HomeMy WebLinkAbout09-Public Works ~j ~ ~No. 1.0465/66 CnrV OF SAN BERNARDIltO - REQUEWT FOR COUNCIL A From: ROGER G. HARDGRAVE nEe'D. _ i\o~ml. O~Bubject: Dept: Publ ic Works/Engineering \1B1 fEU -5 P\li 3: 5 i Date: 1-30-87 Approval and Acceptance of Work -- Modification of Traffic Signals at Baseline Street and Muscott Street, and Sixth Street and "D" Street, per Plan No. 6657 -- SIGNAL CONSTRUCTION CO. Synopsis of Previous Council action: 01-27-84 11-07-83 --- Resolution No. 83-370 adopted authorizing execution of Supplement No. 32 to Local Agency - State Agreement No. 8~5033. Resolution No. 84-53 adopted authorizing execution of Supplement No. 33 to Local Agency - State Agreement No. 8-5033. Plans approved and authorization granted to advertise for bids. Resolution No. 86-162 approved awarding contract to Signal Construction Co. for the low bid of $61,903.00. 03-17-86 05-05-86 (Continued on 2nd page) Recommended motion: That the work performed by the Contractor, in accordance with Specification No. 6657, be approved and accepted, and that final payment be authorized at the expiration of the lien period. cc: Ray Schweitzer Warren Knudson ContlCt person: Jon Roberts Phone: I:\?'I\ Supportlna date eUlChad: Staff Report Ward: 1 / FUNDING REQUIREMENTS: Amount: .-J63, 958.93 242-362-57334 (Baseline/Muscott) Source: (ACCT. NO.) 242-362-57335 (Sixth 11. "0") (ACCT. DESCRIPTION) Street Construction Fund Finance: I{I o....-C.' LA:-- c. , Council Nota.: 11.0211 Agenda Item No. 9, 1- - - CI~ OF SAN BERNARDQo - REQU.Qr FOR COUNCIL ACQoN STAFF REPORT All construction under this contract was satisfactorily completed as of January 29, 1987. The contract was awarded for the low bid price of $61,903.00. The actual final contract price is $63,958.93 due to a cost of $2,055.93 to install three additional traffic control loops, a type III electrical ser- vice, and approximately 110 feet of rigid conduit. This extra work was authorized by contract Change Order No. 1 on a cost not to exceed $2,800.00 basis. During construction, street improvements were constructed on Sixth Street by the developer of the adjacent property to the west, necessitating the rerouting of the series street lighting circuits, and installation of a 240 volt circuit. The contractor submitted a price quote of $500.00 and agreed to perform this work. However, the contractor would not sign the approved Change Order No.2 and would not perform the work. The rerouting and addi- tional circuits were performed by others, and Contract Change Order No.2 was rescinded. We recommend that the work be approved and accepted, and final pay- ment be authorized at the expiration of the lien period. SYNOPSIS OF PREVIOUS COUNCIL ACTION Continued: 09-08-86 --- Approval of Change Order No. One authorizing Contractor to install three additional traffic control loops, a Type III Electrical ser- vice, and approximately 110' of rigid conduit, at a cost not to exceed $2,800.00, for an increase in the contract price from $61,903.00 to $64,703.00. 12-08-06 --- Approval of Change Order No. Two authorizing the Contractor to install the necessary wiring and conductors to connect the street 1 ights at Sixth and "0" Streets to the 240 volt circuit for a lump sum cost of $500.00, for an increase in the contract price from $64,703.00 to $65,203.00. 1-30-87 75.0264