HomeMy WebLinkAbout12-Public Works CITY OF SAN BERtt)RDINO - REQUEST F~~~f!H~CIL ACTION From: ROGER G. HARDGRAVE De~: Public Works/Engineering Date: 5-19-92 Approval of Contract Change Order Su~~: No. 6 - Pavement Rehabilitation on Waterman Avenue, from Mill to 5th Street, per Plan No. 8038 E. L. YEAGER CONSTRUCTION Synopsis of Previous Council action: June, 1988 Allocation of $100,000 in 1988/89 Street Construction Fund Budget approved. Resolution No. 89-197 adopted authorizing execution of agreement with ASL Consulting Engineers for design. Supplemental allocation of $60,000 approved. Supplemental allocation of $1,498,000 approved. Plans approved and authorization granted to advertise for bids. Resolution No. 91-128 adopted authorizing execution of Program Supplement No. 65. Resolution No.. 91-126 adopted authorizing execution of an Agreement with the County. (Cont. on 2nd Page) 06-19-89 June, 1989 June, 1990 02-18-91 04-15-91 04-15-91 Recommended motion: That Change Order No. SIX to the contract with E. L. Yeager Construction for the pavement rehabilitation on Waterman Avenue, from Mill to Fifth Street, in accordance with Plan No. 8038, be approved 1 to authorize the Contractor to place fill material and repave the road entrances at the existing Flood Control access roads, for an increase in the contract price of $11,081.851 from $1,151,450.12 to $1,162,531.97. 044~ cc: Shauna Clark Andy Green" Contact person: Phone: 5025 Supporting date attached: FUNDING REQUIREMENTS: Roqer G. Hardqrave Staff Report, CCO #6 1 Ward: Amount: $11,081.85 (Street Co.nstruction Fund) Source: (Acct. No.) 242-362-57667 from Mill Street to 5th Street Finance: Council Notes: Acct. Descri tion Waterman Av f0~ 75.0262 Agenda Item No J~ CITY OF SAN BE~NOIDINO - REQUEST taR COUNCIL ACTION STAFF REPORT The bridge over the East Twin Creek Channel on Waterman Avenue was widened by the pavement rehabilitation project between Mill Street and Fifth Street. This widening necessitated that the four (4) driveway approaches to the access patrol roads, along both sides of the Flood Control Channel, be removed and reconstructed. After reconstructing those driveway approaches, it was found that there was a difference in elevation of about three feet to the existing patrol roads. In order to maintain access to these roads, in accordance with the requirements of the permit from the San Bernardino County Flood Control District, it was necessary to construct ramps from the roads to the new driveway approaches. Also, the Flood Control District required that the ramps be paved, since the access roads are paved. The Contractor quoted a price of $11,081. 85 to construct and pave these four (4) ramps. We have reviewed the quoted price, and feel that it is fair and reasonable for the work involved. There is a balance of $177,710.88 in contingency funds that will be used to finance the cost for this extra work. Federal-Aid Urban Funds will be used to finance about 86% of the additional cost authorized by this change order. We recommend that this change order be approved. SYNOPSIS OF PREVIOUS COUNCIL ACTION (Cant): 07-15-91 Resolution No. 91-325 adopted awarding a contract to E.L. Yeager. Resolution No. 91-391 adopted authorizing execution of Program Supplement No. 66. 09-03-91 5-19-92 75.0264 o o COftDCT CDlfGB ORDBR ITa. 6 RBV ITa. ROAD Waterman Avenue-Mill to 5th J'BD JIO. TO: E. L. Yeager You are hereby directed to make the herein described changes from the plans and specifications or do the following described work not included in the plans and specifications on this contract. NOTE: This change order is not effective until a~~roved bv the state Hiahwav Enaineer Description of work to be done, estimate of quantities, and prices to be paid. Segregate between additional work at contract price, agreed price and force account. Unless otherwise stated, rates for rental of equipment cover only such time as eauinment is actual Iv used and no allowance will be made for idle timA. The last percentage shown is not accumulated increase of decrease from the original quantity in the Engineers Estimate. .%TO WOIUt AT J'ORCB ACCOtllT'l': SUPPLe ITa. SBBBT 1 OF 1 COIT'.rOC'l' ITa. 8038 Placement of fill material and repave County Flood Control access roads at North and South end of Twins Creeks Bridge, providing access for the existing Flood Control access roads. BSTInTED COST DIlCItBASB 8 By reason of this order the working days Subi Ued by: IRC..... I 11.081.85 time of completion will be adjusted as follows: Re.ident Ilnqineer, Date: Approval Recommended: Date: Approved: City Bnqineer Date: We the undersigned contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all material, except as may otherwise be noted above, and perform all services necessary for the work above specified, and will accept as full ~avment therefor the ~rices shown above. Accepted Date: Contractor: By: Title: If the contractor does not sign acceptance of this order, his attention is directed to the requirements of the specifications as to proceeding with the work and filing a written protest within the time therein specified.