HomeMy WebLinkAbout19-Development ServicesCITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION
From: Valerie C. Ross, Director Subject: Resolution approving Professional
Services Agreements with Joseph E.
Dept: Development Services Bonadiman & Associates, Inc., Guida
Surveying and Associated Engineers, Inc.
Date: July 31, 2008 for On-Call Surveying and Map Checking
Support.
MCC Date: August 18, 2008
Synopsis of Previous Council Action:
None.
Recommended Motion:
Adopt Resolution.
Valerie C. Ross
Contact person: Robert Eisenbeisz, City Engineer Phone: 5203
Supporting data attached: Staff Report, Reso. & Agreements. Ward: All
FUNDING REQUIREMENTS: Amount: $130,000
Source (Acct. No.) CIP Accounts & Plan Check Trust
Acct. Description:
Finance:
Council Notes:
Agenda Item No. ~ ~~
g-10-og
~+' CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION
STAFF REPORT
Subject:
Resolution approving Professional Services Agreements with Joseph E. Bonadiman &
Associates, Inc., Guida Surveying and Associated Engineers, Inc. for On-Call Surveying and
Map Checking Support.
Background:
The Public Works Division of the Development Services Department is responsible for
planning and implementing the City's Capital Improvement Program (CIP). One critical task
that must be completed prior to start of design of most projects is the completion of a
preliminary survey. In the past, an in-house survey party has fulfilled this role.
Approximately 5 yeazs ago Public Works began including Surveying as an item of work in its
contracts, thereby requiring the Contractor to hire a private surveyor to set lines and grades for
the work. This approach has worked extremely well and has reduced the need for in-house
survey staff.
The Public Works Division currently operates one in-house survey crew consisting of a two-
person party. The two-person survey party is adequate for small projects, but limited in its
ability to survey lazge projects or projects that need significant traffic control. Athree-person
party is needed for projects requiring traffic control since one individual is needed for traffic
control while the other two conduct the surveying work. Surveys for large projects and those
requiring significant traffic control are best handled by Consultant Surveyors on an as-needed
basis.
A contract for on-call surveying was available since 2006; however, it expired on June 30,
2008. Since the service is still needed, a Request for Proposals (RFP) to provide on-call
surveying and map checking support was issued on April 11, 2008. RFP's were sent to a total
of 11 consulting engineers and surveyors in the local area.
Map checking support has not previously been included in the request for proposals; however,
with the departure of the City's only Licensed Land Surveyor last yeaz it was felt prudent to
include on-call Map Checking in the Surveying contract. The Subdivision Map Act requires
that maps be approved by a Licensed Land Surveyor or Registered Civil Engineer authorized to
sign maps. Including Map Checking in the Surveying contract will give the City greater
flexibility for checking Maps, Certificates of Compliance and other survey documents.
A selection committee consisting of management level staff reviewed the proposals and the
firms of Associated Engineers, Inc., Hall & Foreman, Inc., Willdan, David Evans & Associates,
Inc., Guida Surveying, Inc. and Joseph E. Bonadiman & Associates, Inc. were invited to present
their proposals to the selection panel on June 11, 2008. Using the selection process approved by
the Mayor and Common Council in 2003, the panel determined that the firms of Joseph E.
Bonadiman, Inc., Guida Surveying, Inc. and Associated Engineers, Inc. demonstrated the best
capability to provide On-Call Surveying and Map Checking Support to the City.
2
CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION
STAFF REPORT -Continued
Therefore, staff is requesting approval of a contract, not to exceed the combined amount of
$130,000 in services with the firms of Joseph E. Bonadiman & Associates, Inc., Guida
Surveying, Inc. and Associated Engineers, Inc.
Projects will be assigned to the consultants at the discretion of the City Engineer. The City may
continue to use its own employees to perform survey and map checking work in addition to any
such work assigned to the consultants. The volume of survey and map checking work is
dependent on various factors and there is no guazantee as to the minimum or maximum volume
of work that may be assigned to any consultants. Joseph E. Bonadiman & Associates, Inc.,
Guida Surveying, Inc. and Associated Engineers, Inc. indicated understanding that the City does
not guazantee a minimum or maximum volume of on-call survey and map checking work.
Compensation to the consultants for surveying will be made at the hourly rate for atwo-person
survey party as stated in the hourly rate sheet attached to the Agreement. The consultant may
be compensated at the hourly rate listed for athree-person survey party if the City Engineer
concurs that conditions warrant the use of a 3-person party.
Compensation for map checking services shall conform to the provisions of Resolution 2006-
149 which requires that the consultants accept 65% of the City's standard plan checking fees
collected from applicants as full compensation for their services and the balance of 35% is
retained by the City to cover in-house administrative costs. The Consultants were advised of
this method of compensation during the RFP process and by execution of the Agreement
consent to the provisions of Resolutions 2006-149.
Financial Impact:
The cost of surveying for projects in the Capital Improvement Program will be charged to the
Account for the specific projects involved.
-Fees collected from the applicant will compensate the City for the cost of checking maps and
related documents. The Consultants have agreed to accept 65% of the City's standard checking
fee as full compensation for their work. The remaining 35% will be retained by the City to
cover its administrative cost.
Recommendation:
Adopt Resolution.
1
2
3
4
5
6
7
8
9
RESOLUTION NO.
RESOLUTION OF THE CITY OF SAN BERNARDINO AUTHORIZING THE
CITY MANAGER TO EXECUTE AGREEMENTS FOR SERVICES WTI'H JOSEPH E.
BONADIMAN & ASSOCIATES, INC., GUIDA SURVEYING, INC. AND ASSOCIATED
ENGINEERS, INC. FOR ON-CALL SURVEYING AND MAP CHECHING SUPPORT.
BE IT RESOLVED BY THE MAYOR AND COMMON COUNCIL OF THE CITY
OF SAN BERNARDINO AS FOLLOWS:
SECTION I. Joseph E. Bonadiman & Associates, Inc., Guida Surveying, Inc. Associated
Engineers, Inc. aze firms that are competent, experienced, and able to perform requested services
and have provided the most advantageous and responsible proposal for provision for On-Call
it
Surveying and Map .Checking Support in amounts totaling up to $130,000 in aggregate.
Pursuant to this determination, the City Manager is hereby authorized and directed to execute
Agreements for On-Call Surveying and Map Checking Support on behalf of the City; a
copy of which are attached hereto and incorporated herein as Exhibit "A" (Joseph E. Bonadiman
& Associates, Inc.), Exhibit "B" (Guida Surveying, Inc.) and Exhibit "C" (Associated Engineers,
1
Inc.). The Purchasing Manager is hereby authorized and directed to issue Purchase Orders for
said services to these three firms, which shall incorporate this Resolution.
SECTION 2. This approval shall be valid through June 30, 2009 unless earlier terminated
as provided in the Agreement or as otherwise agreed to in writing by the parties. An
211
administrative extension of one additional yeaz may be authorized, subject to agreement of both
parties.
SECTION 3. The authorization to execute the above-referenced Agreement for Services
is rescinded if it is not signed by the parties within sixty (60) days of the passage of this
resolution.
///
28
-1-
S-/g o8
-#~9
1
2
3
4
RESOLUTION... AUTHORIZING THE CITY MANAGER TO EXECUTE
AGREEMENTS FOR SERVICES WITH JOSEPH E. BONADIMAN & ASSOCIATES,
INC., GUIDA SURVEYING, INC. AND ASSOCIATED ENGINEERS, INC. FOR ON-
CALL SURVEYING AND MAP CHECHING SUPPORT.
I HEREBY CERTIFY that the foregoing resolution was duly adopted by the Mayor and
Common Council of the City of San Bernazdino at a meeting thereof, held
on the day of , 2008 by the following vote, to wit:
$ Council Members:
9 ESTRADA
10 BAXTER
11
BRINKER
12
DERRY
13
14 KELLEY
15 JOHNSON
16 MC CAMMACK
17
AYES NAYS ABSTAIN ABSENT
City Clerk
The foregoing resolution is hereby approved this
231
day of , 2008.
Patrick J. Morris, Mayor
City of San Bernardino
Approved as to form:
JAMES F. PENMAN,
C
IB
-2-
EXHIBIT "A"
AGREEMENT FOR ON-CALL SURVEYING AND MAP CHECKING SUPPORT
THIS AGREEMENT is made and entered into this day of
2008 ("Effective Date"), by and between the CITY OF SAN BERNARDINO, a charter city
("City"), and Joseph E. Bonadiman & Associates, Ina ("Consultant").
WITNESSETH:
A. WHEREAS, City proposes to have Consultant perform the on-call surveying and map
checking support described herein below; and
B. WHEREAS, Consultant represents that it has that degree of specialized expertise
contemplated within California Government Code, Section 37103, and holds all necessary
licenses to practice and perform the services herein contemplated; and
C. WHEREAS, City and Consultant desire to contract for specific services in connection
with the project described below (the "Project") and desire to set forth their rights, duties and
liabilities in connection with the services to be performed; and
D. WHEREAS, no official or employee of City has a financial interest, within the
provisions of California Government Code, Sections 1090-1092, in the subject matter of this
Agreement.
NOW, THEREFORE, for and in consideration of the mutual covenants and
conditions contained herein, the parties hereby agree as follows:
1.0. SERVICES PROVIDED BY CONSULTANT
1.1. Scope of Services. Consultant shall furnish on-call surveying and map
checking services to City in accordance with Attachment "1", Scope of Services and the
Consultant's proposal dated Apri128, 2008, attached and incorporated herein.
1.2. Professional Practices. All professional services to be provided by Consultant
pursuant to this Agreement shall be provided by personnel experienced in their respective
fields and in a manner consistent with the standards of care, diligence and skill ordinarily
exercised by professional consultants in similar fields and circumstances in accordance with
sound professional practices. Consultant also warrants that it is familiar with all laws that
may affect its performance of this Agreement and shall advise City of any changes in any
laws that may affect Consultant's performance of this Agreement.
1.3. Warranty. Consultant warrants that it shall perform the services required by
this Agreement in compliance with all applicable Federal and California employment laws
including, but not limited to, those laws related to minimum hours and wages; occupational
health and safety; fair employment and employment practices; workers' compensation
insurance and safety in employment; and all other employment related Federal, State and
S:\ Public Works\RFCA's\2008 All\OS-18-OS\Agreement for Surveying&Map Checking\JEB-Ageement On-Call Surveying
Services OS-18-08doc
1
EXHIBIT "A"
local laws and ordinances applicable to the services required under this Agreement.
Consultant shall indemnify and hold harmless City from and against all claims, demands,
payments, suits, actions, proceedings, and judgments of every nature and description
including attorneys' fees and costs, presented, brought, or recovered against City for, or on
account of any liability under any of the above-mentioned laws, which may be incurred by
reason of Consultant's performance under this Agreement.
1.4. Non-discrimination. In performing this Agreement, Consultant shall not
engage in, nor permit its agents to engage in, discrimination in employment of persons
because of their race, religion, color, national origin, ancestry, age, physical handicap,
medical condition, marital status, sexual gender or sexual orientation, or any other category
protected by law, except as permitted pursuant to Section 12940 of the Government Code.
Violation of this provision may result in the imposition of penalties referred to in Labor
Code, Section 1735.
1.5 Non-Exclusive Agreement. Consultant acknowledges that City may enter into
agreements with other consultants for services similaz to the services that aze subject to this
Agreement or may have its own employees perform services similar to those services
contemplated by this Agreement.
1.6. Delegation and Assignment. This is a personal service contract, and the duties
set forth herein shall not be delegated or assigned to any person or entity without the prior
written consent of City.
1.7. Business License: The Consultant shall obtain and maintain a valid City
Business Registration Certificate during the term of this Agreement.
1.8. Duty of Loyalty/Conflict of Interest: The Consultant understands and agrees
that as the City's on-call surveying consultant, Consultant shall maintain fiduciary duty and a
duty of loyalty to the City in performing Consultant's obligations under this Agreement.
Consultant, in performing its obligations under this Agreement, is governed by California's
conflict of interest laws, Government Code Section 87100 et seq., and Title 2, California
Code of Regulations Section 18700 et seq.
2.0. COMPENSATION AND BILLING
2.1. Compensation. Over the term of this Agreement, Contractor shall be paid for
such services in accordance with Attachment " 2", Fee Proposal to Pmvide Professional Civil
Engineering and Surveying Services for On-Call Surveying", attached and incorporated
herein, except that compensation for Map Checking Services shall be made in accordance
with City Resolution No. 2006-149. Total compensation shall be subject to an aggregate limit
of $130,000 together with other consultants perfornng on-call surveying and map checking
support, with no minimum amount of compensation guaranteed.
2.2. Additional Services.. Consultant shall not receive compensation for any
services provided outside the scope of services specified in this Agreement unless the City or
S:\_Public Works\RFCA's\2008 All\f18-18-08\Agreement for Surveying & Map Checking\JE&Agreement On-Call Surveying
Services 08-18-Og.doc
2
EXHIBIT "A"
its Managing Engineer for this Project, prior to Consultant performing the additional
services, approves such additional services in writing. It is specifically understood that oral
requests and/or approvals of such additional services or additional compensation shall be
barred and aze unenforceable.
2.3. Method of Billine. Consultant may submit invoices to City's Managing
Engineer for approval on a progress basis, but no more often than monthly. Said invoice
shall be based on the total of all Consultants' services that have been completed to City's sole
satisfaction. City shall pay Consultant's invoice within thirty (30) days from the date City
receives said invoice. Each invoice shall describe in detail, the services performed and the
associated time for completion. Any additional services approved and performed pursuant to
this Agreement shall be designated as "Additional Services" and shall identify the number of
the authorized change order, where applicable, on all invoices.
2.4. Records and Audits. Records of Consultant's services relating to this
Agreement shall be maintained in accordance with generally recognized accounting
principles and shall be made available to City or its Managing Engineer for inspection and/or
audit at mutually convenient times for a period of three (3) years from the Effective Date.
3.0. TIME OF PERFORMANCE
3.1. Commencement and Completion of Work. The professional services to be
performed pursuant to this Agreement shall commence within five (5) days from the
Effective Date of this Agreement. Said services shall be performed in strict compliance with
the Project Schedule issued by the Managing Engineer. Failure to commence work in a
timely manner and/or diligently pursue work to completion may be grounds for termination
of this Agreement.
3.2. Excusable Delavs. Neither party shall be responsible for delays or lack of
performance resulting from acts beyond the reasonable control of the party or parties. Such
acts shall include, but not be limited to, acts of God, fire, strikes, material shortages,
compliance with laws or regulations, riots, acts of waz, or any other conditions beyond the
reasonable control of a party.
4.0. TERM AND TERMINATION
4.1. Term. This Agreement shall commence on the date approved by the City
Manager and shall be valid through June 30, 2009, unless previously terminated as provided
herein or as otherwise agreed to in writing by the parties. An administrative extension of one
additional yeaz may be authorized, subject to agreement of both parties.
4.2. Notice of Termination. The City reserves and has the right and privilege of
canceling, suspending or abandoning the execution of all or any part of the work
contemplated by this Agreement, with or without cause, at any time, by providing written
notice to Consultant. The termination of this Agreement shall be deemed effective upon
receipt of the notice of termination. In the event of such termination, Consultant shall
S:\_Public Works\ RFCA's\2008 All\OS-18-08\Agreement for Surveying & Map Checking\]E&AgreemeM On-Call Surveying
Services 08-1&08.doc
3
EXHIBTT "A„
immediately stop rendering services under this Agreement unless directed otherwise by the
City.
4.3. Compensation. In the event of termination, City shall pay Consultant for
reasonable costs incurred and professional services satisfactorily performed up to and
including the date of City's written notice of termination. Compensation for work in
progress shall be prorated as to the percentage of work completed as of the effective date of
termination in accordance with the fees set forth herein. In ascertaining the professional
services actually rendered hereunder up to the effective date of termination of this
Agreement, consideration shall be given to both completed work and work in progress, to
complete and incomplete drawings, and to other documents pertaining to the services
contemplated herein whether delivered to the City or in the possession of the Consultant.
4.4 Documents. In the event of termination of this Agrcement, all documents
prepared by Consultant in its performance of this Agreement including, but not limited to,
fmished or unfinished design, development and construction documents, data studies,
drawings, maps and reports, shall be delivered to the City within ten (10) days of delivery of
termination notice to Consultant, at no cost to City. Any use of uncompleted documents
without specific written authorization from Consultant shall be at City's sole risk and without
liability or legal expense to Consultant.
5.0. INSURANCE
5.1. Minimum Scone and Limits of Insurance. Consultant shall obtain and
maintain during the life of this Agreement all of the following insurance coverages:
(a) Comprehensive general liability, including premises-operations,
products/completed operations, broad form property damage, blanket
contractual liability, independent contractors, personal injury with a
policy limit of not less than One Million Dollars ($1,000,000.00),
combined single limits, per occurrence and aggregate.
(b) Automobile liability for owned vehicles, hired, and non-owned
vehicles, with a policy limit of not less than One Million Dollazs
($1,000,000.00), combined single limits, per occurrence and
aggregate.
(c) Workers' compensation insurance as required by the State of
California.
(d) Professional errors and omissions ("E&O") liability insurance with
policy limits of not less than One Million Dollars ($1,000,000.00),
combined single limits, per occurrence and aggregate. Consultant
shall obtain and maintain, said E&O liability insurance during the life
of this Agreement and for three years after completion of the work
hereunder.
S:\_Public Works\RPCA's\2008 All\OS-18-08\Agreement for Surveying & Map Checking\JE&Ageement On-Call Surveying
Services 08-18-OS.d«
4
EXHIBI'T' "A"
5.2. Endorsements. The comprehensive general liability insurance policy shall
contain or be endorsed to contain the following provisions:
(a) Additional insureds: "The City of San Bernardino and its elected and
appointed boards, officers, agents, and employees aze additional
insureds with respect to this subject project and contract with City."
(b) Notice: "Said policy shall not terminate, nor shall it be cancelled, nor
the coverage reduced, until thirty (30) days after written notice is given
to City."
(c) Other insurance: "Any other insurance maintained by the City of San
Bemardino shall be excess and not contributing with the insurance
provided by this policy."
5.3. Certificates of Insurance. Consultant shall provide to City certificates of
insurance showing the insurance coverages and required endorsements described above, in a
form and content approved by City, prior to performing any services under this Agreement.
5.4. Non-limitine. Nothing in this Section shall be construed as limiting in any
way, the indemnification provision contained in this Agreement, or the extent to which
Consultant may be held responsible for payments of damages to persons or property.
6.0. GENERAL PROVISIONS
6.1. Entire Agreement. This Agreement constitutes the entire Agreement between
the parties with respect to any matter referenced herein and supersedes any and all other prior
writings and oral negotiations. This Agreement may be modified only in writing, and signed
by the parties in interest at the time of such modification. The terms of this Agrcement shall
prevail over any inconsistent provision in any other contract document appurtenant hereto,
including exhibits to this Agreement.
6.2. Rye resentatives. The Dfrector of Development Services or her designee shall
be the representative of City for purposes of this Agreement and may issue all consents,
approvals, directives and agreements on behalf of the City, called for by this Agreement,
except as otherwise expressly provided in this Agreement.
Consultant shall designate a representative for purposes of this Agreement
who shall be authorized to issue all consents, approvals, directives and agreements on behalf
of Consultant called for by this Agreement, except as otherwise expressly provided in this
Agreement.
6.3. Project Managers. City shall designate a Managing Engineer to work directly
with Consultant in the performance of this Agreement.
S:\_I'ubtic Works\RFCA's\2W8 All\OS-18-08\Agreement for Surveying & Map Checking\JESAgreement On-Call Surveying
Services OB-18-0S.doc
EXHIBIT "A„
Consultant shall designate a Contract Inspector(s) who shall represent it and
be its agent in all consultations with City during the term of this Agreement. Consultant or
its Contract Inspector(s) shall attend and assist in all coordination meetings called by City.
6.4. Notices. Any notices, documents, correspondence or other communications
concerning this Agreement or the work hereunder may be provided by personal delivery,
facsimile or mail and shall be addressed as set forth below. Such communication shall be
deemed served or delivered: a) at the time of delivery if such communication is sent by
personal delivery; b) at the time of transmission if such communication is sent by facsimile;
and c) 48 hours after deposit in the U.S. Mail as reflected by the official U.S. postmazk if
such communication is sent through regular United States mail.
IF TO CONSULTANT:
Mr. Ed Bonadiman
Joseph E. Bonadiman & Associates, Inc.
234 N. Arrowhead Avenue
San Bernazdino, CA 92408-1013
Fax: (909) 381-1721
Tel: (909) 885-3806
IF TO CITY:
Valerie C. Ross
Director of Development Services
300 North "D" Street
San Bernardino, Ca 92418
Fax: 909-384-5080
Tel: 909-384-5357
6.5. Attorneys' Fees. In the event that litigation is brought by any party in
connection with this Agreement, the prevailing party shall be entitled to recover from the
opposing party all costs and expenses, including reasonable attorneys' fees, incurred by the
prevailing party in the exercise of any of its rights or remedies hereunder or the enforcement
of any of the terms, conditions, or provisions hereof. The costs, salary and expenses of the
City Attorney and members of his office in enforcing this contract on behalf of the City shall
be considered as "attorneys' fees" for the purposes of this pazagraph.
6.6. Governing Law. This Agreement shall be governed by and construed under
the laws of the State of California without giving effect to that body of laws pertaining to
conflict of laws. In the event of any legal action to enforce or interpret this Agreement, the
parties hereto agree that the sole and exclusive venue shall be a court of competent
jurisdiction located in San Bernardino County, California.
6.7. Assignment. Consultant shall not voluntarily or by operation of law assign,
transfer, sublet or encumber all or any part of Consultant's interest in this Agreement without
City's prior written consent. Any attempted assignment, transfer, subletting or encumbrance
shall be void and shall constitute a breach of this Agreement and cause for termination of this
Agreement. Regazdless of City's consent, no subletting or assignment shall release
Consultant of Consultant's obligation to perform all other obligations to be performed by
Consultant hereunder for the term of this Agreement.
6.8 Indemnification and Hold Harmless. Consultant shall protect, defend,
indemnify and hold harmless City and its elected and appointed officials, officers, and
employees from any and all claims; liabilities, expenses, including attorney fees, damage to
S:\_Public Works\I2FCA's\2008 All\08-18-08\Agreement for Surveying & Map Checking\JE&Agreement On-Call Surveying
Services OS-18-08.dac
6
EXHIBIT "A"
property or injuries to or death of any person or persons or damages of any nature including,
but not by way of limitation, all civil claims or workers' compensation claims, arising out of
or in any way connected with the intentional or negligent acts, errors or omissions of
Consultant, its employees, agents or subcontractors in the perfomumce of this Agreement.
6.9. Independent Contractor. Consultant is and shall be acting at all times as an
independent contractor and not as an employee of City. Consultant shall secure, at his
expense, and be responsible for any and all payment of Income Tax, Social Security, State
Disability Insurance Compensation, Unemployment Compensation, and other payroll
deductions for Consultant and its officers, agents, and employees, and all business licenses, if
any are required, in connection with the services to be performed hereunder.
6.10 Ownership of Documents. All findings, reports, documents, information and
data including, but not limited to, computer tapes or discs, files and tapes furnished or
prepazed by Consultant or any of its subcontractors in the course of performance of this
Agreement, shall be and remain the sole property of City. Consultant agrees that any such
documents or information shall not be made available to any individual or organization
without the prior consent of City. Any use of such documents for other projects not
contemplated by this Agreement, and any use of incomplete documents, shall be at the sole
risk of City and without liability or legal exposure to Consultant. City shall indemnify and
hold hamiless Consultant from all claims, damages, losses, and expenses, including
attorneys' fees, arising out of or resulting from City's use of such documents for other
projects not contemplated by this Agreement or use of incomplete documents famished by
Consultant. Consultant shall deliver to City any fmdings, reports, documents, information,
data, in any form, including but not limited to, computer tapes, discs, files audio tapes or any
other Project related items as requested by City or its authorized representative, at no
additional cost to the City.
6.11 Public Records Act Disclosure. Consultant has been advised and is awaze that
all reports, documents, information and data including, but not limited to, computer tapes,
discs or files furnished or prepazed by Consultant, or any of its subcontractors, and provided
to City may be subject to public disclosure as required by the California Public Records Act
(California Government Code Section 6250 et. seq.). Exceptions to public disclosure may be
those documents or information that qualify as trade secrets, as that term is defined in the
California Government Code Section 6254.7, and of which Consultant informs City of such
trade secret. The City will endeavor to maintain as confidential all information obtained by it
that is designated as a trade secret. The City shall not, in any way, be liable or responsible for
the disclosure of any trade secret including, without limitation, those records so mazked if
disclosure is deemed to be required by law or by order of the Court.
6.12. Responsibility for Errors. Consultant shall be responsible for its work and
results under this Agreement. Consultant, when requested, shall furnish clarification and/or
explanation as may be required by the City's representative, regazding any services rendered
under this Agreement at no additional cost to City. In the event that an error or omission
attributable to Consultant occurs, then Consultant shall, at no cost to City, provide all
necessary design drawings, estimates and other Consultant professional services necessary to
S:\_Public Works\RFCA's\2008 All\08-18-OS\Agreement for Surveying & Map Checking\JE&Agreement On-Catl Surveying
Services OS-18-08doc
7
EXHIBIT "A"
rectify and correct the matter to the sole satisfaction of City and to participate in any meeting
required with regazd to the correction.
6.13. Prohibited Employment. Consultant will not employ any regular employee of
City while this Agreement is in effect.
6.14. Order of Precedence. In the event of an inconsistency or conflict in this
Agreement and any of the attached Exhibits or Attachments, the terms set forth in this
Agreement shall prevail.
6.15. Costs. Each party shall beaz its own costs and fees incurred in the preparation
and negotiation of this Agreement and in the performance of its obligations hereunder except
as expressly provided herein.
6.16. No Third Party Beneficiary Rights. This Agreement is entered into for the
sole benefit of City and Consultant and no other parties aze intended to be direct or incidental
beneficiaries of this Agreement and no third party shall have any right in, under or to this
Agreement.
6.17. Headin¢s. Paragraphs and subparagraph headings contained in this
Agreement are included solely for convenience and are not intended to modify, explain or to
be a full or accurate description of the content thereof and shall not in any way affect the
meaning or interpretation of this Agreement.
6.18. Construction. The parties have participated jointly in the negotiation and
drafting of this Agreement. In the event an ambiguity or question of intent or interpretation
arises with respect to this Agreement, this Agreement shall be construed as if drafted jointly
by the parties and in accordance with its fair meaning. There shall be no presumption or
burden of proof favoring or disfavoring any parry by virtue of the authorship of any of the
provisions of this Agreement.
6.19 Amendments. Only a writing executed by the parties hereto or their respective
successors and assigns may amend this Agreement.
6.20. Waiver. The delay or failure of either party at any time to require
performance or compliance by the other of any of its obligations or agreements shall in no
way be deemed a waiver of those rights to require such performance or compliance. No
waiver of any provision of this Agreement shall be effective unless in writing and signed by a
duly authorized representative of the party against whom enforcement of a waiver is sought.
The waiver of any right or remedy in respect to any occurrence or event shall not be deemed
a waiver of any right or remedy in respect to any other occurrence or event, nor shall any
waiver constitute a continuing waiver.
6.21. Severabilitv. If any provision of this Agreement is determined by a court of
competent jurisdiction to be unenforceable in any circumstance, such deternunation shall not
affect the validity or enforceability of the remaining terms and provisions hereof or of the
S:\_Public Works\RFCA's\2(Nl8 All\08-18-08\Ageement for Surveying & Map Checking\JE&Agreement On-Call Surveying
Services O8-1S-0S.doc
EXHIBIT "A"
offending provision in any other circumstance. Notwithstanding the foregoing, if the value
of this Agreement, based upon the substantial benefit of the bargain for any. party is
materially impaired, which determination as made by the presiding court or arbitrator of
competent jurisdiction shall be binding, then both parties agree to substitute such provision(s)
through good faith negotiations.
6.22. Counterparts. This Agreement may be executed in one or more counterparts,
each of which shall be deemed an original. All counterparts shall be construed together and
shall constitute one agreement.
6.23. Corporate Authority. The persons executing this Agreement on behalf of the
parties hereto warrant that they are duly authorized to execute this Agreement on behalf of
said parties and that by doing so, the parties hereto are formally bound to the provisions of
this Agreement.
6.24. Dama¢es. The Parties agree to waive any rights to incidental or consequential
damages and to punitive damages arising out of their performance under this Agreement
whether in torts or contracts or in law or in equity.
///
///
S:\_Public Works\ RFCA's\2(q8 All\OS-18-08\Agreement for Surveying & Map Checking\JEB-Agreement On-Call surveying
Services ~-18-08.doc
9
EXHIBTT "A"
AGREEMENT FOR ON-CALL SURVEYING AND MAP CHECKING SUPPORT
IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed
by and through their respective authorized officers, as of the date first above written.
CITY OF SAN BERNARDINO,
A Municipal Corporation
CONSULTANT
Joseph E. Bonadiman 8c Associates, Inc.
Fred Wilson, City Manager
Approved as to form:
James F. Penman,
City Attorney
By
Signature
Name and Title
S:\_Public Works\RFCA's\2008 All\OS-]8-OS\Agreement for Surveying & Map Checking\JE&Agreement On-Call Surveying
Services 0&15-08.doc
By
10
J03EPH E BONADIMA~Ti~C~1~IT3§'r~«~rJ t NC.
C 1 Y I L E N O I N 6 E^ I N U U 1 6
L A N D f U f V E Y 1' N U
JOSEPH E. ^ONADIMAN, t.0. loon uoo OP P~7E5~[`Tt ~Pv
CNAf LEf P. ^DNADIMAN, L.6. Iffr-Ifff VICE
April 28, 2008
City of San Bernardino
Development Services Department
300 North "D" Street, 3"' Floor
San Bernardino, CA 92418-0001
Attn: Michael W. Grubbs, P.E., Project Manager
Re: Public Works On-Call Surveying and Map Checking Proposal
Dear Mr. Grubbs:
' Joseph E. Bonadiman & Associates, inc. (JBA) is pleased to submit the enclosed proposal to the City of
San Bernardino (City) in response to the City's Request for Proposal (RFP) for Public Works On-Call
Surveying and Map Checking, filing date March 27, 2008. JBA is in receipt of Addendum No. 1 to the
RFP, filing date Apri12, 2008.
We have organized our proposal in accordance with the requirements of the 1tFP. We believe that upon
review of our proposal you will conclude that JBA can offer the City:
• Over 67 years of professional Civil Engineering and Land Surveying experience, including extensive
experience in Topographic Surveys, Construction Staking, and Tentative/Final Subdivision Map
preparation.
• An excellent professional relationship with the City that has spanned multiple decades and has for the
last two years included On-Call Surveying Support Services.
• Excellent professional relationships with various other municipalities in the inland Empire, including
On-Call Surveying Support Services for the San Bernardino City Unified School District (SBCUSD)
and the City of Loma Linda.
• Close proximity to City Hall (less than two blocks away) that ensures accessibility to JBA by City
Staff.
Thank you for considering JBA for the services in question. We welcome the opportunity to further
discuss any aspect of our proposal, and look forward to continuing our excellent working relationship
with the City.
Very Truly Yours,
Edward J. Bonadiman, P
President
Enclosure
s s 4 North A r r o v h e f d A Y e D u e, S a n Bern ^ r d i n o, C A • f 4 o b- l O l s
(f o u) f s b- b s e o - F. z (• o u) f s l- 1 '1 5 1 - r r. h e .. u 1 ,,, f n z o m
i Table of Contents
Joseph E. Bonediman 8 Associates, Ina
April 28, 2008
1 Understanding & Approach
Project Understanding .................................. 1-1
Approach to the Services ................................ 1-3
Expectations .......................................... I-4
Comments &Suggestions ................................ I-4
References ........................................... 1-4
2 Qualifications
Qualifications & Experience Summary ..................... 2-1
Client References ...................................... 2-2
Recent Relevant On-Call Land Surveying Experience .......... 2.3
Recent Relevant Map Checking Experience ................. y_g
Key Project Personnel .................................. 3-1
Availability afStaff ..................................... 3-2
Resumes ojKey Personnel .............................. End of Section
Appendices
A On-Call Services Statement ............................. .
B Business Registration ..................................
C S.O.Q.Excerpts .......................................
City of San Bernardino Development Services Department a
Proposal: On-Call Surveying 8 Map Checking Support TABLE OF CONTENTS
I:\Documents\Proposals\Pmposals 20081City o(San Bemartlino OnLall Surveying 8 Mapping\I Table of Contenis.doc
- Expression of Interest (Transmittal Letter)
ii Tables & Illustrations
Joseph E. Bonadiman 8 Associates, Inc.
Apol 28, 2008
2 Table 2-1: Select Public Works Client References 2-2
2 Table 2-2: Completed City of San Bernardino On-Call
Surveying Projects 2 2
2 Table 2-3: Completed City of Loma Linda On-Call Surveying
Projects 2 3
2 Table 2-4: Completed SBUSD On-Call Surveying 2-4
3 Figure 3-1: Organizational Chart 3-1
Appendix A Figure B-I: City of San Bernardino Business Registration
Certificate 5-0
City of San Bernardino Development Services Department
~ Proposal: On-Call Surveying 8 Map Checking Support TABLES & ILLUSTRATIONS
L1Documents\ProposalslProposals 2008\City of San Bemartlino On-Call Surveying 8 Mappinglii Tables 8 Illustratlons.doc
II
u
LJ
II
LJ
1 Understanding & Approach Joseph E. BonadlmanBAesociatea,lnc.
April 28, 2008
1.1 Project Understanding
Per the Request for Proposal (RPP) dated March 27, 2008, Joseph E. Bonadiman & Associates, Inc.
(JBA) has the following understanding of the Pubtlc Works On-Call Surveying and Map Checking
Support Services (Services) requested by the City of San Bernardino (City):
' General Information
• Changes to personnel assigned for services requested by the
RFP shall not be made without the prior written approval of
the City Engineer.
• The duration of the Contract with the selected firm shall be
' one year, with a provision for an administrative extension of
one additional year, subject to agreement of both parties.
' The total cost of all services performed shalt not exceed
$300,000 in any fiscal year.
• Projects shalt be assigned at the sole discretion of the City Engineer or his designee. The City may
use its own employees and/or other independent Consultants to perform the services in question in
addition to any work assigned to the Consultant. No guarantee is provided as to the minimum or
maximum volume of work that may be assigned to a Consultant.
• In the course of engaging in the services in question, the Consultant shall act in the interest of the City
and shall avoid situations involving an actual or potential conflict of interest. It shall be the
responsibility of the Consultant to discuss any potential or real conflict of interest with City staff.
• The Consultant shall invoice the City for services rendered on a monthly basis. If services for more
than one project in a month are being billed, a cost breakdown shall be provided showing the cost
' attributable to each project.
Invoices shall be supported by backup documents, including copies of each employee's time sheets.
The time sheets shall be prepared and signed by the individual employee in the nomutl course of the
' Consultant's regular time and billing cycle. Payment will be withhetd until adequate backup is
provided.
' In the event of disputed charges, Consultant shall make available to the City supporting documents as
requested. To assure confidentiality, financial and personnel documents submitted as backup shall be
stamped "Confidential".
On-Call Surveying Support
• The Consultant shall provide a Survey Party to perform the following services to the City:
• Constructlon Staking Topographic Surveying
• Right-Of-Way Surveying Other related services as directed
• Intersection Monumentatlon 8 Ties by the City Engineer or his
designee
• Recovery and/or Restoretlon of Monuments
City of San Bemardino Development Services Deparhnent
~ Proposal: On-Call Surveying 8 AAap Checking Support UNDERSTANDING 3 APPROACH
I:\DOCUments\ProposalslProposals 2008\City of San Bemardino On-Call Surveying 8 Mapping\1 Understanding & Approachdoc
J
1 Understanding & Approach
Joseph E. Uonadiman 8 Assoelates, Ina
April 28, 2008
I
• The City shall obtain all necessary permits from outside agencies. However, the Consultant shall be
required to perform all necessary coordination with outside agencies, utilities, and other City
Departments, including traffic control, as it relates to the surveying for the work.
Prior to accepting a surveying assignment, the Consultant shall notify the City Engineer or his
designee in writing if the use of athree-person Survey Party will be required to accomplish the work.
Otherwise, payment will only be authorized at the billmg rate approved for the two-person Survey
Party.
• Consultant shall provide all necessary equipment and materials for satisfactory performance of the
work. This equipment shall include, but is not limited to, the following:
• A Suitably Equipped Survey Truck in Calculators
Excellent Operatlng Conditlon .Cellular Telephone(s)
• High-Visibility Safety Vests 8 Hard Hats .Small Measuring Devices
• Traffic Cones & Warning Devices .pencils, Pens, Paper, etc.
• Data Collector(s) Other Survey-Related Equipment
• Transit(s) & Materials
• Levels, Rods, Chains, etc.
All equipment provided to the Survey Party by the Consultant shall be operated and maintained at no
additional expense to the City. The Consultant shall provide all office support for the Survey Party,
including, but not limited to, computer, clerical, message center, accounting, equipment maintenance,
etc.
• All safety equipment and workplace attire worn by the Consultant's Survey Party shall be neat, clean,
and in conformance with Occupational Safety and Health Administration (OSHA) regulations. Attire
worn by the members of the Survey Party shall be plain (no logos, pictures, artwork, writing, etc.),
' with the exception of company logo attire appropriate for the job. Each member of the Survey Party
must wear anOSHA-approved high-visibility jacket or vest and hard hat when working in the street
or in the vicinity of construction work.
• Traffic control necessary for the safety of the Consultant's Survey Party and the traveling public shall
be the responsibility of the Survey Party, unless otherwise authorized in writing by the City Engineer.
• The Survey Party shall maintain a close liaison with the City Engineer or his designee at all times
while the work is proceeding.
• The Survey Party shall work under the supervision of a Licensed Land Surveyor or Civil Engineer
' licensed to practice surveying in the State of California.
Survey notes shall be provided in hard copy and in electronic format suitable for export to AutoCAD
(dwg).
• Hourly rates for two-person and three-person parties shall be specified. Time shall be noted to the
nearesthalf-hour.
City of San Uemardino Development Services Department
Proposal: On-Call Surveying 8 Map Checking Support UNDERSTANDING 8 APPROACH
I:1Documents\Proposals\Pmposals 2008\City of San 6emardino On-Call Surveying & Mapping\1 Understanding & Approach.tloc
1 Understanding & Approach ~oaephE.BonadlmanbAe:ociatea,lno.
Apr1128, 2008
Map Checkiug Support
• For Map Checking Support, the Consultant shall provide a California Licensed Land Surveyor or
• Registered Civil Engineer licensed to practice surveying in California.
The Map Checker must possess the following qualifications:
• The Map Checker shall receive assignments from and maintain a close liaison with the City Engineer
or his designee. The Map Checker shalt meet frequently with the City Engineer or his designee.
• The current status of each Map Check shall be maintained and shall be made available to the City
Engineer or his designee upon request.
• All requirements for Map Checking regarding provision of office space and equipment, maintenance
' of equipment, and attire are identical to the requirements Consultant Survey Parties discussed
previously.
1.2 Approach to the Services
JBA's approach to the requested services is summarized as follows (in addition to adhering to all
requirements discussed above):
1. Begin the project with a "kick-off' meeting with the City Engineer and his designee(s) to solidify
JBA's and the City's understanding of the details of the requested services, finalize JBA's work
plan(s), and address any outstanding questions or concerns.
2. Promote strong and effective project management by considering our proposed Survey Manager and
Map Checker, Edward J. Bonadiman, P.L.S., to be essentially an extension of the City staff. JBA
will emphasize our single-source contact with the District by Mr. Bonadiman; the second line of
communication shall be our proposed Director of Surveys.
3. Maintain excellent communications between City staff and the proposed Survey Manager/Map
Checker and Survey Director through scheduled coordination meetings with the City Engineer and/or
his designee(s) and progress/status/billing reports. This coordination will be aided by the close
proximity of offices.
4. Provide a dedicated FTP location for the sharing and submittal of all relevant files, drawings, and
' reports for City review and implementation. JBA will also utilize any FTP locations provided by the
City, if the City so desires.
5. Utilize the dedicated JBA Intranet and Document Control System for the organization, scheduling,
tracking of all Survey and Map Checking Projects and all associated files, contacts, and documents.
6. Implement established Qasllty Control (0°QC") protocols, including the following:
Utilize the project tracking/organization measures discussed above.
Provide regular, scheduled progress reports, status reports, and draft deliverables to the City for
review and comment.
• Review of all project deliverables and progress/status reports by both our proposed Survey
~f~yr~~~ Manager/Map Checker and our Director of Surveys.
City of San Bernardino Development Services Department
Proposal: On-Call Surveying 8 Map Checking Support UNDERSTANDING b APPROACH
I~.\Documents\Proposals\Pmposals 2008\City of San Bernardino On-0all Surveying 8 Mapping\t Understanding & Approach.doc
1 Understanding & Approach
Joseph E. Bonadiman 6 Associates, Ina
Apol 29, 2008
1.3 Expectations
JBA does not have any comments or suggestions regarding compliance with the City's RFP. This
Proposal has been prepared in compliance with the RPP.
' 1.4 Comments & Suggestions
JBA does not require any items, actions or information to be provided by the City in addition to the items,
actions, or information already identified in the City's RFP.
1.5 References
' The following documents have been made a part of this Proposal by reference:
^ Request for Proposal (RFP~ to Provide Civil Engineering and Surveyin¢ Services for On-Call
Surveying & Map Checking Support. dated March 2'7, 2008.
Addendum No. 1 to the RFP, dated Apri12, 2008.
City of San Bernardino Development Services Department
~ Proposal: On-Gail Surveying 8 Map Checking Support UNDERSTANDING t. APPROACH
L\DOCUments\Proposals\Proposals 20081City W San Bemartlino On-Call Surveying 8 Mapping\t Understantling 8 Approach.doc
C~
LJ
2 Qualifications
Joseph E. Bonadlman d Associates, Inc.
April 28, 2008
2.1 Qualifications ~ Experience Summary
JBA has a firm commitment to serving the needs of municipal agencies throughout Southern California.
We fully understand the critical importance of public works projects in maintaining the long-term
viability of infrastructure within the City. Our 67 years of unparalleled professional experience
includes:
• Successful completion of large, challenging
survey projects throughout the west, including
the complete survey of the Chavez Ravine in Los
Angeles (the home of the L.A. Dodgers
Stadium), a 110-mile boundary retracement
survey of Edwards Air Force Base, design and
construction surveying for 70 miles of water
transmission main lines in the City of Phelan in
the High Desert, a hydrographic survey of Los
' Angeles Harbor for the Dtpartrnent of the Navy,
and atwo-year surveying contract with the U.S.
Army Corps of Engineers for various projects in
California, Nevada, and Arizona.
• Recent completion of various large-scale
survey projects, including a GPS survey of a
U.S. Marine Corps base in the High Desert of
California, project management for the surveying
of two airports in Canada, and surveys of various
crossing points along the California Aqueduct.
^ Extensive experience in providing oncall
surveying services to various municipalities in
' the Inland Empire, including the City of San
Bernardino, which is located only two blocks
from the JBA office. This close proximity
' ensures a minimal amount of response time and
travel time for any City projects.
• Extensive experience in the preparation and
verification of Tentative snd Final Maps,
Certificates of Compliance, Records of
Snrvey, Corner Records, Monument Ties, and
other related maps and documents.
• Excellent working relationships with numerous
Public Works agencies throughout Southern
California (refer to the References provided in
Section 2.1, below).
rb W i JI•[ i .JN i. ni.,,M,
ql(1,. ~~ i .,.,,. -L .i i -i yYS i
aT d~! iiv l1R ~• nG.. i. i.i~
i .+.- ]IIr1f sty. T.fp 91,F MG[.r,. vY. i.
w~ ... i ~iwr A.SY 1dYY IYrYI •.Y Yr6 1i11/Y -i i
- ~.
'I
Plan & Profile, Topogrophk Survry oj40r" Sheer
Improvements, San Bernardino, CA
',k:
_~_a{
r~,
Iii
,~
Plan & Profi/e, Topographic Survry of "E"Street
Pavement Rehabilitation, San Bernardino, CA
Plan, Profile & Cross Sections, Topographic Sarvry of
Goodlett Street Improvement, San Bernardino, CA
Refer to Appendix C for relevant excerpts from our Statement of Qualifications, including abstraMs
for recent projects.
City of San Bernardino Development Services Department
Proposal: On-Call Surveying & Map Checking Support QUALIFICATIONS
I:\D000mentslProposals\Proposals 2008\City of San Bemardina On~all Surveying & Mappingi2 Dualifications.doc
2 Qualifications
Joseph E. Bonadiman b Associates, Inc.
April 28, 2008
t 2.2 Client References
The best testimony to our professional capabilities is the satisfaction of each client. Thus, we invite the
City to contact the Public Works clients listed below, or others referenced in our project abstracts found in
Appendix C, regarding the management capabilities and technical expertise of our firm.
it
Table 2-1-Select Public Works Client References
Cay of San tlemaMlno Mlehael Grubbs, P.E.
300 North "D" Street Cily Engineer
San Bernardino, CA 92410 909 / 3tM-5057, x3305
Cay of Loma Linda T. Jarb Thalpelr, P.E.
25541 Berton Road Public Works Director
Loma Linda, CA 92354 908 /799.4401
San Bernardino Unified School Dlatrtd Jorge C. Mendez
777 North "P Sheet Assbtant Diredor
San Bernardino, CA 92410 909 /381-1238, x4973
San Bernardino Valley Munidpal
Water DlsMct (SBVMYYD) RobeR Tischer, P.E.
1350 Soutlr 'E' Sleet Manager of Engineering
San Bernardino, CA 92408 gpg / 3gq.5g57, x3305
East Valley Munidpal Water
Dishla (EVMWD) Robert Martin
3054 East Highland Avenue, Suite t8 General Manager
Highland, CA 92346.2807 909 /888.8986
Lake Arrowhead Communhy
Services Distrld (LACED) Ryan Gross, P.E.
District E Ineer
Lake Artowhead, CA 92352 909 / 338.7137
ommunity
k
S
arvlces Dlatrid
(LACED) Ryan Gross, P.E.
P.O. Box 700 Dishict Engineer
Lake Arrowhead, CA 92352 909 / 336-7137
2.3 Recent Relevant On-Call Land Surveying Experience
JBA is currently contracted to provide on-call surveying services for various municipalities, including the
City of San Bernardino, City of Loma Linda, and the San Bernardino Unifted School District
(SBUSD). These contracts have helped solidify the excellent working relationships JBA already enjoys
with these municipalities and have established JBA's reputation as operating some of the most well-
respected and competent survey crews in Southern California.
Since 2006, JBA has providedoncall surveying services to the City of San Bemardvto. Dtuing that time, JBAhas
completed numerous projects for the City, inchuding the select project list inchded on the following page:
City of San Bernardino Development Services Department
Proposal: On-Cell Surveying 6 Map Checking Support QUALIFICATN)N3
i:\DocumenffiWroposalsWroposals 2008\City of San Bernardino On-Call Surveying & Mapping\2 QualificaUOns.doc
2 Qualifications ~~ephE.6onaditnanaAseoclates,lno.
April 28, 2006
u
'._ 1
'`J
J
r aDte o-~ - ~omptecea ury or sea nerBarwao cm-(;au Swweying Pro
40th Street Improvements Topographic Survey 8 Constructlal Staking jects
2007
med~ on~t D ~ Stann Drain TopogwPhlc Survey 8 Constructlon Staking 2007
Siena Way Sexrer Relocatlon Topographic Survey 8 ConsWctlon Staking 2007
'I' Sbeet Sewer Rebcatlon Topographic Survey 8 Conatructlon Staking 2008
Cable Creek Sewer Improvements Topographic Survey 8 ConsWctldn Sgking 2008
Tippecanoe Avenue Sewer
Improvements
Topographk Survey 8 ConsWdion Staking
2006
"I" Sleet Sewer Improvements Topographic Survey 8 Constructlon Staking 2006
Goodlett Street Improvements Topographic Survey 8 ConsWdlon Staking 2006
'G" 8 24th Street Improvements Topographk Survey 8 ConsWctlon Staking 2006
"E' Street Pavement Rehabllitatlon Topographic Survey 8 ConsWctlon Staking 2008
"L"Street Improvements Topographic Survey & ConeWctlon Staking 2006
Date Place Pavement Rehabllltatlon Topographic Survey & ConsWdlart Staking 2008
"G" Sheet Pavement Rehabllitatlon Topographic Survey 8 Constructlat Staking 2008
Waterman Avenue & 5tlt Street
Pavement Rehablllaflon Topagrephlc Su 8 ConsWctlan Stakin
nreN 9 2008
Waterman Canyon Topographic Survey & Consbuctlon Staking 2008
Since 7A04, JBA has provided oncall surveying services to $ye City ofLoma Linda. l~laiug timt tone, JBA has
completed ntm~erous pnmjects for the City, including the select project list included below:
Table ~3-CompletedCity ofLomaLinda On-Call SurvoyingProjeds
Lind Avenue 8 Van Lueven Street Improvemems Topographb Survey 8 200a
ConsWCtlon Staking
Cotlage Street Improvement T
n 2007
Constructlon Staki
g
Orange Grove 8 Academy Street Improvements Topogrephk: Survey 8 2007
Construetbn Stklrlg
Lind Avenue Street Improvements Topogrephb Survey 8 2007
Constructlon Stk
Coley Street Improvements Topogrephk Survey 8 2007
CanaWCtlon Slaking
Juenit Street Improvement Topogrephk: Survey 8 2007
Conetructlon Staking
Cole Street Improvement Topogrephk: Survey 8 2008
CansWCtbn SWking
SeamoM Drive Street Improvement Topogrephk Survey 8 2005
Canstrucfbn Stking
City of San Bernardino Development Services Department
Proposal: On-Call Surveying 8 Map Checking Support QUALIFICATpM3
I:\Documents\ProposalslProposals 2008\Ciry of San Bemartlino On-Call Surveying & Mappirgl2 Oualifirations.doc
C
'mil
Ci
I
2 Qualifications
Joseph E. Bonediman 8 Asaociatea, Inc.
April 28, 2008
Lind Avenue Street Improvements Topogrophk Survey 8 2005
Construcian Staking
Library Expansion Topographk Survey 8 2005
Consfruclbrr Stakhtg
Ohk Street Improvements Topogrophk Survey 8 2005
Comtmctlon Staking g
Rchardson Street Improvements Topagrephk Survey 8 2005
ConsWetlon Staking
Van Leuven Street Imprevemems 7opogrephk Survey 8 2005
Consmxxiort Staking
Hukla Creek Park T~ ~~~~y 8
S~n9 Y005
Ctly Mainterwrxxi Yard Topographk Surrey 6 2005
ConsWCtlon Staking
Since 2004, JBA has provided on-call surveying services to the City of San Bernardino Unified School
District (SBUSD). During that time, JBA has completed numerous projects for the SBUSD, including the
select project list included below:
Table 2-4 -Completed SBUSD On-Call Surveying Projects
Little Mountain Topographic Survey 2007
Mddle Colege High School Topogrephk Survey 2007
Emmerlon Elementary School Topographic Survey 2008
Arroafiead Elementary Scholl Topographic Survey 2004
Cartnadc Elementary Scholl Topographic Survey 2004
HIIlside Elementary Scholl Topogrephlc Survey 2004
Roosevelt Elementary School Topographic Survey 2004
Richardson High School Topographic Survey 2004
Fairfax Elementary School Topographic Survey 2004
Amowvtew Middle Scholl Topographic Survey 2004
Rio Viata Elementary School Topographic Survey 2004
Mount Vemon Elementary Scholl Topogrephic Survey 2004
Urbita Elementary School Topographic Survey 2004
San Bernardino High School Topogrephic Survey 2004
Middle College High School Topographic Survey 2004
Lytle Creek Elementary School Topographic Survey 2004
San Gorgonio High Schaal Topographic Survey 2004
Cfty of San Bernardino Development Services Department
Proposal: On-Call Surveying 8 Map Checking Support QUALIFICATIONS
I:\DOCUments\Proposals\Proposals 2008\City of San Bernardino On-Call Surreyirg 8 Mapping\2 Oualifications.tloc
2 Qualifications Joseph E. BonadlmanBAesociatea,inc.
April 28, 2008
2.4 Recent Relevant Map Checking Experience
JBA is pleased to offer the City over 67 years of experience in the preparation of Tentative and Final
Subdivision Maps, Records of Survey, Piat Maps, Certificates of Compliance, Corner Records,
Monument Ties, and other related maps and documents. This experience makes JBA extremely qualified
to provide map checking services for the City, as does our substantial experience in map checking for
' numerous municipalities throughout Southern California. Recently, JBA has provided project oversight
services, including the checking of plans, maps, and documents, for the Lake Arrowhead Community
Services District (LACSD) and the San Bernardino Valley Water Conservation District (SBVWCD),
' including:
• Project Oversight for the design and construction of the 1-Million Gallon Burnt Mill Reservoir for the
Lake Arowhead Community Services District (LACSD) in Lake Arrowhead, CA. Services included
plan/map/document checking of all PS&E items prepared by District Staff.
• Project Oversight for the design and construction of Cottage Grove Pump Station for the Lake
' Arrowhead Community Services District (LACSD) in Lake Arrowhead, CA. Services included
plan/map/document checking of all PS&E items prepared by District Staff:
• Currently providing project oversight and map/plan/document checking services to the Lake
Arrowhead Community Services District (LACSD) for the construction of the District's Grass Valley
Reclaimed Water Line; also contracted to provide map/pian/dceument checking services and general
Civil Engineering and Land Surveying services on an as-needed basis to the District.
• Currently providing project oversight and map/plan/dceument checking services to the San
Bernardino Valley Water Conservation District (SBV WCD) for the District's Santa Ana River
Rechazge Optimization Project.
The professional capabilities and experience of JBA specific to Land Surveying and Map Checking are
also iDastrated by the projects highlighted in the abstracts found at the end of Appendix C. These
representative accomplishments show the range and depth of our firm's expertise.
We are confident the information provided demonstrates our ability to provide the requisite services to
the City.
City of San Bernardino Development Services Department
~ Proposal: On-Call Surveying & Map Checking Support gUALIFICATIONs
I:\Documents\Proposalslproposals 2008\City of San aemartlino On-Call Surveying 8 Mapping\2 Oualifications.doc
LJ
C
3 Personnel
3.1 Key Project Personnel
Survev Maaaeer Bc Man Checker -Edward J. Bonadiman, P.L.S. wilt
serve as Survey Manager and the primary point of contact for the City, and
will facilitate all meetings, scheduling, and budgetary tasks. In addition,
Mr. Bonadiman will be responsible for the overall management of all field
survey activities, and wiil supervise our Director of Surveys identified
below. Mr. Bonadiman will also serve as Map Checker for the City.
His relevant qualifications and experience includes:
LJ
LJ
• California Licensed Professional Land Surveyor (P.L.S.), No. L-7526.
• Over 17 years of Land Surveying experience, during which time he has
successfully completed a wide range of large residential, commercial,
and public works surveying, mapping, and construction staking
projects.
• Survey Manager for On-Call Surveying Support services provided to
the City of San Bernardino (2006 to Present), City of Loma Linda
(2004 to Present), and the San Bernardino City Unified School District
(2006 to Present).
• Extensive experience in the preparation and verification of subdivision
maps, certificates of compliance, records of survey, corner records,
and monument ties. Expert level knowledge of the Subdivision Map
Act and extensive knowledge of applicable sections of the City's
Development Code.
Joseph E. Bonadiman & Associates, Inc.
April 28, 2008
haw Bs;lrr4i
fno
I y {~ci~
SIaiVEY MANAGER
8 MAP CHECKER
Edwatd J. Bonadiman, P.L.S.
OIaECTOa OF BUtVEYB
Micfixl 1.9anrd'anen
murwi auavEr r~mr
nwFE~.ux surrvrr worn
Na rs mot
Figure 3-I -Organizational Chart
• Extensive knowledge in the application of Conditions of Approval for Tentative Maps and mitigation
monitoring programs and in reading/interpreting Title Reports.
Exceptional project management skills, communication skills, and technical proficiency.
A copy of Edward J. Bonadiman's resume is included at the end of this section.
Edward J. Bonadiman's Hourly Rate Classification'for Map Checking is "Senior Surveyor"
at $140/Hour.
Director ofSurvevs -Michael J. Bonadiman will serve as Director of Surveys and the secondary point
of contact for the City for On-Call Surveying Support services. Under the supervision of our proposed
Survey Manager, Mr. Bonadiman will be responsible for the day-today coordination of all field survey
activities and will have direct oversight of JBA's two-man or three-man Survey Parties. He will also be
responsible for coordination with outside agencies, utilities, and other City departrnents, and shall prepare
all On-Call Surveying Support deliverables. His relevant qualifications and experience includes:
• Over ten years of experience in Land Surveying, Photogrammetry, and Global Positioning System
(GPS) experience.
Cily of San Bernardino Development Services Department
~ Proposal: On-Call Surveying & Map Checking Support PERSONNEL
1:1Dacuments\Pmposals\Proposals 2009\Cily of San aemarAino On-Call Surveying & Mapping\3 Personnal.AOc
3 Peril SOI II I~iI Joseph E. Bonadiman 8 Associates, Ine.
April 28, 2008
Five years of experience as Director of Surveys for JBA, during which time he has completed a wide
range of large residential, commercial, and public works surveying, mapping, and construction
staking projects.
• Director of Surveys for On-Call Surveying Support services provided to the City of San Bernardino
(2006 to Present), City of Loma Linda (2004 to Present), and the San Bernardino City Unified School
District (2006 to Present).
Exceptional project management skills, communication skills, and technical proficiency.
A copy of Michael J. Bonadiman's resume is included at the end of this section.
Michael J. Bonadiman's Hourly Rate Classification ~ u "Assistant Surveyor'' at ,SI00/Hour.
' *Refer to the JBA Hourly Rah Skeer included wfth /Ais Proposal in a separate sealed envelope.
3.2 Availability of Staff
' JBA has sufficient staff available to immediately begin the On-Call Surveying and Map Checking
Support Services specified in the RFP. This includes the Key Project Personnel introduced above as well
as two-man or (if necessary) three-man Survey Parties and any associated support personnel.
3.3 Resumes of Key Personnel
Abridged resumes for the Key Personnel introduced above are provided at the end of this section for the
City's further review and evaluation.
i
Clty of Ban Bernardino Development Services Department
Proposal: On-Call Surveylnp & Map Chedcinp Support PERSONNEL
I:\DOCUments\Proposals\Proposals 2008\City of San Bernardino On-Call Surveying 8 Mapping\3 Personnel.doc
i
'~J
~~
I
1
1
Appendix A Agreement Statement ~OaBphE.BonadimanBASScelates,lnc.
Aprtl za, zoos
Statement Regarding Draft Agreement for On-Call Surveying Services
Per the requirements of the RFP, this statement is to certify that Joseph E. Bonadiman & Associates, Inc.
(JBA) has read the Draft Agreement for On-Call Surveying Services included in the RFP, and that JBA is
able to meet the insurance requirements contained therein.
':J
III
J
City of San Bernardino Development Services Department
Proposal: On-Call Surveying & Map Checking Support AGREEMENT STATEMENT
I:\DOCUmenfs\ProposalslProposals 2l)DB\Cily of San Bernardino OnLall Surveying & MappingNppentlix A -Agreement Statement.tloc
I.1
~J
G~
JI
1
u
ll
L1
Statement of Local Preference Eligibility
Based on the information provided above, JBA is considered a "City of San Bernardino Based
Consultant" with local preference eligibility, pursuant to the requirements set forth in the RFP for said
eligibility.
Appendix B Business Registration JOaephE.BonadimanBASSOCiates,lna
Apri128, 2008
City of San Bernardino Business Registration
A copy of the City of San Bernardino Business Registration for Joseph E. Bonadiman & Associates, Inc.
(JBA) is included below. Per the requirements of the RFP, JBA also provides the following information:
• JBA Physical Address:
234 North Arrowhead Avenue
San Bernardino, CA 92408
• Number of Permanent Employees Assigned to the Above Address: 17
Ftgure B-I -City ofSan Bernardino Business Registration Certifecate
CITY OR SA1V ntCRNARDIIYO
sllslNenactlsnlA77an cr+krulcA3s
ACCOUKr n•r,r.•Wri.orrwrirrr M~wlw.rkrrr•rrr. krr w.+4+.4
nDNNtt«Q r~~rrr~yw `~~~ rwrinl 11Y O.irii~M.YrwelrlrY Ya„ir,i.~srr
27113 ~' °i•W krrirlrY,rr~-,rrt ar r,iy .,rr .•wrr~wr,r.,.
.rryrr-w.r rrw~.rils4.rirn+,+i.r+.~.ferr.y.rri~ri
aU4Qi89S CtASf: 8f1OMaBR E%~IRATIOIi DATB
DATE t!Am N(rlEa: Ibl1/200t
0l/27/t00S aUSaJO81DCA770N: 2M NARROWHEAD AVE
~
~ IOSaPH BBONADDAANl ASSOC -
^
anaasnAw IOSSPH a BDNADIMAN k Assoc
ATreNnnN
wAnara ~ooklau 214 N Aaso7vxaAD AVa Rachel G. Clark
SAN BaRNAtlDDiO. CA. 9)A06.1013 CITY CLkRK
City of San Bernardino Development Services Department
Proposal: On-Call Surveying & Map Checking Support BUSINESS REGISTRATION
I:\D000ments\Proposals\Pmposals 2008\City of San Bernardino On-Call Surveying & MappingNppendix B -Business Registration.doc
~J
LJ
LJ
~.J
u
hrougtrout our history, surveying h~ beat an intrinsic part ofokv
Rekxmly, JBA's survey persormel have
completed a hardfirl ofunigrre projects,
inchding a GPS strtvey ofa U.S. Marine
Caps base inihe I-flgtr Desatof
California, projectrrrarraganart fathe
surveying oftwo airpoAs in Canada, and
surveys ofvarious kaossirgpoirds akxrg
the California Aqueduct Many ofthese
tecerd ptnjects gave also bear assisted with
relatively new technologies such as
Geographic hrfarnation Systems (GIS)
spatial dam analysis and cataloguing.
services. JBA has carrpleted large, chelleneng stavey projects
tlvougltkwt the west, including the canplete survey ofihe Chavez
Ravine in Las Angeles (the bane ofihe LA. Dodges Stadium), a 110-
mile boundary retracernerrt stvvey ofl'sdwards Air Face Base, design
and conshutdon strveying for 70 miles of water hansnission n>sin lines
in the City of)?tkelan in the Fligh Desert, ahydmgaphic storey ofLos
Angeles Harbor fathe Departrnart ofthe Navy, and atwo-year
surveying conhact with the U.S. Amry Caps ofFlrgirrcers for various
projects in Califaarua, Nevada, and Ariaona
JBA is also corrttacted to pmvide onanllll surveying services for various municipalities,
inchdingthe CityofSan Bernardinq CHyofltuma Ii~da, andthe San
Bernardino Unified Schad Dhirict (SBUSD). ltrese casrhacm have heFped solidify
theexcellart working relatim-slrips JBA aheady enjoyswithT)xcemunicipalitiesand
have esmblisited JBA's won erg operating sane ofihe most well-respecxed and
cempetent survey sews in Southern California. 'This reputation is reflected in our
kadat4ive list ofrepeat residattitial, irdttstrial/cernnraoial, and public works cGerrfs who
call upon JBA to provide surveying services for all oftireir projects.
Otv Ptesiklad, Edward J. Bonadiman, P.LS., is a Licer-sed California Surveyor and
is a Corporate Member and Past Presikiart ofthe California Lmrd Surveyor's
Associatiar (San Barrerdirn/Riverside Chapter). Mr. Bamdiman is the Manager of
our Survey Deparlmerrt
Briefdescriptior>s ofthe majorLand Surveying and GPS services provided by JBA are
diskussed onthe following pages,ard include the folowing:
• Survey Control Networks • ALTA/ACSM Surveys
• Topographic Surveys TeMatlve/Final ParceUTract Maps
• Boundary Surveys Mining Surveys
• Records of Survey Mine Limn Monuments (MLMs)
• Design Surveys Stockpile quantities
• Constructlon Surveys • Aerial Mapping
• Hydrographic Surveys Project Management
I:~mcumemswruposal,Nropows 20(16~('Ary of San 9amerairq o,.call Sunreying 8
Mappinp\SOG Ercerpk~$GG Fxceipl - LsM SunreyNp 8 GPS.OOe
~' '' 4,
Joaaph E. 9onaCNnan 8 Aeaoda[as, Ne. Statement of Qualifications 1
n
Primary Land Surveying & GPS Services
• Survey Control Networks
Sophisticated control rretworks are e~ablished by JBA to "tie down" a property and
provide the backbone for all subsequent survey activities.
• Topographic Surveys
JBA uses conventiorral equipment and GPS to construct topographic maps illrrstratirtg
the existing ct~aracOeristics of a site, including topogaphc contours, rattttrai features,
vegetation and pees, buildings, roadways, tuilities, and associated elevation and
attribute data. These topographic surveys provide the basis for all subsegrrart project
site design and txrgineering
• Boundary Surveys 8c Records oPSurvey
A Boundary Survey is developed to Physically locate aclierrt's deed on thegrourd.If
the property has been previously surveyed, ]BA rtdraces the survey, finds existing
monuments (propaiy comers) and/or replaces missing morrrunatLs, azed provides a
map ofthe survey. Ifthe property has not beery surveyed previously, JBA establishes
property canersand prepares/files a Record ofSurvey wilhthe appropriate cotmty.
• Desigo Surveys
Design Surveys are paepered to provide a base drawing far use by argineas and
arehiteds. They illustmle the physical features and tx>mhairAs affecting development of
a site. Design Surveys generally include boundary retstablishmtmis, easartart
locations, man-made and nahnal featres, elevetiorrs, corrtows, and utility locations.
Specific itttns can be omitted or added as appropriate for each individual project.
• Consfructlorr Surveys
JBA has extensive cautrrrction survey errpaierrce. We provide rough and finish grade
staking for all phases ofconstrrrctionand as-buihs ofcompkted work. We frequently
deploy teams using GPS and total stations for large-scale mass gradmg and detailed
contests slabs.
• Hydrographk: Surveys
JBA utilises GPS with sophisticated sonar sourding equipmart to measure the bottom
ofwater bodies. Mining grrazries that have been excavated below the wale table are
also surveyed using this method.
• ALTA/ACSM Surveys
TheALTA/ACSMLcmd Title Survey
Strmdcvds have bear joirdly adopted by
dreAmericcm Land TuleAssociatiat
(ALTA) and theAmerican Congress on
Suveyingard Mappwg (AGSM). These
sfardards was deveoped as a collective
effort in orderto create an accepted and
recognized legal docwnent that presaits
particular information in detail and
exactrress for acceptance by title
insurance companies. ALTA/ACSM
f
I:VJenanenaWmpoeaklP,apasNa 20091Ciry a San aemareir~o OnLall Surveyirg a
Mapping~SW FxeryASOp Excerpt-Lard Sunreyinp 8 GPS.ea
1
runvaux-~ r~vro mrF slxrvEr ,
*' -
~; i
.beWnEeautllmm6MeWalee,MaStatementof~uati&aUone 2
C~
Land Title Surveys are recommended fa~ cxtrranereial har-saaions in which exuded
coverage is required and/or where extremely wiled information is needed.
• Tract & Parcel Maps
VamOOa metilOdS are hied fta'ttle
subdrvrsron Ofreal property, including
Tract Maps, Parcel Maps, Parcel Map
Waivers, Lot Lira Adjustmerrts, and Gift
Deeds. JBA provides surveys m locate
existing improvemerus for the
preparation ofthese subdivisions and
BSSOC18ted documentation.
- m~rawws~rrwr
_: w~r~~ ~rrrr~,
rL' _
l
*~ .:
....{~~
-~
~
I~~ . n:a i
,....
i
f
r" t l
_
~ ' r
.i' ® '
i
I ~ ,
- ~
urvey
surface lacatior-s and bormdmies ofmining claims. During mining a tunneling
opemtiars, the Mining Survey helps ro establish the location ofterdergrourd
operations horiaorrmlly and vertically, laY out shaft cormteCtiors, and guide tunneling.
This is thn~-dimensional traversing, rat essentially differeu from surfice surveying.
• Mine Irmk Monuments (MI.Ms)
JBA has devekrped a monumerAation process to assist plant managers in cormolling
the mining limits ofiherr respective plater sites:
1. The plant boundary is established in the field and drown in AutoCAD. Once the
boundary is completed, the project mining lutrit is calculated and ir>serted irtto the
AutoCAD drawing. Major angle poirds and specific distances along the curves
and straight lines are then monumerrted.
2. Temporary poirAS are set and "tiedout", and the Seal montmrerds are set
3. Once the coraaete has dried, the survey crew will retumand kxate fatal positions.
These positions are read elechonically into a custom database that provides the
cliert wills a detailed report on their particrilar mining operation.
• Mimimg Surveys
Mining S s are used to establish the
• Stockpile Quantities
Stockpile quantifies in the mining irdushy equa0e tosignificant botOom-line dollars.
JBA relies on proven methods for obtaining necessary field measunanerds and
building complicated detained digital terrain models (D'IMs) to assist in quantifying
and managing stockpiles.
• Aerial Mapping
A significant amauntoftopographic
mapping is dome by means ofaerial
photogrammehy, which uses
stereoscopic paps ofpho0ographs taken
5arr aircraft and, mole receraly, from
artificial earth satellites. HoriDOntal and
vertical ground surveys must appear ¢r
the photograptrs. These photos are therr
remnstituted into stereo models for
drafting tnre~scale maps. Precise
cameras are regrdred, and precision-
I:~DOCUmenl•WroposelslPropos•I.400SICity of S•n BemerEirw On.Call Surv•prg 8
Meppirq\S0~ Ezc•rpBSOG Emaryt- LxM Surveybg 8 GPS.tloc
.~
o ~ .`C
Jonnph E 9onadmnn 6 bnodnta, Inc Slntement of pualiacaaom 3
mapping equipment is teed to depict naMal and artificial objets In hue position and to
show title elevations for alt poims in the mapped area.
JBA irtcaPorates sophisticated r>ettwrk designs to ensure accurate aerial target
positions for aerial survey projects.
Client References
We invite you to contact the following clients, or others referenced in our project
abstracts, regarding our Land Surveying and GPS capabilities and technical expertise:
City of Ben Semerdino MlchaN CirubM, P.E.
300 Nonh "D' Sheet City Engineer
San SemaMino, CA 92418 909 /384-5057, x3305
CHy of Lome Llnda 7. Jarb rhalpa)r, P.E
25541 Barton Road Public Wanks Dkector
Loma Llnda, CA 92354 909 / 799•MOt
San Bernardino UnfMd School Dbtrict Jorge C. Mentlez
777 North "P Street AeaktaM Director
San BemaMino, CA 92410 909 /381-1238, x4913
San BarnaMino Va1Ny Munklpal
Water DNtrlct (SBVMWD) Robert rlncher, P.E.
t350 SaAh'E" Street M
-
57!
5
San BemerdMO, CA 92408 909 /384
60
x330
East VeINy Munlelpal Water
Dlstrkt (EVMWD) Robert Margn
3854 East Highland Avenue, Suite 18 ~~ Manager
Highlantl, CA 92348-2807 908 /888-8988
DMC Design Group Davltl M. Cosper, P.E.
140 North Maple Street Suite 104 gainer 8. PresldeM
Corona. CA 92880 951 /549.8100
Joseph Nicholas Homes NbhoW Coussoulb
341 Went 2nd Street Owner & Presklent
San Bemartlino, CA 92401 909 /381-0888
VICMry Homes Austin Rkhey
25 North Sella Antra Avenue, Su0e A Project Manager
Arcadia, CA 91008 828 / 574-9453
Harwood Homes, Inc. Jeff Nlrsch
20835 Agoure Road, Suite 205 President
Calabasas, CA 91302 818 / 99g-3730
f>yrwnic Homes Henry Molandez
1050 Lake Drive, Suite 150 Cwner 8 PreakleM
Went CovMa, CA 91790 828 /931-1411
cr0arxaaerneNropoea.Nropoxele zooe~c~ty w s.a eemartlmo on-can s~rVay~ny a
atapP~~9rs0a ExcelpaSOa Excerpt- LaM SurveYlrg 8 riP$.(IDL
Joaph E 9aneaXaM 8 Aaaodala, 61G Statement of 9ualiflnaona 4
Project Experience
The select project listed below are utdicative ofJBA's
Cafd Slaveying and GPS expertietK:e. Select example
projects are also discLLSSed in Beater detail in the abstracts '
folbwing this section. "'' "~
Orgdng Contract to Provide Topoprephlc San BemertNno, San Bemardkro UniNed
Survey SBM~s CA Sdwol Dlatrict (SBUSD)
Ongoing Contract to Provideroj~ SeMces
for Varbus Improvement P ~ Bemerdino,
CNy of San Bernardino
Ongoing Contract to Provide Survey Services
far Various Improvement Projects Lome Untla, CA CI of Lama Linda
tY
GPS Survey for Marine Corps Base San Bernardino
County, CA Sensis Corporation
Aerial Survey for Ofi0-Aae Lakes 8 Streams San BemaNino San Bernardino Valley
Project County, CA Munictpel Water District
SBVMWD
Boundary Survey, Mapping 6 CormWcNon Los Argeles Los Angeles Metropditan
Slaking far MetroNnk Blue Una Fxlerrebn County, CA Transit Autlwdty
Boundary Survey 8 CanaWC0on Staking for Los Angeles Los Angeles Metropolitan
Metrdink Blue Line Fxbnalon County, CA Trenslt Authority
On-SNe Control & Desi0rJCorrolruc0on for Sewer Baker
CA Baker Comnamity
Meln Una & Sewer Treatment Plant Leech FbMa , Services Dlatrid
Mariano Rancho Boundary Survey (3,400 Acres) Venture, CA Soulhbay Engineers
Cadiz VaNey AgrkzYlurel Project (2,240 Acres)
VertlcaVAedal Contrd, Boundary Survey, Cadiz, CA Cadiz Incorporated
3ubaldenae Survey, & Construction Staking
Prellminary Contrd & ConaWdlon Slakkg for
New Highland City Hall Highland, CA C
NY of Highland
Preliminary Topographic Survey far Tamper Ban Bernardino, San Bemartlino Carty
Creek Channel CA Flood Control Dlstrid
(SBCFCD)
ConaWctbn Staking br Plbt Spreatlirg Basins Chuckwalla Valley, GeopenlMetropolltan
Along the Cdoredo RWer Aqueduct CA Water Dlsfrtd (MWD)
~~~ Comte ~ far New K-Mart Ontario, CA Canyon RWge Contradore
Aerial Survey Control for 2,000-Acre Future
Black Bench Mountain Residential Devebpment Banning, CA ProactNe Engineering
Corrsuaants
Aetlal Survey Control & Boundary Survey for
w suture Mderson Rartch ResWenNal
D
Moreno Valey, CA Highlantl FaiMew
e
P P~~~
Preliminary Tapographb Cross Settlana 8
Delineations of Future Heacodc Street Righlof- Moreno Valley, CA DMC Design Group
Way
ComWdlon Staking for All On-Site & ORSite ,
Improvements for New Apple Valley Plaza gppb Valley, CA Apple Valle Consultants
Y
1:loocumglrewmpoeelswropouh 200e1airy al son BernuOirw On~Call Sunrerin0 8
MeppinalSGa Ercerpl150G Excerpt - LaiM Surveying 6 GPS.EOc
Joseph E 9onadMUn 8 Assoelata, Ma Shtement of auallRcrilons 5
i
ComWdion Staking for al OnStte 8 ORStte
ImprovemerUS for Tremont Ranch ResldeMlal Redlands, CA Dynamk Homes
Subdivision (19 Lots)
CaraWdian Staking for al OnStte $ Oe-Site Desert Hot 3prtrpa, Adolfaon-Peterson
Improvements for Vlab CMno ApartmeMe CA CorreWCtbn
Conatnrdion Staking for al OnSite
Improvements far Misalon Hills Community Rancho Santa
Ma arils
CA
r9
Diffenbaugh ConUadore
Church ,
Constructlon Slaking for al On-Site $ OH-Ske
Improvantenb for Rosedale Estates RealdeMial Cotlan, CA Vldorta Homes
Subdvielon (38 Lola)
CorrnWdlan Staking for al On-She $ 08Site
ImprovemeMS for Trad 13830 ReskleMlal San 9emardino,
CA
Harwood Homes
Subdivlabn (34 Lob)
ConsWctlon slaking fatal OnSire $ Desna
Improvemeras far Mor9ringbird Carryon Estates county or
RiversWe ~
Joseph Nicholas Homes
Realdentlel Subdivision (31 Lots)
Constnx:tlon Staking for al Onsne $ OeSke
Improvenlenb for Trad 12712 Resklentlal Vldorville, CA Joseph Nicholas Homes
Subdivision (54 Lots, Four Phases)
ConsWdbrr Slaking for al On•Sne $ ORSite
Improvemene for Tract 18777 $18778 VldorviNe, CA Vldory Homes
Residentlal Subdivision (107 Lots Cambkted)
CorreWctlon Staking for al On-Stte $ OffStte
Irrgxoverrrents for Trad 29188 (Orange Grove Highgrove, CA Vldorta Homes
Estates) Resklentlal Subdivblan (32 Lob)
conabuctlan slaking for al a,sb a Desire
d 18436 Realdentlal
nta ~
T Chirro, CA JWDA Archttedure
S ~~
I..d
S)
•NOM: Project OsecrlPaena are summaASa Dory erMOb trot nsceaserly Iat ea aerWCea poNded.
Technical Capabilities & Equipment
Our Survey DeparhrteM's exterLSive technical capabilities and egttigne<tt include:
• Currently use Iwo full-tlme tleld survey crews Sokkla Radon GPS Static $ RTK System
wtlh the ability to uce up to six as-needed Mdtlt PaaCreat Rados
• Three luny a[adced fuU-time survey rigs Two Nikon 831 Tdal Statlal
• One ktll•tlme dedk~ted Flekl Supporter Leta 800Serles Total Statlan
• Tdmble GPS 4700 Base Receiver with 6800 VNkI Ebcbonic Leval
Rover $ Trhnark III 25•Watt Sane Radio
MSHA Certification
JBA's survey personnel are certified with the Mining, Safely
Hazard Association (MSI-IA), Number A9S2. Three eight-
hourclasses are required to become MSI-IA Certified. Classes
are designed ro educate the individuals injob site safely, CPR
and specific mine hazard training.
I'.loocumenl•Vhopo6ablProppeels 20omCity of San eemeNaw pn-Cell Survayin9 8
MeppinatSOa EtterpYSaa Exceryt- LenO Sunreyeg 8 GPS.nx
Joeeph E 9onadman a AaodWe, Ina. Statement of OualMcaaone a
I~
1
~ On-Call Surveying Services
City of San Bernardino Development Services Department, San Bernardino; CA
Client
city ojsmr aernaYk'rro
Drpafire+t
300Nath "D'SrY~t
Smr Bermrto~ CA
924!8-000!
Project Location
SarB~edinq CA
Contact
Michel Giubrkv, P.E
rtityFi~rrer
909/384-5057, x3305
Project Date
2006 -PrarerB
Since 2006, JBA has provided tN}txli
surveying services ro the Griy
Slmr
~
Bantvdino. DWdngttarttiihe, . has
rnmple0edrnattaa+spenjegl4 Ctty,
li
p
inchtding the select project
s
below.
40th SVeet Improvements Tapogaphic Survey & CoraWdbn Slaking 2007
PbdmoM Drlve Slam Oreln
Improvements Topographic Survey & ConsWdlon Slaking 2007
Starts Way Sewer Rekrca0on Topogrephic Survey 8 ConaWdbn Slaking 2007
'I" Street Sewer Relocatlon Topographic Survey 8 ConeWdlan Staking 2008
Cade Creek Sewer Improvements Topogaphk: Survey & ConaWCtlon Slaking 2006
Tippecanoe Avenue Sewer
Improvements Topogrephic Survey & Construclbn Staking 2008
"I" Street Sewer Improvements Topographic Survey & CareWCtlon Staking 2008
Goodletl SVeet Improvemaas TopogrepMC Survey 8 CoraWcdon Staking 2008
"G" 8 24tlt Street Irtprovemema Topographic Survey 8 CanaWCtlon SYaking 2008
"E, Street Pavement Rehabgaa0an TopogrepNC Survey 8 CoroWdion Staking 2006
"L' Street Improvemems Topogrephic Survey 8 CorreWdion Staking 2006
Date Place Pevemem RehabOfletbn Topographic Survey & ConstNdion Staking 2006
"G' Sbeel Pavement Rehab0ila0on Topogrephlc Survey 8 CansWdlon Staking 2006
Waterman Avenue 85th Street
Pavemers Rehadliatlon Topographlc Survey & Constrvdion Slaking 2008
Waterman Canyon Topographic Survey 8 CorreWdion Staking 2008
Kev Project Statf
EdwardJ. Botladiman, P.L.S.-ProjcetMarager
Joseph S.C. Botlarliman, P.E.-Q~xrlilyCohvol & Project t7versight
L\DOnrmenhWroposelsNrtpofals 2ggaCiy of San Beme,tlino On-
Cell Surveying 6 MepgnglS00 FxcerpnCCity of San eemer6no
Surveying.doc
Joseph E. Bonadlman 8 Assochbs, Inc.
On-Call Surveying Services
San Bernardino City Unified School District (SBCUSD), San Bernardino, CA
Client
CiryofSrerBernwrirno
Urdjoed School Disofct
(SBCUFD)
777Nath'F"Sbzet
SmrBrnro C,9
92410
Project Location
Sari CA
Contact
Jorge C Men[1t+s
Assislmd Strpero~nalerd
909/38!-/1.?$ x49/3
Project Date
2004 -1'reverp
..~:_.
~,
~ '~- - - -
r(~MY.
1-:'. iai.i' wr---m
Since 2004, JBA has provided on-call
surveying services to the San Bernardino City
Unified School District (SBCUSD). During
tl>et time, JBA has completed numeror~
projects fur dre SBCUSD, including the select
project list inchde below.
Latle Mcuntain Topographic Survey 2007
Middle Colege High Sdrool TopograpMC Survey 2007
EnxneROn Elementary Scholl Topographc Survey 2006
Arrowhead Elementary SchoW Topographic Survey 2004
Camradr Elemenary School Topographb Survey 2004
Hilbkle Elementary Scholl TopographC Survey 2004
Rooseveh Elerentary School Topographic Survey 2004
Richardson High Scholl TopograpMc Survey 2004
Fairfax Elementary School Topogrephb Survey 2004
Arrawlew Middle Sdrool Topographb Survey 2004
Rb Vlata Elemenary School Topographic Survey 2004
Mount Vernon Elementary School Topographc Survey 2004
Urbha Ebmenlery School Topograptdc Survey 2004
San Bernardino High Scholl Topographic Survey 2004
Middle College High Sctaol Topographic Survey 2004
Lytle Creek Elementary School Topographic Survey 2004
San Gorgonio High School Topographic Survey 2004
Kev Project Staff
Edward J. Bonadiman, P.L.S. -Project Mawger
Joseph S.C. Bonadiman, P.E. -QualftyCorArol & ProjectOversight
` 41
I 1:1D000menpWmpoe&aV'ropoeels 200a1Gry a San Bemertino on- '~.
Coil Sunreying 8 Meppingt500 E~CerpM1SBCSO SurreyingGOC ~r
Joseph E nonadiman 5 Assoelstp, Ina.
On-Call Surveying Services ,
City of Loma Linda Public Works Department, Loma Linda, CA
Client
CityofLomaLirda
Public Works llem
25541 BmwnRard
loan I.indq C 4 92354-
3160
Project Location
lamlinat~ ca
Contact
JabTlrtapejr, P.E
City£igineer
909/799-2830
Project Date
2004 -Presets
Since
prgecLv t~ll~g Ci~; incli~lmg~fl3°&
list include`kelbtu..
Linda.
LIM Avenue 8 Ven Leuven Street Improvemena Togo Survey 8 2003
Corgtrtxdion 3aking
Cottage Street Improvement T
~
~
M
~
rn~
Wy 8 2007
C
on
e
ln
tl
Sla
Orange Grope 8 Academy Stroet Improvemena Topographk Survey 8 2007
Conetrudbn Slaklrq
Lind Avenue Street Improvemsms Topoplephk Surrey 8 2007
Comtrrxnbn Slaking
Cooley Street Improvements T~f B~ ~~y 8 2007
Constrrwibn Slaking
Juanfle Street Improvement ~~ 8 2007
Cole Street Improvements Topographic Survey 8 2008
CoraWdbn Stkirq
SeamoM Drive Street Impovement T~%
~~ 8 : 2pp5
n
Lind Avenue Sheet Improvement Tapographic Survey 8 2005
Comtrudion Staking
Library Expansion T
pog
o
~
3u
rv ~d 2005
C
o
~
n
~
Ohio Street Improvements TepopreP~ ~~ 3 2005
Cgnetruclion Staking g
Richardson Street Improvement ~ ~~ 8 2005
C
Van Leuven Street Improvement Topographb Survey 8
ConeWcSon Staking 2005
Hullo Creak Park TopographW; Swvsy 8 2005
Constrrw~don St
City Maintrrarrce Yard Topographk Survey8 2005
ConatruUlon Staking
Kev Project Statf
Edward J. Bonadnnan, P.L.S. -ProjectMauager
Joseph S.C. Bonadiman, P.E. -Qtxy!ltyControl & Project Oversight
L1D000meMa~Pmpoeals~ProposaU 2ooatGry of San BemarGno On-
Call Sunayhq 3 Meppinq~500 ExcerptlGry of Lama ones
Su~yinq.doc
tl
Joseph E. Bonadlman 8 Assaclates, Inc.
J
1
~ Civil Engineering Consulting & Surveying Services
Lake Arrowhead Community Services District (LACSD), Lake Arcowhead, CA
Cli
ent
La/aAm~whead
CarroraodrySenocer
I~iM~ic! (LACSDf
zazoosiwreEr,~oy
l89, Blr~ 3, Ste 150
LakeAn'owlra~t CA
92351
Project Location
LaFeAnavbead CA
Contacts
RJmrGrarcs P.E
Diybict 6gbicer
909/336.7137
•, _:
~%
i i 1. t, ~
1 ..
- ~ `.~- .
__ 1 ~ ~ I
~,
,-
~ s 7~
i 9
~ t';y~ ;.
F /, / ~ ~ ~~~G3' T~ ~.~
~. ~ \
.~ ra.m.,~.~..
- .~
Ken Nelsar Since 2003, JBA leas provided civil JBA leas also provided ergir~eering cansuiting
Ope~ationsMorger engineering and surveying services in the services to LACSD forvarious public works
909/336.7151 LakeArrowlradCommunityServices protects,svrhastlrenewBun~lvtdlltesservoir.
District (LACSD) in Lake Arrowhead, in addition, Joseph S.C. Borradimary P.E.
Project Date CA. Completed survey projects include saved as aging District Engineer finrrr 2003 to
1003 -1'regeia ~ ~Ys ofthe Cedar Glerr 2005, during whichtirce he oversaw all
area, Tract 15612, Trail 17159, Trod District capital improvemera and mairrtenarrce
16185, Tract 16211, and Trot 2526. projects.
Key Project Staff
Joseph S.C. Baradimazr, P.E.-LACSD7ruerim I)islrictEngineer (1003 2005)
Jay Gundra, P.L.S. -ProjectMrnrcrger
EdwatdJ. Bonadiman, P.L.S.-SwveyMaurger
I'.~D000menlsWry,p5916~PrOpgsale 2g081Clty of Sen Bernelekw On-
Cell SUrveyingB MeppingLSOD ExcerytlWCSD CivYBSwXey
Servieee.0oc
~1
Joseph E. Bonadlmen 8 Assochtes, Inc.
t 1 MG Reservoir Design, PS~E/Bid Package Preparation
Burnt Mill Reservoir, Lake Arrowhead, CA
Client
I~uteArrowhroal
CoMSwadrySenxev
District (G9C5D)
P.O. Bmr700
La~Airowlkead CA
92352
Project
Location
La~Arrawh~ CA
Contact
Ryra~ Gracq P.t:
DirYrdctFigineer
909/3367137
Project Date
10062007
As pmt ofa~gareauigconsultingsetvices for
the design of the one million galbn (MG)
Bumt Mill water storage resen'oiy PAP
station, and appunealmtccs, J&1 Provided
project oversigbtsad checldogofa0 plans,
maps, and docummta prepmed by the Lake
Anowhead C«nmunity Services District
Tn addition, JBA pseparodthe finel Plans,
SpaciScatiocB, and Estimates (PS&E) and bid
packages forthe Project, andprovided project
oversight services dining the project's
conshuctionphase.
I{ev Protect Staff
Jay Guntlr~, P.E. -Project Mmxger
Joseph S.C. Bonadimary P.E.-QualiryCariroUProject Oversight
I:~D000maHaWrapoaate~Proposala POOB~CiIy M San BemmMa a.
Call SurveyinliB MepgnpWppeMixC-SOOExcaryfiLACSD-
BumtMAlTenkEOc
JOS6pb E. Bonedimen b Asaoclatp, Inc.
u
I
II
Pump Station PS&E & Bid Package Preparation
Cottage Grove Pump Station, Lake Arrowhead, CA
Client
~it/7V/Vl12Od
CprWirOdlj~.Se1M1RCeS
lAsb'ict (LACSD)
P.O. Bax700
LdVeA+rowhead CA
92352
Project Location
c~a„~Pn~ ca
Contact
R}mCraes P.E
Di.~vict r
909/3367!37
Project Date
zone
;- - __ _
_ v ,,
a'
1
%'
.,
JBA is «ra~y prepmulg the Plans,
Specrficatror-s,~nd Estnnates (PS&E) and
bid packages torthe won ofthe new
~P~P station forthe Lake
Arrowhead Community Services District
(LACSD) in Lake Arrowhead, CA.
As pmt ofits services, JBA provided plan
checking of all mepe, plans, and
docum~b prepared by District Siatir In
addition, JBA is Providing project
mmragertlesrt on an "as-needed" basis during
the bidding phase ofthe project
Key Project Statf
Jay Gunthm, P.E.-ProjectMcourger
Joseph S.C. Baradimmy P.E. -QualfryCondol/Project Oversight
I:\DOCUnenb\PmpoaelelPraposeb 20G81Cdy a Sen BemeMirq On-
Cell SUnreyin98 McPPinp4ppervNr C-SODEMCapaALSD-
cacage crave Pump s~eeon.e«
Josph E. Bonadlman E Assochda, Inc.
,~~
+~
~~.
t Construction Management & Project Oversight
Grass Valley Reclaimed Water Line Project, Lake Arrowhead, CA
LJ
'J
Client
IakeArrowhead
P.O. Bar700
[,alreArrowhear~ CA
92352
Project Location
lal~Arrawhea~( CA
Contact
~ GraeR P.E
DisuictE.gvreer
909/336.7137
Project Date
zoos
.BA is aarerdly perfomrir~g construction
managemerrt services forthe car~fiar of
the new Grass Valley Reclaimed Watce Lire
for the Lake Arrowhead Commrmity
Services District (LACSD) in Lake
Arrowhead, CA.
As part of its services, JBA is providing Plan
cheddBg ofaR maps,plana, and
docum~b prepared by District Staff, as
well asaddiNonalgerreral plan checka~gand
project raanagernerd services err an "as-
rreeded"basis.
Kev Protect Staff
Manuel A. Delgado, P.E. -Project Mtnrager
Joseph S.C. Bonadiman, P.E. -QualftyConlroUProject Oversight
P~DacumenpWropoeelaNropaaela 2008'Ciry of San SemarWw On
Cell SurvayNp 8 aappinpWppentlix C -SOD EMCerynLACSD -
Reclaimetl Wafer lire doc
Joseph E Bonadlman b Assoc4tes, Inc.
Project Oversight & Map/Plan/Document Checking
SBVWCD Santa Ana River Recharge Optimization Projt3ct, San Bernardino County, CA
'._ 1
Client
Sm~ Bernadino Ydley
Water Caarneriat
District (SBl'WCO)
/630 West RedorLr
Boule~rrrl SuiAeA
Re~~ CA91373
Project Location
S~ Ber~e6no Caaa};
CA
Contact
MwvinShmv
(,errerd Mancger
909/793-1503
Project Date
2008
JBA is iY 1~~ngP~
and map/plan/docmnerrt ehecldng services for
the Sen 13anartlino Valley Water Ca~vation
District (SBV WCD) Smaa Ana Rives Recharge
Optimization Project in San 13emmdino County>
ca
As part ofits services, JBA is providing
plan cheekiag of all maP~ P~ and
documeMe prepared by District Staff, as
well as additional ge~eaal Plan checking
and project roarragerneaN services on an
°~-seeded°° basis.
Kev Proiect Staff
Joseph S.C. Bonadiman, P.E. -Proj~7Mau{ger
1:1D000aMblPmpoagalPrapmals2WBr(abdsari Bernartira a. ~~
Call Surveying 8 MappirgNppeMla C -SOD EarspllSBVMWD -
$AR.Opc
Joseph E. Bonadlmen b Associaas, inc.
.
` J O S E P H E B O N A D[ M-A-~C~ ATS 8 OTC ~BT~Eu Ste, 1 N C.
C I V I L F. N R I N C !. ^ I N U n l x I. A N A x U^ Y C Y I N 1:
CHA^LEx P. ^^nN AU~NAN ~4.x. 1•/^-Ux• OF r~(,E]~~.Y~ ~~VICE
April 28, 2008
City of San Bernardino
Development Services Department
300 North "D" Street, 3`d Floor
San Bemazdino, CA 92418-0001
Attn: Michael W. Grubbs, P.E., Project Manager
Re: Hourly Rates for Two-Person Survey Party &Three-Person Survey Party
Dear Mr. Grubbs:
Pursuant to the requirements of the City of San Bemazdino (City) Request For Proposal (RFP)
dated Mazch 27, 2008 and amended via Addendum No. 1 dated Apri12, 2008, Joseph E.
Bonadiman & Associates, Inc. (JBA) submits the following Hourly Rates for aTwo-Person
Survey Party and Three Person Survey Party, respectively:
2-Man Survey Crew Prevailing Wage (Mileage, Materials & Equipment included) $200.00
3-Man Survey Crew Prevailing Wage (Mileage, Materials & Equipment included) $255.00
As requested, a copy of JBA's Hourly Rate Sheet is attached for reference. Per Addendum No. 1
to the RFP, it is understood that compensation for Map Checking services shall adhere to the
requirements set forth in City Resolution No. 2006-149 and the current City Fee Schedule.
Very Truly Yours,
_'l~
Edward J. Bona iman, P.L.S.
President
Attachment: Hourly Rate Sheet
^ x• North A r r o w h e a d Avenue g u n a e r n^ r d i n o, C A F 9 4 0^- l o l l
(• O x) X x x- x x 11 s - F• x (^ O^) x x l- 1 1 x 1 - w w w b o n x d I m a n V o m
ATTAC)EIlVIENT "2" TO EXHIBTT "A"
Hourly Rates
Joseph E. Bonatiiman & Associates, Inc.
I. Principals (P.E.) $250.00
II. Project Manager (P.E.) $180.00
III. Project Engineer (P.E.) $160.00
IV. Senior Engineer (P.E.)/Surveyor (L.S.) $140.00
V. Associate Engineer (P.E.)/Surveyor (L.S.) $120.00
VI. AsaistantEngineer/Surveyor $100.00
VII. Junior Engineer/Surveyor $90.00
VIII. Engineering/Surveyor Technician II $gp,00
IX. Engineering/Surveyor Technician I $75.00
X. Draftsperson III (CAD) $70.00
XI. Draftsperson II (CAD) $65.00
XII. Draftsperson I _ $60.00
XIII.
XN. Bookkeeping
Secretarial $50.00
$45.00
XV. Field Engineering:
Resident Engineer $140.00
Field Survey Supervisor $120.00
Resident Inspector $100,00
2-Man Survey Crew (Mileage, Materials & Equipment included) $175.00
2-Man Survey Crew Prevailing Wage (Mileage, Materials & Equipment included) $200.00
3-Man Survey Crew (Mileage, Materials & Equipment included) _
$220.00
3-Man Survey Crew Prevailing Wage (Mileage, Materials & Equipment included) _$255.00
2-Man GPS Crew (Mileage, Materials & Equipment included) $210.00
1-Man GPS Crew (Mileage, Materials & Equipment included) $160.00
XVI. Miscellaneous Services and Expenses:
Subsistence Cost
Material & Other Expenses Cost
Mileage Charges IRS Rate
Telephone Cost
Outside Consultant Service Cost
Per Diem $140 Per Day
++%r .
11C~-ui nt \P gosels'A' wcsak::LC81Cny cl San Bemaramo Oo- ~ J Joseph E. Bonadiman 8 AffOClates one.
fal15er Ng3!AaGp~r'9LLeller-HOUtly Wiles-gllacen'enl.~oc r
EXHIBIT "B"
AGREEMENT FOR ON-CALL SURVEYING AND MAP CHECHING SUPPORT
THIS AGREEMENT is made and entered into this day of ,
2008 ("Effective Date"), by and between the CITY OF SAN BERNARDINO, a charter city
("City"), and Guida Surveying, Inc. ("Consultant").
WITNESSETH:
A. WHEREAS, City proposes to have Consultant perform the on-call surveying and map
checking support descnibed herein below; and
B. WHEREAS, Consultant represents that it has that degree of specialized expertise
contemplated within California Government Code, Section 37103, and holds all necessary
licenses to practice and perform the services herein contemplated; and
C. WHEREAS, City and Consultant desire to contract for specific services in connection
with the project described below (the "Project") and desire to set forth their rights, duties and
liabilities in connection with the services to be performed; and
D. WHEREAS, no official or employee of City has a financial interest, within the
provisions of California Govermnent Code, Sections 1090-1092, in the subject matter of this
Agreement.
NOW, THEREFORE, for and in consideration of the mutual covenants and
conditions contained herein, the parties hereby agree as follows:
1.0. SERVICES PROVIDED BY CONSULTANT
1.1. Scone of Services. Consultant shall furnish on-call surveying and map
checking services to City in accordance with Attachment "1", Scope of Services and the
Consultant's proposal dated Apri128, 2008, attached and incorporated herein.
1.2. Professional Practices. All professional services to be provided by Consultant
pursuant to this Agreement shall be provided by personnel experienced in their respective
fields and in a manner consistent with the standazds of care, diligence and skill ordinarily
exercised by professional consultants in similaz fields and circumstances in accordance with
sound professional practices. Consultant also warrants that it is familiaz with all laws that
may affect its performance of this Agreement and shall advise City of any changes in any
laws that may affect Consultant's performance of this Agreement.
1.3. Warran Consultant warants that it shall perform the services required by
this Agreement in compliance with all applicable Federal and California employment laws
including, but not limited to, those laws related to minimum hours and wages; occupational
health and safety; fair employment and employment practices; workers' compensation
insurance and safety in employment; and all other employment related Federal, State and
S:\_Public Works\RFCA's\2008 All\08-18-08\ Agreement for Surveying & Map Checking\Guida-Agreement On-Call
Surveying Services OS-18-08.doc
1
EXHIBIT "B„
local laws and ordinances applicable to the services required under this Agreement.
Consultant shall indemnify and hold harmless City from and against all claims, demands,
payments, suits, actions, proceedings, and judgments of every nature and description
including attorneys' fees and costs, presented, brought, or recovered against City for, or on
account of any liability under any of the above-mentioned laws, which may be incurred by
reason of Consultant's performance under this Agreement.
1.4. Non-discrimination. In performing this Agreement, Consultant shall not
engage in, nor permit its agents to engage in, discrimination in employment of persons
because of their race, religion, color, national origin, ancestry, age, physical handicap,
medical condition, marital status, sexual gender or sexual orientation, or any other category
protected by law, except as permitted pursuant to Section 12940 of the Government Code.
Violation of this provision may result in the imposition of penalties referred to in Labor
Code, Section 1735.
1.5 Non-Exclusive Agreement. Consultant acknowledges that City may enter into
agreements with other consultants for services similaz to the services that are subject to this
Agreement or may have its own employees perform services similaz to those services
contemplated by this Agreement.
1.6. Delegation and Assignment. This is a personal service contract, and the duties
set forth herein shall not be delegated or assigned to any person or entity without the prior
written consent of City.
1.7. Business License: The Consultant shall obtain and maintain a valid City
Business Registration Certificate during the term of this Agreement.
1.8. Dutv of Loyalty/Conflict of Interest: The Consultant understands and agrees
that as the City's on-call surveying consultant, Consultant shall maintain fiduciary duty and a
duty of loyalty to the City in performing Consultant's obligations under this Agreement.
Consultant, in performing its obligations under this Agreement, is governed by California's
conflict of interest laws, Government Code Section 87100 et seq., and Title 2, California
Code of Regulations Section 18700 et seq.
2.0. COMPENSATION AND BILLING
2.1. Compensation. Over the term of this Agreement, Contractor shall be paid for
such services in accordance with Attachment " 2", Fee Proposal to Provide Professional Civil
Engineering and Surveying Services for On-Call Surveying", attached and incorporated
herein, except that compensation for Map Checking Services shall be made in accordance
with City Resolution No. 2006-149. Total compensation shall be subject to an aggregate limit
of $130,000 together with other consultants perfomung on-call surveying and map checking
support, with no minimum amount of compensation guaranteed.
2.2. Additional Services. Consultant shall not receive compensation for any
services provided outside the scope of services specified in this Agreement unless the City or
S:\_Public Works\RFCA's\ZWS All\08-18-~\Agreement for Surveying & Map Checidng\Guida-Agreement On-Call
Surveying Services OS-18-0B.doc
2
EXHIBIT "B"
its Managing Engineer for this Project, prior to Consultant performing the additional
services, approves such additional services in writing.. It is specifically understood that oral
requests and/or approvals of such additional services or additional compensation shall be
barred and are unenforceable.
2.3. Method of Billin¢. Consultant may submit invoices to City's Managing
Engineer for approval on a progress basis, but no more often than monthly. Said invoice
shall be based on the total of all Consultant's services which have been completed to City's
sole satisfaction. City shall pay Consultant's invoice within thirty (30) days from the date
City receives said invoice. Each invoice shall describe in detail, the services performed and
the associated time for completion. Any additional services approved and performed
pursuant to this Agreement shall be designated as "Additional Services" and shall identify
the number of the authorized change order, where applicable, on all invoices.
2.4. Records and Audits. Records of Consultant's services relating to this
Agreement shall be maintained in accordance with generally recognized accounting
principles and shall be made available to City or its Managing Engineer for inspection and/or
audit at mutually convenient times for a period of three (3) years from the Effective Date.
3.0. TIME OF PERFORMANCE
3.1. Commencement and Completion of Work. The professional services to be
performed pursuant to this Agreement shall commence within five (5) days from the
Effective Date of this Agreement. Said services shall be performed in strict compliance with
the Project Schedule issued by the Managing Engineer. Failure to commence work in a
timely manner and/or diligently pursue work to completion may be grounds for termination
of this Agreement.
3.2. Excusable Delavs. Neither party shall be responsible for delays or lack of
performance resulting from acts beyond the reasonable control of the party or parties. Such
acts shall include, but not be limited to, acts of God, fire, strikes, material shortages,
compliance with laws or regulations, riots, acts of war, or any other conditions beyond the
reasonable control of a party.
4.0. TERM AND TERMINATION
4.1. Term. This Agreement shall commence on the date approved by the City
Manager and shall be valid through June 30, 2009, unless previously terminated as provided
herein or as otherwise agreed to in writing by the parties. An administrative extension of one
additional year may be authorized, subject to agreement of both parties.
4.2. Notice of Termination. The City reserves and has the right and privilege of
canceling, suspending or abandoning the execution of all or any part of the work
contemplated by this Agreement, with or without cause, at any time, by providing written
notice to Consultant. The termination of this Agreement shall be deemed effective upon
receipt of the notice of termination. In the event of such termination, Consultant shall
S:\_Public Works\RFCA's\2008 All\08-18-08\Agreement for Surveying & Map Checknig\Guida-Agreement On-Call
Surveying Services OS-78-08.doc
3
EXHIBIT "B"
immediately stop rendering services under this Agreement unless directed otherwise by the
City.
4.3. Compensation. in the event of termination, City shall pay Consultant for
reasonable costs incurred and professional services satisfactorily performed up to and
including the date of City's written notice of temvnation. Compensation for work in
progress shall be prorated as to the percentage of work completed as of the effective date of
termination in accordance with the fees set forth herein. In ascertaining the professional
services actually rendered hereunder up to the effective date of termination of this
Agreement, consideration shall be given to both completed work and work in progress, to
complete and incomplete drawings, and to other documents pertaining to the services
contemplated herein whether delivered to the City or in the possession of the Consultant.
4.4 Documents. In the event of termination of this Agreement, all documents
prepared by Consultant in its performance of this Agreement including, but not limited to,
finished or unfinished design, development and construction documents, data studies,
drawings, maps and reports, shall be delivered to the City within ten (10) days of delivery of
termination notice to Consultant, at no cost to City. Any use of uncompleted documents
without specific written authorization from Consultant shall be at City's sole risk and without
liability or legal expense to Consultant.
5.0. INSURANCE
5.1. Minimum Scope and Limits of Insurance. Consultant shall obtain and
maintain during the life of this Agreement all of the following insurance coverages:
(a) Comprehensive general liability, including premises-operations,
products/completed operations, broad form property damage, blanket
contractual liability, independent contractors, personal injury with a
policy limit of not less than One Million Dollars ($1,000,000.00),
combined single limits, per occurrence and aggregate.
(b) Automobile liability for owned vehicles, hired, and non-owned
vehicles, with a policy limit of not less than One Million Dollars
($1,000,000.00), combined single limits, per occurrence and
aggregate.
(c) Workers' compensation insurance as required by the State of
California.
(d) Professional errors and omissions ("E&O") liability insurance with
policy limits of not less than One Million Dollazs ($1,000,000.00),
combined single limits, per occurrence and aggregate. Consultant
shall obtain and maintain, said E&O liability insurance during the life
of this Agreement and for three years after completion of the work
hereunder.
S:\_Public Works\ RFCA's\2008 All\Og-18-08\Agreement for Surveying & Map Checking\Guida-Agreement On-Call
Surveying Services OS-18-08.doc
4
EXHIBIT "B"
5.2. Endorsements. The comprehensive general liability insurance policy shall
contain or be endorsed to contain the following provisions:
(a) Additional insureds: "The City of San Bernazdino and its elected and
appointed boazds, officers, agents, and employees aze additional
insureds with respect to this subject project and contract with City."
(b) Notice: "Said policy shall not terminate, nor shall it be cancelled, nor
the coverage reduced, until thirty (30) days after written notice is given
to City."
(c) Other insurance: "Any other insurance maintained by the City of San
Bernardino shall be excess and not contributing with the insurance
provided by this policy."
5.3. Certificates of Insurance. Consultant shall provide to City certificates of
insurance showing the insurance coverages and required endorsements described above, in a
form and content approved by City, prior to performing any services under this Agreement.
5.4. Non-limitin¢. Nothing in this Section shall be construed as limiting in any
way, the indemnification provision contained in this Agreement, or the extent to which
Consultant may be held responsible for payments of damages to persons or property.
6.0. GENERAL PROVISIONS
6.1. Entire Agreement. This Agreement constitutes the entire Agreement between
the parties with respect to any matter referenced herein and supersedes any and all other prior
writings and oral negotiations. This Agreement may be modified only in writing, and signed
by the parties in interest at the time of such modification. The terms of this Agreement shall
prevail over any inconsistent provision in any other contract document appurtenant hereto,
including exhibits to this Agreement.
6.2. Rye resentatives. The Duector of Development Services or her designee shall
be the representative of City for purposes of this Agreement and may issue all consents,
approvals, directives and agreements on behalf of the City, called for by this Agreement,
except as otherwise expressly provided in this Agreement.
Consultant shall designate a representative for purposes of this Agreement
who shall be authorized to issue all consents, approvals, directives and agreements on behalf
of Consultant called for by this Agreement, except as otherwise expressly provided in this
Agreement.
6.3. Project Managers. City shall designate a Managing Engineer to work directly
with Consultant in the performance of this Agreement.
S:\_Public Works\RFCA's\2008 All\OS-18-08\Agreement for Surveying & Map Checking\Guida-Agreement On-Call
Surveying Services 08-18-0B.doc
5
EXHIBIT "B"
Consultant shall designate a Contract Inspector(s) who shall represent it and
be its agent in all consultations with City during the term of this Agreement. Consultant or
its Contract Inspector(s) shall attend and assist in all coordination meetings called by City.
6.4. Notices. Any notices, documents, correspondence or other communications
concerning this Agreement or the work hereunder may be provided by personal delivery,
facsimile or mail and shall be addressed as set forth below. Such communication shall be
deemed served or delivered: a) at the time of delivery if such communication is sent by
personal delivery; b) at the time of transmission if such communication is sent by facsimile;
and c) 48 hours after deposit in the U.S. Mail as reflected by the official U.S. postmazk if
such communication is sent through regulaz United States mail.
IF TO CONSULTANT:
Mr. Ralph Guida IV, PLS
Guida Surveying, Inc.
9241 Irvine Boulevard
Irvine, CA 92618
Fax: (949)777-2050
Tel: (949) 777-2000
IF TO CITY:
Valerie C. Ross
Director of Development Services
300 North "D" Street
San Berrtardino, Ca 92418
Fax: 909-384-5080
Tel: 909-384-5357
6.5. Attorneys' Fees. In the event that litigation is brought by any party in
connection with this Agreement, the prevailing party shall be entitled to recover from the
opposing parry all costs and expenses, including reasonable attorneys' fees, incurred by the
prevailing party in the exercise of any of its rights or remedies hereunder or the enforcement
of any of the terms, conditions, or provisions hereof. The costs, salary and expenses of the
City Attorney and members of his office in enforcing this contract on behalf of the City shall
be considered as "attorneys' fees" for the purposes of this pazagraph.
6.6. Governing Law. This Agreement shall be governed by and construed under
the laws of the State of California without giving effect to that body of laws pertaining to
conflict of laws. In the event of any legal action to enforce or interpret this Agreement, the
parties hereto agree that the sole and exclusive venue shall be a court of competent
jurisdiction located in San Bernazdino County, California.
6.7. Assignment. Consultant shall not voluntarily or by operation of law assign,
transfer, sublet or encumber all or any part of Consultant's interest in this Agreement without
City's prior written consent. Any attempted assignment, transfer, subletting or encumbrance
shall be void and shall constitute a breach of this Agreement and cause for termination of this
Agreement. Regardless of City's consent, no subletting or assignment shall release
Consultant of Consultant's obligation to perform all other obligations to be performed by
Consultant hereunder for the term of this Agreement.
6.8 Indemnification and Hold Harmless. Consultant shall protect, defend,
indemnify and hold harmless City and its elected and appointed officials, officers, and
employees from any and all claims, liabilities, expenses, including attorney fees, damage to
S:\_Public Works\ RFCA's\2005 All\~-18-08\Agreement for Surveying & Map Checking\Guida-Agreement On-Call
Surveying Services OS-18-08.doc
6
EXHIBIT "B"
property or injuries to or death of any person or persons or damages of any nature including,
but not by way of limitation, all civil claims or workers' compensation claims, arising out of
or in any way connected with the intentional or negligent acts, errors or omissions of
Consultant, its employees, agents or subcontractors in the performance of this Agreement.
6.9. Independent Contractor. Consultant is and shall be acting at all times as an
independent contractor and not as an employee of City. Consultant shall secure, at his
expense, and be responsible for any and all payment of Income Tax, Social Security, State
Disability Insurance Compensation, Unemployment Compensation, and other payroll
deductions for Consultant and its officers, agents, and employees, and all business licenses, if
any are required, in connection with the services to be performed hereunder.
6.10 Ownership of Documents. All fmdings, reports, documents, information and
data including, but not limited to, computer tapes or discs, files and tapes famished or
prepared by Consultant or any of its subcontractors in the course of performance of this
Agreement, shall be and remain the sole property of City. Consultant agrees that any such
documents or information shall not be made available to any individual or organization
without the prior consent of City. Any use of such documents for other projects not
contemplated by this Agreement, and any use of incomplete documents, shall be at the sole
risk of City and without liability or legal exposure to Consultant. City shall indemnify and
hold ham7less Consultant from all claims, damages, losses, and expenses, including
attorneys' fees, arising out of or resulting from City's use of such documents for other
projects not contemplated by this Agreement or use of incomplete documents furnished by
Consultant. Consultant shall deliver to City any findings, reports, documents, information,
data, in any form, including but not limited to, computer tapes, discs, files audio tapes or any
other Project related items as requested by City or its authorized representative, at no
additional cost to the City.
6.11 Public Records Act Disclosure. Consultant has been advised and is aware that
all reports, documents, information and data including, but not limited to, computer tapes,
discs or files fuished or prepazed by Consultant, or any of its subcontractors, and provided
to City may be subject to public disclosure as required by the California Public Records Act
(California Government Code Section 6250 et. seq.). Exceptions to public disclosure may be
those documents or information that qualify as trade secrets, as that term is defined in the
California Government Code Section 6254.7, and of which Consultant informs City of such
trade secret. The City will endeavor to maintain as confidential all information obtained by it
that is designated as a trade secret. The City shall not, in any way, be liable or responsible for
the disclosure of any trade secret including, without limitation, those records so mazked if
disclosure is deemed to be required by law or by order of the Court.
6.12. Responsibility for Enors. Consultant shall be responsible for its work and
results under this Agreement. Consultant, when requested, shall furnish clarification and/or
explanation as may be required by the City's representative, regazding any services rendered
under this Agreement at no additional cost to City. In the event that an error or omission
attributable to Consultant occurs, then Consultant shall, at no cost to City, provide all
necessary design drawings, estimates and other Consultant professional services necessary to
S:\_Public Works\RFCA's\2008 All\OS-18-08\Agreement for Surveying & Map Checking\Guida-Agreement On-Call
Surveying Services 08-78-0S.doc
7
EXHIBIT "B"
rectify and correct the matter to the sole satisfaction of City and to participate in any meeting
required with regazd to the correction.
6.13. Prohibited Emplovment. Consultant will not employ any regulaz employee of
City while this Agreement is in effect.
6.14. Order of Precedence. In the event of an inconsistency or conflict in this
Agreement and any of the attached Exhibits or Attachments, the terms set forth in this
Agreement shall prevail.
6.15. Costs. Each party shall beaz its own costs and fees incurred in the preparation
and negotiation of this Agreement and in the performance of its obligations hereunder except
as expressly provided herein.
6.16. No Third Party Beneficiary Ri ts. This Agreement is entered into for the
sole benefit of City and Consultant and no other parties aze intended to be direct or incidental
beneficiazies of this Agreement and no third party shall have any right in, under or to this
Agreement.
6.17. Headines. Pazagraphs and subpazagraph headings contained in this
Agreement aze included solely for convenience and aze not intended to modify, explain or to
be a full or accurate description of the content thereof and shall not in any way affect the
meaning or interpretation of this Agreement.
6.18. Construction. The parties have participated jointly in the negotiation and
drafting of this Agreement. In the event an ambiguity or question of intent or interpretation
arises with respect to this Agreement, this Agreement shall be construed as if drafted jointly
by the parties and in accordance with its fair meaning. There shall be no presumption or
burden of proof favoring or disfavoring any party by virtue of the authorship of any of the
provisions of this Agreement.
6.19 Amendments. Only a writing executed by the parties hereto or their respective
successors and assigns may amend this Agreement.
6.20. Waiver. The delay or failure of either party at any time to require
performance or compliance by the other of any of its obligations or agreements shall in no
way be deemed a waiver of those rights to require such performance or compliance. No
waiver of any provision of this Agreement shall be effective unless in writing and signed by a
duly authorized representative of the party against whom enforcement of a waiver is sought.
The waiver of any right or remedy in respect to any occurrence or event shall not be deemed
a waiver of any right or remedy in respect to any other occurrence or event, nor shall any
waiver constitute a continuing waiver.
6.21. Severabiliri. If any provision of this Agreement is determined by a court of
competent jurisdiction to be unenforceable in any circumstance, such detemlination shall not
affect the validity or enforceability of the remaining terms and provisions hereof or of the
S:\_Public Works\RFCA's\2008 All\0&18-08\Agreement for Surveying & Map Checking\Guida-Agreement On-Call
Surveying Services OS-18-08.doc
8
EXHIBIT "B"
offending provision in any other circumstance. Notwithstanding the foregoing, if the value
of this Agreement, based upon the substantial benefit of the bargain for any party is
materially impaired, which deternvnation as made by the presiding court or arbitrator of
competent jurisdiction shall be binding, then both parties agree to substitute such provision(s)
through good faith negotiations.
6.22. Counterparts. This Agreement may be executed in one or more counterparts,
each of which shall be deemed an original. All counterparts shall be construed together and
shall constitute one agreement.
6.23 Corporate Authority. The persons executing this Agreement on behalf of the
parties hereto warrant that they are duly authorized to execute this Agreement on behalf of
said parties and that by doing so, the parties hereto are formally bound to the provisions of
this Agreement.
6.24 Damaees. The Parties agree to waive any rights to incidental or consequential
damages and to punitive damages arising out of their performance under this Agreement
whether in torts or contracts or in law or in equity.
///
///
S:\_1'ublic Works\RFCA's\2008 All\08-18-OA\Agreement for Surveying & Map Checking\Guida-Agreement OmCall
Surveying Services OS-18-0B.doc
9
EXHIBIT "B"
AGREEMENT FOR ON-CALL SURVEYING AND MAP CHECHING SUPPORT
IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed
by and through their respective authorized officers, as of the date first above written.
CITY OF SAN BERNARDINO,
A Municipal Corporation
CONSULTANT
Guida Surveying, Inc.
Fred Wilson, City Manager
Signature
Name and Title
Approved as to form:
James F. Penman,
City Attorney
By ~ ~-. !'
S:\_Public Works\RFCA's\2008 All\f18-18-(~\Agreement for Surveying & Map Checking\Guida-Agreement On-Call
Surveying Services118-18-08.doc
10
•
s
S
r
S
i
ATTACHII~IENT "1" TO EXHIBIT "B"
C
April 28, 2008
Cfty of San Bernardino
Attn: Michael W. Grubbs, PE
300 North "D" Street, 3`d Floor
San Bernardino, CA 92418
Re: On-Call Surveying and Map Checking Support Services
Dear Mr. Grubbs:
Wkh a number of important Capital Improvement Program projects in the works, the City of San
Bernardino needs to identify a firm that can provide excellent on-call surveying support, checking of
maps, checking of certificates of compliance, and related work. The selected firm must not only be able
to complete such services successfully, accurately, and efficiently, but also must be able to respond
quickly and function as a seamless extension of the City staff. Guida Surveying, Inc. is just such a firm. .
A multi-disciplined land surveying firm, Guida Surveying is a Califomla Corporation that has been
providing surveying and mapping services throughout Southern California since 1988. Guida Surveying is
known for providing well-trained and skilled field personnel on an "On-Call" basis to the public and private
sectors throughout California. Our core business is land surveying, and providing "on-call" surveying
services is the cornerstone that built Guida Surveying into the firm it is today.
Guida maintains offices in Irvine, San Marcos, Palm Desert, and the San Francisco Bay Area. Guida has
provided these surveying services to many municipal clients. Our team can mobilize survey crews on
short notice, attend meetings, give presentations, and deliver reports in a timely manner. We have an
impressive track record of quick response, timely completion of assignments, and production of high
quality documents. Our reputation was buiR on our ability to supply surveying and mapping personnel as
needed, typically within 24-48 hours of notice. Wkh a staff of 65, including 18 Professional Land
Surveyors and 20 field crews with GPS systems, Guida is pleased to provide staff, equipment, and
vehicles to supplement the City's resources and maintain project schedules.
Our team possesses the technical expertise to guide clients to successful project completion. We focus
on applying innovative methods and approaches to achieve cost-effective results for our clients.
We bring a true client perspective to the challenges and issues faced on large and small public projects.
Guida has years of hands-on experience working on public projects. With proactive communication and a
streamlined approach to accomplishing tasks, we can easily adapt to the procedures and standards of our
clients. We want the City to see our team as an extension of your in-house staff.
As a result of our proven track record, Guida was recently awarded a contract with the City of Irvine and
the City of Pasadena along with many other agencies and cities to provide surveying services on an as-
needed basis.
As you read our submittal, please consider the following key points demonstrating the benefits Guida
Surveying brings to the City:
Project Management. Led by Project Manager, Dean Boukfin, PLS, our team is experienced, highly
qualified, and available for the duration of the contract. Our Team offers a variety of benefits to the City in
terms of demonstrated project performance, technical competence, and responsiveness. Outstanding
project management and coordination are the keys to meeting the project deliverable deadlines and
ensuring the overall success of this project. Mr. Bouldin's expertise in boundary surveying, cross-
sections, topographic mapping, and GPS control surveys, and map preparation is unmatched. His
proactive approach, responsiveness to client needs, talent for problem solving, and experience in staff
management results in projects running smoothly and staying on schedule. The City can rely upon his
expertise to deliver the approach and leadership necessary to achieve project success.
Guida Surveying, Inc.
9241 Irvine Boulevard
Irvine, CA 92618
T (949) 777-2000 F (949) 777-2050
www.auidasu rvevina.com
s
s
0
s
r
i
1
1
C
Experience. Surveying is the center of our practice. We have specific experience with land surveying in
California and compliance with all state and local regulations. Our key personnel have the background
and practical experience to guide this program to a successful conclusion.
Availability and Commitment of Staff. Our key personnel are available and dedicated to working on
this contract through the final deliverable. We have the depth of resources needed for large, long-term
contracts, and we have management's pledge to ensure our commitment to the City. We can guarantee
that personnel and equipment resources are available to meet the requirements of your project and any
modifications in the work load.
Quality Assurance. Besides offering continuous training and encouraging professional development
through involvement in industry associations, we emphasize the importance of quality in our work product,
by enforcing quality control procedures. We concentrate on producing superior technical work resulting in
high quality deliverables to our clients. The same attention is given to ensuring the quality and reliability
of data collected as is given to presenting information clearly in text, tables, figures, and maps. We
include Peer Reviews, by licensed professionals, and Project Manager reviews as part of our steps to
quality assurance. Field personnel follow site-specific procedures outlined by work plans as well as
health and safety plans.
Local Knowledge. Having worked in Southern California for more than 20 years, Guida brings a strong
understanding of local laws, ordinances, regulations, and permitting requirements. Living and working
nearby, our Team can provide guidance to assist the City with common issues and negotiate through the
regulatory framework which can impact your project. Our knowledge of regional issues will ensure proper
coordination and compliance at a local and state level.
Responsiveness. We realize that the success of your project depends upon our ability to mobilize
immediately and respond to your request. Guida Surveying has earned a reputation of providing
responsive service in short time frames and adapting to each of our client's standards and procedures.
Our Project Team has an impressive track record of quick response, timely completion of assignments,
and the production of high-quality documents.
We are confident that you will find that our firm's capabilities, technical expertise, and key personnel
along with our management's commitment-directly match the City's selection criteria. Should you have
any questions or require further information, please do not hesftate to contact me at:
Ralph Guida IV, PLS
Guida Surveying, Inc.
9241 Irvine Boulevard
Irvine, CA 92818
949-777-2000
Sincerely,
GUIDA SURVEYING, INC.
- n
`"Ralph Guida IV, PLS
President
rsluidaivCa~cuidasurvevina.com
~ Guida Surveying, Inc.
9241 Irvine Boulevard
Irvine, CA 92618
' T (949) 777-2D00 F (949) 777-2050
wnnnu nuidasurvwvinn rnm
~ ON-CALL SURVEYING AND
MAP-CHECKING SERVICES
2. TABLE OF CONTENTS
Section Page
Cover Letter .......................................................................................................i
1. Qualificotions ............................................................................................. 1
2. Personnel ...................................................................................................5
3. Map Checker .......................................................................................... 13
4. Availability of Staff .................................................................................. 15
5. Processes ................................................................................................ 16
6. Items to be Provided by the City ......................................................... 19
7. Compliance with RFP Requirements ................................................... 20
8. Draft Agreement Statement ................................................................. 21
9. Local Preference Eligibility ..................................................................... 22
Guida Surveying will bring proven expertise and
resources needed to provide the
City of San Bernardino with excellent client
service while providing land surveying services
that exceeds your expectations.
^~~~~^
^
^
^ ^~^
^
^~~~~^
GUIDA
O
1
/~
r
i
ON-CALL SURVEYING AND
MAP-CHECKING SERVICES
1. QUALIFICATIONS
Our Project Team brings extensive land
surveying experience with large municipal
clients like Port of Long Beach, Metropolitan
Water District, Irvine Ranch Water District,
Transportation Corridor Agencies, County of
Orange, San Diego County Water Authority,
and various Cities throughout California.
We have the qualifications and the staff
necessary to pertorm the work in all areas
stated in the City's RFP.
Guida Surveying also provided surveying
services to the Port of Long Beach for atwo-
year period. When asked about our
responsiveness, forrner head of the Port of
Long Beach Surveying Department, Mr. Mo
Miller, likes to tell of the time he missed a
departmental survey request and had to get a
survey crew quickly. Mr. Miller called Mr.
Ralph Guida and requested a crew
immediately. Mr. Guida jumped into action
and mobilized a crew to complete the survey
that same day. While Guida Surveying cannot
always provide staff within 4 hours of a
request, we maintain a company policy to staff
any project within 24-48 hours of notice.
The Irvine Ranch Water District has
renewed our On-Call contract annually for the
past 10 years, a clear mark of a satisfied
client. Since 1988, we have provided "On-
Call" services to several engineering firms,
including RBF Engineering, Tetra-Tech, and
David A. Boyle Engineering. We continue to
supplement other large Architect- Engineering
firms with surveying staff and equipment.
Guida was recently awarded on-call surveying
contracts with the CRies of Irvine, Corona,
Pasadena, and Lake Forest. Additionally,
the State of California Department of
General Services Administration selected
Guida to provide on-call surveying for various
recreation and park facilities throughout the
state.
Guida Surveying has an impressive track
record of quick response, timely completion of
assignments, and production of high quality
documents. To better illustrate our
capabilities and technical competence we
have provided descriptions of similar projects
on which we have worked, below.
METROPOLITAN WATER DISTRICT OF
SOUTHERN CALIFORNIA
3-YEAR ON-CALL SURVEYING SERVICES
SOUTHERN CALIFORNIA
Guida provided on-call surveying services
and equipment to support Capital Investment
Program Projects and Operations and
Maintenance projects for MWD throughout
southern California. Tasks include providing
cross-sections, topographic mapping,
boundary surveys, map preparation, map
checking, control surveys, and global
positioning.
Guida was
able to fully
adhere to the
schedule
and budget
for this
project.
PORT OF LONG BEACH ON-CAL
SURVEYING & MAPPING SERVICE
LONG BEACH, CA
Guida is providing office and field personnel
to support the Port's staff. This was
originally a 1-year contract that was recently
extended an
additional
year. Guida
has been able
to fully adhere
to the schedule
and budget for
this project.
L
S
IRWD ON-CALL SERVICES
IRVINE, CA
For more than 10 years, Guida has provided
On-Call right-of-way engineering, surveying,
and mapping services to the IRWD.
Highlights of our work include:
Shady Canyon Road Infrastructure
Pipelines: provided surveying, staking, GPS
Control, monument preservation, and
coordination with client for approximately 1.5
miles of infrastructure pipelines. Sewer,
~ui~nsuRVEVir~c i~ic
•
1
r
r
1
r
ON-CALL SURVEYING AND
MAP-CHECKING SERVICES
reclaimed water, and domestic water lines
were all installed. All surrounding
monumentation was located and replaced
after completion of construction.
Whiting Ranch Zone 9 Reservoir: provided
surveying, staking, right-of-way retacement,
and coordination with client. Project
consisted of construction of a new steel
water reservoir and the pipelines required for
service.
San Joaquin Marsh Redevelopment:
provided surveying, staking, and
coordination with client. This was an
environmentally sensitive project due to the
yearly migration of birds nesting there. The
project consisted of revitalizing the area for
other animals. Sensitive plants had to be
protected in place, and field modifications
had to be made to accommodate the existing
condition. Topographical surveys of the
removal area were provided, and the
quantity of removal was calculated and used
to verify contractor payments. Provided
aerial topographic mapping and control for a
digital map
for GIS.
Guida was
able to fully
adhere to
the
schedule
and budget
for all
projects
completed for the IRWD.
WASTEWATER TREATMENT FACILITIES
SURVEYING AND MAPPING
ORANGE COUNTY
For more than 17 years, Guida has provided
on-call surveying and mapping services for a
variety of projects for Robin Hamers &
Associates. Guida has provided detail
topographic surveys for design of new or
replacement wastewater treatment systems.
This level of detail is important due to all the
exiting utilities in the City of Costa Mesa and
the need for undisrupted service. Research
was very important and required skilled
personriel to look for potential problems in
the field so the Engineer could design the
new facility without conflicts and delays.
Guida takes pride in providing high quality
survey data that works with complex
developments and project constraints.
STATE ROUTE 57 PR/ED
ANAHEIM, CA
Guida Surveying is providing surveying to
HDR, Inc. in preparing a Project Report &
Environmental Services (PR/ED) for
proposed improvements to northbound State
Route 57 (SR-57) between Katella Avenue
and Lincoln Avenue for the Orange County
Transportation Authority. We are conducting
all surveying and mapping in accordance
with Caltrans standards to complete the
Project Report. This includes horizontal and
vertical control, drainage surveys,
topographical surveys, cross sections, open
ended traverses, profile data sheets, and
required documentation.
CALTRANS, DISTRICT 7
LOS ANGELES COUNTY
Provided surveying services for several
freeway widening projects, including I-405, 1-
101, and I-210 aerial mapping. Provided
Design surveys for widening and retrofitting of
several bridges along I-405r I-5, and I-110.
Provided design survey for redesign of an
interchange along I-101, and aerial control for
topography of I-210.
CITY OF CORONA ON-CALL SURVEYING
SERVICES
CORONA, CA
Guida Surveying was selected in 2005 to
provide on-call surveying mapping for the
City of Corona. Projects include city
properties, new construction of public works
projects, map checking, utilities, preparing
legal descriptions, subdivision of parcels,
and property resale for aone-year period.
PORTOLA PARKWAY "PHASE II STREET
IMPROVEMENTS"
IRVINE, CALIFORNIA
Project Manager for 1 mile of street
improvements. Responsible for establishing
and maintaining Horizontal and Vertical
control for the entire length of the project,
GUIDA SURV`tYIPJG. WC 2
s
i
1
r
r
1
i
M
i
P
r
r
1
ON-CALL SURVEYING AND
MAP-CHECKING SERVICES
Verify construction drawing alignments,
oversee staking calculations and schedule
survey crews as requested from site
superintendent to complete project on time
and within budget.
FOOTHILUEASTERN TRANSPORTATION
CORRIDOR AGENCY
SR 241/133 MERGE/DIVERGE
ORANGE COUNTY, CALIFORNIA
Provided construction staking for the widening
along State Route 241 from Portola Parkway
northwest to State Route 133. Calculated in
the field grade rates along highway and
projected out to new edge of pavement to
maintain the same rate, Staked signs, lights
and drainage grates with minimal grade
staking. Project completed on time and under
budget.
INTERSTATE 210 SOUNDWALLS
PASADENA, CA
Provided GPS aerial control and processing
for approximately 10 miles of mapping along 1-
210 near Pasadena and Arcadia for design
and construction of soundwalls. All points
were tied to existing Caltrans control provided
by District 7. NAD 83 Zone 5 metric
coordinates were provided for over 60 aerial
targets NAVD 88 elevations were assigned to
each.
LONG BEACH AIRPORT MEP
LONG BEACH, CA
Guida was selected by STV to provide utility
location and surveying services to support
STV's recently awarded contract with the
Long Beach Airport. The scope of services
include mechanical, electrical, and plumbing
engineering design services for various airfield
and building facilities.
CONCORD TO SACRAMENTO PIPELINE
SACRAMENTO, CA
In 2004 Guida Surveying provided
secondary control and supplemental
topographic survey fora 70-mile pipeline
running from Concord, CA to West
Sacramento, CA to help meet growing
demand for gasoline, jet fuel, and diesel in
Nevada and northern California.
This new 70-mile, 20-inch underground
pipeline will meet the growing demand for
fuel and consequently retire the existing
pipeline, which had been riddled with
problems. Guida was awarded the
surveying contract for the project by ARB,
Inc. Upon notification of selection, Guida
mobilized five additional survey crews and
equipment needed for the project within two
weeks. The scope of services we performed
included staking out the easement right-of-
way, main line location, valves, tie-in
IocaUons, and locating and identifying every
weld and pipe joint. The construction
schedule was very aggressive, with work
starting in mid May 2004 and completed by
the end of December 2004.
Due to the length of the project, the pipeline
contractor was operating five different layout
spreads and two bore crews simultaneously,
all in different locations along its 70-mile
length. At the peak of production, as much
as 3 to 4 miles of pipeline was being placed
per week. As the work progressed, Guida
had an onsite survey supervisor and a
survey CADD technician checking and
organizing the data on a daily basis so the
overall as- built drawing of the pipeline would
be available upon completion of
construction. The majority of the survey
location work was done utilizing GPS RTK
survey methods based on primary control
established by
Conventional
surveys were
also used in
areas where
satellite signal
was
inaccessible.
INLAND FEEDER MONUMENTATION,
METROPOLITAN WATER DISTRICT
HIGHLAND, CA
Project consisted of monumenting 37
centerline P.I. points of 5.3 miles of pipeline
per MWD specifications.
GL'iDASURVEYI~JG, WC- 3
r
r
r
ON-CALL SURVEYING AND
MAP-CHECKING SERVICES
MORENO LAKESIDE PIPELINE
SAN DIEGO COUNTY
Guida Surveying was retained by Kinco
Construction to provide construction staking,
as-built, monumentation and right of way
retracement for a 5.1 mile water main
pipeline for the San Diego County Water
Authority. The pipeline is 60" to 54" in
diameter and includes 834 feet of tunneling.
LAKE HODGES TO OLIVENHAIN TUNNEL
& PIPELINE
SAN DIEGO COUNTY, CA
Guida provided surveying services for the
1.2 mile project that consisted of control,
layout and field coordination.
NEWPORT BEACH ON-CALL SURVEYING
NEWPORT BEACH, CA
The City selected Guida as their On-Call
consultant to provide surveying services on
an as-needed basis annually. Guida
completed a design survey for the pavement
rehabilitation of Shorecliff housing
development. We also conducted a
hydrographic survey of the Grand Canal
located near Balboa Island. For this task, we
completed cross-sections of sediments to
complete the ocean bottom profile for a
dredging project. In addition, we responded
within 2 hours to the City's police department
to conduct a forensic survey at a local crime
scene to assist the police in their
investigation and to create an exhibit of an
accident fatality. This project demonstrates
the adaptability and quick response of the
Guida Team. Guida was able to fully adhere
to the schedule and budget for this project.
CITY OF PASADENA ON-CALL
SURVEYING
PASADENA, CA
Guida Surveying was selected in 2007 to
provide on-call surveying mapping for the City
of Pasadena. Projects will include city
properties, new construction of public works
projects, map checking, utilities, preparing
legal descriptions, and subdivision of parcels.
CITY OF IRVINE ON-CALL SURVEYING
IRVINE, CA
Guida Surveying was selected in 2007 to
provide on-call surveying mapping for the City
of Irvine. Projects will include street
improvements and public works facilities, map
checking, utilities, and preparing legal
descriptions.
LAKE FOREST ON-CALL SURVEYING
LAKE FOREST, CA
Guida Surveying was selected in 2007 to
provide on-call surveying mapping for the
City of Lake Forest. Projects will include
street improvements and public works
facilities, map checking, utilities, and
preparing legal descriptions.
MONUMENT PRESERVATION AND
CORNER RECORDS
PALM DESERT, CA
The City of Palm Desert selected Guida to
provide office and field personnel to locate
and preserve property line monuments along
Fred Waring Drive. Corner Records were
prepared and submitted to the County of
Riverside for recordation.
THE GREAT PARK
IRVINE, CA
Project surveyor on a 1300 acre aerial control
survey. Assisting with field coordination and
GPS static post processing for Fuscoe
Engineering.
RIO HONDO COLLEGE
WH/TT/ER, CA
Guida is providing surveying services for the
planning, design, and construction of
improvement projects for the Rio Hondo
Community College District. Services
requested under this contract will support the
expansion and modernization of campus
projects for afour-year period. Work includes
construction survey oversight and control.
GU!f?ASUr'JEYIrIG INC.. a
P
r
r
f
d
1
1
I
ON-CALL SURVEYING AND
MAP-CHECKING SERVICES
2. PERSONNEL
Guida has put together an outstanding team
of highly qualified professionals whose
experience and combined skill set most
directly addresses the needs of the City as
presented in its published RFP. Key team
members are identified on the organization
chart below. Full resumes for these
individuals follow the organization chart..
Changes to personnel assigned for services
requested by the RFP will not be made
without prior written approval of the City
Engineer.
DEAN BOULDIN, PLS
PROJECT MANAGER/MAP CHECKER
Dean Bouldin
has 22 years
experience
including
mapping and
design with a
concentration
in public works
projects.
Responsibilitie
s have
included
design and drafting of civil plans including
streets and highways, water, sewer and storm
drain improvement plans. He has been
responsible for developing traffic signal plans
and striping plans, calculating quantities and
cost estimates for projects, and has acted as
a liaison between utility companies and
clients.
Port of Long Beach On-Call Surveying
Services Contract. Project Manager for this
contract, which provides field and office
personnel to assist Port staff. Also provided
CADD management and input for existing
utility mapping; mapping, deed research,
calculator and boundary analysis for a record
of survey of the Naval complex.
On-Call Contract for Surveying, Mapping,
and Related Services, MWD. Project
Manager for this 3-year contract, includes
providing cross-sections, topographic
mapping, boundary surveys, map preparation,
map checking, control surveys, and global
positioning.
Boundary Corrrer Monumentatlon, MWD,
Desert Hot Springs, CA. Project consisted of
monumenting 24 boundary corners of MWD-
owned property that adjoins the California
Aqueduct, resetting 2 Public Land System
section corners, and the filing of a record of
survey. The National Geodetic Survey's
(NGS) Continuously Operating Reference
Stations (CORS) were used to establish the
horizontal control network. The property is
located in extremely rugged desert terrain. All
corner positions were located using Real Time
GUiDASURVEnr;G. iNC . 5
ON-CALL SURVEYING AND
MAP-CHECKING SERVICES
Kinematic GPS systems. A Bell Jet Ranger
helicopter carried the field crew and
equipment to the very difficult-to-access
boundary corners.
Inland Feeder Monumentation, MWD.
Project consisted of monumenting 37
centerline P.I. points of 5.3 miles of pipeline
per MWD specifications.
On-Call Map Checking Services, Orange
County Surveyors Office. Support the
County Surveyor's office with map checking of
Final and Parcel Maps.
EI Toro Marine Corps Air Station Record of
Survey 97-1038, Orange County Surveyors
Office. Duties included supporting the County
Surveyor with the QA/OC of this 49 sheet
Record of Survey.
San Diego Creek Channel Scour Study,
Orange County Surveyors Office. Project
consisted of field collecting cross sections of
channel to determine sediment conditions.
Tasks included supporting field crews with the
collection of data, end area volume reports,
statioNoffseUelevation reports of existing
conditions and County supplied design data,
and cross-section and profile plots of existing
conditions overlaid with County supplied
design templates. Deliverables included
bound paper reports and CADD files in
Microstation format.
Topographic Survey, Metropolitan
Transportation Agency, Canoga Park, CA.
Project consisted of a topographic survey of
approximately 30 acres for design purposes of
a MTA bus terminal. Project Tasks included a
GPS horizontal control network, differential
level runs, location of above-ground features,
a 25 foot topographic grid over the entire site,
25 foot cross sections of the adjoining arterial
streets, and measurement of flowline
elevations of underground utilities.
Vertical Control Network, City of Burbank,
Burbank, CA. Baseline Utility Study of the
Long Beach Naval Station, Port of Long
Beach, Long Beach, CA.
PHILLIP BUTCHER, PLS
PROJECT SURVEYOR
Phillip Butcher
brings 30+
years of land
surveying
experience,
which include
hydrographic
surveying
projects for the
US Navy Engineering Command, Southwest
Division. His work for military facilities
included Boundary and Topographic surveys
at North Island, Camp Pendleton, Miramar, EI
Toro, EI Centro and Point Loma military
installations.
All American Canal. Project Manager for the
new 12.5-mile canal and lining project located
in San Diego County.
City of Carlsbad. Project manager for the
construction and completion of the Carlsbad
Golf Course. Provided as-builts,
topographical infomtation, and construction
layout for the duration of the project.
County of San Diego. Provided map
checking for the County Surveying Division.
Chief of Surveys. Manager of survey and
mapping department, residential, commercial,
and industrial land development. Cadastral,
boundary, geodetic, topographic, construction
and topographic surveys in the U.S. and
abroad.
Caltrans Right of Way Engineering:
Provided calculations for existing property
lines and new right of way requirements,
including legal descriptions of slope
easements, drainage easements, temporary
construction easements and utility easements
for 22 miles of existing property lines and 13
miles of new right of way lines.
Eastern Transportation Corridor. Project
Surveyor responsible for supervising and
scheduling field personnel for the construction
staking. Prepared calculations and
supervision for the construction of 26 miles of
the 241 toll road which included 55 Bridges.
Served as the QA/OC and Safety Officer.
GUI D,4SURVEYtrdG,iNC. o
Q
~~
Q
ON-CALL SURVEYING AND
MAP-CHECKING SERVICES
RALPH GUIDA, IV, PLS
PRINCIPAL-IN-CHARGE
Ralph Guida,
IV, brings 19
years of
surveying
experience
along with
remarkable
business,
operations and
managerial
skills to the
team. He has steered Guida Surveying into a
dynamic, client-oriented organization. Along
with his experience in construction staking,
topographic, and the tasks involved in land
surveying, his expertise in management has
enabled him to build and train a highly efficient
team of professionals, the backbone of the
firm. Mr. Guida is responsible for the day-to-
day management of the office and typically
serves as Project Principal for most projects.
Barona Indian Reservation Record of
Survey. Supervised the retracing of
boundaries of a 6000 acres parcel. This
included reviewing original Government Plot
Surveys, calculating boundary location, and
processing GPS control.
Santa Ana River Mapping, County of
Orange. Project Manager on Guida's land
surveying support services providing base
sheet information for the OCWD/OCSD
Groundwater Replenishment System Project.
We provided horizontal and vertical control for
over 14 miles of aerial topographic strip
mapping along the Santa Ana River and
surface streets utilizing GPS surveying
technology.
San Joaquin Marsh Reconstruction, Irvine
Ranch Water District. Supervised field
surveying and provided construction
calculation for grade operations.
Bonita Canyon Drive Pipeline. Supervised
coordination of field surveying which included
GPS control, location of existing monuments
for future replacement, and pre-calculation for
location of water, sewer, and curbs.
BRADFORD BUTCHER, PLS
PARTY CHIEF
Brad Butcher
brings 35
years
experience in
the Surveying
and
Construction
layout field.
Eastern Transportation Tollway, Orange
County. Party Chief responsible for rough
grade slope staking for 26 miles of toll-way
including, 52 bridges and off-on ramps.
Diamond Valley Lake Marina, MWD,
Riverside County. Party Chief for survey
layout of new marina including boat ramp,
parking, GPS buoy locations and access
roads.
3 Segments-San Diego Trolley
Construction. Project Surveyor for Old Town
to Hazard Center segment, Hazard Center to
Qual-Comm Stadium segment and the Palse
Bay Extension By-Pass segment.
Two-50 Mega-Watt power plant
Construction, Escondido and Otay Mesa
Project. Responsible for layout of both
facilities from rough grade project completion.
32-Story Omnl Hotel (San Diego Ball Park).
Party Chief for gridline layout. Responsible for
layout of gridline control for 32 stories.
10~tory Bridgeworks Building. Party Chief
responsible for Construction layout from the
Ground up through top out.
17-Story Costa Verde Garden Communities
South Tower, San • Dtego. Party Chief
responsible for Construction layout from the
Ground up through top out.
Alvarado Hospital Buildings. Party Chief
responsible for construction layout from the
ground level to top out and site work.
Symphony Towers. Party Chief responsible
for construction layout from the ground level to
top out.
Naval Hospital Parking Structure. Party
Chief responsible for construction layout from
ground up through top out.
GUIDA SURVEYING. INC . 7
ON-CALL SURVEYING AND
~ MAP-CHECKING SERVICES
VICTOR BANUELOS
PARTY CHIEF
Mr. Banuelos brings 16 years experience in
the Surveying and Construction layout field.
Diamond Valley Lake Marina. Party Chief
responsible for survey layout of new marina
including boat ramp, parking, GPS buoy
locations and access roads.
Barona Indian Reservation Record of
Survey, San Diego County. -Party Chief
responsible for retracing of existing boundary
corner and the setting of new boundary
corners using system 500 Leica GPS System.
Physicians Medical Center. Party Chief for
construction layout from ground up to top out
including, street and site improvements.
UCSD Student Academic Service Facility.
Parry Chief for Construction layout from
ground up through top out including, site and
street improvements.
Dual 18 - Story Little Italy Apartment
Complex San Diego. Party Chief:
Responsible for Construction layout from the
Basement through top out including
monitoring of surrounding buildings and
shoring.
Chula Vista Police Headquarters. Party
Chief responsible for Construction layout from
the Ground up through top out for Highland
Partnership.
Eastern Transportation Tollway, Orange
County. Party Chief responsible for rough
grade slope staking for 26 miles of toll-way
including, 52 bridges and off-on ramps.
Two-50 Mega-Watt Power Plant
Construction -Escondido and Otay Mesa
Project. Responsible in part for layout of both
facilities from rough grade project completion.
MARK BECKER, LSIT
FIELD PARTY CHIEF
Mr. Becker
brings 23
years
experience in
the Surveying
and
Construction
layout field.
He joined Guida
field party chief
design surveys.
San Joaquin Reservoir - IRWD, Newport
Beach, CA. Field Party Chief. Responsible
for mass grading for reservoir slopes,
geologically engineered for multi-layered soil
grades and membrane, patrol road widening
with associated stone drain.
Rancho Santa Fe Road Widening -San
Marcos, CA. Field Party Chief. Responsible
for mass grading defined by slope stakes and
infrastructure additions including: water,
sewer, sewer force main, storm drain, gas and
joint trench for dry utilities.
Qusil Gardens Drive -Encinitas, CA. Field
Parry Chief. Responsible for staking of road
widening project including grading, retaining
walls, storm drain, sewer and water utilities.
Trolley Stations Metropolitan
Transportation Development Board -San
Diego, CA. Field Party Chief. Responsible
for topographic surveys of existing trolley
stations for the purpose of accommodating
ADA users who will be impacted by new train
design.
C-UIDASURVC'II"JG.fNC. 8
Surveying, Inc in 2004 as
for heavy construction and
ON-CALL SURVEYING AND
MAP-CHECKING SERVICES
ADAM D'ALVIA, PLS
PROJECT SURVEYOR
Adam D'Alvia
brings eight
years of survey
and mapping
experience
with emphasis
on boundaries,
topographic
maps, aerial surveys, subdivisions, and
ALTA/ACSM surveys and GPS surveys. He is
an expert in field to office automation. In
addition, Mr. D'Alvia has provided construction
staking and GPS surveying for several large
construction projects throughout southern
California.
Caltrans, Los Angeles County, District 7.
Party Chief for several freeway widening
projects, including I-405, US-101, and I-210
aerial mapping. Provided design surveys for
widening and retrofitting of several bridges
along I-405, I-5, and I-110. Provided design
survey for redesign of an interchange along
US-101 and aerial control for topography of 1-
210.
On-Call Metropolitan Water Distrlct of
Southern California. Surveying services for
an on-call contract. Performing surveying
services for multiple water facilities located
throughout Southern California.
TIM FETTIG, PLS
MANAGER, FIELD CREWS
Tim Fettig has 18
years' experierxe
as Chief of Parties,
speaaNzirg in
boundary
surveying and
corrs6uction
staking. Mr. Fettig
is known as one ~
Guida Surveying's
"firemen"-a multl-talented problem solver. He is a
stidder far aB of the mirxrte details required to obtain
a complete survey. Mr. Feltig brings to the team
excellent communication and management of field
crews and project scheduling skies.
Pier J and Pier T, Port of Long Beach.
Party Chief for the construction staking of the
railways, paving, utilities, and structures
located on Pier J in the Port of Long Beach.
County of Orange, San Dlego Creek, Irvine,
CA. Party Chief on over 1 mile of concrete
line channel, providing construction staking for
storm drain and grading improvements.
Newport Coast Planning Areas, Newport
Beach, CA. Project Surveyor on the
boundary, design, construction, and
monumentation of a master builder lot within
the Newport Coast development.
Portola Parkway, Irvine, CA. Party Chief
providing the boundary, topographic survey
and the construction staking for this two-mile
infrastructure project. Construction staking,
grading, road construction, storm drain, sewer,
domestic water and reclaimed water pipelines.
Irvine Bridges, Irvine, CA. Party Chief
providing the boundary, topographic survey
and the construction staking on road, railroad
and pedestrian bridges over crossings. The
projects included topographic surveys for the
design and relocation of the existing road,
storm drain channel, and utilities.
Avenue H and I-14 Overcrossing,
Lancaster, Caltrans. Project Surveyor
responsible for directing field crews for the
construction of surface street infrastructure,
highway interchange and bridge construction.
GUIDA SURVtYIP1G, INC 9
it
ON-CALL SURVEYING AND
MAP-CHECKING SERVICES
RICH SMITH, PLS
PARTY CHIEF
Rich Smith has
18 years of
experience as
a Party Chief
specializing in
topography
and boundary
surveys. His
field to office
automation
experience has
allowed him to fl
topography maps with over 1,200 shots within
36 hours of beginning the field survey. Mr.
Smith has frequently been called "the fastest
data collector in the west." He also has
provided extensive construction staking and
GPS surveying experience on several large
construction projects throughout southern
California.
Pier J and Pier T, Port of Long Beach.
Party Chief for the staking out of structures
located on Pier J and field locating and stake
out of utilities and rail lines for Pier T.
Metropolitan Water DlstHct of Southem
California. Parry Chief for an on-call
surveying services contract. Performing
surveying services for multiple water facilities
located throughout Southern California.
County of Orange, San Dlego Creek, Irvine.
Party Chief on over 1 mile of concrete line
channel, providing construction staking for
storm drain and grading improvements.
On-Call Surveying for Irvine Ranch Water
District. Party Chief for the construction
staking for new reservoir sites, pipelines,
various structures, pump stations, and tanks.
Big Canyon Reservoir, Irvine Ranch Water
District. Performed design survey and
construction staking for proposed reservoir
located in Orange County.
University Drive, Irvine Ranch Water
District Pipellne, Irvine. Party Chief
providing construction staking for over 1 mile
of water pipeline.
I-60/1-215 Water Transmission Pipellne.
Conducted construction staking for 4
proposed water transmission line relocations
for the City of Riverside, Public Utilities
Department.
Santiago Canyon Landfill, County of
Orange. Party Chief providing construction
staking on storm retention basins; concrete
lined storm channels; a 72 inch storm drain
line; and grading.
PAUL CUOMO, PLS
MAP CHECKING /QUALITY ASSURANCE
Paul Cuomo
brings 42 years
of surveying
experience
specializing in
boundary
control,
subdivision
mapping and
A.L.T.A. Surveys. Early in his career, Mr.
Cuomo served as a Party Chief with Caltrans
for over 20 years, and is very familiar with the
freeway system in Orange County. As former
Deputy Orange County Surveyor for 13 years,
Paul was responsible for the review and
approval of all subdivision maps, record of
surveys and annexations recorded in the
County of Orange. Paul was the project
manager for the countywide digital base map
comprised of over 800,000 parcels. This is
being utilized as the base map for many GIS
systems throughout the County.
Mr. Cuomo retired from Orange County in
1993 and became a Boundary Consultant. He
joined Guida surveying in 1999 as Director of
Mapping. Since that time he has managed the
surveying and mapping on over 40 A.L.T.A
surveys, 10 subdivisions and 10 condominium
projects, 20 Records of survey, numerous Lot
Line Adjustments, legal descriptions,
boundary and topographic surveys.
County of Orange, Right-of-Way Projects
and Construction Projects. As Manager of
the Field Section for two years, he was
responsible for the right-of-way retracement,
construction and control surveying on
GU1DA SUP. VEl'i NG. INC . 10
•
m
1
e
ON-CALL SURVEYING AND
i MAP-CHECKING SERVICES
numerous County flood control and highway
projects. He managed 7 field crews and 3
office squads during this period. One of his
responsibilities as Manager of the Office
Section was to examine and approve Records
of Survey prepared by County Survey staff for
County projects. This included a retracement
survey along the right-of-way of the Santa Ana
River from the Pacific Ocean to Prado Dam.
Local Cities. Mr. Cuomo works on behalf of
several cities in Orange County as a Boundary
and Mapping Specialist. Some of the local
city projects he has managed include:
• City of Newport Beach: Serves as Project
Manager for on-call contract. Served as an
expert witness for two projects involving
litigation.
• City of Lake Forest: Project Manager
providing on-call surveying services and
serving as a technical advisor to the City's
Engineering Design Team.
• City of Laguna Niguel: Expert witness for
City on one occasion.
• City of Sante Fe Springs: Expert witness
for City on one occasion.
• City of Costa Mesa: Project Manager for
on-call surveying services contract for the
City. Project Manager for Victoria Street
accident location study; Baker Street Right
of Way location; and Canyon Park
boundary and encroachment survey.
• City of Garden Grove: Prepared maps
and legal descriptions for street widening
and dedication.
^ City of Torrance: Prepared maps and
legal descriptions for street widening and
dedication.
County of Orange, Deputy County
Surveyor. Manager of the Office Section,
overseeing 33 employees. Responsible for
the review, examination and approval of all
subdivision maps, boundary annexations, city
incorporations, city and county boundary
changes, lot line adjustments, certificates of
compliance and for the maintenance of all
county base maps, precinct maps and district
maps. puring his tenure at the County.
DAVID WILLIAMS, PLS
MAP CHECKING /QUALITY ASSURANCE
Mr. Williams
brings over 40
years of
experience in
construction
surveying,
right-of-way
engineering,
photogrammetr
is surveying, topographic surveying,
subdivision engineering, exhibit mapping, and
map checking. With a successful track record
of project management for surveying large,
complex projects, Mr. Williams is greatly
qualified to evaluate and make
recommendations during the planning, design,
and construction phases of any site
development project in southern California.
Much of his experience includes large, task-
order based contracts that involved the
collaboration of various contractors, agency
coordination, and public stakeholders. Mr.
Williams fulfilled a 20-year career at Caltrans
performing as Field Office Manager, Field
Survey Supervisor and District
Photogrammetry Engineer, at District 7.
Long Beach United States Naval Shipyard.
Principal for various topographic, alignment,
settlement monitoring precise leveling and
mapping assignments including design, final
plans and specifications for reconstruction of
1,800 lineal feet of interior roadway.
Cahrans District 7, On-Call Survey
Contract. Principal for six task orders
involving construction staking; right-of-way
staking and location; major structure and
bridge staking; topographic pavement
surveys; and photogrammetric control
surveys.
San Joaquin Hflis Transportation Corridor.
Principal for three Records of Survey of 30
sheets, 31 sheets and 10 sheets respectively
locating construction control points, Orange
County Primary and Secondary Control
Points, and all adjacent right-of-way and
boundary lines.
GU~DA SURVEYI~~1G, ING I 1
ON-CALL SURVEYING AND
MAP-CHECKING SERVICES
On-Call Surveying Services, Fuscoe
Engineering. Party Chief on a variety of
construction staking projects throughout
southern California. Completed a survey for
Highway 101 in Santa Barbara, including the
on-ramps and off-ramps.
On-Call Surveying, City of Tustin. Provided
topo grading surveys for street improvements.
On-Call Surveying, Costa Mesa Sanitary
District. Party Chief responsible for surveying
a small subdivision and providing topographic
surveys and staking for the Sanitary District.
TOM OAKLAND
SURVEY ANALYST /CADD
Mr. Oakland
has extensive
experience in
survey
analysis and
preparation of
CADD documents for surveying assignments.
He prepared parcel maps, annexations, lot
line adjustments, and A.L.T.A. maps.
Barona Band of Mission Indians, San
Diego, CA. Project consisted of the
establishment of the boundary survey of the
6000+ acre reservation. Also responsible for
survey analysis and CADD drawings for
horizontal and vertical control, design survey,
construction staking, and as-built fora 1-mile
water line servicing the Barona Casino.
On-call Surveying Services, City of
Newport Beach, CA. Provided survey
analysis for design survey for the pavement
rehabilitation of Shorecliff housing
development and hydrographic survey of the
Grand Canal located near Balboa Island.
Metropoiltan Water District (MWD), Los
Angeles, CA. Responsible for survey
analysis and CADD support for on-call
surveying services and equipment to support
Capital Investment Program Projects and
Operations and Maintenance projects for
MWD throughout southern California. Tasks
include providing cross-sections, topographic
mapping, boundary surveys, map preparation,
map checking, control surveys, and global
positioning.
Cross Connection, MWD. Party Chief
responsible for the topographic survey, GPS
and As-built design for construction
improvements from Orange County to San
Diego County.
Newport Coast Planning Areas, Newport
Beach. Office Project Surveyor on the
boundary, design, construction, and
monumentation of a master builder lot within
the Newport Coast development.
The depth of experience
of Guida's -Project Team
illustrates our tenure in
the surveying and
mapping business..
c~~;~oP.s~,2vErr,c,is,c. i~a
ON-CALL SURVEYING AND
MAP-CHECKING SERVICES
3. MAP CHECKER
Project Manager Dean Bouldin, PLS, will also
serve as Map Checker. Mr. Bouldin, an
experienced senior team member, is fully
qualified in the checking of subdivision maps,
certificates of compliance, certificates of
compliance, records of survey, corner records,
monument ties, etc. He possesses expert-
level knowledge of the Subdivision Map Act
and is capable of applying the related sections
of the City's Development Code.
He is knowledgeable in principles of Land
Development as it relates to Map Checking,
including a strong background in applying
conditions of approval for tentative maps and
mitigation monitoring programs. Mr. Bouldin
is capable of reading and interpreting title
reports and possesses superior oral and
written communication skills.
If the City chooses to work with Guida
Surveying, we will commit to ensuring that Mr.
Bouldin's current status is maintained and will
be available to the City Engineer or his
designee upon request.
Guida Surveying will provide Mr. Bouldin with
all necessary office space, equipment, and
materials for satisfactory performance of the
work. The equipment will include but will not
be limited to high visibility safety vests and
hard hats, calculators, cellular telephone,
small measuring devices, pens, pencils,
paper, and other related equipment and
materials.
All equipment supplied to the Map Checker
by Guida Surveying will be maintained in
excellent condition at no additional expense
to the City. Guida Surveying will provide all
office support for the Map Checker, including
but not limited to computer, clerical, message
center, accounting, equipment maintenance,
etc.
All safety equipment and attire worn by the
Map Checker in public places under the
terms of the Agreement with the City shall be
neat and clean and shall conform to OSHA
regulations. Attire worn by the Map Checker
will be plain (no logos, pictures, artwork,
writing, etc.) except that company logo attire
may be permitted, subject to approval of the
City Engineer. The Map Checker must wear
an OSHA-aproved high-visibility jacket or
vest and hard hat while performing duties in
the street or in the vicinity of construction
work.
A full resume for Mr. Bouldin is presented on
the following page.
:Guida Survey
bring proven e;
and resources
to provide our
that exceed your
expectations.
GUIDASURVEI"ING. INC . I?
•
•
•
w
i
P
i
ON-CALL SURVEYING AND
MAP-CHECKING SERVICES
DEAN BOULDIN, PLS
PROJECT MANAGER/MAP CHECKER
Dean Bouldin
has 22 years
experience
including
mapping and
design with a
concentration
in public works
projects.
Responsibilitie
s nave
included
design and drafting of civil plans including
streets and highways, water, sewer and storm
drain improvement plans. He has been
responsible for developing traffic signal plans
and striping plans, calculating quantities and
cost estimates for projects, and has acted as
a liaison between utility companies and
clients.
Port of Long Beach On-Call Surveying
Services Contract. Project Manager for this
contract, which provides field and office
personnel to assist Port staff. Also provided
CADD management and input for existing
utility mapping; mapping, deed research,
calculator and boundary analysis for a record
of survey of the Naval complex.
On-Call Contract for Surveying, Mapping,
and Related Services, MWD. Project
Manager for this 3-year contract, includes
providing cross-sections, topographic
mapping, boundary surveys, map preparation,
map checking, control surveys, and global
positioning.
Boundary Corner Monumentatlon, MWD,
Desert Hot Springs, CA. Project consisted of
monumenting 24 boundary corners of MWD-
owned property that adjoins the California
Aqueduct, resetting 2 Public Land System
section corners, and the filing of a record of
survey. The National Geodetic Survey's
(NGS) Continuously Operating Reference
Stations (COBS) were used to establish the
horizontal control network. The property is
located. in extremely rugged desert terrain. All
corner positions were located using Real Time
Kinematic GPS systems. A Bell Jet Ranger
helicopter carried the field crew and
equipment to the very difficult-to-access
boundary corners.
Inland Feeder Monumentatfon, MWD.
Project consisted of monumenting 37
centerline P.I. points of 5.3 miles of pipeline
per MWD specifications.
On-Call Map Checking Services, Orange
County Surveyors Office. Support the
County Surveyor's office with map checking of
Final and Parcel Maps.
Et Toro Marine Corps Alr Station Record of
Survey 97-1038, Orange County Surveyors
Office. Duties included supporting the County
Surveyor with the QA/OC of this 49 sheet
Record of Survey.
San Diego Creek Channel Scour Study,
Orange County Surveyors Office. Project
consisted of field collecting cross sections of
channel to determine sediment conditions.
Tasks included supporting field crews with the
collection of data, end area volume reports,
station/offseUelevation reports of existing
conditions and County supplied design data,
and cross-section and profile plots of existing
conditions overlaid with County supplied
design templates. Deliverables included
bound paper reports and CADD files in
Microstation format.
Topographic Survey, Metropolitan
Transportation Agency, Canoga Park, CA.
Project consisted of a topographic survey of
approximately 30 acres for design purposes of
a MTA bus terminal. Project Tasks included a
GPS horizontal control network, differential
level runs, location of above-ground features,
a 25 foot topographic grid over the entire site,
25 foot cross sections of the adjoining arterial
streets, and measurement of flowline
elevations of underground utilities.
Vertical Control Network, City of Burbank,
Burbank, CA. Baseline Utility Study of the
Long Beach Naval Station, Port of Long
Beach, Long Beach, CA.
GUIOA SURVEYI~iG, iNC 14
ON-CALL SURVEYING AND
MAP-CHECKING SERVICES
4. AVAILABILITY OF STAFF
We have reviewed our workload and the
resources required to successfully complete
this assignment. We have the depth of
resources needed for large, long-term
contracts, and we have management's pledge
to ensure our commitment to the City. We
can guarantee that personnel and equipment
are available to meet the requirements of your
project and any modifications in the work
load. Once selected, we will not accept any
work for the proposed staff that would hinder
our performance on this important contract.
N'
GUiCASURVEnfdG.IrdC. ~5
•
•
S
r
r
r
i
i
r
1
ON-CALL SURVEYING AND
MAP-CHECKING SERVICES
5. PROCESSES
At the beginning of all projects, Guida will
understand the full scope of the specific
project so that we can efficiently plan and
perform the office and field tasks required and
deliver the proper deliverables to the City
within budget.
Construction Surveys. Guida will meet with
the City to discuss the scope of the project,
who is supplying the digital CAD file and
hardcopies of the gradin~mprovement plans,
if the survey will be tied into City horizontal
and vertical datum, and who the contractor will
be. Guida will prepare a cost proposal based
on the scope of the project. Once the proposal
is approved by the City and we receive the
notice to proceed, Guida will perform a
QA/OC review of the digital CAD file and
hardcopies of the grading/improvement plans.
Within 48 hours of the survey request, our
office staff will then pre-calculate the staking
coordinates for our field crew to use. We will
then meet with the assigned field crew to
discuss their task. We will give them a field
package consisting of directions to the site,
exhibits showing area limits, staking
coordinates, horizontal and vertical datum
sheets, etc. The field crews will meet with the
contractor on-site to discuss the specific task.
Daily grade sheets will be delivered to the
contractor. A QA/OC review will be performed
on all grade sheets. We will then deliver to the
City all digital ASCII files, hardcopies of all
grade sheets, hardcopies of all field notes,
and any other hardcopies requested by the
City.
Right-of-Way Surveying. Guida will meet
with the City to discuss the scope of the
project. Guida will prepare a cost proposal
based on the scope of the project. Once the
proposal is approved by the City and we
receive the notice to proceed, Guida will
research and gather all necessary record
documents which include Corner Records,
Tract Maps, Parcel Maps, and Records of
Surveys. We will also gather information from
the City including title reports and supporting
documents, centerline tie sheets, etc. A
OA/OC review will be preformed to make sure
that we have all of the necessary information
that we will need. If a field survey is required,
we will then meet with the assigned field crew
to discuss their task. We will give them a field
package consisting of directions to the site,
exhibits showing area limits, search
coordinates, horizontal and vertical datum
sheets, etc. We will perform another QA/OC
review to make sure that our field crews
accomplished their tasks. If the right-of-way
survey will be based on record data only, we
will proceed with the office work required. Our
office staff will prepare right-of-way exhibits,
legal. descriptions and exhibit plats for
acquisitions, street dedications, street
vacations, etc.. We will perform another
QA/OC review of the finished documents
before submittal to the City. We will then
deliver to the City all exhibits, hardcopies of all
field notes, and any other hardcopies
requested by the City.
Intersection Monumentation and Ties.
Guida will meet with the City to discuss the
scope of the project. Guida will prepare a cost
proposal based on the scope of the project.
Once the proposal is approved by the City and
we receive the notice to proceed, Guida will
research and gather all necessary record
documents which include Corner Records,
Tract Maps, Parcel Maps, and Records of
Surveys. We will also gather information from
the City including centerline tie sheets. A
QA/OC review will be preformed to make sure
that the field crews have all of the necessary
information that they will need to complete
their portion of the project. We will then meet
with the assigned field crew to discuss their
task. We will give them afield package
consisting of directions to the site, exhibits
showing area limits, search coordinates,
horizontal and vertical datum sheets, etc. The
field crew will set intersection monuments and
ties per City standards. All survey monuments
set shall be permanent in nature and tagged
by a licensed Land Surveyor authorized to
practice Land Surveying in the State of
California. We will perform another QA/OC
review to make sure that our field crews
accomplished their tasks. Our office staff will
prepare corner records based on the field
data. We will perform another QA/OC review
of the finished corner records before submittal
GUIDAiIiRVEYING, iNC . 16
•
i
1
r
ON-CALL SURVEYING AND
MAP-CHECKING SERVICES
to the County for filing. We will then deliver to
the City all digital ASCII files, hardcopies of all
field notes, and any other hardcopies
requested by the City.
Perpetuation of Survey Monumentation.
Perpetuation of Survey Monumentation will be
maintained as described in Section 8771 of
the Professional Land Surveyor's Act. Guida
will meet with the City to discuss the scope of
the project. Guida will prepare a cost proposal
based on the scope of the project. Once the
proposal is approved by the City and we
receive the notice to proceed, Guida will
research and gather all necessary record
documents which include Corner Records,
Tract Maps, Parcel Maps, and Records of
Surveys. We will also gather information from
the City including centerline tie sheets. A
QA/OC review will be preformed to make sure
that the field crews have all of the necessary
information that they will need to complete
their portion of the project. We will then meet
with the assigned field crew to discuss their
task. We will give them a field package
consisting of directions to the site, exhibits
showing area limits, search coordinates,
horizontal and vertical datum sheets, etc. The
field crew will set monument ties per City
standards. All survey monuments set shall be
permanent in nature and tagged by a licensed
Land Surveyor authorized to practice Land
Surveying in the State of California. We will
perform another QA/OC review to make sure
that our field crews accomplished their tasks.
Our office staff will prepare corner records
based on the field data. We will perform
another QA/OC review of the finished corner
records before submittal to the County for
filing. Once construction is completed, our
field crew will set a new permanent monument
per the created comer records. Our office staff
will prepare new comer records describing the
set monument. We will perform another
OA/OC review of the finished corner records
before submittal to the County for filing. We
will then deliver to the City all digital ASCII
files, hardcopies of all field notes, and any
other hardcopies requested by the City.
Topography. Guida will meet with the City to
determine the area limits, topographic
features to be located, if the survey will be tied
into City horizontal and vertical datum, and the
required deliverables. Guida will prepare a
cost proposal based on the requirements of
the City. Once the proposal is approved by the
City and we receive the notice to proceed,
Guida will research any additional information
that may be necessary to complete the
project. A QA/OC review will be preformed to
make sure that the field crews have all of the
necessary information that they will need to
complete their portion of the project. We will
then meet with the assigned field crew to
discuss their task. We will give them a field
package consisting of directions to the site,
exhibits showing area limits, search
coordinates, horizontal and vertical datum
sheets, etc. On difficult surveys the project
manager will meet with the field crew on-site,
so that they fully understand the scope of the
project. Whether we use GPS survey methods
or conventional survey methods depends on
the size and location of the project site. Guida
will use the most economical method. Once
the field portion is completed, another QA/OC
review will be performed to make sure that our
field crews accomplished their tasks. Our
office staff will import the field data into
AutoCAD 2008 to produce a final deliverable
based on the scope of the project, which could
include a Digital Terrain Model. If aerial
photogrammetry is to be included with our
field topography, all data will be merged
together into one DWG mapping file. Another
QA/OC review will be performed to check that
the DWG mapping file is complete. We will
then deliver to the City all AutoCAD DWG
files, all digital ASCII files, hardcopies of all
field notes, and any other hardcopies
requested by the City.
Map Checking -Tract Map, Parcel Map,
and Record of Survey. Guida will review the
submitted map to make sure that it is
technically correct and that all provisions of
the Subdivision Map Act and any local
ordinances applicable at the time of approval
of the tentative map have been complied with.
We will receive the map checking submittal
package from the City. We will review the
submitted map to make sure that it
substantially agrees with the approved
GUIDA SURVEYING. IN: I ?
•
ON-CALL SURVEYING AND
MAP-CHECKING SERVICES
• tentative map. We will review the title report
and supporting documents to make sure that
the owner's names, beneficiaries, legal
description, easements, etc. are shown on the
map correctly. We will review the Conditions Our professionals
have Wol'1Ceti tog@ther
eMenSively#or many.
yeBrS.
of Approval to make sure that all items are This proven ability to
~ addressed on the map. We will review how
the boundary was established. We will review
the traverse closures to make sure that the
map's boundary, lots/parcels, and easements
close. We will review the first sheet to make Wofk together shows
that teamwork
iS the key sfrength of
OUr Project Tearrt,
sure that all certificates are correct
. Depending on the City's request, we will either
send the map corrections to the City or
directly to the person preparing the map. On
. second and third submittals we will review the
map to make sure that all corrections and
comments have been addressed before
' approving the map. If more than three map
checks are required, we will suggest that a
meeting be set-up between Guida and the
,,
M person preparing the map to discuss any map
issues.
Map Checking -Lot Line AdJustments,
CeHificates of Compliance, Comer
Records, Monument Ties, etc. Guida will
review the submitted document to make sure
that it is technically correct and that all
d provisions of the Subdivision Map Act and any
local ordinances have been complied with. We
will receive the document submittal package
from the City. If applicable, we will review the
title report and supporting documents to make
sure that the owner's names, beneficiaries,
'
' legal description, easements, etc. are shown
on the document. If applicable, we will review
the traverse closures to make sure that the
document's boundary, lots/parcels, and
easements close. Depending on the City's
request, we will either send the document
®
` corrections to the City or directly to the person
preparing the document. On second and third
submittals we will review the document to
make sure that all corrections and comments
have been addressed before approving the
document.
C~UIDASiiRVE'/ING. I~~iC 1$
ON-CALL SURVEYING AND
MAP-CHECKING SERVICES
6. ITEMS TO BE PROVIDED BY THE
CITY
For the on-call surveying services described in
the City's published RFP, Guida Surveying
assumes that the following items will be
provided by the City.
• construction staking - up-to-date digital
CAD files and grading/improvement plans
and any other pertinent information.
• R/W surveying - title reports and
supporting documents, recorded tract
maps, recorded parcel maps, recorded
record of surveys, etc. and any other
pertinent information.
• Intersection monuments and ties -city
centerline tie notes and any other
pertinent information.
• Recovery and/or restore monuments -
any City data pertaining to specific
monuments such as "go to" descriptions,
horizontal and vertical data sheets.
• Map checking -copy of map to be
checked, any underlying recorded maps,
title report and supporting documents,
traverse closures, etc.
GUIDASUkVE'YI~:G.!NC. i;%
ON-CALL SURVEYING AND
': MAP-CHECKING SERVICES
7. COMPLIANCE WITH RFP
REQUIREMENTS
Guida Surveying finds the City's published
RFP to be clear and straightforward.
Therefore, we do not believe that any
additional comments or suggestions are
necessary to comply with the requirements of
the RFP.
To maintain its reputation as a
leader in survey and mapping,
Guida Surveying practices a
policy of consigten# corporate
training and participation in
industry associ~fions.
GUiDA SURVEYING, iPaC . 20
ON-CALL SURVEYING AND
MAP-CHECKING SERVICES
8. DRAFT AGREEMENT
STATEMENTS
Guida Surveying has read the Draft
Agreement for On-Call Surveying Services
and will execute the Agreement if offered a
contract by the City and is able to meet the
insurance requirements contained therein.
GUiDA SURVEYING, INC . 21
ON-CALL SURVEYING AND
MAP-CHECKING SERVICES
9. LOCAL PREFERENCE
ELIGIBILITY
Guida's office locations include Irvine, La
Quinta, San Marcos, Dublin, and Arizona.
This project will be managed from our Irvine
office. Although we do not maintain an office
in the City of San Bernardino, our close
proximity means that we can mobilize survey
crews on short notice, attend meetings, give
presentations, and deliver reports in a timely
manner.
GUiDn SUwEYi~iG, IrJC . 7.2
-~--~- ATTACiEIl14ENT "2" TO EXHIBIT "B"
.~
°-' Guida Surveying
......
`~0'"' Hourly Rates
The table below presents the hourly rates for our personnel. As requested, the table
includes rates for atwo-person survey team, athree-person survey team, and the Map
Checker.
al-7a . ~ ~ I~~ e -
Project ManagedMap $170
Checker
Project Surveyor $135
CADD Operator $115
ResearchlClerical $75
One-Man Survey Crew $170
,Two-Man Survey Crew ~ $230
Three•Man Survey Crew $320
!Notes:
1.Ovgjrtime is 1.5 times rates listed
2. 15% will be added to all reproduction, research
material, and delivery services
3. Rates shown are effective through September
2008, following years will have an annual
escalation rate of 4%
_. _.
-'µy~~,~ %~~~%1
~'
Ralph Guida IV, PLS
President
rauidaivCa~auidasurvevino.com
EXHIBIT "C"
AGREEMENT FOR ON-CALL SURVEYING AND MAP CHECHING SUPPORT
THIS AGREEMENT is made and entered into this day of ,
2008 ("Effective Date"), by and between the CITY OF SAN BERNARDINO, a charter city
("City"), and Associated Engineers, Inc. ("Consultant").
WITNESSETH:
A. WHEREAS, City proposes to have Consultant perform the on-call surveying and map
checking support described herein below; and
B. WHEREAS, Consultant represents that it has that degree of specialized expertise
contemplated within California Govemment Code, Section 37103, and holds all necessary
licenses to practice and perform the services herein contemplated; and
C. WHEREAS, City and Consultant desire to contract for specific services in connection
with the project described below (the "Project") and desire to set forth their rights, duties and
liabilities in connection with the services to be performed; and
D. WHEREAS, no official or employee of City has a fmancial interest, within the
provisions of California Government Code, Sections 1090-1092, in the subject matter of this
Agreement.
NOW, THEREFORE, for and in consideration of the mutual covenants and
conditions contained herein, the parties hereby agree as follows:
1.0. SERVICES PROVH)ED BY CONSULTANT
1.1. Scope of Services. Consultant shall furnish on-call surveying and map
checking services to City in accordance with Attachment "1", Scope of Services and the
Consultant's proposal dated April 28, 2008, attached and incorporated herein.
1.2. Professional Practices. All professional services to be provided by Consultant
pursuant to this Agreement shall be provided by personnel experienced in their respective
fields and in a manner consistent with the standazds of caze, diligence and skill ordinarily
exercised by professional consultants in similar fields and circumstances in accordance with
sound professional practices. Consultant also wazrants that it is familiaz with all laws that
may affect its performance of this Agreement and shall advise City of any changes in any
laws that may affect Consultant's performance of this Agreement.
1.3. Warran Consultant warrants that it shall perform the services required by
this Agreement in wmpliance with all applicable Federal and California employment laws
including, but not limited to, those laws related to minimum hours and wages; occupational
health and safety; fair employment and employment practices; workers' compensation
insurance and safety in employment; and all other employment related Federal, State and
S:\_Public Works\RFCA's\2008 All\OS-18-08\Agreement for Surveying & Map Checking\AssociaMd Engineers-Agreement
On-Call Surveying Services 08-18-0S.doc
1
EXHIBIT "C"
local laws and ordinances applicable to the services required under this Agreement.
Consultant shall indemnify and hold harmless City from and agairist all claims, demands,
payments, suits, actions, proceedings, and judgments of every nature and description
including attorneys' fees and costs, presented, brought, or recovered against City for, or on
account of any liability under any of the above-mentioned laws, which may be incurred by
reason of Consultant's performance under this Agreement.
1.4. Non-discrimination. In perfomung this Agreement, Consultant shall not
engage in, nor pemut its agents to engage in, discrimination in employment of persons
because of their race, religion, color, national origin, ancestry, age, physical handicap,
medical condition, nuuital status, sexual gender or sexual orientation, or any other category
protected by law, except as permitted pursuant to Section 12940 of the Government Code.
Violation of this provision may result in the imposition of penalties referred to in Labor
Code, Section 1735.
1.5 Non-Exclusive Agreement. Consultant acknowledges that City may enter into
agreements with other consultants for services similaz to the services that aze subject to this
Agreement or may have its own employees perform services similaz to those services
contemplated by this Agreement.
1.6. Delegation and Assignment. This is a personal service contract, and the duties
set forth herein shall not be delegated or assigned to any person or entity without the prior
written consent of City.
1.7. Business License: The Consultant shall obtain and maintain a valid City
Business Registration Certificate during the term of this Agreement.
1.8. Duty of Loyalty/Conflict of Interest: The Consultant understands and agrees
that as the City's on-call surveying consultant, Consultant shall maintain fiduciary duty and a
duty of loyalty to the City in performing Consultant's obligations under this Agreement.
Consultant, in performing its obligations under this Agreement, is governed by California's
conflict of interest laws, Government Code Section 87100 et seq., and Title 2, California
Code of Regulations Section 18700 et seq.
2.0. COMPENSATION AND BILLING
2.1. Compensation. Over the term of this Agreement, Contractor shall be paid for
such services in accordance with Attachment " 2", Fee Proposal to Pmvide Professional Civil
Engineering and Surveying Services for On-Call Surveying", attached and incorporated
herein, except that compensation for Map Checking Services shall be made in accordance
with City Resolution No. 2006-149. Total compensation shall be subject to an aggregate limit
of $130,000 together with other consultants performing on-call surveying and map checking
support, with no minimum amount of compensation guazanteed.
2.2. Additional Services. Consultant shall not receive compensation for any
services provided outside the scope of services specified in this Agreement unless the City or
S:\_Public Works\RFCA's\2008 All\(~-18-OS\Agreement for Surveying & Map Checking\Associated Engineers-Agreement
On-Call Surveying Services OS-18-OS.dac
2
EXIiIBIT "C"
its Managing Engineer for this Project, prior to Consultant performing the additional
services, approves such additional services in writing. It is specifically understood that oral
requests and/or approvals of such additional services or additional compensation shall be
barred and are unenforceable.
2.3. Method of Billine. Consultant may submit invoices to City's Managing
Engineer for approval on a progress basis, but no more often than monthly. Said invoice
shall be based on the total of all Consultant's services which have been completed to City's
sole satisfaction. City shall pay Consultant's invoice within thirty (30) days from the date
City receives said invoice. Each invoice shall describe in detail, the services performed and
the associated time for completion. Any additional services approved and performed
pursuant to this Agreement shall be designated as "Additional Services" and shall identify
the number of the authorized change order, where applicable, on all invoices.
2.4. Records and Audits. Records of Consultant's services relating to this
Agreement shall be maintained in accordance with generally recognized accounting
principles and shall be made available to City or its Managing Engineer for inspection and/or
audit at mutually convenient times for a period of three (3) years from the Effective Date.
3.0. TIME OF PERFORMANCE
3.1. Commencement and Completion of Work. The professional services to be
performed pursuant to this Agreement shall commence within five (5) days from the
Effective Date of this Agreement. Said services shall be performed in strict compliance with
the Project Schedule issued by the Managing Engineer. Failure to commence work in a
timely manner and/or diligently pursue work to completion may be grounds for temunation
of this Agreement.
3.2. Excusable Delavs. Neither party shall be responsible for delays or lack of
performance resulting from acts beyond the reasonable control of the party or parties. Such
acts shall include, but not be limited to, acts of God, fire, strikes, material shortages,
compliance with laws or regulations, riots, acts of waz, or any other conditions beyond the
reasonable control of a pazty.
4.0. TERM AND TERMINATION
4.1. Term. This Agreement shall commence on the date approved by the City
Manager and shalt be valid through June 30, 2009, unless previously terminated as provided
herein or as otherwise agreed to in writing by the parties. An administrative extension of one
additional yeaz may be authorized, subject to agreement of both parties.
4.2. Notice of Termination. The City reserves and has the right and privilege of
canceling, suspending or abandoning the execution of all or any part of the work
contemplated by this Agreement, with or without cause, at any time, by providing written
notice to Consultant. The ternunaflon of this Agreement shall be deemed effective upon
receipt of the notice of termination. In the event of such termination, Consultant shall
S:\_Public Works\2FCA's\2008 All\0&18-OS\Agreement for Surveying & Map Checking\Associated Engineers-Agreement
On-Call Siuveying Services 08-18-OS.doc
3
EXHIBIT "C„
immediately stop rendering services under this Agreement unless directed otherwise by the
City.
4.3. Compensation. In the event of termination, City shall pay Consultant for
reasonable costs incurred and professional services satisfactorily performed up to and
including the date of City's written notice of termination. Compensation for work in
progress shall be prorated as to the percentage of work completed as of the effective date of
termination in accordance with the fees set forth herein. In ascertaining the professional
services actually rendered hereunder up to the effective date of termination of this
Agreement, consideration shall be given to both completed work and work in progress, to
complete and incomplete drawings, and to other documents pertaining to the services
contemplated herein whether delivered to the City or in the possession of the Consultant.
4.4 Documents. In the event of termination of this Agreement, all documents
prepazed by Consultant in its performance of this Agreement including, but not limited to,
finished or unfmished design, development and construction documents, data studies,
drawings, maps and reports, shall be delivered to the City within ten (10) days of delivery of
termination notice to Consultant, at no cost to City. Any use of uncompleted documents
without specific written authorization from Consultant shall be at City's sole risk and without
liability or legal expense to Consultant.
5.0. INSURANCE
5.1. Minimum Scone and Limits of Insurance. Consultant shall obtain and
maintain during the life of this Agreement all of the following insurance coverages:
(a) Comprehensive general liability, including premises-operations,
pmducts/completed operations, broad form property damage, blanket
contractual liability, independent contractors, personal injury with a
policy limit of not less than One Million Dollars ($1,000,000.00),
combined single limits, per occurrence and aggregate.
(b) Automobile liability for owned vehicles, hired, and non-owned
vehicles, with a policy limit of not less than One Million Dollazs
($1,000,000.00), combined single limits, per occurrence and
aggregate.
(c) Workers' compensation insurance as required by the State of
California.
(d) Professional errors and omissions ("E&O") liability insurance with
policy limits of not less than One Million Dollazs ($1,000,000.00),
combined single limits, per occurrence and aggregate. Consultant
shall obtain and maintain, said E&O liability insurance during the life
of this Agreement and for three years after wmpletion of the work
hereunder.
S:\_Public Works\RFCA's\2008 All\OS-18-08\Agreement for Surveying & Map Checking\PB-Agreement On-CaLL Surveying
Services 08-18-08.doc
4
EXHIBIT "C"
5.2. Endorsements. The comprehensive general liability insurance policy shall
contain or be endorsed to contain the following provisions:
(a) Additional insureds: "The City of San Bemazdino and its elected and
appointed boards, officers, agents, and employees aze additional
insureds with respect to this subject project and contract with City."
(b) Notice: "Said policy shall not terminate, nor shall it be cancelled, nor
the coverage reduced, until thirty (30) days after written notice is given
to City."
(c) Other insurance: "Any other insurance maintained by the City of San
Bernazdino shall be excess and not contributing with the insurance
provided by this policy."
5.3. Certificates of Insurance. Consultant shall provide to City certificates of
insurance showing the insurance coverages and required endorsements described above, in a
form and content approved by City, prior to performing any services under this Agreement.
5.4. Non-limitine. Nothing in this Section shall be construed as limiting in any
way, the indemnification provision contained in this Agreement, or the extent to which
Consultant may be held responsible for payments of damages to persons or property.
6.0. GENERAL PROVISIONS
6.1. Entire Aereement. This Agreement constitutes the entire Agreement between
the parties with respect to any matter referenced herein and supersedes any and all other prior
writings and oral negotiations. This Agreement may be modified only in writing, and signed
by the parties in interest at the time of such modification. The terms of this Agreement shall
prevail over any inconsistent provision in any other contract document appurtenant hereto,
including exhibits to this Agreement.
6.2. Representatives. The Director of Development Services or her designee shall
be the representative of City for purposes of this Agreement and may issue all consents,
approvals, directives and agreements on behalf of the City, called for by this Agreement,
except as otherwise expressly provided in this Agreement.
Consultant shall designate a representative for purposes of this Agreement
who shall be authorized to issue all consents, approvals, directives and agreements on behalf
of Consultant called for by this Agreement, except as otherwise expressly provided in this
Agreement.
6.3. Project Managers. City shall designate a Managing Engineer to work directly
with Consultant in the performance of this Agreement.
S:\_Public Works\RFCA's\2008 All\OS-18-OS\Agreement for Surveying & Map Checking\PB-Ageement OnCall Surveying
Services 08-18-0S.doc
5
EXHIBIT "C"
Consultant shall designate a Contract Inspector(s) who shall represent it and
be its agent in all consultations with City during the term of this Agreement. Consultant or
its Contract Inspector(s) shall attend and assist in all coordination meetings called by City.
6.4. Notices. Any notices, documents, correspondence or other communications
concerning this Agreement or the work hereunder may be provided by personal delivery,
facsimile or mail and shall be addressed as set forth below. Such communication shall be
deemed served or delivered: a) at the time of delivery if such communication is sent by
personal delivery; b) at the time of transmission if such communication is sent by facsimile;
and c) 48 hours after deposit in the U.S. Mail as reflected by the official U.S. postmazk if
such communication is sent through regulaz United States mail.
IF TO CONSULTANT:
Mr. Jim Imbiorski, PLS
Parsons Brinkerhoff
685 East Carnegie Drive, Suite 210
San Bernazdino, CA 92408
Fax: (909) 889-1884
Tel: (909) 888-1106
IF TO CITY:
Valerie C. Ross
Director of Development Services
300 North "D" Street
San Bernardino, Ca 92418
Fax:909-384-5080
Tel: 909-384-5357
6.5. Attomevs' Fees. In the event that litigation is brought by any party in
connection with this Agreement, the prevailing party shall be entitled to recover from the
opposing party all costs and expenses, including reasonable attorneys' fees, incurred by the
prevailing party in the exercise of any of its rights or remedies hereunder or the enforcement
of any of the terms, conditions, or provisions hereof. The costs, salary and expenses of the
City Attorney and members of his office in enforcing this contract on behalf of the City shall
be considered as "attorneys' fees" for the purposes of this pazagraph.
6.6. Governing Law. This Agreement shall be governed by and construed under
the laws of the State of California without giving effect to that body of laws pertaining to
conflict of laws. In the event of any legal action to enforce or interpret this Agreement, the
parties hereto agree that the sole and exclusive venue shall be a court of competent
jurisdiction located in San Bernardino County, California.
6.7. Assignment. Consultant shall not voluntarily or by operation of law assign,
transfer, sublet or encumber all or any part of Consultant's interest in this Agreement without
City's prior written consent. Any attempted assignment, transfer, subletting or encumbrance
shall be void and shall constitute a breach of this Agreement and cause for termination of this
Agreement. Regazdless of City's consent, no subletting or assignment shall release
Consultant of Consultant's obligation to perform all other obligations to be performed by
Consultant hereunder for the term of this Agreement.
6.8 Indemnification and Hold Harmless. Consultant shall protect, defend,
indemnify and hold harmless City and its elected and appointed officials, officers, and
employees from any and all claims, liabilities, expenses, including attorney fees, damage to
S:\_Public Works\RFCA's\?A08 All\08-18-08\Agreement for Surveying & Map Checking\P&Agreement On-Call Surveying
Services OB-]8-08.doc
6
EXHIBI'T' "C„
property or injuries to or death of any person or persons or damages of any nature including,
but not by way of limitation, all civil claims or workers' compensation claims, arising out of
or in any way connected with the intentional or negligent acts, errors or omissions of
Consultant, its employees, agents or subcontractors in the performance of this Agreement.
6.9. Independent Contractor. Consultant is and shall be acting at all times as an
independent contractor and not as an employee of City. Consultant shall secure, at his
expense, and be responsible for any and all payment of Income Tax, Social Security, State
Disability Insurance Compensation, Unemployment Compensation, and other payroll
deductions for Consultant and its officers, agents, and employees, and all business licenses, if
any are required, in connection with the services to be performed hereunder.
6.10 Ownership of Documents. All fmdings, reports, documents, information and
data including, but not limited to, computer tapes or discs, files and tapes furnished or
prepared by Consultant or any of its subcontractors in the course of performance of this
Agreement, shall be and remain the sole property of City. Consultant agrees that any such
documents or information shall not be made available to any individual or organization
without the prior consent of City. Any use of such documents for other projects not
contemplated by this Agreement, and any use of incomplete documents, shall be at the sole
risk of City and without liability or legal exposure to Consultant. City shall indemnify and
hold hazmless Consultant from all claims, damages, losses, and expenses, including
attorneys' fees, arising out of or resulting from City's use of such documents for other
projects not contemplated by this Agreement or use of incomplete documents furnished by
Consultant. Consultant shall deliver to City any findings, reports, documents, information,
data, in any form, including but not limited to, computer tapes, discs, files audio tapes or any
other Project related items as requested by City or its authorized representative, at no
additional cost to the City.
6.11 Public Records Act Disclosure. Consultant has been advised and is awaze that
all reports, documents, information and data including, but not limited to, computer tapes,
discs or files famished or prepazed by Consultant, or any of its subcontractors, and provided
to City may be subject to public disclosure as required by the California Public Records Act
(California Government Code Section 6250 et. seq.). Exceptions to public disclosure may be
those documents or information that qualify as trade secrets, as that term is deemed in the
California Government Code Section 6254.7, and of which Consultant informs City of such
trade secret. The City will endeavor to maintain as confidential all information obtained by it
that is designated as a trade secret. The City shall not, in any way, be liable or responsible for
the disclosure of any trade secret including, without limitation, those records so marked if
disclosure is deemed to be required by law or by order of the Court.
6.12. Responsibility for Errors. Consultant shall be responsible for its work and
results under this Agreement. Consultant, when requested, shall furnish clarification and/or
explanation as may be required by the City's representative, regarding any services rendered
under this Agreement at no additional cost to City. In the event that an error or omission
attributable to Consultant occurs, then Consultant shall, at no cost to City, provide all
necessary design drawings, estimates and other Consultant professional services necessary to
S:\_Public Works\RPCA's\2IX78 All\(~-18-~\Agreement for Surveying & Map Checking\P&Agreement On-Call Surveying
Services l)8-18-OS.doc
7
EXHIBIT "C"
rectify and correct the matter to the sole satisfaction of City and to participate in any meeting
required with regazd to the correction.
6.13. Prohibited Emplovment. Consultant will not employ any regulaz employee of
City while this Agreement is in effect.
6.14. Order of Precedence. In the event of an inconsistency or conflict in this
Agreement and any of the attached Exhibits or Attachments, the terms set forth in this
Agreement shall prevail.
6.15. Costs. Each party shall bear its own costs and fees incurred in the prepazation
and negotiation of this Agreement and in the performance of its obligations hereunder except
as expressly provided herein.
6.16. No Third Party Beneficiary Rim. This Agreement is entered into for the
sole benefit of City and Consultant and no other parties aze intended to be direct or incidental
beneficiaries of this Agreement and no third party shall have any right in, under or to this
Agreement.
6.17. Headines. Pazagraphs and subparagraph headings contained in this
Agreement are included solely for convenience and aze not intended to modify, explain or to
be a full or accurate description of the content thereof and shall not in any way affect the
meaning or interpretation of this Agreement.
6.18. Construction. The parties have participated jointly in the negotiation and
drafting of this Agreement. In the event an ambiguity or question of intent or interpretation
arises with respect to this Agreement, this Agreement shall be construed as if drafted jointly
by the parties and in accordance with its fair meaning. There shall be no presumption or
burden of proof favoring or disfavoring any parry by virtue of the authorship of any of the
provisions of this Agreement.
6.19 Amendments. Only a writing executed by the parties hereto or their respective
successors and assigns may amend this Agreement.
6.20. Waiver. The delay or failure of either parry at any time to require
performance or compliance by the other of any of its obligations or agreements shall in no
way be deemed a waiver of those rights to require such performance or compliance. No
waiver of any provision of this Agreement shall be effective unless in writing and signed by a
duly authorized representative of the party against whom enforcement of a waiver is sought.
The waiver of any right or remedy in respect to any occurrence or event shall not be deemed
a waiver of any right or remedy in respect to any other occurrence or event, nor shall any
waiver constitute a continuing waiver.
6.21. Severabilitv. If any provision of this Agreement is determined by a court of
competent jurisdiction to be unenforceable in any circumstance, such determination shall not
affect the validity or enforceability of the remaining terms and provisions hereof or of the
S:\_Public Works\RFCA's\2008 All\OB-]8-08\Agreement for Surveying & Map Checking\PB-Agreement On-Call Surveying
Services ~-IS-0B.doc
EXHIBIT "C"
offending provision in any other circumstance. Notwithstanding the foregoing, if the value
of this Agreement, based upon the substantial benefit of the bazgain for any party is
materially impaired, which determination as made by the presiding court or azbitrator of
competent jurisdiction shall be binding, then both parties agree to substitute such provision(s)
through good faith negotiations.
6.22. Counterparts. This Agreement may be executed in one or more counterparts,
each of which shall be deemed an original. All counterparts shall be construed together and
shall constitute one agreement.
6.23. Corporate Authority. The persons executing this Agreement on behalf of the
parties hereto warrant that they aze duly authorized to execute this Agreement on behalf of
said parties and that by doing so, the parties hereto are formally bound to the provisions of
this Agreement.
6.24. Dama¢es. The Parties agree to waive any rights to incidental or consequential
damages and to punitive damages arising out of their performance under this Agreement
whether in torts or contracts or in law or in equity.
///
///
S:\_Public Works\RFCA's\2008 All\OS-18-OS\Agreement for Surveying & Map Checking\Associated Engineers-Agreement
On-Call Surveying Services 08-18-0S.d«
9
EXHIBIT "C"
AGREEMENT FOR ON-CALL SURVEYING AND MAP CHECHING SUPPORT
IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed
by and through their respective authorized officers, as of the date first above written.
CITY OF SAN BERNARDINO,
A Municipal Corporation
CONSULTANT
Associated Engineers, Inc.
Fred Wilson, City Manager
Approved as to form:
James F. Penman,
Name and Title
S:\_Public Works\RFCA's\2008 All\OS-18-OS\Agreement Eor Surveying & Map Checking\Assodared Engineers-Ageement
On-Call Surveying Services OB-18-O8.doc
By
Signature
I~
City Attorney
ATTACHMENT "1" TO EXHIBIT "C"
~_ _=a 685 East Carnegie Drive
_- 6 Suite 270
r San Bernardino, CA 92408
p` telephone: 909-888-7706
-~~ a e.,v Fax: 909-889-1884
'..
April 28, 2008
Mr. Michael W. Grubbs, P.E.
City of San Bemazdino
300 North "D" Street, 3ro Floor
San Bemazdino, CA 92418
Re: Request for Proposal to Provide Professional Civil Engineering and Surveying Services for On-Call
' Surveying and Map Checking Support
Dear Mr. Grubbs:
Associated Engineers, as a wholly owned subsidiary of Parsons Brinckerhoff, welcomes the opportunity to provide
' civil engineering and surveying services as needed by the City of San Bemazdino. PB/AE together, are now afull-
service engineering firm with the ability to provide a full range of engineering services for planning, design, and
constmction management of local infrastructure projects. In addition, with Associated Engineers capabilities, we can
provide our clients with design and construction services in surveying, mapping, right-of way, construction staking,
and constrnction management services. As a local firm with a combined professional staff of 90, we seek to be the
preferred provider of engineering services in the City and County of San Bemazdino.
This project will be led by Jim Elliott, PE., PLS. Jim who is both an professional civil engineer and a licensed land
surveyor, brings more than 27 years of experience in surveys and mapping. He is head of the Mapping Department
and has in-depth experience in providing the kind of services that the City of San Bemazdino is requesting.
Assisting Jim Elliott, is Marc Wilson, PLS., as Chief of Surveys. Marc has conducted design and construction
surveys for local agencies and Caltrans. Jim Fivash, PLS., has over 30 years of experience as a mapper and map
e checker. In addition, Jim has led two- and three man-party crews on construction surveys. Marc Wilson will be
supported by party chiefs who will lead two-or three-man party crews for surveying, depending on the nature and
complexity of the surveys. Map Checking support will also be provided by Janeen Nedlik, PLS., Larry Gill, PLS.,
and Gene Gray,LSIT.
This proposal has been organized to meet the requirements set forth in theRequest for Proposal. Section 5 provides
such additional information as comments on the Agreement, Insurance Requirements and Local Preference
Eligibility. We are in receipt of the Addendum No. 1 dated April 2'~, 2008 which we have read and referenced in
the prepazation of this proposal.
I will be the Principal-in-Charge and can be reached at 909.888.1106 or by email at imbiorski@pbworld.com. Our
local office is located at 685 East Carnegie Drive, Suite 210 in San Bemazdino.
The staff assigned to this project is committed for its duration. If you have any questions, or desire additional
information, please do not hesitate to contact me.
Sincerely,
PARSONS BRINCKERHOFF
G f~~~G~<'~G~
Jim Imbiorski.
~xecut~ve Vice ~residentl[nland Empire Manager
vet a entury o
Engineering Excellence
Technical Proposal
Professional Civil Engineering & Surveying Services
for
On-Call Surveying and Map Checking Support
1
Submitted to:
CITY OF SAN BERNARDINO
DEVELOPMENT SERVICES DEPARTMENT
Submitted by:
PARSONS BRINCKERHOFF
Jim [mbiorski, PLS
G85 East Carnegie Drip e, suite 210
San Bernardino, (~alifornia 92-408
909.888. I 1 UG
Fax 909.889.1884
April 28, 2008
San Bernardino On-Call SurvevinY and
Table of Contents
SECTION PAGE
1. FIRM QUALIFICATIONS
Firm Overview ~ _ ~
Projects 1.2
References. i_3
2. ORGANIZATION
Organization Chart 2_q
3. PERSONNEL
Resumes of Key Staff 3-5
1im Elliott 3-5
Jim Imbiorski 3-6
Marc Wilson 3.8
1im Fivash 3-9
Support Staff 3-15
Availability
4. UNDERSANDING/APPROACN/SCOPE
Project Understanding 4-16
Project Approach/Process to Perform Duties 4-16
Scope 4-16
Quality Control Measures
5. ADDITIONAL INFORMATION
City Role and Provisions 5_i 8
Response to Draft Agreement/Insurance Requirements $. ~ g
Local Preference 5-19
City Registration (PB has renewed -awaiting original) 5-20
Table of Contents
0.T{
City of San Bernardino
su M On-Call Surveying and Map Checking Support
~ 1. FIRM QUALIFICATIONS
FIRM OVERVIEW
Associated Engineers, as a wholly owned subsidiary of Parsons Brinckerhoff (PB), is submitting this
proposal, to provide civil engineering and surveying services for On-Call Surveying and Map
Checking Support, to the Public Works Division of the City of San Bemardino. This PB/AE Team is
seamlessly united in providing civil engineering services to our local clients. Our office in San
Bemazdino located at 685 East Carnegie Drive, Suite 210 is the project office, and Jim Imbiorski,
Executive Vice President of Associated Engineers, and the PB/AE Inland Empire Office Manager,
will be the Principal-in Charge. All correspondence relating to this proposal may be addressed to his
attention at: (Tel) 909-888-1106; (Fax) 909-889-1884; (E-mail) imbiorski@pbworld.com.. Jim will
ensure that the resources required for the on-call task orders, will be provided in acost-effective and
expeditious manner.
PB established its first southern California office in 1975, and its Inland Empire presence in the City
of San Bemazdino in 1985 to meet the growing transportation needs of our local clients. In the last 23
' years, PB has worked successfully with Associated Engineers on almost every highway project we
have designed and/or constructed for transportation agencies, Caltrans and local cities. Associated
Engineers has provided our team with expertise in surveys, mapping, right-of-way, utilities
identification and coordination, and construction staking. As a firm, Associated Engineers has also
provided civil engineering and construction management services on every major highway in the
Inland Empire. Associated Engineers, a California Corporation, has engaged in civil engineering,
surveying and mapping since 1955. The firm's 65 employees include eight (8) Licensed Land
Surveyors who specialize in providing design surveys, topographical mapping and Right-of-Way
engineering for numerous projects throughout Southern California. Other staff includes ten (10)
Registered Civil Engineers, civil designers, CADD operators/ survey/ mapping technicians, and
administrative staff who support these services. Projects have included all aspects of civil engineering
design, studies, surveys, planning, utility coordination and constmction management. Survey
capabilities include boundary, topographic, ALTA and utility mapping, aerial control surveys, right-
' of-way mapping and construction staking. Associated Engineers' clientele include municipalities,
flood control districts, school districts, water agencies, airport and highway authorities, industrial,
commercial and residential developers, utility companies and various State and Federal agencies.
All work provided by the PB/AE team will be performed by or under the direct supervision of a
licensed professional qualified to perform land surveying in the State of California. Any established
monument of maps requiring a seal and signature will be mazked "LS 6334" indicating the license
number of James L. Elliott, who is in "Responsible Charge" of the work. Prior to the beginning of any
fieldwork, necessary, we will meet with the City and/or its representative to confirm the permits
required and to coordinate with the entities involved. We will hold apre-work safety meeting with our
staff, and the City, to ensure that safety standards are maintained and OSHA requirements are met.
Over the years, Associated Engineers has built a strong reputation for quality work and professional
integrity. The PB/AE team follows stringent quality standards. As an ISO 9001 firm, quality is built
into every project through a system of checks and balances. The Project Manager plays a key role in
ensuring that the project moves according to schedule. Through existing management tools, and the
PB Information Systems' reports, the project manager keeps track of project schedule, costs, and
progress, and maintains on-going communication with the client.
Associated Engineers has prepared and recorded over 900 tract maps and parcel maps in San
Bernardino County. The firm has a combined experience of well over 100 years of professional land
_ _ _ _ ...
Section I - I Firm Qualifications
City of San Bernardino
to iM On-Call Surveying and Map Checking SuppoR
' surveying in this area and is well acquainted with local survey and mapping issues. Associated
Engineers maintains an in-house library of current County Surveyor record maps and field notes, as
well as County Assessor's Records, for more efficient project research.
' Associated Engineers continues to maintain state-of-the-art computer capabilities. The firm currently
networks over 50 PC workstations to a file server with a capacity of over 900 gigabytes of storage,
which is archived to backup tape nightly. Over 30 PC stations are configured for CADD applications
including MicroStation, InRoads, AutoCAD, as well as hydrology, hydraulics applications, Microsoft
Office and others. Two HP Design Jet 1O55C color network plotters assist with all plotting
' requirements, including draft and final plan mylars, together with 36-inch wide color photo and
presentation quality plots.
Associated Engineers subscribes to First American Real Estate Solutions and DataTree for current
online access to property deeds & records, Assessor's Maps and subdivision maps for every county.
To achieve maximum efficiency in the field, Associated Engineers uses fast, accurate and dependable
survey equipment. The firm utilizes Geodimeter System 600 total stations as its mainstay survey
instrument. When remote and safe data gathering are required, the firm has a Geodimeter Reflectorless
610 GR200 instrument. Associated Engineers has two Lieka Series 3000 digital bar-code reading
levels for precision differential level runs, and Trimble 5700 GPS receivers for large scale control
' surveying or fast RTK data collecting. The firm is also able to trace underground utility locations
using two Metrotech 810 Line Tracers.
FIRM QUALIFICATIONS
Caltrans -District 8, On-Call Surveys, San Bernardino and Riverside Counties, California:
Associated Engineers performed on-call surveys for Caltrans District 8. This work included providing
construction surveys for 1.5 miles of State Route 395 in Adelanto. Staking activities included
referencing of cadastral monuments, staking for the construction of grading, curbs, drainage facilities,
traffic signals, and asphalt concrete pavement. Centerline monuments were reset; notes and ties were
e famished to Caltrans. Another task performed by Associated Engineers included the staking and
monumentation of l9 miles of newly established right-of-way lines along State Route 71 from Los
Angeles County to the Riverside County line.
1 State Route 30 -Los Angeles County Line to the City of San Bernardino -Segments 1,2,3,4,5,7,10
& 11: Associated Engineers served as asub-consultant to various Prime Consultants (along this route)
to provide various survey and mapping support. This 26-mile project was for the construction of a six
lane new freeway from the Los Angeles County Line through the cities of Upland, Rancho
Cucamonga, Fontana and Rialto, to the I-215 in the City of San Bernardino. Associated Engineers
was responsible for all design, drainage, bridge, utility and soundwall surveys on Segments 1, 2, 3, 4,
5, 7, 10 and 11 used for the Project Study Report, Project Report and Final Plans, Specifications &
Estimates for this project. Working closely with Caltrans District 08 Right-of-Way and Survey
Departments, Associated Engineers established a metric centerline. This alignment was used as control
for all construction plans and Right-of-Way Maps along the entire 26-mile route. All work product
was based on Calvans provided NAD 83' Horizontal and NAVD'29 Vertical Control and delivered in
accordance with Caltrans Survey and Drafting Manuals. Associated Engineers also provided
calculations and mapping to include land net location and mapping on Segment 4, property ownership
maps on Segment 8, conversion of Right-of-Way lines from imperial to metric units for Segments 4
and 5, utility locations and mapping on Segments 6 and 7, and metric topographical mapping on
Segments 4, 5, 7 and 8.
City of Ontario Sphere of Influence Area Corner Records and Intersection Ties, • Ontario,
California: Associated Engineers performed a records search for field notes, corner records and tie
references to monumentation in the project area. Performed Field surveys to locate and verify
_ ._. _ _
Section I - 2 Firm Qualifications
C~i
LJ
~~
LJ
On-Cal[ Survevine and
City of San Bernardino
monuments and restore lost monuments. All points were pre-marked in accordance with Landata
Airborne Systems' flight specifications, and GPS tied to NAD83 coordinate control as a quality
assurance check. Field results were calculated and delivered to the City in ASCII and CADD formats
Digital Orthophoto and Mapping Project' City of Pomona, Californra: Associated Engineers, who
was a subconsultant to Landata Airborne Systems, performed a control survey, set aerial targets and
provided NAD83/NAVD88/CCS83 Zone 5 coordinates in US units for 61 control points for the City
of Pomona project.
On Call Survey Services 1979 -Present, Rancho Cucamonga, California: Associated Engineers has
performed design, right-of-way, monument preservation and consttvction surveys on over 125 projects
since 1979. Examples of construction projects include the South City Storm Drain Master Plan, Haven
Avenue Street Improvements (68 construction projects), Highland Avenue Improvements (14
construction projects) and Arrow Route Bridge Replacement. Design surveying services included
street cross sections, topography (in both metric and imperial), establishing vertical data, tying and
replacing cadastral and street monumentation. We have also prepared legal descriptions and plats for
right-of-way acquisition and easements.
Milliken Avenue Improvement Project, Ontario, California: Associated Engineers performed the
calculations and mapping as well as the construction staking, management and inspection for LS miles
of Milliken Avenue from Mission Avenue to Jurupa Avenue. The project consisted of adding two
traffic lanes, full-length drainage and sewer improvements, traffic signals and railroad crossing.
Staking activities included referencing of cadastral monuments, slope staking, control for relocation of
wet and dry utilities, staking for the construction of walls, curbs, drainage facilities and asphalt
concrete pavements. All staking activities were performed in accordance with Caltrans' Staking
Manual. Our survey staff also assisted the Resident Engineer's staff in checking grades, alignments,
staking property boundaries and right-of-way lines, replacing monuments and filing Comer Records.
On-Call Map Checking Services for the City of Ontario, California: Checking of Tract Maps and
Pazcel Maps for compliance with the local ordinances and The Subdivision Map Act.
On Call Subdivision and Record of Survey Map Checking Services, San Bernardino County,
California: Associated Engineers was awarded a contract to provide Subdivision and Record of
Survey Map Checking Services to the County of San Bernardino. The scope of work includes
surveying services that pertain to verifying the integrity of the final maps, pazcel maps and records of
survey checking for conformance with the established County Standards.
Interstate 2151nterchange, KP 66.7 to KP 68.8, Riverside County, California: Associated Engineers
was responsible for all boundary determination, prepazation of Right-of-Way Hazdcopies, legal
descriptions, deeds and appraisal maps for 45 parcels with 20 map sheets. This project was completed
4 weeks ahead of schedule and used only 60% of the approved budget. Caltrans took advantage of the
remaining budget and added another task for Associated Engineers to prepare a Record of Survey for
this project. All Right-of-Way Maps were prepazed with duel units (English -Metric) in conformance
with Caltrans procedures Handbook and Drafring Manuals.
l~
REFERENCES
Mr. Mike Raihle, County Surveyor, San Bemardino County- Surveyors Office, (Phone) 909-387-8145
825 E. 3rd Street, San Bemadino, CA 92415-0850
Mr. Glen Stott, Principal Engineer, City of Ontario, 909-395-2025
Mr. Uday Shah, Principal Engineer, City of Ontario, 909-395-2657
Cit of Ontario, 1425 S. Bon View Avenue, Ontario, CA 92761-4460.
Mr. Dick Beckley, Office Chief Surveys, Caltrans District 8, (Phone) 909 383-4082
464 West 4`"Street, San Bernadino, CA 92401
Section 1 - 3 Firm Qualifications
..,~
Cety of San Bernardino
a' __ _ On-Cal! SurvevinE and Man Checi'rinn .6z.,.,os
C_.I
2.ORGANIZATION
The PB/AE Project Manager has developed an organization chart in response to the requirements set
forth in the Request for Proposal. The PB/AE team has worked for the City of San Bemardino on past
projects, and understands the nature of On-Call services. The organization chart was developed to
show clear lines of authority, to show the strengths of the firm in surveying, mapping, and map
checking support. We understand that depending on the nature of the project, the size of the survey
team (2-man or 3-man) will be specified and cleared with the City, and the time noted to the nearest
half-hour. Services will be invoiced on a monthly basis and a cost breakdown will be submitted
cleazly defining the costs per project if multiple tasks are assigned. Jim Elliott LS., PE. will be the
project manager. Jim has more than 27 years of experience in mapping and surveying projects. He
works closely with the field survey staff and patty chiefs as well as Map Checking Support Staff.
Reporting directly to Jim Elliott will be the two leads -Marc Wilson PLS for Surveys, and Jim Fivash,
PLS for Map Checking.
On Notice to Proceed, Jim Elliott will meet with the responsible service lead and strange a meeting
with the City to establish scope, cost, schedule, and a quality control plan. The responsible lead will
then meet with the required staff for surveyor map checking support, and set the pazametets, safety
standazds, and other requirements to ensure safe, efficient, and successful completion of the on-call
task order.
ORGANIZATION CHART
Project Manager
Michael Grubbs, PE
Jim Imbiorski, PLS
CJ
u
J
'J
Jim Elliott, PLS, PE
Marc Wilson, PLS
Mark Noreen, LSIT
Phil Latucca, LSIT
Jeff Teny, LSIT
__ . _..
Section 2 - 4 _._ . _ _
Jim Fivash, PLS
Janeen Nedlik, PLS
Larry Gill, PLS
Gene Gray, LSIT
_. _
Organization
On-Call
City of San Bernardino 5
and Man Checkine Sannnrt
1 3. PERSONNEL
S This section provides resumes of key staff identified in the Organization chart in the previous section.
James L. Elliott, P.E., P.L.S.
Vice-President Project Assignment
James L. Elliott is both a Licensed Civil Engineer and a Licensed Land Project Manager
Surveyor. He has 27 years of experience devoted to surveying, Years of Experience: 27
engineering, and mapping, in the Southern California area. Jim is Education
responsible for mapping oversight at Associated Engineers and has
provided a variety of surveying services on a wide range of projects B.A. Mathematics University of
including roadways highways, commercial, industrial, and residential. California, 1980, San Diego
As head of the Mapping Department, he is involved with all map ProfesSionel Registrations
calculations.
' State Route 30, San Bernardino Cou Civil Engineer, CA #43907
nty, California: Associated Land Surveyor, CA #6334
Engineers is responsible for all calculations and mapping for surveying
' and right-of--way engineering services for SANBAG / Caltrans -District 8. Projects have included
land net location and mapping on Segments 1, 4, and 7, property ownership maps on Segment 8,
conversion of right-of-way lines from imperial to metric units for Segments 4 and 5, utility locations
and mapping on Segments 6 and 7, and metric topographical mapping and on Segments 1, 2, 3, 4, 5, 7,
8, 10 and 1 I. Mr. Elliott has been involved in oversight of all survey and mapping activities.
State Route 30 Segments 10 and 11, San Bernardino, Califfornia: Associated Engineers is
responsible for all preliminary survey and topographical mapping for approximately 6 miles of new
freeway construction from Riverside Drive in Rialto easterly crossing the Lytle Creek Wash to the 1-
215 interchange in the City of San Bernardino. The Scope of Work includes setting ground control
and providing over 2,000 acres of aerial mapping of the combined project azea, as well as design
surveys and construction survey control.
Caltrans District 8 On-Cal[ Surveys, San Bernardino and Riverside Counties, California: Mr.
Elliott supervised survey and office staffs work providing on-call surveys for Caltrans District 8.
This work included providing construction surveys for 1.5 miles of State Route 395 in Adelanto.
Staking activities included referencing of cadastral monuments, staking for the construction of
grading, curbs, drainage facilities, traffic signals, and asphalt concrete pavement. Centerline
monuments were reset, notes and ties were furnished to Caltrans. Other tasks performed by
Associated Engineers included the staking and monumentation of 19 miles of newly established right-
of-way lines along State Route 71 from Los Angeles County to the Riverside County line.
On Call Survey Services, City of Rancho Cucamonga, Rancho Cucamonga, California: Associated
Engineers has performed design, right-of-way, monument preservation and construction surveys on
over 125 projects since 1979. Mr. Elliott has been responsible for mapping on each of these jobs,
including the construction of the South City Storm Drain Master Plan, Haven Avenue Street
Improvements (68 construction projects), Highland Avenue Improvements (l4 construction projects)
and Arrow Route Bridge Replacement.
On-Call Design and Construction Surveys, Los Angeles County Department of Public Works,
California: provided on-call surveying for the County of Los Angeles' Public Works Depaztment.
! Contract services support the construction, improvement, and maintenance of public roads, drainage
!! systems, sewer and water lines. Mr. Elliott provided calculations and mapping oversight for this work.
_.,_ _,._
echon 3 - 5 Personnel
' ~ ~ City of San Bernardino 6
On-Call Surveying and Map Checking Support
James J. Imbiorski, P.L.S.
Executive Vice President Project Assignment
Principal-in-Charge/Qualify Control
Jim Imbiorski has more than 43 years of land surveying, construction Years of Experience: 43
and construction contract administration experience. Since joining
Associated Engineers in 1975, Jim served in positions from Senior Professional Registration
' Party Chief to Vice President and Head of the Survey Department. As hand Surveyor, CA #4430
Survey Manager, Jim Imbiorski will provide general oversight of the land Surveyor, AZ #30356
quality of surveying operations for [his project. He will be responsible
for verifying and maintaining horizontal and vertical control points,
replacing any points that are damaged or destroyed. Mr. Imbiorski is a
licensed Professional Land Surveyor and has a broad background in surveying, including design,
construction, cadastral, and boundary surveys, mapping and records of survey. During his 43-year
career, he has managed survey operations for more than a hundred projects.
Boulder Avenue Bridge at City Creek, Highland, California: This project will replace the existing
two-lane bridge on Boulder Avenue across City Creek with a new four-lane bridge. A community
trail will be designed to cross under Boulder Avenue along the west levee of City Creek. The new
bridge will be constructed in two stages in order to maintain traffic on Boulder Avenue throughout the
construction period. Associated Engineers, as a subeonsultant, Associated Engineers will perform
supplemental design surveys, aerial mapping, utility coordination and Right-of--Way Engineering for
the roadway design and bridge replacement project. Mr. Imbiorski is responsible for Quality Control
for Associated Engineers' work.
Greenspot Road Bridge ad Santa Ana River, Highland, California: This project will construct atwo-
lane replacement bride on a new alignment that will allow the design speed on Greenspot Road within
the project limits to be increased to 65 mph. The existing bridge to be rehabilitated for use as a
bicycle/ equestrian trail. As a subconsultant, Associated Engineers will provide supplemental design
surveys, aerial mapping and Right-of-Way Engineering for the roadway design and bridge
e replacement project. Mr. Imbiorski serves as Survey Task Leader.
State Street -Baseline to Arroyo Valley High School Drive, San Bernardino, California:
Associated Engineers provided PS 8r E and construction surveys and right-of-way engineering for the
portion of State Street that was recently constructed. The project also included the design of the
proposed State Street preliminary plans from Arroyo Valley High School Drive to 5th Street and right-
of-way engineering. Mr. Imbiorski served as Project Manager for this project.
South Highland Avenue, Fontana, California: Mr. Imbiorski served as project manager for
Associated Engineers' provision of surveying and staking for the construction of the realignment of
two miles of existing State Route 30 (Highland Avenue) in the City of Fontana. Staking activities
included referencing of cadastral monuments, slope staking, control for relocation of wet and dry
utilities, staking for the construction of walls, curbs, drainage facilities and asphalt concrete
pavements. Our staff also assisted the Resident Engineer's staff in checking grades, alignments,
staking property boundaries and right-of-way lines, replacing monuments and filing Corner Records.
Cherry Avenue Roadway and Infrastructure Improvements, San Bernardino County, California:
Associated Engineers performed construction staking, management and inspection for the
reconstruction of approximately two miles of Cherry Avenue in Fontana, from Interstate 10 to the
Metrolink rail line. These improvements were constructed along with other transportation-related
infrastructure to support the California Speedway, a $120 million, state-of-the-art auto racing facility.
The infrastructure improvements included the construction of four bridges, major drainage facilities,
over 6 miles of walls and 25 miles of curb. Staking activities included referencing of cadastral
monuments, slope staking, control for relocation of wet and dry utilities, staking for the construction
of walls, curbs, drainage facilities and asphalt concrete pavements.
.._ _
_.
Section 3 - 6 - . __. ...._ ._ . _ ..
Personnel
City of San Bernardino 7
Su iM On-Call Surveying and Map Checking Support
District 08 "On-Call" Surveys, San Bernardino and Riverside County, California -Contract
Number 08A1037: Associated Engineers, a Prime Consultant, has provided various "On-Call" tasks
for District 8. "On-Call" task orders included preparation of Right-of-Way Maps, Hardcopy Maps and
' Deeds for projects in San Bernardino and Riverside Counties, prepazation of Resolutions of Necessity
documents for Segments 10 and 11 of SR-30/210 (new freeway) in San Bernardino, preparation of
Relinquishment Maps for SR-30 along Highland and 19th Streets within the cities of Upland, Rancho
' Cucamonga and Fontana, prepazation of miscellaneous court exhibits for condemnation actions within
Segments 3 and 4 of SR-30/2(0, and prepazation of Right-of-Way Maps, Hardcopy Maps and Deeds
for Segments of SR-62 in Yucca Valley and for SR-395 in Victorville. Mr. Imbiorski served as
Project Manager for these projects. He also served as an Expert Witness in support of Caltrans.
South Highland Avenue, Fontana, California: Mr. Imbiorski served as project manager for
Associated Engineers' provision of surveying and staking for the construction of the realignment of
two miles of existing State Route 30 (Highland Avenue) in the City of Fontana. Staking activities
included referencing of cadastral monuments, slope staking, control for relocation of wet and dry
utilities, staking for the constmction of walls, curbs, drainage facilities and asphalt concrete
pavements. Our staff also assisted the Resident Engineer's staff in checking grades, alignments,
' staking property boundaries and right-of-way lines, replacing monuments and filing Comer Records.
Cherry Avenue Roadway and Infrastructure Improvements, San Bernardino County, California:
Associated Engineers performed constmction staking, management and inspection for the
' reconstruction of approximately two miles of Cherry Avenue in Fontana, from Interstate 10 to the
Metrolink rail line. These improvements were constrncted along with other transportation-related
infrastructure to support the California Speedway, a $120 million, state-of-the-art auto racing facility.
The infrastructure improvements included the construction of four bridges, major drainage facilities,
over 6 miles of walls and 25 miles of curb. Staking activities included referencing of cadastral
monuments, slope staking, control for relocation of wet and dry utilities, staking for the conswction
of walls, curbs, drainage facilities and asphalt concrete pavements.
On-Cal[ Survey Services, City of Rancho Cucamonga, Rancho Cucamonga, California: Associated
Engineers has performed design, right-of-way, monument preservation and constmction surveys on
over 150 projects since 1979. Mr. Imbiorski has managed surveying services for each of these jobs,
including the construction of the South City Storm Drain Master Plan, Haven Avenue Street
Improvements (68 constmction projects), Highland Avenue Improvements (14 construction projects)
and Arsow Route Bridge Replacement.
State Route 30/210, San Bernardino County, Calfornta: Mr. Imbiorski was Project Manger
responsible for all calculations and mapping for surveying and right-of-way engineering responsible
for all calculations and mapping for surveying and right-of-way engineering services for SANBAG/
Caltrans -District 8. Projects have included land net location and mapping on Segment 1, 4 and 7,
property ownership maps on Segment 8, utility locations and mapping Segments 6 and 7, and metric
topographical mapping and detailed design surveys on Segments 1,2,3,4,5,7,8,10 and 11.
{.
i?J
_.
_ _ _ _._
Section 3 - 7 Personnel
On-Cal[
City of San Bernardino 8
and Map Checkinr Support
' Marc Wilson, P.L.S.
Chief of Surveys Project Assignment
Marc Wilson as Chief of Surveys, performs construction surveying Chiel of Surveys
Y
' for all projects, directs the activities of his party and prepares daily ews of Experience: 19
field reports. He performs analytical calculations in the field as Education
needed and maintains communication with the project engineer. In
hi
21
i California Polytechnic University,
' s
-year survey
ng career, Mr. Wilson has performed design, Pomona, Pomona, California
construction, cadastral, boundary, topographic and control surveys,
and office calculations. He has performed preliminazy and
' Professi0nel Registration
construction surveying to Caltrans
standards for numerous Land Surveyor, CA #8111 (2006)
transportation projects.
District 08 "On-Call" Surveying Services, San Bernardino and Riverside County, California
' (Contract No. 08A1037): Associated Engineers, as Prime Consultant, provided "On-Call" Right-of-
Way engineering and surveying for District 8, San Bernardino and Riverside Counties. Fourteen (14)
task orders were issued. They include: providing professional expert witness and technical services to
support the prepazation of court exhibits, Right-of-Way engineering services, field surveys, land-net
ties, Right-of-Way mapping and drafting, providing acquisition documents, legal exhibits,
condemnation legals and deed plats. Mr. Wilson served as Chief of Surveys.
' Caltrans "On-Call" -District 59, State Route IOl / 4l /nterchange Improvements, Ventura County,
California As asub-consultant, Associated Engineers provided the surveys and mapping required for
SR 101/ 41 Interchange Bridge No. 51-0141/ 51-317. All surveys were based on Caltrans famished
horizontal and vertical control monuments and values. All surveys were collected and delivered in
NAD ' 83 Metric Units. Mr. Wilson served as Chief of Surveys on this project.
State Route 30 -Los Angeles County Line to the City of San Bernardino -Segments 1,2,3,4,5,7,10
& ll: Associated Engineers served as asub-consultant to various Prime Consultants (along this route)
to provide various survey and mapping support. Associated Engineers was responsible for all design,
drainage, bridge, utility and soundwall surveys on Segments 1, 2, 3, 4, 5, 7, ]0 and 11 used for the
e Project Study Report, Project Report and Final PS&E for this project. Working closely with Caltrans
District 08 Right-of-Way and Survey Departments, AE established a metric centerline. This alignment
was used as control for all construction plans and Right-of-Way Maps along the entire 26 mile route.
All work product was based on Caltrans provided NAD 83' Horizontal and NAVD '29 Vertical
Control and delivered in accordance with Caltrans Survey and Drafting Manuals. Mr. Wilson served
as Lead Party Chief on this project.
' State Route 60 HOV Lanes, Riverside County, California: As a subconsul[ant, Associated
Engineers was responsible for all design, drainage, utility, bridge and sound wall surveys required for
preparation of the PSR, PR and Final PS&E for 7.5 miles of HOV lanes, bridge replacements,
structural improvements and soundwalls. Working closely with Catrans District 08 -Survey
Department, Associated Engineers established a metric centerline of improvement, converted existing
Caltrans Right-of-Way Maps and photogrammetric mapping to Metric 1:500 design scale hard copies
and electronic Files. All work product was based on Caltrans provided NAD 83'Control, performed in
conformance with Caltrans' Right of Way, Survey and Drafting Manuals. Mr. Wilson served as Lead
Party Chief on this project.
Construction Management Services for Beaumont Avenue Bridge, Loma Linda, California: This
project is located in the City of Loma Linda and the unincorporated area of San Bernardino County.
Associated Engineers, as asub-consultant, provided alignment for Beaumont Avenue, established
temporary benchmarks on each side of flood channel, recovered monuments for survey control, Staked
offsets to bridge centerline and staked offsets to bridge abutments. Mazc was chief of surveys.
Section 3 - 8 -.. __.. .
Personnel
n
City of San Bernardino 9
t" "~ On-Call Surveying and Map Checking Support
' James Fivash P.L.S.
Mapping Manager Project Assignment
James Fivash has over 30 years of experience as a mapper and map Lead Map Checker
checker. He has supervised a 3 person mapping department. His Years of Experience: 31
responsibilities include preparation of final maps, parcel maps, professional Registration
boundary analysis, proper legal descriptions, exhibits, ALTA Survey ~~~ 4420
Maps, preparation and filing of Tract Maps, Parcei Maps, Records of (19~
Survey, Lot Line Adjustments and [he preparation of proposals for all Nevada Land Surveyor No.
of the foregoing. He interacts closely with clients in dealing with all 11429 (1995)
mapping aspects of the projects, and directs project managers and
surveyors as to the correct procedures to follow in regards to Professional Affilietlon
boundaries, easements, mapping certifications and topography. Works CalifOmia Land Surveyors
' closely with the engineering department for final mapping and map Association (CLSA),
checking. James experience also extends to being a party chief and Riverside/San Bernardino
leading a 2-3 man survey party performing construction surveys, Chapter
' topographic surveys, and boundary surveys. Responsible for attendant Charter Member, Desert Chapter,
calculations and location of property and centerline monuments for the CLSA
above. Fluent in Autocad 2007/2008
• RCTC SR 91/24l/1-15 Right-of-Way Mapping and Surveying for SR 91 from SR 241 to
Magnolia Street in Riverside and on Interstate l5 from Caja[co Street to Hidden Valley
Parkway in Corona. Prepazation of drawings of the existing rights-of-way, centerline alignments
of the highways as well as the cross streets and alignments of [he on and off ramps at various
interchanges. Analysis of boundary and centerline monumentatiion vs. record information from
Caltrans Right-of-Way Maps, Records of Survey, Parcel Maps and Tract Maps.
Prior Experience
• As Mapping Manager for Adkan Engineers, Riverside, California: responsible for all all phases of
boundary analysis and mapping of lazge and small tracts of land and the preparation of
e Subdivision Maps. Parcel Maps and Record of Survey Maps. Experience includes prepazation of
maps for Tract 29027, Tract 29632, Tract 28632-1, Tract 33402 and Tract 29515, all in the City
of Riverside, California. Projects also include preparation of legal descriptions, Lot Line
Adjustments, ALTA Land Survey Maps and Record of Survey Maps.
• Land Surveyor, Mapping Department, The Keith Companies (now Stantec Corporation), Las
Vegas, NV. (6.5 years) Responsible for preparation of ALTA Land Survey Maps, legal
descriptions and attendant property exhibits for right-of-way dedications in conjunction with the
preparation of Subdivision Maps fot Commercial purposes and the prepazation of Records of
Survey maps for the subsequent land division within the Commercial Subdivisions.
tl
Ll
t'
__ _.
Section 3 - 9
.. _.
Personnel
~I
On-Call
City of San Bernardino 10
and Map Checkinr Sunnort
' Mark Noreen, L.S.I.T.
SurveyodParty Chief project Aeslgnment
Mr. Noreen has been surveying for Associated Engineers for 33 years. Party Chief
In that time, he has completed literally hundreds of construction staking Years of Experience: 33
jobs, both large and small. He has a thorough knowledge of
construction surveying practices. He will perform field calculations as Education
necessazy and maintain continuous communication with the Resident Chaffey Community College
Engineer, and as Party Chief is role on this project will be to direct the profeSSionel Reglstretions
day-to-day activities of his party and to report directly to the Project 1985, Land Surveyor In Training,
Manager. California fiZL003709
Assessment District ;K6: Milliken Avenue Improvements, Ontario,
California: The project involved the repair and widening of Milliken
Avenue and Philadelphia Street. Associated Engineers evaluated the plans and specifications for both
constructability and cost-effective design. For the majority of Milliken Avenue, Associated Engineers
recommended a complete reconstruction of the existing pavement section in lieu of the proposed
' overlay. Associated Engineers worked closely with the City of Ontario and Riverside Construction
Co. to complete the revised project within the original time frame and budget. The scope also
included supervision of all field inspection and testing and coordinated efforts to maximize the benefit
' of construction dollars. Mr. Noreen served as party chief.
State Route 30, Early Bridge Construction, San Bernardino, California: Associated Engineers is
currently completing a contract to furnish construction staking services for the construction of ten (10)
' bridges, related drainage, street, sound walls, and utility facilities along a 10-mile stretch at State
Route 30 from the Los Angeles County line to Rancho Cucamonga. Associated Engineers provided
these services on an on-call task order based contract to Caltrans Metric Staking Standards. Mr.
Noreen served as Party Chief for construction survey support on various projects including bridges,
storm drains, utility relocation, local street and sound wall construction.
Caltrans District 8 On-Call Surveys, San Bernardino and Riverside Counties, California: Mr.
Noreen was the Party chief for Caltrans District 8 on-call surveys. This work included construction
surveys for 1.5 miles of State Route 395 in Adelanto. Staking activities included referencing of
cadastral monuments, staking for the construction of grading, curbs, drainage facilities, traffic signals,
' and asphalt concrete pavement. Centerline monuments were reset; notes and ties were furnished to
Caltrans. Another task included the staking and monumentation of 19 miles of newly established
right-of-way lines along State Route 7l from Los Angeles County to the Riverside County line.
' Railroad Canyon Road, Canyon Lake, California: Mr. Noreen was the Party Chief for construction
staking for the reconstruction of approximately one mile of Railroad Canyon Road, a four lane divided
highway from east of I-IS to Canyon Lake. This project included the complete removal and
reconstruction of sub-base, base and finish pavements and the reconstruction of super-elevated
corners, shoulders, fill and cut slopes as necessary for widening existing pavements.
Section 3 - 10 Personnel
' City of San Bernardino I I
~ On-Call Surveying and Map Checking Support
' Phil Lattuca, L.S.I.T. pro Assi nment
Surveyor/Party Chief ~ g
Party Chief
' Mr. Lattuca has eleven years of surveying experience. He is a Party Chief. Years of Experience: 11
He has a thorough knowledge of construction surveying practices. Mr.
Lattua's role in this project will be to direct the day-to-day activities of his Education
party and to report directly to the Project Manager. He will perform field BS Business Management,
calculations as necessary and maintain continuous communication with the University of Redlands
Resident Engineer. Mr. Lattuca has served as Party Chief/ Instrumentman AS Degree, Crofton College
and Chainman for various projects, stated below. professfonel RegiStratlons
' Interstate 10/ Etiwanda Avenue /nterchange, Fontana California: 2002 Land Surveyor In Training,
Associated Engineers was responsible for providing design surveys, aerial Calrfomia 16487
mapping, right-of-way mapping, utility coordination and civil design for
drainage, utility relocation and local street for the reconfiguration of the
existing interchange to bring it up to current requirements. All work was performed in metric to
Caltrans Standards for PSR, PR & PS & E. Mr. Lattuca served as Party Chief on this project.
' Interstate l0 HOV Lanes, from State Route 57 to Los Angeles County Line, Los Angeles,
California: Associated Engineers was responsible for surveying and mapping services for MTA/
' Caltrans, District 7. The project included preparing composite right-of-way base maps in Intergraph
format, required translation of existing drainage, bridge, utility surveys and mapping for 6.1 miles of
Interstate 10 from the San Bernazdino County line to Kellogg Hill. Mr. Lattuca performed the duties
of an instrumentman and Chainman.
State Route 3Q Early Bridge Construction Projects, San Bernardino County, California: Associated
Engineers, as a Prime Consultant, has provided conswction-staking services for the construction of
the early bridge construction projects along State Route 30 fora 10-mile stretch from Los Angeles
County line to Rancho Cucamonga. These services were performed on an "On-Call" task order based
contract to Sanbag. Mr. Lattuca served as Party Chief on this project.
Ca[trans District 8 On-Call Surveys, San Bernardino and Riverside Counties, California: Mr.
Lattuca served as Party Chief for performance of oncall surveys for Caltrans District 8. This work
included providing construction surveys for 1.5 miles of State Route 395 in Adelanto. Staking
activities included referencing of cadastral monuments, staking for the construction of grading, curbs,
drainage facilities, traft"ic signals, and asphalt concrete pavement. Centerline monuments were reset;
notes and ties were famished to Caltrans. Other tasks performed included the staking and
monumentation of 19 miles of newly established Right-of-Way lines along State Route 71 From Los
Angeles County to the Riverside County line.
1-1
I' I
L
G
Ole _ _. _
Section 3 - 11 - - _
Personnel
GI
City of San Bernardino 12
say ~M On-Cal[ Surveying and Map Checking Support
Jeff Terry, LSIT
Party Chief Project Assignment
- Mr. Terry has ten years of surveying experience. He is a Party Chief. Party Chief
He has a thorough knowledge of construction surveying practices. Mr. Years of Experience: 10
Terry's role in this project will be to direct the day-to-day activities of Education
his party and to report directly to the Project Manager. Mr. Terry will Bachelor of Science, Liberal
perform field calculations as necessazy and maintain continuous Studies University of Calitomia,
communication with the Resident Engineer.
Riverside
Date Palm Drive Overhead Widening Project, Cathedral City,
California: Associated Engineers is providing construction-surveying Professional Registration
services for the Date Palm Drive Overhead Bridge Widening project. Land Surveyor In Training, CA
Construction Staking activities include staking for survey control,
clearing/ removals, slops, intermediate slopes, rough grades, final grads, major structures -ground,
major structures -Superstructure, curbs, drainage, minor structures, monument ties, and replacement
and corner records. Associated Engineers is also responsible for postconstruction surveys and
' mapping to include as-built conditions where directed by the Resident Engineer, replace cadastral
monuments destroyed by construction, filing comer records with the County of Riverside, setting final
centerlines monuments and preparing centerline ties. Mr. Terry serves as Party Chief on this project.
I Mountain Avenue and 6th Street Improvements, Ontario, California: Mr. Terry was the Party Chief
for construction staking of roadway construction improvements including coordinating with Caltrans
representatives.
State Route 30 Early Construction Projects, San Bernardino, California: Mr. Terry was the Field
Surveyor for design survey and construction survey support on various projects including bridges,
storm drains, utility relocation, local street and sound wall construction.
Interstate 10 HOV Lanes (Prom State Route 57 to Los Angeles County Line), Los Angeles,
California: Mr. Terry was Party Chief for design survey for addition of HOV Lanes to 6.1 miles of
Interstate 10.
State Route 30, Segment 7, Fontana, Californla: Mr. Terry was Field Surveyor for monument
preservation surveys.
South Highland Avenue, Mango to Lytle Creek, Fontana, California: Mc Terry was Field Surveyor
for all staking necessary for the construction of the realignment of two miles of existing State Route
30 (Highland Avenue). Staking activities included referencing of cadastral monuments, slope staking,
control for relocation of wet and dry utilities, staking for the construction of walls, curbs, drainage
facilities and asphalt concrete pavements. All staking activities were performed in accordance with
Caltrans' Staking Manual. Assisted the Resident Engineer's staff in checking grades, aiignments,
staking property boundaries and right-of-way lines, replacing monuments and filing Comer Records.
R
~(,
__ . _
Section 3 - 12 Personnel
On-Call
City of San Bernardino 13
and Map Checkine Support
Janeen Nedlik, P.L.S.
Surveyor/Coordinator Project Assignment
Ms. Nedlik has more than 25 years of land surveying and civil Map Checker Support
engineering experience. She has been involved with numerous projects Years of Experience: 25
covering all phases of surveying and property analysis, as well as design. Education
Project experience includes transportation-related projects such as Masters Degree Program,1984-
schools, rail, bridges, roadway and highway improvements. 1986, CSU San Bernardino
• District 08 "Ors-Call" Surveying Services, San Bernardino and B•S. Degree, Cal'rfornia
Riverside County, California (Contract No. 08A1037): Associated Polytechnic University, Pomona,
Engineers, as Prime Consultant, is providing "On-Call" Right-of- 1984
Way engineering and surveying for District 8, San Betnazdino and Professional Reglstretions
Riverside Counties. To date, fourteen (l4) task orders have been 1999 land Surveyor California
issued. They include: providing professional expert witness and #7563
technical services to support the preparation of court exhibits, Right-
of-Way engineering services, field surveys, land-net ties, Right-of-Way mapping and drafting,
providing acquisition documents, legal exhibits, condemnation legals and deed plats. We also
prepazed relinquishment and vacation maps. Ms. Nedlik served as Task Leader on some of these
projects.
' State Route 60, HOV Lanes, Riverside County, California: As asub-consultant to Holmes &
Nazver, Associated Engineers was responsible for all design, drainage, utility, bridge and sound
wall surveys required for preparation of the Project Study Report, Project Report and prepazation
of Final PS & E for 7.5 miles of HOV lanes, bridge replacements, structural improvements and
soundwalls. Working closely with Catrans District 08 -Survey Department, Associated Engineers
established a metric centerline of improvement, converted existing Imperial Right-of-Way maps
and photogrammetry to Metric 1:500, design scale hard copy maps and electronic files. All work
product was based on Caltrans provided NAD 83'Control, performed in conformance with
Caltrans' Right of Way, Survey and Drafting Manuals. Ms. Nedlik was the Office Surveyor for
this project.
• State Route 30 -Los Arsgeles County Line ta the City of San Bernardino -Segments
1,2,3,4,5,7,10 & Il: Associated Engineers served as asub-consultant to various Prime
Consultants (along this route) to provide various survey and mapping support. Associated
Engineers was responsible for all design, drainage, bridge, utility and soundwall surveys on
Segments 1, 2, 3, 4, 5, 7, 10 and I 1 used for the Project Study Report, Project Report and Final
Plans, Specifications & Estimates for this project. Working closely with Caltrans District 08
Right-of-Way and Survey Departments, Associated Engineers established a metric centerline. This
alignment was used as control for all construction plans and Right-of-Way maps along the entire
26-mile route. All work product was based on Caltrans provided NAD 83' Horizontal and NAVD
'29 Vertical Control and delivered in accordance with Caltrans Survey and Drafting Manuals. Ms.
Nedlik was the Office Surveyor for this project.
• State Route 30, Early Bridge Construction Projects, Sart Bernardino County, California:
Associated Engineers, as Prime Consultant, provided construction staking services for the
construction of the early bridge construction projects along State Route 30 fora 10-mile stretch
from Los Angeles County line to Rancho Cucamonga. These services were performed on an "On-
Call" task order based contract to SANBAG.. Ms. Nedlik was the Office Surveyor for this project.
• Interstate l0/ Etiwanda Avenue Interchange, Ontario, California: Provided office support for
construction surveys, aerial mapping, Right-of-Way mapping, utility coordination and civil design
for drainage.
_ . _.. __
Section 3 - 13 Personnel
City of San Bernardino 14
On-Call Survevins and Man Checkine Sannort
' Larry Gill, PLS
Right of way Engineer/Mapper
Mr. Gill has over 27 years of engineering and surveying experience.
' His responsibilities have included land surveying, boundary analysis,
right-of-way mapping, photo control, pipe network hydraulic
computer analysis, assessment district engineering, and computer
systems management. He has also provided engineering design
services for various projects including subdivisions, transportation,
and public improvements.
'~J
i`,
u
ir~
,
1.
f;
z'
.Project Assignment
Map Checker Support
Years of Experience: 27
Education
B.S. Geology, San Diego State
University 1974
Professional Registrations
Professional Land Surveyor - CA
• CALTRANS Highway 138, E[ Cajon Pass, Calj/ornla -The #78141999,
project included about 3.5 miles of realignment, right-of--way
mapping, legal descriptions, plats and Record of Survey for Highway 138 in Cajon Pass,
California. The project extended easterly from Interstate 15 to Summit Post Office Road. This
highway was previously designed by Caltrans but was never built. New design criteria required
that the old plans and right-of--way maps be revised and additional right-of-way purchased. New
right-of-way maps were created that showed all proposed fee pazcel acquisitions, drainage and
temporazy construction easements along with the associated tabulations. Legal descriptions and
B.Sx I 1 plats were created for each parcel needed for either fee or easement purposes. The new
realigned centerline was tnonumented prior to construction and a Record of Survey filed. Caltrans
reviewed the Right-of-Way maps and the Record of Survey to insure conformance with standards.
The field survey consisted of recovering or establishing government comers and existing highway
monuments over an 8 square mile area in very mountainous terrain. Responsible for right-os-way
and mapping.
• Municipal Survey, City of Adelanto, California -This project was a 51 square mile municipal
survey to establish complete horizontal and vertical control within the city. A total of 54 new
benchmarks were created at every mile within the city. Precise first order double rod level circuits
were rnn between each benchmark. The precision of the level circuits exceeded first order second-
class requirements by the city. Mr. Gill's responsibilities included collection and processing all
field data. In addition, Mr. Gill coordinated with field crews for data collection and review and
created all computer files delivered to the city.
• North American Chemical Company, New York, NY-The project included the mapping of all
facilities that were sold from Kerr McGee to North American Chemical Company. This included
ALTA surveys for the three chemical plants, a 35 mile long ALTA survey of three Potable
waterlines from wells in Ridgecrest to the chemical plants in Trona and a IS file ALTA survey of
the Southern Brackish Waterline from the wells in Seazles Lake to the chemical plants. Three
different ALTA surveys were prepared for Bureau of Land Management, Naval Weapons Center
China Lake and North American Chemical Company. gen for legal descriptions and
ALTA/ACSM surveys for joint use of waterlines and related facilities.
• Commuter Rail, Atchison, Topeka, and Santa Fe Railway Company, California -This project
involved surveying for a portion of the Commuter Rail Project from San Bernardino to Yorba
Linda. Mr. Gill's responsibilities included supervision of surveys and creation of a Record-of-
Survey. Additional responsibilities included coordination with AT&SF staff for all requirements
and products, coordination with all design engineers, contractors and clients.
. _ -,.
Section 3 - 14
Personnel
City of San Bernardino 15
S" a On-Call Surveying and Map Checking Support
' Gene A. Gray, LSIT
Map Checking Support Project Assignment
Mr. Gray brings over 24 yeazs of experience to this project. He is an Map Checking Support
' expert in AutoCAD and MicroStation and provides CADD and Yews of Experience: 24
technical support to our survey crews. Mr. Gray's role in [his project professional Registrations
will be CADD mapping of Records of Survey, plats, Corner Records, LSIT CA ZL005117i
Right-of-Way easement documents, and other surveyed records.
• State Route 30, Segment 10, San Bernazdino, California: Mr.
Gray served as Cadd Technician for all Right-of-Way Mapping
for approximately 3 miles of new freeway construction.
• Interstate 10 Interchange at Etiwanda, Fontana, California: Mr. Gray has been involved in the
recent prepazation of Right-of-Way Maps, hardcopy maps and utility maps for this Caltrans
project. Mr. Gray also prepared Metric and English files for both Microstation and AutoCAD.
• State Route 74, Riverside County, Riverside, Califomia: Mr. Gray assisted with metric
conversion of existing map files, prepared Hardcopy and Right-of-Way Maps and review for
' CAD compliance.
• State Route 71, Segments 1, 2 & 3, San Bernardino, California: Associated Engineers was
responsible for all design surveys, land net surveys, Right-of-Way Mapping, cross-section local
' roads, utility research, sub-surface topography and aerial mapping control Mr. Gray performed
as Cadd Technician for this project.
• Lomas Santa Fe Grade Separation (NCTD), San Diego County, California: Associated Engineers
provided surveying and mapping services for Right-of-Way, utilities and design for this project.
Mr. Gray served as Cadd Technician for this project.
• On-Call Right-of-Way Acquisition Services, South End Project, Los Angeles County, Califomia:
Associated Engineers provided surveying and Right-of--Way Engineering services. Mr. Gray
served as Survey Technician for this project while working with Hazo Engineering.
• interstate 215, KP 66.7 to KP 68.8, Riverside County, California: Associated Engineers was
responsible for boundary determination, preparation of Right-of-Way Hard copies, legal
descriptions, deeds and appraisal maps for 45 pazcels with 20 map sheets. This project was
completed 4 weeks ahead of schedule and used only 60% of the approved budget. Caltrans took
advantage of the remaining budget and added another task for Associated Engineers to prepare a
Record of Survey for this project. Mr. Gray served as CADD Technician.
PERSONNF,I. AVAILABILITY
The team identified on the organization chart will be the team that will respond to the needs of a task
order. We do not anticipate any changes in personnel, and we are committed to delivering the best
quality service at a reasonable and acceptable cost to the City.
...
- ..
Section 3 - IS Personnel
4, .
City of San Bernardino
su iM On-CaU Surveying and Map Checking Support
' 4. PRQJECT UNDERSTANDINGlSCOPE
PROJECT UNDERSTANDING
The City of San Bemadino has need far On-Call Surveying Support for the Capital Improvement
Program, checking of maps, checking of certificates of compliance and related work. The PB/AE
team is qualified to undertake this project based on our past performance in the areas of survey and
checking of maps.
The PB/AE team has performed many on-call projects within the Inland Empire, and is experienced in
the nature and demands of an on-call procurement. Associated Engineers has the depth of staff
resources, and the project manager and lead registered engineers to undertake these assignments and
complete them in a timely manner to the satisfaction of the City of San Bemadino. Surveys and
' Mapping by Associated Engineers may include the establishment of horizontal and vertical control,
roadway cross-sections, drainage surveys, utility location surveys and mapping, control for
geotechnical investigations, property and right-of-way surveys, and preparation of topographical
maps, record maps, legal descriptions and plats and construction support surveys. All work will be
performed under the supervision of a licensed land surveyor and in compliance with the Land
Surveyor's Act.
PB/AE also commits to providing the staff identified in our organization chart for the duration of the
procurement which we understand will be for one-year with a provision and administrative extension
of an additional year, subject to agreement of both parties, with a total cost not to exceed $300,000 in
any fiscal yeaz:
PROJECT APPROACH/1'ROCESS TO PERFORM DUTIES
Upon receipt of a request for surveying services from the City, the PB/AE project manager will meet
with the City's project manager to determine the nature and scope of required services including
deliverable formats and schedule and any special requirements. Appropriate PB/AE staff will be
identified and assigned for completion of the task order assignment and will include professional
oversight and review, a cost estimate and schedule. No work will commence without receipt of a
notice to proceed from the City. At the conclusion of the work, the PB/AE project manager will
review all deliverables with the City to their complete satisfaction.
SCOPE
Purpose: To Provide "Survey Party" based on project needs and as directed by City Engineer
• Provide Field Survey Party (two person or three person) as determined by the project
• Perform construction staking
• Right-of-way Surveying
• Intersection Monumentation and ties
• Recovery and/or restoration of monuments
• Topographic surveying
• Survey Party coordinates with outside agencies, utilities and other City Departments regarding
permits
• Coordination with traffic control relating to surveying
r _ _ __. . __ _ , _ ___ _ ___
® Section 4 - 16 Project Understanding/Scope
E~
i
~I
J
J
LJ
u
On-Call
and
City of San Bernardino
• Consultant will provide all necessary materials and equipment for satisfactory completion of work
including: suvey truck, safety vests, hard hats, traffic cones, warning devices and other survey
related equipment and materials
• All equipment and attire will conform to OSHA regulations.
• Maintain close liaison with the City Engineer during task assignment
• The survey party will work under the supervision of a licensed Land Surveyor in the State of
California
• Survey notes shall be provided in hard copy and electronic format suitable for export to AutoCAD
format (dwg)
Purpose: To Provide Map Checking Services
• Map checking will be performed by, or under the direct supervision of a licensed Land Surveyor
or a pre-1982 registered Civil Engineer licensed to practice surveying in California
• The Map Checker is knowledgeable in principals of Land Development as it relates to Map
Checking
• The map checker has the capability of reading and interpreting title reports
• He will maintain close liaison with the City engineer or his designee and will be available to meet
on request
• The Map Checker will have all the necessary equipment and materials tfor the satisfactory
performance of the work
• All safety equipment and attire worn by the Map Checker will conform to strict OSHA regulations
and will be the responsibility of the consultant team.
QUALITY CONTROL MF,ASURES
All work will be performed by, or under the direct supervision of a licensed Land Surveyor or a pre-
1982 registered Civil Engineer licensed to practice surveying in Califoria. Only qualified staff will
be assigned to work on each task order. As appropriate for the task, quality control measures will
include the following:
For Field Surveys
• Control survey networks will observe proper geometric strength of figure
• A secondary backlight is taken to confirm setup position
• Differential levels aze mn for elevation control
• Vertical levels are run to two independent benchmarks
• Detailed field notes are prepared by the party chief to supplement electronic collection files
• Double-tied fast-static occupations with tripods are made for horizontal control
For Office Mapping and Computations
• All work is done professionally and in compliance with accepted industry standards
• Professional and peer review by qualified LS
• Closure calculations are attached to maps, legal descriptions, etc. for review by supervisor
• Corrections are back-checked and reviewed by supervisor
• Nightly data backup with offsite tape storage
__
Section 4 - 17 __ ... _.. _ _.
Project Understanding/Scope
City ojSan Bernardino
~ "~ On-Call Surveying and Map Checking Support
5. ADDITIONAL INFORMATION
This section responds to the additional requirements of this Request for Qualifications.
' CITY ROLE AND PROVISIONS
The PB Team requests the City to provide items related to scope and survey. City should provide a
statement including but not limited to:
• Record documents
• Plans as needed
• Items of Title
We understand that the City will procure the various permits required for the on-call procurements
as they arise, and that the consultant will have to coordinate with the agencies involved.
' CONSULTANT COMMENTS/ADDITIONS TO COMPLY WITH RFP
Our response is expressed in the statements above
FIRM RESPONSE TO DRAFT AGREEMENT
The Drafr Agreement is acceptable to us with the following modification shown in red:
Article 1.3 -Warranty
Consultant warrants ------Consultant shall indemnify and hold harmless City from and against all
claims, demands, payments, suits, actions, proceedings, and judgments of every nature and description
including attorneys' fees and costs, presented, brought, or recovered against City for, or on account of
any liability under any of the above-mentioned laws, which may be incurred by reason of Consultant's
nesli2ent or willful misconduct in performance under this Agreement,
Kay needs to provide the language
INSURANCE REQUIREMENTS
Parsons Brinckerhoff as the pazent company of Associated Engineers, Inc., will comply with all the
insurance requirements in the RFQ
BUSINESS REGISTRATION
Our Business Registration is included
LOCAL PREFERENCE ELIGIBILITY
See attached.
J
~,
___..
ection 5 - I8 Additional Information
I9City of San Bernardino On-Call Surveying and Map Checking Support
Stt iw
LOCAL PREFERENCE ELIGIBILITY
Associated Engineers is a wholly owned subsidiary of Parsons Brinckerhoff. The PB office is located
at 685 East Carnegie Drive, Suite 210 in the City of San Bernardino. Jim Imbiorski who is the
Executive Vice President of Associated Engineers, and the Inland Empire Manager for Parsons
Brinckerhoff is locally based in this office. There is a seamless inclusion of staff and services and
utilization of space resources. This project will be managed out of this office with Jim Imbiorski as
the Principal-in-charge.
Both PB and Associated Engineers have worked on numerous projects within the City of San
Bernardino. Approximately 10 employees out of the AE office are currently working in SB. PB has a
staff of 28 employees who have been working out of our local office for the past decade. We have
also included a list of current and past projects within the past two yeazs that we are currently working
' on or have worked on within the City of San Bernazdino.
Cheat Project Nartte/ Description Location
Home Lumber Judson Baptist Topo
TY Lin Intemational
Mt. View Avenue SB
TY Lin Intemational
78-inch Water Line SB
TY Lin International
I6-inch Water Line SB
IVDA
Tippecanoe Avenue Widening SB
SB
Investment Building Group Orange Show Road Improvements SB
Salvation Army Salvation Army
San Bernardino County
Camp Dresser & McKee
On-Call Surveys SB
SB
Lynwood and Mountain
City of San Bernardino
On-Call Survey Services SB
Kleinfelder
HMC Architects
Fault Line Surveys SB
SB
Cypress Elementazy School Modernization
Camp Dresser & McKee
EW WD Plant 150
Del Rosa SB
LAN Engineering ,
Waterman Canyon Bridge SB
MBZ Plumbing
Waterman Industrial SB
Brook & Associates
Sterling Heights SB
Camp Dresser & McKee
Sterling Avenue Pipeline SB
Camp Dresser & McKee
West End Pump Station SB
Mauch Corporation
^
3r° Street Office Building SB
SB
4'
Street Rock Lytle Creek
Scott Beard
Starbucks, 40'" and Waterman SB
SB
Mauch Corpomtion New Yard at SBIAA
Stater Bros. Market
Stater Bros Distribution Center SB
Investment Building Group
22 Acre, full site SB
West Coast Hotels, LLC
Hotel Site- Waterman and Vanderbilt SB
SB
Section s - I9 _ _ _
Local Preference Ehgtbility
CITY OF SAN BERNARDINO
BUSRYESS AEGi37RAT10N CER77RICATE
ACCOUNT n' °i~ ~' cawre M.r wYe.r r gins eftli eve. dY Mrre. or.~P.w y.,,W uy
NUMBER ~r.5ow~y~ ~ ~C°P+~~Canra~tlrwrwM.r.n~arruee.cMar~wgar.
23114 r~•~°~~ ~w+~. r rpy w.r ra^ nca~nr . ~.r ..e r «n .... +...n .s..
eU5MES5 CLASS: ENGINEER EXPIRATION DATE
DATE PAID NOTES: ~ ~
07/6/2007 eusHJESS LOCATION: 264 g LELANO NORTON WAY gl'E 1
owNex, FRJA OR ASSOAATF,D ENGINEERS, IPiC
mRtoRAriDN
9U5-VESS NAME ASSOCIATED ENGINEERS, INC
AnanrswN
MAfLINO ADDRESS 3311 SHELBY ST Rachel G. Clark
ONTARIO,. cA. 9n6a.asn c:mcceRt;
^
ciTSt of sAx sEax~inunvo
»veuvasH Rec~rR,-TaN c>arrmicATs
ACCOUNT TM' *~+~ ~µr+r. aNer. i~.o~ d~ a ry ao..r..rmr 6.rr • er belles ar sw~+b a6r W
NUMB&R ..~ia.~~q~+~•••~o. ~e.~egr.e 7+ra.tllabrie.a.Y1e...ealia as e. e.ues r.a.=brc
4.+~brtr.rcrb.r
25971 lt~LL 76 W o.er i wv~rr ~. ~ ,.,.r xx errs . new.l rMb fe 4 eea dos a nieva
'4°e~'`~bwee. n.xPradrrn~.ra.Orrrr.m.e..R.soxp.rg•.~e.rp.~s
HUSOVBSS C1A33: ENGgNS@t gXpBtA11ON DATE
DAT&PAID N07'BS: yly~$
04119/2007 HUS0ai98I.OCA71pN: 885 CARNEOIE DR 3TE 210
°W~ P>A1~ ~ PARSONS, HRINCIDiBHOFP, QUADB R DOUGLAS AT
aDRT(1RA7ION
NAB PB AMBRICAS, INC.
ATI&f1iON
MA°~AD 1 PBNNPLZ Rachel G. Clark
NBwYORx, rIY, 10119.0001 crnrcr.ealc
J ~
ATTACHMENT "2" TO EXHIBTT "C"
100
r+as -
April 28, 2008
Mr. Michael W. Grubbs, P.E.
City of San Bernardino
300 North "D" Street, 3"' Floor
San Bernardino, CA 92418
Suite 270
San Bernartlino, CA 92408
7e/ephane: 909-888-1108
Fax: 909-889-1884
Re: Request for Fee Proposal to Provide Professional Civit Engineering and Surveying Services for On-
Call Surveying and Map Checking Support
Dear Mr. Grubbs:
In response to your Request for Proposal, dated March 17, 2008, Associated Engineers, a wholly owned
subsidiary of Parsons Brinckerhoff, is pleased to submit one (1) copy of our standard hourly rate schedule to
provide professional engineering services for the above-mentioned project. Associated Engineers has been
involved in municipal engineering since its inception in 1955. To provide these services, Associated
Engineers has assembled a seasoned team of professionals to provide a unique depth of experience for this
project.
responsible manner. We look forward to working with the City on this exciting project. If you have any
questions about our fee, or desire additional information, please do not hesitate to contact Mr. Jim Elliott,
PLS, PE, Project Manager at 909.980.1982 or elliott(~~pbworld.com., or Jim Imbiorski at the PB San
Bernardino office at 909.888.1106.
We are corrunitted to providing you with professional engineering services in a timely, cost~ffective and
This fee proposal is signed by an official who is able to bind the firm and the offer made in this proposal shall
remain in effect for 120 days from the date the proposal is opened and recorded.
We are eager to work with you on this procurement, and look forward to a favorable response.
PARSONS
Jim Imbiorski.
Executive Vice Presidendlnland Empire Manager
ATTACIiMENT "2" TO EXHIBTT "C"
gg0 T ~ Associated Engineers, lnc. CONSULTING CIVIL ENGINEERS
~ 3311 E. SHELBY STREET, ONTARIO, CA 91764.4872 (909) 980.1982 FAX (909) 94t-0891
Pg
a,F/V
"` '°°° COMMERCIAL HOURLY RATES
(Effective 04/01/08)
OFFICE TIME
Principal Registered Civil Engineer $190.00 per hour
Principal Licensed Land Surveyor $190.00 per hour
Principal Construction Administrator $170.00 per hour
Senior Construction Administrator $185.00 per hour
Civil Engineer
1. Project Manager $170.00 per hour
2. Senior $130.00 per hour
3. Associate $120.00 per hour
Assistant Engineer $115.00 per hour
Junior Engineer $96.00 per hour
Utility Coordinator-1 $115.00 per hour
Utility Coordinator-2 $88.00 per hour
Chief of Surveys (LLS) $140.00 per hour
Licensed Land Surveyor $140.00 per hour
Land Survey Technician $110.00 per hour
Cadd Technician $89.00 per hour
Engineering Intern $55.00 per hour
Engineering Aide $50.00 per hour
Senior Administrator $120.00 per hour
Project Administrator $85.00 per hour
Administrative Assistant $68.00 per hour
FIELD TIME
3-Man Survey Party $310.00 per hour
2-Man Survey Party $230.00 per hour
1-Man Survey Party $170.00 per hour
Flagman $75.00 per hour
Senior Staff Inspector $125.00 per hour
Staff Inspector $115.00 per hour
Travel Time - 3-Man Survey Party $120.00 per hour
Travel Time - 2-Man Survey Party $93.00 per hour
Above schedule is for straight time only. Overtime requested by client will be at 1-1/2 times the rates
shown and Sundays/Holidays at 3 times the rates shown. These hourly rates do not include printing
costs, fees paid to Governmental agencies or other reimbursable expenses. These expenses are billed
at cost + 10%.
Above schedule subject to change based on annual increases to direct labor retes.
Travel time rates will be billed for those hours in excess of 8 hours per day.
Expert Witness time will be billed at 1~F~ times the hourly rates shown with a 4-hour minimum plus expenses.
PLANNING DESIGNING