Loading...
HomeMy WebLinkAbout10-Public Works Dept: Public Works/Engineering FQ No. 6,1483 0 - RI!QUI!ST FOR COUNCIL ;l9N EC'O _AD~~W'j:F!>pproval of Change Order No. ONE -- ,. . _ ~onstruction of Restroom/Concession '387 HnR 12 PM 4: 2~uilding at Del Vallejo Jr, High -- , - Plan No, 6865 --DUNCAN CONSTRUCTION, INC, o 0 CITY OF SAN BI!RNARDINO From: ROGER G, HARDGRAVE Date: 3-10-87 Synopsis of Previous Council action: 12-17-84 -- The transfer of $55,000 to Del Vallejo Jr. High School Park Site approved. June, 1985 - An additional allocation of $30,000 approved in 1985-86 8udget. June. 1986 - An additional allocation of $80,000 approved in 1986-87 8udget. 10-06-86 -- Plans approved and authorization granted to advertise for bids, 01-19-87 -- Resolution No, 87-21 adopted awarding contract to Duncan Construction for the low bid price of $126,173.00, Recommended motion: That Change Order No, One to the contract with Duncan Construction, Inc" for the construction of a restroom/ concession building at Del Vallejo Jr, High School, in accordance with Plan No, 6865, be approved; to authorize the Contractor ro raise the finish floor elevation of the building, increase the sewer line from 4 inches to 6 inches and re-route the existing irrigation lines, at a net increase in contract price of $2,162,00, from $126,173.00 to $128,335,00. cc: Ray Schweitzer Warren Knudson Annie Ramos i~ pf"'~ -f...:::;;' Signa Con~ct penon: .10" Rnh,:)rtc:: Phone: 5225 7 Supporting de.. ettached: Staff Report Ward: FUNDING REQUIREMENTS: Amount: $2.162.00 Source: (ACCT. NO,) 243-363-57521 (ACCl, DESCRIPTION) "Del Vallejo Park Concession Stand" Finance: I-J "'- ~ A:.J Council Nates: n.n'lI~ Agenda Itam No. /0- - cfJy OF SAN BBRNARDaOo - REQUEO' FOR COUNCIL ACTON STAFF REPORT During construction of the restroom/concession building pad, it was determined that an error in measurement by the field survey crew, prior to design, resulted in a planned finish floor elevation that would not allow proper sewage line flow. In order to alleviate this situation, the building pad elevation has been raised approxi- mately one foot and the 4-inch sewer line has been increased to 6 inches, In addition, existing two-inch and one-inch irrigation lines were encountered within the building pad area. The location of these lines had not been known at the time of design. Approxi- mately 150 feet of each line must be re-routed. The contractor has agreed to perform the work for the lump sum price of $2,162.00, increasing the contract price from $126,173,00 to $128,335.00. We consider these costs to be reasonable and justified, Had the building been originally designed at the elevation to allow proper flow, it would be expected that these additional costs would be re- flected in the original bid price. We recommend that Change Order No, One be approved, 3-10-87 75.0264 J. - Oproject: ~W~Re~tS8N~tR8beN/SoGE BUILDING Pl an No. 6855 o Date: 3/10/87 <:) File No. 6.1483 ENGINEERING DIVISION DEPARTMENT OF PUBLIC WORKS CITY OF SAN BERNARDINO. CALIFORNIA CONTRACT CHANGE ORDER NO. ~ (Change necessitated because of field conditions) TO: Duncan Construction 1966 S, Date Street 8loomington, CA. 92316 Gentlemen: You are hereby authorized and directed to accomplish the followin9 work: Change 4" to 6" sewer pipe @ $372.00 Additional concrete due to change in finish floor @ $1,540.00 Rerouting irrigation lines @ $250.00 Total extra work cost added to contract ...,.,.......................$ ?162,OO Previous Contract Price.............................................$ 126.173,00 Amended Cost Price....... ..................................................$ 128.335.00 Additional time to complete contract due to change order ............ 7 days CONTRACTOR: CITY OF SAN BERNARDINO: By: ~<IL (Ly1--oiftk ~ Title: &~Ol' ",~.Je...."t- ~""~ COI\S.-hu<-+'u('\ By: ROGER G. HARDGRAVE Director of Public Works/City Engr. I\ccepted Date: Approved Date: oJ-I 0- J( 7