Loading...
HomeMy WebLinkAbout29-City Administrator CITOOF SAN BERNARDI~ - REQU~T FOR COUNCIL~N From: RAYMOND D. SCHWEITZER City Administrator March 24, 1987 Subject:Review and Approval of the Central Garage Management Audit by Hughes, Heiss and Associates. Dept: Dat~ Synopsis of Previous CouncillCtion: 7/7/86 -- Approved RFP and authorized City Administrator to solicit proposals for a Management Audit of the Central Garage. 9/22/86 -- Adopted resolution to select Hughes, Heiss & Associates to conduct a management audit of the Central Garage Division, Public Works Department, and set up Council Committee to work with the consultant during the course of the study. Recommended motion: That the final report of the Central Garage Management Audit by Hughes, Heiss & Associates be approved and the City Administrator directed to work with the Public Works Director and Garage Superintendent to evaluate the impact of each recommendation and devise a plan of implementation with time frame. Contect person: Roger Hardgrave Supporting date ettlChed: yes Phone: 5025 Ward: FUNDING REQUIREMENTS: Amount: Source: (ACCT. NO.) (ACCT. DESCRIPTION) Finance: Council Notel: n.d!'! Agenda Item No._ ~ r. CITOOF SAN BERNARDI to - REQUECJ FOR COUNCIL AeON STAFF REPORT The Final Report on the Central Garage audit prepared by Hughes, Heiss & Associates is a product based on observations and study of the Garage operation, interviews and discussions with Garage staff and user departments, and analysis of data gathered on budgets, fleet inventory, usage, maintenance policies and procedures and staff assignments, etc. The Council appointed Ad Hoc Committee consisted of Councilwoman Esther Estrada and Councilman Jack Reilly worked' closely with staff and consultants, and gave meaningful suggestions and direction throughout the entire study phase. The report is organized into six chapters: ChaDter 1 provides, a descriptive overview of Garage organization and operations. ChaDter 2 - provides an assessment of the organizational structure of the Garage. ChaDter 3 - provides an assessment of staff utilization and service levels. ChaDter 4 - provides an analysis of the management of the City's fleet. ChaDter 5 - presents an analysis of the equipment maintenance information system (MIS). ChaDter 6 - presents a plan of implementation with proposed dates for the recommendations. Major findings and key recommendations for each Chapter are capsulized in the cover letter of the Final Report. Staff of the Public Works Department and the City Administrator's Office have reviewed the report. Recommendation: Approve the Final Report and direct the City Administrator to work with the Central Garage and other affected departments to evaluate the impact of each recommendation: then devise a plan of implementation with a realistic time frame. 75.0264 3-1.i{.-f7 Jl - - - ~ au. .d \ o o ~ HUGHES . HEISS & ASSOCIATES MANAGEMENT CONSULTANTS 675 Mariners Island Blvd. I Suite 106 San Mateo. California 9440.- 415/57ll-6111 MIIrch 1, 1987 Mr. Raymond Schwel1%er CIty AdmInIstrator CIty of San BernardIno 300 North "0" Straet San BernardIno. CalIfornIa 92418 Dear It'. Schwel 1%er: I n the Fa II of 1986, we I n I tl ated a study of the CI ty of San B.-nardl no to analyze the organIzatIon and operatIons of the Central Garage Dlv Islon. ThIs report presents our fIndIngs. conclusIons, and recommendatIons. The purpose of th I s I etter I s to encapsul ate these fInd I ngs and r8COllllllendatlons. Our report Is organIzed Into sIx chapters. Key components of our analysIs are briefly slIIIIIarlzed below: Chapter I provIdes a descrIptIve overvIew of current Central Garage DIvIsIon organIzatIon and operatIons. PrIncIpal fIndIngs contaIned In thIs chapter Include the fol lowIng: The staff Ing of the Dlv Islon has decreased by four posItIons sInce FY 1982-83. . Over the SlIftIe perIod of tIme, the sIze of the fleet has grown by 55 pIeces of equIpment or 11'. SInce FY 1982-83, total Garage DIvIsIon costs have grown by approxImately 1~ or 3.6' a year. The PublIc Serv Ices two-th I rds of total maIntenance costs. Department accounts for al most CIty EquIpment operatIng and Chapter II prov Ides an assessment of the organIzatIonal structure of the Central Garage DIvIsIon. Key fIndIngs and recommendatIons Include the fol lowIng: (Si) III o o o o The equipment Maintenance Superintendent should be reel asslf led to Fleet Manager and the responslbll Itles of the positIon broadened to prov Ide full-tIme management and control over all aspects of the CIty's fleet, assure greater flexibIlIty In meeting the CIty's fleet requIrements through pooling of vehicles, enable the CIty to reduce fleet costs through I ntens Ive ana I ys I s of utI! lzatlon and fleet size. and to Improve the plannIng and analysIs of need for equipment repl acement. A User's Comm Ittee shoul d be established to prov Ide a forllll for exchange of concerns regardIng the quality of equipment mal ntenance, turnaround tIme for repa I rs, and equ I pment replacement needs. The roles and respons/bll Itles of the Central Gerage DIvision and the PurchasIng Dlv Islon In the procurement and werehouslng parts need to be clearly del lneated. The Storekeeper I lISsllJ'led to the Parts Roan shoul d be assigned responslbl! Ity for callIng parts warehouses to locate needed parts; the Storekeeper I shoul d "chase" parts. Staff of the Central Garage Dlv Islon should not be Involved In these actIvitIes. The rol e of the FI eet Ma I ntenance Superv I SOl'" shou I d be refocused on hIgh "payback" analysis of fleet cost control opportun I tl es. Chapter III prov Ides an lISsessment of staff utll lzat/on and servIce levels. Key findIngs Include: The turnaround for equIpment maintenance and repairs 15 excellent. A total of 80s of all repaIrs receIve "sam~day servIce". In other words, the maintenance and repaIr of the ,equIpment Is c:cmpleted the same day of arrival at the DivIsion. LIttle overtIme Is required to acc:cmpl Ish the work performed by the DIvIsIon. Rei atl vel y Ilttl e equ I pment mal ntenance 15 be I ng "f lII"IlIed out" to outsIde vendors. The level of staff utll lzatlon can be Improved. this Is IndIcated bV a number of factors. FIrst, the amount of Indl ract or I abor hours -- or the overhead - lIIlIounts to ,,, of total hours worked. Second, the actual tIme taken by staff to repaIr equIpment exceeds the manufacturer's allowed shop tIme In many Instances. thIrd, work samplIng IdentIfied the level of productIvity of equIpment maintenance and repair staff as 67S versus an expected 85S. -2- o o o o The preventIve maIntenance of lIght equIpment meets the objectIves of the DIvIsIon, but that of heavy equIpment fall s fer short of these obJectIves. A number of actIons shoul d be taken to Improve the eff Iclent utIlIzatIon of staff as well as the preventIve maIntenance of heavy equIpment. The EquIpment Meehanlc Forllllen need to spend more tIme on the shop floor supervIsIng theIr staff and need to functIon as "servlcewrlters". A work plannIng and schedulIng system should be Implllllented. A part-tIme hourly laborer should be authorIzed for the Central Garage DIvIsIon to relIeve equIpment maIntenance staff fran several low skill tasks. The cost of thIs posItIon would apprOKlmately $5.000 annually In salary. The We' der I pos I tl on shou I d be de I eted. and the cost 5llvlngs utll Ized to establ Ish another posItIon -- an EquIpment Mechanic Hel per to Improve preventIve ma I ntenance of heavy eq u I pment. Maintenance of SIll a I I grounds maIntenance equIpment should be contracted. ThIs wIll cost an addItIonal $8.000 annually, but wfll free up 31. of the tIme of an EquIpment Meehanle for preventIve malntenanee of heavy equIpment. The repaIr of refuse bins should be reassIgned to the Publ Ie Serv lees Depar1ment and the efforts of the Auto Body Repa I rman refocused on body repa I rand pa I nt I ng. Th I s w fll enabl e the CIty to reduce Its annual budget for contract body repaIr and paIntIng -- Account 53125 -- by $35.000. . A swIng shIft should be establIshed to perform preventIve malntenanee of heevy equIpment. Key poInts regardIng thIs swIng shIft are presented below: The swing shIft should be establIshed wIth exIstIng staff. The analysIs of staff utilIzatIon elearly IndIcates the capacIty to handle addItIonal work. .. The swIng shIft should be allocated three posItIons: A lead EquIpment MechanIc, EquIpment Meehanle Helper. and an EquIpment Servlee Worker. Currently, there Is a vllCllnt EquIpment Meehanle posItIon In the light EquIpment SectIon. ThIs posItIon should be allocated to the sw Ing shIft and upgraded to lead EquIpment Meehanlc. The EquIpment Meehanlc Helper posItIon -- created by utll Iz Ing the cost 5llV Ings generated by the del.etlon of the Welder I should be allocated to -3- o o o o the swing shIft. An EquIpment ServIce Werker alloc:ated to the Heavy Equ I pment Sect I on shoul d be allocated to the swIng shIft. EstablIshment of the swing shift will cost an additIonal $4,000.00 annually In sal ary and frInge benef Its due to the upgrade of the EquIpment Machanlc to Lead EquIpment Meehan I c. .. The hours of the sw Ing shIft shoul d approxImate 1:00 pm to 9:30 pm. .. The Sterekeeper I assIgned to the parts roan shoul d prov Ide coverage fer at least hal f of the sw Ing sh I ft. Th I s w I I I requ I re another Sterekeeper I, currently assIgned to the warehouse, to provIde coverage fer pert of the mernl ng until the other Sterekeeper I arrIves at 9:00 l1li. .. The sw Ing sh 1ft shoul d be establIshed as soon as possIble. Chapter IV provIdes an analysIs of the management of the CI1y's fleet. Key recommendatIons Include the fol lowIng: A slgnlf lcant portIon of the CI1y's fleet Is underutlllzed. The EquIpment MaIntenance SuperIntendent should IdentIfy specIfIc opportunItIes fer reducIng the fleet. ReductIon of the Cltyrs fleet -- In the magnItude of 6' to 12J - Is cl early achlevabl e. An equIpment pool should be establIshed both at CI1y Hall and at the Central Garage Dlv Islon and the number of vehlcl es assIgned to employees reduced. The, Central Garage DIvIsIon should develop perfermance contracts wIth operatIng depar1ments regardIng the number of equl pment avail abl e fer use by these depar1ments. The CI1y needs to develop a cl1ywlde polIcy on equIpment abuse, the EquIpment MaIntenance SuperIntendent should document Instances of equIpment abuse and notIfy the oper at I ng de par 1ment , and cia II Y oper ater eq u I pment checklIsts shoul d be ut I I Ized fer heavy equ I pment. The preventIve mel ntenance progrllll shoul d be rev lsed and Include utIlIzatIon of checklIsts, and notIfIcatIon of operatIng depar1ments of when theIr equIpment Is due fer preventIve maIntenance. Replacement guIdelInes need to be developed fer equIpment, and the Equipment MaIntenance SuperIntendent should prepare a fIve year ~I an fer repl acement of equl pment. -4- o o o o . The CIty shoul d Instill I sIx to seven hoists for ..e.lntenance and repair of heevy equIpment on a "phesed-on" basis ovr the next three to four y..rs. Two three post hol sts shoul d be Installed In FY 1987-88. The cost of these 1wo hoists would approxImately $60,000 IncludIng InstallatIon. Chapter V presents an analysIs of the equIpment maIntenance InformatIon system. Key recommendatIons Include the followIng: An addItional shop schedulIng and control system should be developed at an estImated cost of $4,000. Four addItIonal computer terminals are needed for the Central Grage DIvIsion. The cost of this equIpment would approxImate $15,000. The autanated fuelIng system needs to be pranptl y lInked to the CIty's maInframe. HlstorlCllI datil for equIpment maIntenance needs to be entered Into the equIpment maIntenance Informatl9/'l system. The cost of a part-tIme clerk to enter thIs detll would apprOKlmately $5,000. The lleta ProcessIng DIvIsIon and the Central Garage DIvIsIon needs to reach agreenent on the format of the output reports for the equIpment maIntenance InformatIon sy stem. The Central GlI/"age DIvIsIon should pranptly enter equIpment ldentlf IClItlon detll Into the equIpment maIntenance InformatIon system. Chapter V I presents a plan of Impl ementatl on for these recommend,tlons. It has been a pl8llsure to work wIth the CIty of San Brnardlno In thIs lISS I gnment. GlI/"Y Goel In Sen I or Assoc late SlnC8re~ ~HEISS & ASSOCIATES -5-