Loading...
HomeMy WebLinkAbout08-Public Works -" CITY OF SAN BER~DINO - REQUESTFDt'o.CPH~~IL ACTION Date: 7-09-92 . Approval of Contract Change Order Subject: No. TWO - Replacment of Sewer Line in .0. Street, from 7th Street to 9th Street, per Plan No. 8587 - T. L. PAVLICH CONSTRUCTION From: ROGER G . HARDGRAVE Dept: Public Works Synopsis of Previous Council action: 09-16-91 -- Transfer of $78,000, from Account No. 245-365-57731, "Cajon Truck Extension," to Account No. 245-365- 57886," Replacement of Sewer in "0" Street, approved. 10-21-91 Plans approved and authorization granted to advertise for bids. 01-06-92 Bid for relining sewer line rejected, and authoriza- tion granted to advertise for bids. 05-04-92 Resolution No. 92-157 adopted awarding contract to T. L. Pavlich Construction for low bid price of $72,190.00. Recommended motion: That Change Order No. Two to the contract with T. L. Pavlich Con- struction, for the replacement of sewer on "0" Street, in accordance with Plan NO. 8587, be approved; to authorize the Contractor to install approximately 200 feet of additional 8-inch sewer pipeline, in order to connect the sewer in 8th Street to the new main in "0" Street, for an estimated increase in the contract price of $8,694.00, from $73,940.00 to $82,634.00. cc: Shauna Clark Andy Green Manuel Moreno, Jr. Contact person: Roqer G. Hardqrave Phone: Staff Report, Supporting data attached: Contract Chanqe Order No.2 Ward: 5025 1 FUNDING REQUIREMENTS: Amount: $8,694.00 (Sewer Line Construction Fund) Source: (Acct. No.) 245-365-57886 (Acct, DescriPtion) dA'~_ Re~~; 4!7?;Z ::" .$ 7$./G?o, - I!?~ ' r~ St., from 7th St. to 9th St. Agenda Item No ~ CITY,OF SAN BERNt"DINO - REQUEST ~ COUNCIL ACTION STAFF REPORT The plans for replacement of the sewer main in "0" Street direct the existing sewer line, in 8th Street, to be connected to the new sewer line being constructed in "0" Street. During the excavation and installation of the sewer main in "0" Street, it was found that the sewer main on 8th Street did not tie into the existing "0" Street sewer. Public Services per- sonnel were notified, and they investigated the existing sewer line. They were unable to provide any additional information on the point or connection. It should be noted that the existing sewer line in "0" Street was constructed in 1889, and the records are not clear. The flow in the sewer main in 8th Street appears to be impeded. In order to insure the proper functioning of this sewer main, it will be necessary to provide a connection to the new sewer main being installed in "0" Street. It will be required to install about 200 feet of additional sewer main, in order to make this connection. The Contractor has agreed to install the additional length of 8-inch sewer main at the contract unit bid price, plus $7.47 per linear foot for replacement of permanent pavement surfacing. This will result in an estimated increase of $8,694.00 in the contract price, from $73,940.00 to $82,634.00. There is an available balance of $12,060 in contingencies, which can be used to finance the cost of this extra work. We recommend that Change Order No. Two be approved. 7-09-92 75-0264 --.,-,. " o . Replacement of Sewer Ma~n Project: in "D" St." 7th to 9th St. o Date: 7-09-92 Plan No. 8587 File No. 3.14-17 ENGINEERING DIVISION DEPARTMENT OF PUBLIC WORKS CITY OF SAN BERNARDINO. CALIFORNIA CONTRACT CHANGE ORDER NO. TWO (Change necessitated because of field conditions) T. L. Pavlich Construction 10347 - 60th Street To: Mira Lama, CA 91752 Gentlemen: You are hereby authorized and directed to perform the following work: Installation of approximately 200 lineal feet of 8-inch sewer main from Station 5+80, approximately 100 lineal feet north~ relocating a sewer manhole at station 6+80, continuing approxi- mately 100 lineal feet west and tying into the existing 8-inch sewer line on 8th St. All work shall be accomplished at the contract unit prices of $36.00 per lineal foot for installation of sewer main plus $7.41 per lineal foot for A.C. pavement repair. Total extra work cost added to contract..........$ 8,694.00 73,940.00 82,634.00 Previous Contract Prtce..........................$ Amended Cost Price...............................$ Additional time to complete contract due to Change Ord.r..................................... Two Workinq Davs CONTRACTOR CITY OF SAN BERNARDINO " By: Title: By: ROGER G. HARDGRAVE Director of Public Worksl City Engineer Approved Date: Accepted DUe: