Loading...
HomeMy WebLinkAbout14-Development Services CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION Dept: Development Services Date: November 30,1999 ORIGINAL File: 4.7142 & 4.7144 Synopsis of Previous Council Action: July 1, 1998 - As part of the FY 1998-1999 Capital Improvement Program, allocated $550,000 in account no. 248-368-5504-7142 for construction of Master Plan Storm Drain in "H" Street from 17th Street to Highland Avenue. July 1, 1998 - As part of the FY 1998-1999 Capital Improvement Program, allocated $238,694 in account no. 248-368-5504-7144 for construction of Master Plan Storm Drain in "H" Street from Highland Avenue to 27th Street. June 21, 1999 -Adopted Resolution Approving Agreement with Associated Engineers, Inc. for Design of Master Plan Storm Drain in "H" Street from 17th Street to 27th Street. Subject: Resolution Approving Amendment No. 1 to Agreement with Associated Engineers, Inc. for Design of Master Plan Storm Drain in "H" Street from 17th Street to 27th Street. . MCC Date: 12-20-1999 From: Michael E. Hays, Director Reconnnended Motion: Adopt Resolution. U?f~ Ha~ Contact person: Michael Grubbs, Sf. Civil Engineer Phone: 5179 Supporting data attached: Staff Report, Reso and Map Ward: 6&7 FUNDING REQUIREMENTS: Amount: $2,016.00 Source: Acct. No. 248-368-5504-7142 & 7144 Acct. Description "H" St. M.P.D-l 17th -Hi Finance: Council Notes: Agenda Item No. M '~~I'r" CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION Staff Report Subject: Resolution Approving Amendment No. I to Agreement with Associated Engineers, Inc. for Design of Master Plan Storm Drain in "H" Street from 17th Street to 27th Street. Backl!l"ound: As part of the FY 1998-1999 Capital Improvement Program, the Mayor and Common Council approved two segments of this "H" Street storm drain. The first segment is proposed to connect to the existing "H" Street storm drain, which presently terminates at 17th Street, and extend to Highland Avenue. The second segment will connect to the first segment at Highland Avenue and extend to 27th Street. See Exhibit" A" for project location. On June 21, 1999, the Mayor and Common Council adopted a Resolution approving an Agreement with Associated Engineers, Inc. (Engineer) for design. The original sizing and cost of this drain was estimated based on the City's Comprehensive Storm Drain Project No. 7-Dl which was prepared in 1982. It was recognized that significant changes to the drainage patterns have occurred due to the construction of the Route 30 Freeway, and, therefore, the Engineer was tasked to re-analyze the hydrology and hydraulics of the storm drain as part of its Contract. The Engineer has completed the new hydrology and hydraulic analysis and has identified several ways by which the overall size and cost of the storm drain may be reduced. The additional work is required to evaluate the different alternatives. The Engineer has submitted a supplement to their original proposal offering to perform this additional work for a not-to- exceed fee of $2,016.00. Staff concurs that this additional study is justified and the proposal submitted by the Engineer is fair and reasonable for the proposed additional work. Financial Imoact: Sufficient funds are available in accounts 248-368-5504-7142 ("H" St. M.P.D-l 17th to Highland) and 248-368-5504-7144 ("H" St. M.P.D-l Highland to 27th) to cover all costs of the original Agreement ($32,976.00) and this amendment to the Agreement ($2,016.00). Recounnendation: That the Mayor and Common Council adopt the attached Resolution approving Amendment No.1 to Agreement with Associated Engineers, Inc. for design of Master Plan Storm Drain in "H" Street from 17th Street to 27th Street. . EXHIBIT" A" LOCATION MAP MASTER PLAN STORM DRAIN IN "H" STREET FROM 17TH STREET TO 27TH STREET :;f~ :;! 'II I 1 ..... 'ill: 0.. ;!i' ,~ II~o I ~ 15 .. z: 1000 . . i VI .. .. . . .. z: <t 51 400 w z: "" gw o ~ ~ 1200 It- UJ !EIIll1I. - 51 2lSI w :;: AOOK ~ H... .. -:--ZOTH- .. ~ t:; III ..-. a( H ~~ .Sf 1011II . t;; Sf tlS..... Ii; .., "" 16TH > >< "" :z: '" "" "" .t" , o ~(Q)~W 1 2 RESOLUTION OF THE CITY OF SAN BERNARDINO APPROVING AMENDMENT NO. 1 TO AGREEMENT FOR PROFESSIONAL SERVICES V\'lTH 3 ASSOCIATED ENGINEERS, INC. FOR THE DESIGN OF A MASTER PLAN STORM 4: DRAIN IN "H" STREET FROM l,m STREET TO 2,m STREET. 5 6 7 8 9 10 RESOLUTION NO. BE IT RESOLVED BY THE MAYOR AND COMMON COUNCIL OF THE CITY OF SAN BERNARDINO AS FOLLOWS: SECTION I. The Mayor of the City of San Bernardino is hereby authorized and directed to execute on behalf of said City, Amendment No.1 to Agree,ment for professional services with Associated Engineers, Inc. for the design of a master plan storm drain in "H" street from 17m Street to 27m Street. A copy of said Amendment No. 1 to Agreement for 11 12 professional services is attached as Exhibit "A" and made a part hereof. .".....'.--- 13 SECTION 2. The authorization to execute the above referenced Amendment No.1 to o 14 Agreement is rescinded if the parties to the agreement failro ex~Jt witl1in sixty (60) days 19 /1/ 20 /1/ 21 /I 22 //1 23 24 /1/ 25 //1 26 /1/ 0 27 /1/ 28 15 of the passage of this resolution. 16 17 18 /1/ /1/ 11/30/1999 ~o. It fZ,/V;/;f .. o o o , ' RESOLUTION AUTHORIZING THE EXECUfION OF AMENDMENT NO.1 TO AGREEMENT FOR PROFESSIONAL SERVICES WITH ASSOCIATED ENGINEERS, INC. 1 2 3 Common Council of the City of San Bernardino at a 4 5 6 7 8 9 10 I HEREBY CERTIFY that the foregoing resolution was duly adopted by the Mayor and held on the day of , 19_, by the following vote, to wit: Council Members: AYES 18 The foregoing resolution is hereby approved this 19 19 20 21 22 23 24 25 26 27 28 NAYES ABSTAIN ABSENT ESTRADA LIEN MCGINNIS 11 12 13 14 15 16 17 SCHNETZ SUAREZ ANDERSON MILLER City Clerk day of Approved as to form and legal content: JUDITH VALLES, Mayor City of San Bernardino AMES F. PENMAN City An ey 9- 11130/99 2 meeting thereof 1999-318 EXHIBIT "A" CG(Q)[P)1(1 Ct'"rt:;r- AMENDMENT TO AGRRFMF.NT FOR PROFESSIONAL S1mVTCRl\ This AMENDMENT TO AGREEMENT, hereinafter referred to as Amendment No.1, is made and entered into this 20tlUayof December, 1999, by and between the CITY OF SAN BERNARDINO, California, a municipal corporation, hereinafter referred to as the "CITY" and Associated Engineers. Inc. , a California corporation, hereinafter referred to as "ENGINEER". WITNESSETH WHEREAS, the Mayor and Common Council by Resolution No. 1999-139 on June 21, 1999, approved an Agreement with Engineer for professional services to design a storm drain in "H" Street between 17th Street and 27th Street; and WHEREAS, City has requested additional professional design services of the Engineer; and WHEREAS, Engineer has provided a proposal dated October 15, 1999, for the additional professional services; and WHEREAS, San Bernardino City Council has elected to engage the additional professional services of Engineer upon the terms and conditions as hereinafter set forth. NOW, THEREFORE, it is mutually agreed, as follows: 1. Engineer shall perform those additional professional design services proposed in the attached letter dated October 15, 1999; and 2. The compensation for Engineer shall be increased in a not-to-exceed amount of $2,016.00; and 3. All other provisions of the original Agreement approved by Resolution No. 1999-139 shall remain in effect. III III III 1999-318 EXHIBIT "A" IN WITNESS WHEREOF, the parties hereto have caused this Amendment No.1 to Agreement to be executed on the date written above by their duly authorized officers on their behalf. ASSOCIATED ENGINEERS, INe. A California Corporation By: Name: April Morris Title: President ATTEST: CITY OF SAN BERNARDINO, A municipal corporation By:~,l1.~ Ra I Clark, City Clerk By: ~~c-- - Susan Lien Mayor Pro Tern . Approved as to form and legal content JAMES F. PENMAN City Attorney 7' f1 2 r. 1999-318 r UlZ&eNT Associated Engineers, Inc. CONSULTING CIVIL ENGINEERS 3311 E. SHELBY STREET, ONTARIO. CA 91764-4872 (909) 980-1982 FAX (909) 941-ll891 fD)rn@~owrn@D in} . - OCT t 8 19S3 . October 15, 1999 Ray Casey, City Engineer City of San Bernardino 300 N. "0" Street San Bernardino, Ca 92418 CITY OF SAN BERNA~I:;;;'O DevELOPMENT S~R"lces DEPARTMENT IN: 99-72 /!o. 1q 3a 'f{, RE: "H" Street Storm Drain Project Dear Ray, As a follow-up to our discussions earlier this week, we propose the following extra services for the subject project: . Conduct a hydrologic evaluation of the tributary area draining to both freeway drainage systems constructed in conjunction with Route 30 in the vicinity of "H" Street . Estimate the 010, 025 and 0100 for each watershed based on the gross tributary area (no detailed break down of sub.areas and routing wi1hin the total watershed) to 1. the extreme upper end of the drainage systems 2. their intersection wi1h 27'" Street . Determine the existing size and flow capacity of each section of the tHO freeway drainage systems downstream of 27th Street to their point of confluence at "W Street and lS'" Street assuming 1 . no evaluation of catch basin and lateral capacities will be done, just the main storm drain 2. Manning's equation assuming open channel flow will be used with no analysis of minor losses or water surface profiles . Two alternative Storm Drain solutions will be analyzed based on the results from the date above, to determine preliminary (gross) sizes and lengths of pipes 1. Present Comprehensive Storm Orain Plan concept 2. Revised CSDP concept re-routing drainage to the freeway system(s} if feasible We will provide these services on an hourly basis in accordance with the attached hourly rate schedule. We expect to expend 4 days 01 Juni - time l$li3/nour rate) 10 accomplish the above tasks, equating to a Not-To-Exceed f of $2016.00. If this meets with your approval, please advise me as to how you ould like to handle the paper work for this agreement. If you have questions, please call. Thank you C"':_____I. loh/I H~ /!~ /n O"~~o_ ( fJ..e a.,..... t7U YVt ~ F ~ f o. as I/ldea; '/~~ / i7f)P~~ t l .." J" -..;. " /"': ..Jo.i' ~'-."". '/" ~ :,:'. '" ~:/I." 'J.' 2.. ~ /p h r',(,i.'. .... "" .1 r _~t"M ./ ..F.... 'To" }/ /'f't.' ~_# .., c,~.~;" i ~ INC PLANNING DESIGNING SURVEYING