Approval of Change Order No, ONE --
Upgrade Ballfield Lighting at Fiscalini
Field in Perris Hill Park, per Plan No,
7185 -- G D M ELECTRICAL CONSTRUCTION
Dept:
Date:
Synopsis of Previous Council action:
11-17-87 Resolution No, 86-443 adopted expressing support in the relocation of
the Ventura Gulls, Class "A" Baseball Team to San Bernardino.
Council Ways & Means Committee reviewed proposed lease and directed
the City Engineer to proceed with preparation of the plans for the
Capital Improvements, and recommended CDBG Funds be allocated,
Resolution adopted authorizing execution of a lease with the San
Bernardino Spirit Class "A" Baseball Team for use of Fiscalini Field,
Approval of Plans and Authorization to Advertise for Bids, Spec No. 7155,
All bids rejected and authorization granted to readvertise project.
Resolution No. 87-55 adopted awarding a contract to G 0 M Electrical
Construction for low bid price of $71,880,00,
12-13-86
12-22-86
12-22-86
02-02-87 --
02-16-87 --
Recommended motion:
That Change Order No, One to the contract with G 0 M Electrical
Construction, for upgrading lighting system of Fiscalini Field in
Perris Hill Park, in accordance with Plan No, 7185, be approved;
to authorize various additions and deletions as shown on Revision
No, 2, dated 2-22-87, for a net decrease in the contract price of
$2,721.50, from $71,880.00 to $69,158,50.
cc: ~ay Schweitzer
Ilarren Knudson
Contact parson:
Joe Reynolds
Phon.:
5028
Supporting dati .ttachad: Staff Report & Change Order No.1
Ward:
2
FUNDING REQUIREMENTS:
Amount: ($2.721. 50)
Source: (ACCT. NO,) 121-544-57596
(ACCT, DESCRIPTION) Underground Electrical System
Finance:
Council Not..:
75.0211
Agende Item No.
~
CI~' OF SAN BI!RNARDI~ - RI!QUI!'" FOR COUNCIL AC'tPN
STAFF REPORT
After award of the contract, the Contractor proposed certain revisions
to the plans, that would provide for a credit of $6,865.00, These revisions
would provide a simpler system, and allow the existing switch panel to be used
on a temporary basis. Suppliers of the new switch panel are unable to guarantee
delivery in sufficient time to allow for installation by 4-10-87, without a
fee of $12,000 - $15,000 for an accelerated schedule.
This proposal was reviewed by the Electrical Engineer engaged by the
City for design services, who recommended that it not be accepted.
The readerboard to be supplied by the club is ~anufactured by Electronic
Display Systems. We were advised after the bid opening that a separate "clean"
circuit is needed, in order to avoid malfunctions due to other electronic equip-
ment. The Contractor submitted another proposal to address this requirement,
which reduced the credit to $2,721,50. The Contractor also submitted a letter
from another Electrical Engineer stating that the revised system is in compli-
ance with the Code and will function satisfactorily.
We recommend that Change Order No. One be approved,
2-25-87
75-0264
o
Project:
Upgrade Ballfield Li~ing at
Fiscalini Field in Perris Hill Park
o
o
Date:
2-25-87
Plan No. 7185
File No. 7,3730
ENGINEERING DIVISION
DEPARTMENT OF PUBLIC WORKS
CITY OF SAN BERNARDINO, CALIFORNIA
CONTRACT CHANGE ORDER NO. ~
(Change necessitated because of field conditions)
G D M Electrical Construction
P. O. Box 30122
TO: San Bernardino, CA 92413
. Gentlemen:
..
You are hereby authorized and directed to make the following listed additions
and deletions, in accordance with Revision No. 2 to the plans, dated 2-27-87:
1.
2.
3.
4.
Delete distribution system to light towers
Add revised distribution system to light towers
Delete load centers (switchgear)
Delete transformer
($19,242.00)
17,119.00
( 3,120,00)
( 1,622,00)
(See attached sheet)
Total extra work cost added to contract .............................$( 2,721,50)
Previous Contract Price .............................................$ 71,880.00
Amended Cost Price ...................................................$ 69,158.50
Additional time to complete contract due to change order ............
-0-
CONTRACTOR:
CITY OF SAN BERNARDINO:
By:
Title:
By:
ROGER G. HARDGRAVE ------
Director of Public Works/City Engr.
Accepted Date:
Approved Date:
0') ., r- 0. /
. .
0-
o
o
o
Change Order No. ONE
Plan No, 7185 -----
Page - 2 -
5. Delete conduit & conductors to scoreboard ($ 7,493,50)
and Police Pistol Range
6, Add Conduit and conductors to scoreboard 3,097.00
7, Add Conduit and conductors to pistol range 3,420,00
8, Add conduit and conductors to Panel URn 5,120.00
TOTAL NET REDUCTION ($ 2,721.50