HomeMy WebLinkAbout02-Public Works c C CITY OF SAN BERNARDINO Fi.,) No. 6.141-K ..) - REQUEST FOR COUNCIL ~!3-N. ROGER G. HARDGRAVE REC'D:-ADJilIH.Olliibject: Publ i c Works/Engi neel1ga7gSEP 1 0 r~1 3: :;" Finding of Need for Health & Safety Reasons -- Approval of Plans & Authorization to Advertise for Bids -- Installation of Lights for Fiscalini Field, per Plan No. 7332 From: Dept: Date: 9-09-87 Synopsis of Previous Council action: June, 1987 --- Allocation of $117,090 from 1987/88 CDBG Program, for new lights at Fiscalini Field, approved. Recommended motion: I. That a finding be made that the installation of new lighting standards at Fiscalini Field, in accordance with Plan No. 7332, is needed for health and safety reasons. 2. That the plans for installation of new lighting standards for Fiscalini Field, in accordance with Plan No. 7332, be approved; and the Director of Public Works/City Engineer authorized to advertise for bids. cc: Ray Schweitzer Jim Penman W. Knudson A. Ramos K. Henderson Ward: 5025 2 Contact person: Roqer G. Hardqrave Supporting data attached: Staff Report Phone: FUNDING REOUIREMENTS: Amount: $94,000 Source: (ACCT. NO.) 121-544-57SQ6 (ACCT. DESCRIPTION) Flnanca: j./a..-t?;LA Council Notes: APPROVED BY CITY ATTORNEY DATE: '1- /0 ).7 j H..D'''I Agenda Item No. ,,;L. CI,c OF SAN BERNARDICD - REQUEO FOR COUNCIL ACON STAFF REPORT The lighting towers at Fiscalini Field were installed as a WPA Project in the 1930's. They have exceeded their anticipated useful life and could soon be unsafe through the normal rusting process associated with weathering. Failure of one of these towers could result in loss of life or injury. Lighting levels on the playing field are not completely in accordance with standards issued by the California League. In- stallation of these new lighting standards will raise the light- ing levels to the criteria set forth for Class A baseball. Plans for installation of these new lighting standards have been prepared by the Engineering Division and the project is ready to be advertised for bids. The project will consist, in general, of removing the existing lighting towers and installing new lighting standards and fixtures. Provision may be made for mounting speakers on the new standards, if deemed appropriate by the noise study now being conducted. Removal of the 4 infield towers and installation of 4 new lighting standards are included in the Basic Bid. Removal of the 4 outfield towers and installa- tion of new standards will be included as Additive Alternate "A." This method will ensure that the lighting in the infield will be upgraded, and the outfield facilities will be included in the contract, if a favorable bid is received or if a source of supple- mental funding can be identified. Listed below is an estimate of the total project cost: Sub-Total Contingencies (5%)i TOTAL ESTIMATED PROJECT COST $ 78,000 11,700 $ 89,700 4,300 $ 94,000 Construction Contract (Basic Bid) Engr. & Insp. (W.O. #1809) Additive Alternate "A" $ 51,000 An amount of $117,090 has been allocated, under Account No. 121-544-57596, from the 1987/88 CDBG Program to finance the costs incurred for this project. We recommend that a finding be made that this project is needed for health and safety reasons, the plans approved, and authorization granted to advertise for bids. 9-09-87 75-0264