Loading...
HomeMy WebLinkAboutS13-Public Works From: ROGER G. HARDGRAVE File No. 6.141-H - REQUOT FOR COUNCIL ~ t Subject: Approval of Change Order No. ONE -- Construction of Bleacher Additions & Alteration to Fisca1ini Field in Perris Hill Park, per Plan No. 7150 -- WICKUM CONSTRUCTION Cle OF SAN B~RNARDCO Oept: Public Works/Engineering Date: 2-11-87 Synopsis of Previous Council action: 11-17-86 Resolution No. 86-443 adopted expressing support in the relocation of the Ventura Gulls, Class "A" Baseball Team to San Bernardino. 12-13-86 Council Ways & Means Committee reviewed proposed lease and directed the City Engineer to proceed with preparation of the plans for the Capital Improvements. 12-22-86 -- Resolution adopted authorizing execution of a letter-type proposal from L.A. Wainscott & Associates for architectural/civil engineering services. 01-05-87 01-19-87 Plans approved and authorization granted to advertise for bids. Resolution No. 87-22 adopted awarding a contract to Wickum Construction for the low bid price of $229,000.00. Recommended motion: cc: Ray Schweitzer W. Knudson A. Ramos That Change Order No. One to the contract with Wickum Construction for construction of the bleacher additions and alterations to Fisca1ini Field at Perris Hill Park, in accordance with Plan No. 7150, be approved; to authorize construction of required work for bleacher foundations, and various additional items of work on the bleachers due to the revision to the plans, at an estimated increase of $42,271.75 in the contract price, from $229,000 to $271,271.75. Contact penon: Roa~r HardorilvP Phone: 5025 Supporting dete attached: Staff Report & Change Order No.1 Werd: 2 FUNDING REOUIREMENTS: Amount: U?::'71 7~ Source: (ACCT. NO.) (ACCT. DESCRIPTION) (1% Fee on IDB's) Finance: W~ ((1 - Council Note.: n.Dn! Agenda Item No. S -/..5 J.. CIO OF SAN BERNARDIC)O - REQUIQT FOR COUNCIL ACOON STAFF REPORT Construction of the required clearing and grubbing, foundations, re- taining walls and sidewalk, was originally included in the bid documents for the clubhouse, per plan No. 7154. The price for these items of work in the low bid was $95,400.00. All of these bids were rejected on 2-2-87, and auth- orization was granted to readvertise. Bids for construction of the clubhouse will be opened on 2-19-87. General Seating, who is doing the bleacher work for Wickum Construction, has notified us that the stringers must be completed by 2-20-87, in order that they can maintain their schedule for completion of all work by the first home game. This schedule could not be met by the contractor for the clubhouse. Wickum Construction was, therefore, requested to submit a price quote for this work. The estimated cost submitted by Wickum Construction was $41,354.75. We have reviewed this price and found it to be generally in accordance with current pricing levels. Wickum Construction has indicated that they could start work on 2-16-87 and be completed by 2-20-87. The plans were revised to reduce the extent and cost of concrete work. This entailed subsitution of aluminum walkways and steps in lieu of concrete ones, resulting in additional work on the bleachers, at an increase in the contract price of $917.00. Listed below is the estimated total construction cost: TOTAL ESTIMATED CONSTRUCTION COST $ 271 ,271. 75 127,500.00 9,843.00 5,375.00 $ 413,989.75 Bleacher Additions & Revisions Clubhouse (Estimated) F enci ng Sewer This cost does not include the Architect's Fee or construction inspection costs. Councilmen Reilly and Quiel have stated that they are willing to have their Park Extension Fee Funds applied to this project. We recommend that Change Order No. One be approved. URGENCY CLAUSE: It is imperative that this Change Order be approved at the meeting of 2-16-87, in order for the Contractor to maintain his schedule to complete all work by the first home game of the San Bernardino Spirit. 2-11-87 75-0264 Bleacher Additions & Alterations Proj~ to John Fisca1~ni Field in p~ris Hill Plan No. 7150 Park o Date: File No. 2-11-87 6.141-H o ENGINEERING DIVISION DEPARTMENT OF PUBLIC WORKS CITY OF SAN BERNARDINO, CALIFORNIA CONTRACT CHANGE ORDER NO. ONE (Change necessitated because of field conditions) Wickum Construction 43B9 West Elliott Avenue TO: Merced, CA 95340 Gentlemen: You are hereby authorized and directed to perform the following listed items of extra work: 1. Construction of Required Work for Bleacher Foundations -- Estimated Item Quantity Unit Description Unit Price Cost a. 1,175 L.F. Construct 8" X 8" Re- inforced Stringers at a unit price of Seven Dollars per linear foot (See attached sheet) $ 7.00 $ 8,225.00 Additional time to complete contract due to change order ............ 42,271. 75 229.000.00 271 ,271.75 -0- -Total extra work cost added to contract .~~~J~,~J.................$ Prey; ous Contract Pri ce ............;................................. $ Amended Cost Price ..................................................$ CONTRACTOR: CITY OF SAN BERNARDINO: By: Title: By: ROGER G. HARDGRAVE Director of Public Works/City Engr. Accepted Date: 2:-11-87 Approved Date: 0 0 0 0 Estimated Item Quantity Unit Description Unit Price Cost b. 2,929 S.F. Construct 4" concrete $ 2.75 $ 8,054.75 Sidewalk @ a unit price of Two Dollars and Seventy Five Cents per square foot c. 139.5 L.F. Construct Extension of $80.00 $ 11,160.00 Concrete Block Retaining Wall (including cuttin~ and replacing sidewalk at a unit price of Eighty Dollars per linear foot. d. 39 L.F. Construct 2-inch Pipe $15.00 $ 585.00 Handrail, at a unit price of Fifteen Dollars per linear foot. e. 39 L.F. Construct Concrete Block $70.00 $ 2,730.00 Retaining Wall, at a unit price of Seventy Dollars per linear foot. f. 1 L.S. Clearing, Grubbing, and $5,600 $ 5,600.00 subgrade preparation, at a lump sum price of Fifty- Six Hundred Dollars. g. 1 L.S. Construct Two Concrete $5,000 $ 5,000.00 Grade Beams, at a lump sum price of Five Thousand Dollars Sub-Total $ 41,354.75 2. Various additional items of work required, due to revisions to plan in order to reduce extent of concrete, at a lump sum price of -------------- 917 .00 TOTAL ESTIMATED COST OF CHANGE ORDER NO. ONE $ 42,271. 75 ---------- ---------- 2-11-87