HomeMy WebLinkAbout11-Public Works r~ 'CITY. OF SAN BEOARDINO - REQUESO:OR COUNCIL ACTION File No. 1.667 Approval of Change Order No. 7 - Subject: Pavement Rehabilitation .on Wah>TmRn Avenue, from Mill to 5th Street, per Plan No. 8038 -- E. L. YEAGER CONSTRUCTION From: ROGER G. HARDGRAVE Public Works/Engineering Dept: Date: 5-14-92 Synopsis of Previous Council action: June, 1988 Allocation of $100,000 in 1988/89 Street Construction Fund Budget approved. Resolution No. 89-197 adopted authorizing execution of agreement with ASL Consulting Engineers for design. Supplemental allocation of $60,000 approved. Supplemental allocation of $1,498,000 approved. Plans approved and authorization granted to advertise for bids. Resolution No. 91-128 adopted authorizing execution of Program Supplement No. 65. Resolution No. 91-126 adopted authorizing execution of an Agreement with the County. (Cont. on 2nd Page) 06-19-89 June, 1989 June, 1990 02-18-91 04-15-91 04-15-91 Recommended motion: That Change Order No. 7 to the contract with E. L. Yeager Construction for pavement rehabilitation on Waterman Avenue, . from Mill to Fifth Streets, in accordance with Plan No. 8038, be approved; to authorize the Contractor to widen the northeast corner of Fifth Street and Waterman Avenue, providing a turning lane for northbound traffic, at an increase in the contract price of $18,288.82; from $1,162,531.97 to $1,180,820.79. d/~ - Signature cc: Shauna Clark Andy Green . Contect person: Supporting date atteched: FUNDING REQUIREMENTS: Roqer G. Hardqrave 5025 Phone: Staff Report, CCO 47 1 Ward: Amount: $18,288.82 (Federal-Aid Urban Funds) Source: (Acct. No.l 242-362-57667 (Acct. DescriDtionl Waterman Avenue Rehabilitation, Mill Street to 5th Street Finance: [).-!lJ JJ------ Council Notes: 75-0262 Agenda Item No /1 ,',,~ o o File No. 1. 667 SYNOPSIS OF PREVIOUS COUNCIL ACTION Cant: 09-03-91 Resolution No. 91-325 adopted awarding a contract to E.L. Yeager. Resolution No. 91-391 adopted authorizing execution of Program Supplement No. 66. 07-15-91 ,"",-.- .CITY' OF SAN BEIGARDINO - REQUES,oOR COUNCIL ACTION STAFF REPORT After construction on this project had been started, the owner of the parcel on the northeast corner of Waterman Avenue and Fifth Street agreed to dedicate an easement to provide the planned ultimate right-of-way on Fifth Street. Since the ultimate right-of-way had been granted, it was deemed advisable to construct the new curb return and install the new traffic signal poles, in accordance with the planned ultimate width for Fifth Street. This action would avoid the cost of relocating these facilities whenever Fifth Street is widened, probably in connection with the re-use of Norton A.F.B. Installing the curb return of the ultimate location will improve traffic flow, by allowing a free right turn lane to be provided for westbound motorists. The Contractor submitted a price quote of $18,288.82 for this extra work, which included relocating an existing catch basin and extending the storm drain. We reviewed the quoted price, and determined that it was in line with the unit prices for the contract. . All costs incurred for the change order will be financed from the approximate balance of $159,432.06 for contingencies, under Account No. 242-362-57667. Federal-Aid Urban Funds will be used to finance about 86% of the cost for this change order. We recommend that Change Order No. 7 be approved. 5-14-92 75.0264 o o COftDCT CBUGB ORDBR )1(). 7 RBV 110. ROAD Waterman Avenue-Mill to 5th nD 110. TO: E. L. Yeager You are hereby directed to make the herein described changes from the plans and specifications or do the following described work not included in the plans and specifications on this contract. NOTE: This change order is not effective until aDDroved bv the state Hiahwav Enaineer Description of work to be done, estimate of quantities, and prices to be paid. Segregate between additional work at contract price, agreed price and force account. Unless otherwise stated, rates for rental of equipment cover only such time as eauinment is actuallv used and no allowance will be made for idle time. The last percentage shown is not accumulated increase of decrease from the original quantity in the Engineers Estimate. BURA .OU: 70'1' FORCB Accomrr: 8UPPL. )1(). 8BBB'1' 1 OP 1 COIl'1'RACT NO. 8038 Widening of the northeast corner of 5th Street and Waterman Avenue in order to provide a left turning lane for traffic turning north onto Waterman Avenue. B8'1'IMA'1'BD C08'1' DBCRBASB S INCRBASB S 18.288.82 By reason of this order the time of completion will be adjusted as follows: working days . 8ub111i~t.ed by: Re.iden~ Bnqineer, Da~e: Approval Reco..ended: Da~e: Approved: ci~y Bngineer Da~e: We the undersigned contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all material, except as may otherwise be noted above, and perform all services necessary for the work above specified, and will accept as full navment therefor the nrices shown above. Accepted Date: Contractor: By: '1'itle: If the contractor does not sign acceptance of this order, his attention is directed to the requirements of the specifications as to proceeding with the work and filing a written protest within the time therein specified.