Loading...
HomeMy WebLinkAbout09-Public Works cc>, OF SAN BERNARDOO - REQUE5NpOif3cOUNCIL ACT From: ROGER G, HARDGRAVE Subject: C'!J,-ADH1N. OFF Publ ic Works/Engineering .. rEB 2 . ..., I 5 Q" IC: OS 2-25-87 Approval of Change Order No, ONE -- Upgrade Ballfield Lighting at Fiscalini Field in Perris Hill Park, per Plan No, 7185 -- G D M ELECTRICAL CONSTRUCTION Dept: Date: Synopsis of Previous Council action: 11-17-87 Resolution No, 86-443 adopted expressing support in the relocation of the Ventura Gulls, Class "A" Baseball Team to San Bernardino. Council Ways & Means Committee reviewed proposed lease and directed the City Engineer to proceed with preparation of the plans for the Capital Improvements, and recommended CDBG Funds be allocated, Resolution adopted authorizing execution of a lease with the San Bernardino Spirit Class "A" Baseball Team for use of Fiscalini Field, Approval of Plans and Authorization to Advertise for Bids, Spec No. 7155, All bids rejected and authorization granted to readvertise project. Resolution No. 87-55 adopted awarding a contract to G 0 M Electrical Construction for low bid price of $71,880,00, 12-13-86 12-22-86 12-22-86 02-02-87 -- 02-16-87 -- Recommended motion: That Change Order No, One to the contract with G 0 M Electrical Construction, for upgrading lighting system of Fiscalini Field in Perris Hill Park, in accordance with Plan No, 7185, be approved; to authorize various additions and deletions as shown on Revision No, 2, dated 2-22-87, for a net decrease in the contract price of $2,721.50, from $71,880.00 to $69,158,50. cc: ~ay Schweitzer Ilarren Knudson Contact parson: Joe Reynolds Phon.: 5028 Supporting dati .ttachad: Staff Report & Change Order No.1 Ward: 2 FUNDING REQUIREMENTS: Amount: ($2.721. 50) Source: (ACCT. NO,) 121-544-57596 (ACCT, DESCRIPTION) Underground Electrical System Finance: Council Not..: 75.0211 Agende Item No. ~ CI~' OF SAN BI!RNARDI~ - RI!QUI!'" FOR COUNCIL AC'tPN STAFF REPORT After award of the contract, the Contractor proposed certain revisions to the plans, that would provide for a credit of $6,865.00, These revisions would provide a simpler system, and allow the existing switch panel to be used on a temporary basis. Suppliers of the new switch panel are unable to guarantee delivery in sufficient time to allow for installation by 4-10-87, without a fee of $12,000 - $15,000 for an accelerated schedule. This proposal was reviewed by the Electrical Engineer engaged by the City for design services, who recommended that it not be accepted. The readerboard to be supplied by the club is ~anufactured by Electronic Display Systems. We were advised after the bid opening that a separate "clean" circuit is needed, in order to avoid malfunctions due to other electronic equip- ment. The Contractor submitted another proposal to address this requirement, which reduced the credit to $2,721,50. The Contractor also submitted a letter from another Electrical Engineer stating that the revised system is in compli- ance with the Code and will function satisfactorily. We recommend that Change Order No. One be approved, 2-25-87 75-0264 o Project: Upgrade Ballfield Li~ing at Fiscalini Field in Perris Hill Park o o Date: 2-25-87 Plan No. 7185 File No. 7,3730 ENGINEERING DIVISION DEPARTMENT OF PUBLIC WORKS CITY OF SAN BERNARDINO, CALIFORNIA CONTRACT CHANGE ORDER NO. ~ (Change necessitated because of field conditions) G D M Electrical Construction P. O. Box 30122 TO: San Bernardino, CA 92413 . Gentlemen: .. You are hereby authorized and directed to make the following listed additions and deletions, in accordance with Revision No. 2 to the plans, dated 2-27-87: 1. 2. 3. 4. Delete distribution system to light towers Add revised distribution system to light towers Delete load centers (switchgear) Delete transformer ($19,242.00) 17,119.00 ( 3,120,00) ( 1,622,00) (See attached sheet) Total extra work cost added to contract .............................$( 2,721,50) Previous Contract Price .............................................$ 71,880.00 Amended Cost Price ...................................................$ 69,158.50 Additional time to complete contract due to change order ............ -0- CONTRACTOR: CITY OF SAN BERNARDINO: By: Title: By: ROGER G. HARDGRAVE ------ Director of Public Works/City Engr. Accepted Date: Approved Date: 0') ., r- 0. / . . 0- o o o Change Order No. ONE Plan No, 7185 ----- Page - 2 - 5. Delete conduit & conductors to scoreboard ($ 7,493,50) and Police Pistol Range 6, Add Conduit and conductors to scoreboard 3,097.00 7, Add Conduit and conductors to pistol range 3,420,00 8, Add conduit and conductors to Panel URn 5,120.00 TOTAL NET REDUCTION ($ 2,721.50 ~-r;J.S-t (., . ,