- REQUESOOR COUNCIL ACTION
File No. 1.667
Approval of Contract Change Orders
Subject: Nos. 10, 11, 12 - Pavement Rehab-
ilitation on Waterman Avenue, from
Mill St. to 5th St., per Plan
No. 8038 --
E. L. YEAGER CONSTRUCTION
CITY OF SAN BEIQARDINO
From:
ROGER G . HARDGRAVE
Dept:
Public Works/Engineering
Date:
8-25-92
Synopsis of Previous Council action:
June, 1988 Allocation of $100,000 in 1988/89 Street Construction
Fund Budget approved.
Resolution No. 89-197 adopted authorizing execution
of agreement with ASL Consulting Engineers for
design.
Supplemental allocation of $60,000 approved.
Supplemental allocation of $1,498,000 approved.
Plans approved and authorization granted to advertise
for bids.
Resolution No. 91-128 adopted authorizing execution
of Program Supplement No. 65.
Resolution No. 91-126 adopted authorizing execution
of an Agreement with the County. (Cont. on 2nd Page)
06-19-89
June, 1989
June, 1990
02-18-91
04-15-91
04-15-91
Recommended motion:
That Change Orders Nos. 10, 11, & 12 to the contract with E. L.
Yeager Construction for the pavement rehabilitation on Waterman
Avenue, from Mill to Fifth Street, in accordance with Plan No.
8038, be approved 1 to authorize the Contractor to install chain
link gates at the County Flood Control access roads, install addi-
tional steel reinforcement at the bridge widening, and replace the
existing Traffic Signal Heads on newly installed Traffic Signal
Poles, at a total increase in the contract price of $25 14.321
from $1,193,817.06 to $1,218,931.38.
cc: Shauna Clark
Contact person: Roqer G. Hardqrave
Staff Report,
Supporting data attached: CCO I s Nos. 10, 11, 12
FUNDING REQUIREMENTS:
Phone:
5025
Ward:
1
Amount: $25,114.32 (Street Construction Fund)
Source: (Acct. No.!
242-362-57667
Acct.Oescri tion Waterman Avenue Rehabilitation
from Mill Street to 5th Street
Council Notes:
::----
75-0262
Agenda Item No /0
.
o
..........
J1e No. 1. 667
SYNOPSIS OF PREVIOUS COUNCIL ACTION (Cont):
07-15-91
09-03-91
06-01-92
06-15-92
08-03-92
08-03-92
8-25-92
Resolution No. 91-325 adopted awarding a contract to
E.L. Yeager.
Resolution No. 91-391 adopted authorizing execution
of Program Supplement No. 66.
Change Order No. 7 approved for widening northeast
corner of Fifth Street.
Change Order No. 6 approved for installing and paving
ramps for Flood Control District access roads at
Twin/Warm Creek.
Change Order No. 8 approved, for re-paving parking
lot at Navy Reserve Center.
Change Order No. 9 approved for installation of
hardware for Traffic Signal Interconnect system.
,-
CI~Y OF 'SAN BERCARDINO - REQUESTCJoR COUNCIL ACTION
STAFF REPORT
A permit was required from the San Bernardino County Flood
Control District for work involved in widening the Waterman
Avenue Bridge over the East Twin Creek Channel. This permit re-
quired that the 4 existing pipe gates at their access roads be
upgraded to chain link. Since this upgrade was a condition for
issuance of the required permit from the Flood Control District,
the Contractor was directed to proceed on a time and material
basis. The actual costs incurred were $5,492.26. Contract
Change Order No. 10 authorizes payment to the Contractor for the
actual costs incurred, as provided in Section 9-1.03 of the State
Standard Specifications.
The estimated quantity of reinforcing steel in the
contract documents was 23,760 1bs. This estimate was prepared by
the private consulting engineer, based upon a standard of so many
pounds of reinforcing steel per cubic yard of concrete. The
actual quantity of steel installed was 48,556 Ibs., based upon
actual delivery tickets. Section 4-1.03B, of the State Standard
Specifications, provides that any increase of quantities in
excess of 25% must be authorized by change order. Contract
Change Order No. 11 authorizes payment of $12,256.40 to the
Contractor for the 18,856 Ibs. of reinforcing steel actually
installed, in excess of 125% of the bid quantity.
The plans direct that some of the signal heads that are to
be removed be salvaged and reinstalled. These heads had 8-inch
lenses. During construction, the Caltrans representative noticed
that some of these heads were deteriorated due to their long
service life, and suggested that new signal heads with 12-inch
lenses be installed instead of the salvaged ones. The signal
heads to be removed were inventoried, and 15 identified as not
suitable for reinstallation. New signal heads were installed at
an agreed upon price of $7,365.66. Since this is traffic signal
work, the entire cost of Change Order No. 12 will be financed
with Federal-Aid Urban Funds.
The total cost of Contract Change Orders Nos. 10, 11, and
12 is $25,114.32. There will be a balance of $109,816.93 in
contingency funds after the cost of these 3 change orders has
been deducted.
We recommend that Change Orders Nos. 10, 11 & 12 be
approved.
8-25-92
75-0264
c
~
'__..J
CONTRACT CHANGE ORDER NO. 10
ROAD Waterman Avenue-Mill to 5th
FED NO.
TO: E. L. Yeager
You are hereby directed to make the herein described changes from the plans and
specifications or do the following described work not included in the plans and
specifications on this contract. NOTE: This change order is not effective until
aooroved bv the state Hiahwav Enaineer
Description of work to be done, estimate of quantities, and prices to be paid.
Segregate between additional work at contract price, agreed price and force
account. Unless otherwise stated, rates for\rental of equipment cover only such
time as eouioment is actuallv used and no allowance will be made for idle time.
The last percentage shown is not accumulated increase of decrease from the
original quantity in the Engineers Estimate.
EXTRA WORK AT FORCE ACCOUNT:
REV NO.
SUPPL. NO.
SHEET 1 OF 1
CONTRACT NO. 8038
Install 4 DOUble Drive Chain Link Gates and Fencing at the Flood Control
Right-of-Way, as directed by the Resident Engineer, at a total cost of
$5,492.26.
ESTIMATED COST DECREASE S
By reason of this order the
-0- working days
INCREASE S 5.492.26
time of completion will be adjusted as follows:
Submitted by:
Resident Engineer,
Date:
Approval Recommended:
Date:
Approved:
City Engineer
Date:
We the undersigned contractor, have given careful consideration to the change
proposed and hereby agree, if this proposal is approved, that we will provide all
equipment, furnish all material, except as may otherwise be noted above, and
perform all services necessary for the work above specified, and will accept as
full oavment therefor the orices shown above.
Accepted Date: Contractor:
By: Title:
If the contractor does not sign acceptance of this order, his attention is
directed to the requirements of the specifications as to proceeding with the work
and filing a written protest within the time therein specifie~.
c
-,
~
CONTRACT CHANGE ORDER NO. 11 '
ROAD Waterman Avenue-Mill to 5th
FED NO.
TO: E. L. Yeager
You are hereby directed to make the herein described changes from the plans and
specifications or do the following described work not included in the plans and
specifications on this contract. NOTE: This change order is not effective until
aooroved bv the state Hiahwav Enaineer
Description of work to be done, estimate of quantities, and prices to be paid.
Segregate between additional work at contract price, agreed price and force
account. Unless otherwise stated, rates for rental of equipment cover only such
time as eouioment is actuallv used and no allowance will be made for idle time.
The last percentage shown is not accumulated increase of decrease from the
original quantity in the Engineers Estimate.
EXTRA WORK AT FORCE ACCOUNT:
REV NO.
SUPPL. NO.
SHEET 1 OF 1
CONTRACT NO. 8038
Provide and Install 18,856 lbs. of reinforcing steel at the contract bid price
,f $.65 per lb., at a total cost of $12,256.40.
:STIMATED COST DECREASE S
INCREASE S 12.256.40
;y reason of this order the time of completion will be adjusted as follows:
-0- working days
ubmitted by:
Resident Engineer,
Date:
pproval Recommended:
Date:
pproved:
City Engineer
Date:
a the undersigned contractor, have given careful consideration to the change
~oposed and hereby agree, if this proposal is approved, that we will provide all
~ipment, furnish all material, except as may otherwise be noted above, and
arform all services necessary for the work above specified, and will accept as
III oavment therefor the orices shown above.
:cepted Date: Contractor:
r: Title:
: the contractor does not sign acceptance of this order, his attention is
.rected to the requirements of the specifications as to proceeding with the work
Id filing a written protest within the time therein specified.
c
,---.",
....)
CONTRACT CHANGE ORDER NO. 12
ROAD Waterman Avenue-Mill to 5th
FED NO.
TO: E. L. Yeager
You are hereby directed to make the herein described changes from the plans and
specifications or do the following described work not included in the plans and
specifications on this contract. NOTE: This change order is not effective until
aooroved bv the State Hiahwav Enaineer
Description of work to be done, estimate of quantities, and prices to be paid.
Segregate between additional work at contract price, agreed price and force
account. Unless otherwise stated, rates for rental of equipment cover only such
time as eouioment is actuallv used and no allowance will be made for idle time.
The last percentage shown is not accumulated increase of decrease from the
original quantity in the Engineers Estimate.
EXTRA WORK AT AGREED PRICE:
REV NO.
SUPPL. NO.
SHEET 1 OF 1
CONTRACT NO. 8038
Provide 15 new Traffic Signal Heads, to be mounted on the new Traffic Signal
Poles, located on Waterman Avenue, at Rialto/Second/Third/Fourth/ and Fifth
streets, at the agreed price of $7,365.66.
ESTIMATED COST DECREASE S
By reason of this order the
-0- working days
INCREASE S 7.365.66
time of completion will be adjusted as follows:
Submitted by:
Resident Enqineer,
Date:
Approval Recommended:
Date:
Approved:
City Engineer
Date:
We the undersigned contractor, have given careful consideration to the change
proposed and hereby agree, if this proposal is approved, that we will provide all
equipment, furnish all material, except as may otherwise be noted above, and
~erform all services necessary for the work above specified, and will accept as
full oavment therefor the orices shown above.
\ccepted Date:
Contractor:
3y:
Title:
:f the contractor does not sign acceptance of this order, his attention is
lirected to the requirements of the specifications as to proceeding with the work
lnd filing a written protest within the time therein specified.