORCED CONCRETE BLOCK WALL STANDARD P1.AN MErRIG 601 - 1 SHEEr 2 OF 4 ~. GENERAL NOTES I. GROUND UNE TO BE AT 1HE SAllE ElEVATION ON BOTH SIDES CJ' THE WALL WAll SHAll NOT BE USED TO RETAIN EARM 2. DISTANCE OF THE FOOliNG FROII DESCENDING SLOPE SHAll BE PER UBC SEC. 2907(d)J PER AGENCY REQUIREMENTS. J. AlL CONCRElE SHAll BE POURED IN ACCORDANCE WITH SSPWC SECT. J00-3.3. 4. SPECIAL INSPEClION IS NOT REQUIRED FOR WAllS. 5. PROlllOE FUll IIORTAR BED AT lHE BOTIOII or lHE ARST COURSE AND 0111 T NORTAR m \{RTICAL JOINTS OF ARST COURSE. 6. FOR TYPE or BLOCKS, BONO PI. TlERN AND JOINT ANISH, SEE PLAN. 7. YttlEN BLOCKS ARE LAID IN STACKED BooD, CONlINUOUS JOINT REINFORCEMENT SPACED AT 1.2 m (4'-0") O.c. SHALl BE PR01IIDED IN AODITloo TO THE BONO BEAN RElNfORCEl.tENT. LOCAlE RElNFORCEUENT IN JOINTS THAT ARE APPROXlIIA TE NIDPOINT BmeN BooD BEAIIS. 8. GROUT AlL CELLS. .......... ..~..-r;!IP-IIJ- r.-~ - 9. HORIZooTAl .aNTS SHALl BE TOOLD CONCAVE OR WEATHERED. \{RTlCAL JOINTS SHAll BE TOOLED CONCAVE OR RAKED. WEATHERED AND RAKED JOINTS ARE NOT PERlAITTED FOR SLUlAPED BLOCKS. 10. HOllOW NASONRY UNITS...ASlM C90, GRADE N, rtPE lORn, NORI.tAR VtEJGiT UNITS WITH IIAX1I1UII UNEAR SHRINKAGE OF o.06~ MORTAR ... 1:0.05: 4.5 PORTLAND CENENT:UME:SAND RAllO GROOT..... 1:3:2 PORTlAND CEUENT:SANO:PEA GRAVEL RATIO . , r c=14 IAPa (2,000 PSI) 60 11. REINFORCING SHALL BE tR'il;; lie (GRADE 401, AND LAPPED A IAINIMUN 40 BAR OIl.. UNLESS NOlED OTHERWISE PER SSPWC SECTION 201-2. JOINT REINFORCING WIRE SHAlL BE PER 1.5TII 1.82. 12. USE TABULAR INFORMATION FOR THE NEXT HIGiER "H" FOR INTERIlEOIAlE WAll. HElGiTS THAT ARE SEMEN THE "H"s GIVEN. 13. BOND BEAlIS SHAll. BE PLACED AT TOP Of WAll AND SUBSEOUENll Y SPACED NOT TO EXCEED 1.2 m (4'-0") O.C. BElOW. 14. THE BlOCK WAlL SHAlL BE CONSTRUCTED IN ACCORDANCE'MTH SSPWC SEC. 303-4.1. 15. CONCRElE SHALL BE 295-C-17 (500-C-2500) PER SSPWC SECTION 201-2. 16. DIIIENSlONS SHO'Ml ON THIS PLAN FOR IAElRIC AND ENCUSH UNITS ARE NOT EXACllY EQUAL VALUES. IF NElRIC UNITS ARE USED, All VAlUES USED FOR CONSTRUCTION SHAll BE UETRIC UNITS. IF ENCUSH UNITS ARE USED, ALL AlL VAWES USED FOR CONSTRUCTION SHALL BE ENCUSH UNITS. AMERICAN PUBLIC WORKS ASSOCIA nON - SOUTHERN CALIFORNIA CHAPTER STAHlIARO PlAN METRIC REINFORCED CONCRETE BLOCK WALL 601 - 1 SHEET 4 OF 4 Jan .. 31 01 01:00p P~ramid Construotion 760-949-8480 p.2 ()(.1ober 31. 2000: Excavation, backfill and compaction where tree roots were removed foreman $ 55.00/hr 4 Hrs. $ 220.00 Laborer $ 30.00ihr. 4 r In;. $ 120.00 Backhoc $ :l:l.46/hr. 4Hrs. $ 89.34 Operator $ 45.00/hr. 4Hrs: $ 180.00 Compact;cm Wheel $ 11.881hr. 4Hrs. $.. 'U.S2. $ 657.36 November 1.2000: EXl;llvaliull. backfill and oompaction where tree roots were removGd. Foreman Laborer Backhoe Operator Compaction Wheel Water Truck $ 55.00ihr. $ 30.00lhr. $ 22.46/hr. $ 45.00/h.... $ 11.88/hr. $ 25.00lhr. 8 1ll'S. 8Hrs. 8 Hrs. SIIrs. 8Hrs. 8 Hrs. November 2. 2m Backfill and compact Foreman Labuct:r Backhoe Operator Compaction Wheel Water truck $ 55.00/hr. $ 30.00/hr. $ 22.46/hr. S 45.00/hr. $ 1 I. 881hi. $ 25.00/hr. 8Hl'S. anTs. 8Hrs. grilli. SHrs. 8 Hls. November 3. 2ooU: Hackfill and compact Foreman Laborer . Backhoe Operator . Compa"tion Wht:C1 Water Truck. :& 55.00Ihr. $ 30.00/hr. $ 22.46/hr. $ 45.00/hr. $ 1 1. 88/hr. $ 25.00/hr. 6 Hrs. 6 Hrs. 6Hrs. 6 l-1rs. 6 Ifrs. 6Hrs. $ 440.00 S 240.00 $ 179.68 $ 360.00 S 95.04 L.1.00.00 $ 1,514.72 $ 440.00 $ 240.00 S 179.68 $ 360.00 $ 95.04 $ 200.00 $ 1,514.1:.1. $ 330.00 $ 180.00 $ 134.76 $ 270.00 $ 71.28 $ 150.00 $ 1,136.04 RO. Box 3306 . Victoruille, CA 92393 · (760) 949-8560 . Fax (760) 949.8480 . -_. Jan 31 01 Ol:OOp P~~amid Con5t~uction November 6. 2000: Backfill and compact Backhoe Operator Second Operator Skip Loader w/Operator Compaction Wheel Water Truck $ 22.46/hr. $ 45.00/hr. S 45.00/hr. $ 14.84/hr. S 11.88/hr. $ 25.00/hr. 8Hrs. 8Hrs. 8Hrs. 8Hrs. 8Hrs. 4Hrs. December 6. 2000: Compact bottom of footing for block wall. 760-949-8480 p.3 $ 179.68 $ 360.00 $ 360.00 $ 118.72 S 95.04 $ 100.00 $ 1,213.44 Operator $ 45.001hr. 21h S 90.00 Laborers (2) $ 30.00/hr. 16 Hes. S 480.00 Overtime for (2) Laborers $ 45.00/hL 5Hrs . $ 225.00 Shcepstool Roller $134 72/day 2 Days $ 269.44 Water Truck $ 25.00/hr. 8Hrs. S 200.00 $ 1.264.44 December 7. 2000: Loading and haul off asphalt, concrete and debris. S 26.44/hr. $ 45.00/hr. $ 30.00/hr. $ 30.00/hr. $ 8.9 I Ihr. $ 67.oo/hr. SHrs. SHes. 16Hrs. 9Hrs . 8H~. aHTS. Backhoe Operator Laborers (2) "'Laborers (2) Dobcat Trucking Dump Fees l:)WIlI' 1'\;." (1 Lu..d hC\!oh, b" Iv<ll8:. I;..<b NO TICKT:T) "Working with loading $ 211.52 $ 360.00 $ 480.00 $ 270.00 $ 71.28 $ 536.00 $ 51.00 DISALLOWED $ (,55.00 $ 2,641:1.89 1,985.80 December 8. 2000: Loading and haul otf asphalt, concrete and debris. Backhoe :& 26.44/hr. 8Hrs. $ 211.52 Operator $ 4S.oo/hr. 8 l-lrs. $ 360.00 Opcrdtor Overtime $ 67 .50/hr. .5/Hn. S 33.75 Laborers (3) $ 30.00/hr. 18 HIS. S 540.00 Bobcat $ 8.91/hr. aHTS. $ 71.:28 Trucking $ 67. OO/hr. 10.75 Hrs. $ 720.25 Dump Fees :& 507.00 S 2.443.80 .:Ian :31 01 01:00p P~ramid Con5~ruc~ion 760-949-8480 S~.I!.\emjler 8 thn19ctobcr 3 I. 2000: Job changed due to the City of San Bernardino changing the scope ofwurk. Traffic Control 1 Month Rental $ 625.10 Sub Total 15% Profit and Overhead $ 1JJlHl.12 $ I.~ 51.56 TOTAL AMOUNT DUE: SloiClhlCl8 . Asphalt paVlOg 4" ThIck 154.8 tons@)$'JO.OO/ton $ 13,932.00 $lA.A93.98 TOTAl. p.4 12,355.42 1,853.31 14,208.73 28,140.73